Event__18434_Exhibit_D_-_Price_Schedule.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- PIT Bumper for Minnesota State Patrol
- Solicitation number
- 2000018434
- Issued by
- Minnesota
About this file
This is a Price Schedule submission form (Exhibit D) for a Minnesota State Patrol PIT Bumper procurement, administered by the State of Minnesota. The solicitation seeks a vendor to provide PIT (Pursuit Intervention Technique) bumpers installed for Minnesota State Patrol on an as-needed basis through a formal Request for Proposal (RFP). Vendors may propose services across multiple labor categories including metal fabrication, machining, metal finishing, drawing/drafting services, and engineering/design services. The submission must be completed electronically through the Supplier Portal by the deadline specified in the solicitation event details. Required documentation includes Responder Declarations, Exceptions to State's Terms and Conditions, Responder Forms (including Workforce Certification and Equal Pay Certificate), Additional Information, and the completed Price Schedule.
Vendors must provide hourly labor rates for each applicable service category and specify percentage markups from cost for raw materials, with all material suppliers and manufacturers requiring pre-approval from the AMS/Buyer. The price schedule template identifies common material suppliers for steel, galvanized steel, stainless steel, aluminum, and coated steel products. Vendors may propose services for one, two, or all three categories as applicable to their capabilities. Supplier and manufacturer changes after contract award require written approval from the buyer. The document provides sample pricing submissions to guide vendor responses in the designated yellow-highlighted cells of the submission form.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Sheet Instructions
| Price Schedule Instructions |
| Labor Rates: Enter the labor rate, per hour, for the categories called for in the solicitation. A Vendor can propose services for one, two, or all three categories. |
| Materials: Provide the % mark-up from your costs, as defined in the solicitation. |
| List of Material Suppliers: List all supplier/manufacturers that you will purchase the Materials you've listed from. Supplier/manufacturers added after the award of the contract must be approved by the AMS/Buyer. |
SAMPLE PRICE SUBMISSION
| Exhibit D Price Schedule | BUSINESS INFORMATION | ||||
| Vendor Name | Matt's Machining & Fabrication | ||||
| Price Schedule instructions are available | |||||
| on the Instruction tab. | Contact Person | Matt Figgins | |||
| Street Address | 50 Sherburne Ave | ||||
| Vendor's responses go in the cells highlighted in yellow. | City/State/Zip | Saint Paul, MN, 55155 | |||
| Phone | 651-201-2444 | ||||
| Matthew.Figgins@State.mn.us |
| Labor Rates | Raw Materials (Percent Mark-Up From Your Cost) | List of Raw Material Suppliers | |||
| Category | Labor Rate/Hour | Raw Material | % Mark-up from Raw Material | Manufacturer/Supplier Name | Materials Supplied (List All That Apply) |
| Metal Fabrication | $XX | Steel | XX% | Company A | Steel, Stainless Steel |
| Machining | $XX | Galvanized Steel | Company B | Steel, Aluminum | |
| Metal Finishing | Stainless Steel | XX% | Company C | Coated Steel | |
| Drawing/Drafting Services | $XX | Aluminum | XX% | ||
| Engineering/Design Services | Coated Steel | XX% | |||
| Other (replace text w/ material) | |||||
| Other (replace text w/ material) | |||||
| Other (replace text w/ material) | |||||
| Other (replace text w/ material) |
Price Schedule
| Exhibit D Price Schedule | BUSINESS INFORMATION | ||||
| Vendor Name | |||||
| Price Schedule instructions are available on the Instruction tab. | Contact Person | ||||
| Street Address | |||||
| Vendor's responses go in the cells highlighted in yellow. | City/State/Zip | ||||
| Phone | |||||
| Labor Rates | Raw Materials (Percent Mark-Up From Your Cost) | List of Raw Material Suppliers | |||
| Category | Labor Rate/Hour | Raw Material | % Mark-up from Raw Material Cost | Manufacturer/Supplier Name | Materials Supplied (List All That Apply) |
| Metal Fabrication | Steel | ||||
| Machining | Galvanized Steel | ||||
| Metal Finishing | Stainless Steel | ||||
| Drawing/Drafting Services* | Aluminum | ||||
| Engineering/Design Services* | Coated Steel | ||||
| Other (replace text w/ material) | |||||
| Other (replace text w/ material) | |||||
| Other (replace text w/ material) | |||||
| Other (replace text w/ material) |
File details come from the government source that posted it. Updated .