1b_-_Continuation_page_for_STANDARD_FORM_1442a.docx
DOCX document 24 KB Posted
- Attached to
- AFB USAO Flooring Replacement Federal contract opportunity
- Solicitation number
- EQ10PCB-1-17-0074
About this file
1442 - Continuation Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 3_-_USAO_Flooring_Project_Q&A.xlsx | XLSX spreadsheet | |
| 4_-_GSA527-15b.pdf | ||
| 2b_-_AFB_USAO__Flooring_Replacement_Mod_Drawing.pdf | ||
| 0_-_SF30_for_EQ10PCB-1-17-0074.pdf | ||
| 1_-_SF_30_Continuation_Sheet_working.pdf | ||
| 2a_-_AFB_USAO_Flooring_Replacement_SOW_MOD_10.19.17.pdf | ||
| AFB_USAO_Flooring_Replacement_Sign_In.pdf | ||
| 0_-_SF30_for_RFQ_EQ10PCB-1-17-0074.pdf | ||
| 1b_-_SF_30_Continuation_Sheet_working.pdf | ||
| SF30_AM001_Site_Walk_Update_Pkg.pdf | ||
| 3_-_C101_Small_Business_Set-Aside_GC_Agreement.docx | DOCX document | |
| 4b_-_AFB_USAO_Flooring_Replacement_Drawing.pdf | ||
| 1a_-_SF1442-14b.pdf | ||
| 6b_-_NEW_-GSA_Vendor_Fitness_Determination_Training_Manual_Final_(1).pdf | ||
| 6a_-_NEW_-Attachment_A_Security_Requirements.pdf | ||
| 2_-_C301_GC_Reps_&_Certs.docx | DOCX document | |
| 5_-_AK170001.pdf | ||
| 1_-_C201_Small_Business_Set_Aside_GC_LPTA_Sol_1.pdf | ||
| 4a_-_AFB_USAO_Flooring_Replacement_SOW.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Continuation page for STANDARD FORM 1442a
Example
ABC Company
| Categories of Labor under the Construction Wage Determination |
| Number of |
Hours Hourly Wage Overhead & Profit Total
| CLIN 0001 |
| Laborer “LABO0001‐016” |
| 20 |
| $32.29 |
| $110.00 |
| $755.80 |
| CLIN 0002 |
| IRONWORKER Reinforcing, |
Structural and Ornamental) “IRON0086‐010”
| 20 |
| $45.00 |
| $200.00 |
| $1,100.00 |
| CLIN 0003 |
| Equipment and Materials (Provide additional sheet for breakdown of costs) |
$4,500
$6355.80
Company Name:
| Categories of Labor under the Construction Wage Determination (Refer to attached Wage Determination document) |
| Number of |
Hours Hourly Wage Overhead & Profit Total
| CLIN |
| Description |
Total
| 0001 |
| AFB USAO Flooring Replacement project |
This project is to provide and install new carpet vinyl composite tile (VCT), Tile and cove base for the United States Attorney’s Office (USAO) in accordance with the statement of work (SOW).
This project does not include environment work.
NOTE 1: Contractor shall provide all labor, materials, supervision, and equipment necessary to install new carpet vinyl composite tile (VCT), Tile and cove base; remove and dispose of, offsite, existing carpet and cove base in accordance with the statement of work (SOW).
NOTE 2: Contractor shall move furniture/movable equipment to perform the work. Furniture/Equipment shall be returned to preexisting condition and location upon completion of each phase of the work.
NOTE 3: Contractor must provide a cost break out for all pricing submitted to include sub-contractor pricing.
Name of person completing this form
Title/Position
Phone Number
DUNS Number
Tax ID Number
EQ10PCB-1-17-0074