Exhibit 1 - Log of Project.pdf
PDF 509 KB Posted
- Solicitation number
- RFP 591 260000002435 2
- Issued by
- Michigan
About this file
This is a project log exhibit for Bridge Deck Repairs at the I-75/I-69 Interchange in Genesee County, Michigan. The project encompasses three locations: Location A at SN 2556 (I-75 Ramps H & M over I-69 Ramp L), Location B at SN 2520 (I-75 Ramps H & M over Swartz Creek), and Location C at SN 2550 (WB I-69 Ramps H & F over Ballenger Road). The work includes hand chipping, deep concrete patching along I-75 and I-69 ramps, and traffic maintenance throughout the project limits. Traffic control items include 95 fluorescent plastic drums (furnished and operated), six double-sided lighted Type III barricades, two Type C connected arrow boards, two NTCIP-compliant portable changeable message signs, 818 square feet of temporary Type B prismatic signs, one mobile attenuator, four sign covers, minor traffic devices, and lighting for night work. Hand chipping quantities total 255 square yards across all three locations (145 SY at SN 2556, 50 SY at SN 2520, and 60 SY at SN 2550), with concrete patching totaling 25 cubic yards distributed similarly across the sites.
The project shall be executed in accordance with the MDOT 2020 Standard Specifications for Construction. All work is to be performed as directed by the Engineer, with traffic maintenance required per Special Provisions. The document does not specify pricing terms, contract award dates, contract term, renewal options, funding sources, or set-asides. No information regarding incumbent contractors, bidder meetings, site visits, response deadlines, or bid due dates is provided in this exhibit.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOG OF PROJECT
LOCATION
Location A: SN 2556 I-75 Ramps H & M over I-69 Ramp L
Location B: SN 2520
I-75 Ramps H & M over Swartz Creek
Location C: SN 2550
WB I-69 Ramps H & F over Ballenger Road
DESCRIPTION OF WORK
Throughout the project limits, the following work shall be done as directed by the Engineer.
Hand Chipping, Deep and Concrete Patching along I-75 and I-69 Ramps.
Maintain traffic per the Special Provision for Maintaining Traffic.
ITEMS OF WORK QUANTITIES UNIT
MAINTAINING TRAFFIC ITEMS
Plastic Drum, Fluorescent, Furn 95 Ea Plastic Drum, Fluorescent, Oper 95 Ea Barricade, Type III, High Intensity, Double Sided, Lighted, Furn 6 Ea Barricade, Type III, High Intensity, Double Sided, Lighted, Oper 6 Ea Connected Arrow Board, Type C, Furn 2 Ea Connected Arrow Board, Type C, Oper 2 Ea Sign, Portable, Changeable Message, NTCIP–Compliant, Furn 2 Ea Sign, Portable, Changeable Message, NTCIP–Compliant, Oper 2 Ea Sign, Type B, Temp, Prismatic, Furn 818 Sft Sign, Type B, Temp, Prismatic, Oper 818 Sft Mobile Attenuator 1 Ea Sign Cover 4 Ea Minor Traf Devices 1 LSUM Ltg for Night Work 1 LSUM
SN 2556 ITEMS
Hand Chipping, Deep 145 Syd Patching Conc, C-L-HE 14 Cyd
SN 2520 ITEMS
Hand Chipping, Deep 50 Syd Patching Conc, C-L-HE 5 Cyd
SN 2550 ITEMS
Hand Chipping, Deep 60 Syd Patching Conc, C-L-HE 6 Cyd
EXHIBIT 1 -
LOG OF PROJECT
GENERAL NOTES
SPECIFICATIONS FOR CONSTUCTION
The improvements covered by these plans shall be done in accordance with the MDOT 2020 Standard Specifications for Construction.
EXHIBIT 1 -
STR 2520
STR 2550
STR 2556