EV00017898_BridgesSnowRemoval_Addendum_1.pdf
PDF 187 KB Posted
- Attached to
- Bridges Snow Removal & Salting Services
- Solicitation number
- EV00017898
- Issued by
- Massachusetts
About this file
This is an Addendum #1 to the bidding documents for the City of Boston Public Works Department's Bridges Snow Removal & Salting Services contract (EV0001). The City of Boston seeks two contractors to provide snow removal and salting services for designated bridge sidewalks and associated pedestrian ways throughout the city. Contractors must respond within 30 minutes of notification and maintain a list of designated employees. The scope of work requires all necessary labor, equipment, and supplies to clear and salt bridge sidewalks and pedestrian ways promptly after notification. Bidders are required to acknowledge receipt of this Addendum in their bid submission by providing a signed copy.
This Addendum represents a clarification or modification to the original bidding documents for the contract. The specific changes and clarifications are referenced in the document, though the detailed content of those changes is not fully outlined in this excerpt. All other provisions of the Invitation for Bids remain unchanged. Stephen Flaherty, the Project Manager, is identified as the responsible official. Bidders must formally acknowledge receipt of this Addendum as a condition of their bid submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF BOSTON
PUBLIC WORKS DEPARTMENT
EV0001 -
ADDENDUM #1
day, , 2026
Bidders should acknowledge receipt of this Addendum in their bid by providing signed copy in their submission
The following changes and clarifications are hereby made part of the Bidding Documents for the above-referenced project. Bidders must acknowledge receipt of this Addendum in their bid submission.
1. CHANGES TO THE BID
All other provisions of the Invitation for Bids remain unchanged.
Bidder Signature
Stephen Flaherty Project Manager