EXHIBIT 2 - SCHEDULE OF QUANTITIES AND PRICES (BID PRICING SHEET).pdf

PDF 119 KB Posted

Attached to
Metro C/K Line Mainline Fastener Replacement
Solicitation number
OP138405
Issued by
California

About this file

This is a Schedule of Quantities and Prices (Bid Pricing Sheet) for the Los Angeles County Metropolitan Transportation Authority (LACMTA). The document establishes the pricing framework for a rail infrastructure project involving fastener removal, installation, and assembly work. The base scope of work includes seven line items covering program management, safety, training, quality assurance, mobilization and demobilization, on-track equipment, reporting and closeout, fastener labor, fastener assembly materials (53,530 units), and spare shims (500 units). Additionally, the IFB includes three optional scope items for embedded insert replacement services (250 units) and spare fastener units (2,500 units). Bidders must submit firm unit prices and lump sum prices for all services, with total prices calculated by multiplying unit prices by estimated quantities.

All unit prices and lump sum prices must be inclusive of overhead, profit, applicable taxes, tariffs, insurance, freight, delivery, handling, and all other contractor and subcontractor expenses. The estimated quantities provided are based on information available at the time of IFB issuance and do not represent a guarantee of actual quantities to be used. Any blank unit prices or total prices may render the bid non-responsive unless the missing values can be calculated from available information. Bidders must complete all pricing fields and sign the submission with contact information, including name, title, email address, phone number, and submission date.

View the file

Other files

File Type Posted
EXHIBIT C - LIQUIDATED DAMAGES.pdf PDF
EXHIBIT H - MISCELLANEOUS.pdf PDF
EXHIBIT J - 29 CFR 5.5.pdf PDF
EXHIBIT 11 - NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER.pdf PDF
EXHIBIT 9 - GENERAL CERTIFICATIONS.pdf PDF
FORM 2 - AFFIDAVIT.pdf PDF
EXHIBIT 3 - RESERVED.pdf PDF
EXHIBIT 13 - CENTURY TRACKWORK INSTALLATION DRAWINGS.pdf PDF
OP138405.pdf PDF
EXHIBIT B - PRICING AGREEMENT.pdf PDF
EXHIBIT D - DEOD CONTRACT COMPLIANCE MANUAL (Non-Fed).pdf PDF
EXHIBIT E-2 - PAYMENT CERTIFICATION (FINAL).pdf PDF
EXHIBIT I - RESERVED.pdf PDF
EXHIBIT 16 - METRO RAIL DESIGN CRITERIA (SECTION 4).pdf PDF
Exhibit A Pre-Assessment Form.pdf PDF
FORM 1 - SBE-DVBE SUBS & SUPPLIERS.pdf PDF
FORM 6 - SBE-DVBE DEALER-DISTR AFFIRMATION.pdf PDF
EXHIBIT 4 - LIST OF CERTIFIED FIRMS.pdf PDF
EXHIBIT G - APPROVED SUBCONTRACTORS AND SUPPLIERS.pdf PDF
EXHIBIT F - RELEASE OF CLAIMS.pdf PDF
EXHIBIT 8 - ETHICS DECLARATION.pdf PDF
EXHIBIT 10 - CERTIFICATE OF COMPLIANCE WITH 49 CFR PART 655.pdf PDF
EXHIBIT 15 - CONSTRUCTION SAFETY & SECURITY MANUAL (CSSM) [January 2022].pdf PDF
Exhibit B Post-Assessment Form.pdf PDF
EXHIBIT 14 - EL SEGUNDO TRACKWORK INSTALLATION DRAWINGS.pdf PDF
EXHIBIT 12.2 - PREVAILING WAGE HANDOUT (State 7.30.2026).pdf PDF
EXHIBIT E-1 - PAYMENT CERTIFICATION (CONTINUOUS).pdf PDF
EXHIBIT A - SCOPE OF SERVICES.pdf PDF
EXHIBIT A-2 - GENERAL SPECIFICATIONS.pdf PDF
EXHIBIT A-1 - TECHNICAL SPECIFICATIONS.pdf PDF
EXHIBIT 7 - LIST OF COMPLETED CONTRACTS - LAST FIVE (5) YEARS.pdf PDF
EXHIBIT 5 - BID LETTER.pdf PDF
FORM 3 - BUSINESS DATA SHEET.pdf PDF
FORM 5 - BIDDERS LIST FORM.pdf PDF
SUBCONTRACTOR LISTING FORM.pdf PDF
FORM 4 - SBE-DVBE AFFIRMATION.pdf PDF
EXHIBIT 12.1 - DIR PUBLIC WORKS VERIFICATION FORM.pdf PDF
EXHIBIT 6 - LIST OF CURRENT CONTRACTS - BACKLOG.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 2

