Exhibit_A_-_Cooler_Checklist.pdf

PDF 80 KB Posted

Attached to
Evaporative Cooler Maintenance and Repair
Solicitation number
IFB-27-FMD-0415
Issued by
Maricopa County, Phoenix City, Arizona

About this file

Exhibit A is a cooler checklist document supporting the City of Phoenix's Evaporative Cooler Maintenance and Repair contract opportunity. The checklist establishes standardized inspection and maintenance procedures for evaporative cooling units, covering both wet and dry sections of the equipment. The document requires technicians to perform comprehensive evaluations including water system verification, pad cleaning and replacement, electrical component inspection, motor and blower maintenance, belt replacement, and overall equipment condition rating based on age classifications. The contract opportunity with the City of Phoenix is for a three-year term commencing on or about January 18, 2027, with two additional one-year extension options exercisable at the City's sole discretion. The solicitation is available through the City's Procurement Portal, with technical support available through the portal interface or via email at procurement-support@opengov.com.

The checklist document functions as a quality assurance and record-keeping tool requiring technicians to document specific equipment specifications, maintenance actions completed, inspection findings, and facility information. Required data fields include equipment model and serial numbers, media sizes and quantities, motor specifications, pump details, voltage and phase information, and CFM capacity. Technicians must verify proper electrical connections, lubricate bearings, ensure secure panel installation, and confirm job site cleanup. The form accommodates both aspen media and celldek media pad options and includes condition rating categories spanning equipment age ranges from zero to six years (good condition) through twelve or more years (bad condition).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A -COOLER CHECKLIST

Ensure no water in dry section

Thoroughly Clean Basin Clean Water Distribution System Replace Float and Adjust

WET SECTION

Ensure Even Flow Across the pads Verify Drain Line is Clear and Open Ensure water not entering dry section with cooler running

Disassemble Wet Section to clean Gently clean CelDek Pads

Inspect Pulley: OK / REPLACE

Rate Condition of Equipment: Good 0-6 Yrs / Fair 6-12 Yrs / Bad 12+ Yrs

COMMENTS:

Ensure all panels are secured Ensure no screws or parts left on the roof Ensure job site is cleaned upBleed of line installed and secured

Check Amperage Draw on Motor Ensure cooler pump is operational Inspect Electrical Disconnect (If Bad, Notify COP Rep)

Replace Belts Belt Size: __________ Qty: _________ Blower wheel clear of debris

INSPECTION CHECKLIST: Place check marks next to items after inspected

Inspect and tighten electrical connectionsLubricate motor/blower bearings

ASPEN MEDIA: SIZE OF PADS:

CELL DECK MEDIA: CLEAN / REPLACE SIZE OF PADS:

QUANTITY:

QUANTITY:

DRY SECTION ELECTRICAL

MOTOR HP: PUMP VOLTAGE:

WET SECTION: MODEL # QUANTITY OF WET SECTIONS:

PUMP SIZE:

SERIAL #

MANUFACTURER: SIDE DRAFT / DOWN DRAFT

MODEL #: VOLTAGE: PHASE:

CFM:

SERIAL #

TECHNICIAN NAME: WORK ORDER:

FACILITY: LOCATION OF UNIT:

DATE:

UNIT #

Revised 4/8/2025

File details come from the government source that posted it. Updated .