ESBD_531527_1782411586665_G.4 Pricing Schedule ABIA Fuel.pdf
PDF 942 KB Posted
- Attached to
- ABIA FUEL STORAGE REPAIR
- Solicitation number
- TMD26-CFMO-0044133
- Issued by
- Travis County, Austin City, Texas
About this file
This is a pricing schedule document for a fuel storage repair project at Austin-Bergstrom International Airport (ABIA) under Texas contract TMD26-CFMO-0044133. The project encompasses the complete removal and replacement of existing fuel storage infrastructure and the installation of a new operational fuel storage and dispensing system. The scope of work includes seven primary deliverables: removal and disposal of existing fuel storage tanks, piping, pumps, filters, valves, and associated equipment; furnishing and installation of two 15,000-gallon above-ground fuel storage tanks with appurtenances; installation of a new stainless steel welded fuel piping system; installation of a new fuel offload and filtration system with pumps, separators, strainers, controls, and meters; installation of a dispensing system with hoses, nozzles, valves, and controls; electrical work including EFSO system, lightning protection, and lighting repairs; and documentation, as-built drawings, startup, training, final testing, and closeout activities. All items are bid on a lump-sum basis with a quantity of one per line item.
The bidder must provide all labor, materials, equipment, supervision, permits, testing, startup, commissioning, bonds, insurance, overhead, profit, and incidentals to deliver a complete and operational project. The total base bid is identified as "not to exceed" with the contractor estimating project completion within a specified number of calendar days following the Notice to Proceed. Award will be determined by the most responsive and responsible bidder at the lowest price based on the base bid and all options, with Texas Department of Mobility applying best value criteria as directed by Texas Government Code 2155.074. The document notes that award is contingent upon the availability of state and/or federal funding, and TMD reserves the right to award all, none, or any sequence of bid alternates based on funding availability. Bidders are required to provide pricing amount assumptions for each deliverable in a separate assumptions table.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Class and Item: 909-22 Building Construction, Non-Residential, OƯice Bldg., etc., 914-38 Electrical, 914-68 Plumbing
The Bidder shall provide all labor, materials, equipment, supervision, permits, testing, startup, commissioning, bonds, insurance, overhead, profit, and incidentals necessary to provide a complete and operational project in accordance with the Contract Documents.
ABIA Fuel Storage Repair - TMD26-CFMO-0044133
Description Unit Quantity Amount ($)
1. Remove and dispose of existing fuel storage tanks, piping, pumps, filters, valves, and associated equipment
Lump Sum
2. Furnish and install two (2) 15,000-gallon above-ground fuel storage tanks, including tank appurtenances, stairs, catwalks, vents, gauges, and supports
Lump Sum
3. Furnish and install new stainless steel welded fuel piping system and associated mechanical components
Lump Sum
4. Furnish and install new fuel oƯload and filtration system, including pumps, separators, strainers, controls, meters, and associated equipment
Lump Sum
5. Furnish and install dispensing system, hoses, nozzles, valves, controls, and associated dispensing equipment
Lump Sum
6. Electrical work including EFSO system, lightning protection, lighting repairs, controls, testing, and commissioning
Lump Sum
7. Documentation, as-built drawings, startup, training, final testing, closeout, and all remaining work required for a complete and operational fuel storage and dispensing system
Lump Sum
TOTAL BASE BID (NOT TO EXCEED)
Contractor estimates that the project will be completed within _________ calendar days following the Notice to Proceed.
The Total Base Bid shall include all labor, materials, equipment, supervision, permits, bonds, insurance, testing, commissioning, overhead, profit, and incidentals necessary to complete the project in accordance with the Contract Documents.
Note: This cost breakdown is for evaluation and payment purposes only. The Contractor is responsible for providing a complete, turnkey project as described in the Scope of Work, regardless of how costs are allocated.
Attachment G.4 Page 1 of 2
* Award will be based on the most responsive, responsible Bidder and lowest price based on base bid and all options. TMD will award based on best value for the state as directed by Texas Government Code § 2155.074 when awarding a Contract. Award is contingent upon the availability of State and/or Federal funding. TMD reserves the right to award all, none or any sequence of bid alternates contingent upon the availability of funds.
Table 2: Pricing Assumptions PRICING ASSUMPTIONS: Bidder shall provide any pricing amount assumptions for each Deliverable in reference to amounts and/or pricing conditions by outlining them (if any) in Table 2: Pricing Assumptions. Bidder may add additional rows as needed.
# Assumption
Attachment G.4 Page 2 of 2