EV00017898_BridgesSnowRemoval_Addendum_1.pdf

PDF 187 KB Posted

Attached to
Bridges Snow Removal & Salting Services
Solicitation number
EV00017898
Issued by
Massachusetts

About this file

This is an Addendum #1 to the bidding documents for the City of Boston Public Works Department's Bridges Snow Removal & Salting Services contract (EV0001). The City of Boston seeks two contractors to provide snow removal and salting services for designated bridge sidewalks and associated pedestrian ways throughout the city. Contractors must respond within 30 minutes of notification and maintain a list of designated employees. The scope of work requires all necessary labor, equipment, and supplies to clear and salt bridge sidewalks and pedestrian ways promptly after notification. Bidders are required to acknowledge receipt of this Addendum in their bid submission by providing a signed copy.

This Addendum represents a clarification or modification to the original bidding documents for the contract. The specific changes and clarifications are referenced in the document, though the detailed content of those changes is not fully outlined in this excerpt. All other provisions of the Invitation for Bids remain unchanged. Stephen Flaherty, the Project Manager, is identified as the responsible official. Bidders must formally acknowledge receipt of this Addendum as a condition of their bid submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF BOSTON

PUBLIC WORKS DEPARTMENT

EV0001 -

ADDENDUM #1

day, , 2026

Bidders should acknowledge receipt of this Addendum in their bid by providing signed copy in their submission

The following changes and clarifications are hereby made part of the Bidding Documents for the above-referenced project. Bidders must acknowledge receipt of this Addendum in their bid submission.

1. CHANGES TO THE BID

All other provisions of the Invitation for Bids remain unchanged.

Bidder Signature

Stephen Flaherty Project Manager