3_-_USAO_Flooring_Project_Q&A.xlsx
XLSX spreadsheet 67 KB Posted
- Attached to
- AFB USAO Flooring Replacement Federal contract opportunity
- Solicitation number
- EQ10PCB-1-17-0074
About this file
Q&A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 4_-_GSA527-15b.pdf | ||
| 2b_-_AFB_USAO__Flooring_Replacement_Mod_Drawing.pdf | ||
| 0_-_SF30_for_EQ10PCB-1-17-0074.pdf | ||
| 1_-_SF_30_Continuation_Sheet_working.pdf | ||
| 2a_-_AFB_USAO_Flooring_Replacement_SOW_MOD_10.19.17.pdf | ||
| AFB_USAO_Flooring_Replacement_Sign_In.pdf | ||
| 0_-_SF30_for_RFQ_EQ10PCB-1-17-0074.pdf | ||
| 1b_-_SF_30_Continuation_Sheet_working.pdf | ||
| SF30_AM001_Site_Walk_Update_Pkg.pdf | ||
| 1a_-_SF1442-14b.pdf | ||
| 3_-_C101_Small_Business_Set-Aside_GC_Agreement.docx | DOCX document | |
| 4b_-_AFB_USAO_Flooring_Replacement_Drawing.pdf | ||
| 1b_-_Continuation_page_for_STANDARD_FORM_1442a.docx | DOCX document | |
| 6b_-_NEW_-GSA_Vendor_Fitness_Determination_Training_Manual_Final_(1).pdf | ||
| 6a_-_NEW_-Attachment_A_Security_Requirements.pdf | ||
| 2_-_C301_GC_Reps_&_Certs.docx | DOCX document | |
| 5_-_AK170001.pdf | ||
| 1_-_C201_Small_Business_Set_Aside_GC_LPTA_Sol_1.pdf | ||
| 4a_-_AFB_USAO_Flooring_Replacement_SOW.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Item # | Date Submitted | Question | Response Date | Response | Responded By |
| 1 | 10/9/17 | electronic and/or hand delivered to Anchorage Federal Building. If delivered, how many copies? | 10/24/17 | Electronic delivered to michael.zhao@gsa.gov and heather.bowden@gsa.gov | CO |
2 10/9/17 The Solicitation mentions a Cover Letter needing Subcontractor DUNS and Cage #'s. What if a subcontractor has neither? 10/24/17 If a subcontractor has neither the DUNS # nor the Cage #, prime contractor will submit its own DUNS # and Cage # only. Please ensure to still list the vendors your subing with. CO
3 10/9/17 Page 8 of 35 of the Solicitation Factor 1 Technical Capability item b 1) mentions proposed plan narrative should correlate with schedule. Is a schedule required? 10/24/17 Yes, the schedule is required CO
4 10/9/17 Page 10 of 35 of the Solicitation II.E. Other Information to be Submitted with Proposal 2) GSA Form 527. Is this to be included with proposal? 10/24/17 Yes, GSA Form 527 will need to be included with the proposal CO
5 10/9/17 Amendment 1 page 8. II. A. Proposal Contents, shall consist of the following documents….. GSA Form 527 does not appear to be incorporated into any of the solicitation attachments. Can it be provided since it is required that I submit it? 10/24/17 Yes, GSA From 527 will be attched to this Amendment A003 CO
| 6 | 10/9/17 | Amendment 1 page 10. Technical Submittal Requirement 6)…..At least 50% of the cost of the contract performance incurred for personnel shall be expended for employees of the concern. As described, this clause is the subcontract language for FAR52.219-14 (1) Services (except construction). On the FBO website, this project is listed with classification code 56 – Construction & building materials. It also lists NAICS code 238330 flooring contractors which the first two numbers, 23, fall under the Construction line of business. On that note, wouldn’t the language for FAR52.219-14 (3) apply to this contract? | 10/24/17 | Accordin to FAR 19.508(e), FAR 52.219 - 14 applys to this solicitation. II.D. Evaluation Factros: Factor 1. Technical capability to meet the Government’s Requirement: b 6) in the solicitation will be replaced by: This requirement is a small business set-aside, the Offeror shall confirm that they have the personnel and financial capability/capacity to perform the contract in accordance with FAR 52.219-14 -- Limitations on Subcontracting. Specifically addressing “(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for --(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the | |
| cost of materials, with its own employees. | CO |
File details come from the government source that posted it. Updated .