SCHEDULE OF QUANTITIES AND PRICES (BID PRICING SHEET)

INSTRUCTIONS:

The Bidder shall submit its firm unit prices and lump sum prices for the Services set forth in the Bid and described in the IFB on the following form entitled SCHEDULE OF QUANTITIES AND PRICES.

The estimated quantities shown on the SCHEDULE OF QUANTITIES AND PRICES are based on the best information available at the time the IFB was issued and are used for the purpose of evaluating the Bids.

LACMTA does not represent, expressly or by implication, that the actual quantities used in performing the Services will equal the estimated quantities.

In the case of items for which a fixed dollar amount predetermined by LACMTA has already been entered on the SCHEDULE OF QUANTITIES AND PRICES, the dollar amount so entered shall be binding on all Bidders as the price for such item; said dollar amount shall not be revised unless LACMTA directs a Change in the Services affecting the item to which said dollar amount relates.

Unit prices, lump sum prices, and other values must be entered in the appropriate spaces provided in the SCHEDULE OF QUANTITIES AND PRICES. Unit prices must be multiplied by the estimated quantity shown and the total inserted in the "Total Price" column. The "Total Prices" must be added together in arriving at the "Total Bid Price". The Total Bid Price shall be for the completion and acceptance of all Services listed in the SCHEDULE OF QUANTITIES AND PRICES as required by the Contract.

The unit prices and lump sum prices must conform to their respective requirements and parameters as specified in the Scope of Services. They also must be inclusive of all costs for the Services specified in other Contract Documents, including the proportional costs for overhead, profit, all applicable taxes, tariffs, insurance, freight, delivery and handling, and all other expenses of the Contractor, Subcontractors, and Suppliers of all tiers.

Should any unit price be left blank, the Bid will be considered non-responsive unless the blank item can be calculated from the information available (i.e., unit price can be determined by dividing the total price by the estimated quantity).

Should any total price be left blank, the Bid may be considered non-responsive unless the blank item can be calculated from the information available (i.e., total price can be determined by multiplying the unit price by the estimated quantity).

EXHIBIT 2 - SCHEDULE OF QUANTITIES AND PRICES (BID PRICING SHEET)

BASE STATEMENT OF WORK ITEMS

ITEM

NO.

DESCRIPTION

ESTIMATED

QUANTITY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

Program Management, Safety, Training, Quality Assurance, Submittals, Project Controls, Planning, Coordination and Meetings, Rail Operations Coordination, Track Allocation Planning (per Exhibit A)

1 LS $ $

2 Mobilization and Demobilization (per Exhibit A) 1 LS $ $

3 On-Track Equipment (per Exhibit A) 1 LS $ $

4 Reporting and Closeout (per Exhibit A) 1 LS $ $

5 DF Fastener Removal and Installation (Labor) (per Exhibit A) 1 LS $ $

DF Fastener Assembly (includes all assembly components, including shims) (Material) (per Exhibit A)

53,530 EA $ $

Spare Shims (assorted 1/16", 1/8", and 1/4" thicknesses) (Material) (per Exhibit A)

500 EA $ $

SUBTOTAL – BASE SOW ITEMS $

OPTIONAL STATEMENT OF WORK ITEMS

ITEM

NO.

DESCRIPTION

ESTIMATED

QUANTITY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

8 Embedded Insert Replacement (Labor) (per Exhibit A) 250 EA $ $

9 Embedded Insert Replacement (Material) (per Exhibit A) 250 EA $ $

Optional Spare DF Fastener Units (includes all assembly components, including shims) (Material) (per Exhibit A)

2,500 EA $ $

SUBTOTAL – OPTIONAL SOW ITEMS $

TOTAL BID PRICE (including all Services listed under the items above) (sum of Total Price Item Nos. 1-10) $

CONTACT NAME & TITLE: CONTACT E-MAIL ADDRESS:

CONTACT NUMBER: DATE OF SUBMISSION:

BIDDER NAME: SIGNATURE: