About this file
This document is an Emergency Purchase Statement from the Illinois Department of Natural Resources, Office of Mines and Minerals, Abandoned Mine Land Reclamation Division. It details an emergency construction services contract awarded to Durbin Enterprises, Inc. to conduct subsurface borings at the collapsed Oleander mine shaft in Beecher City, Illinois. The Division required the contractor's services to determine if the shaft remained open or had become backfilled after the initial collapse and remediation in 2018. The emergency contract was necessary due to the potential for additional, rapid and unpredictable failure of the unstable mine shaft, which poses a threat to public safety. The original contract term was from May 20, 2019 to August 16, 2019, with a total estimated cost of $33,920.
The final actual cost of the emergency contract was $37,458.00. Funding was provided through state appropriated funds. The contract was awarded through an emergency procurement process under the Illinois Procurement Code, as the situation represented an immediate threat to public safety that required prompt action. The Division solicited bids from four firms with the required expertise, and selected the lowest bidder, Durbin Enterprises, Inc.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EMERGENCY PURCHASE STATEMENT
Statement Page 1 of 2 State of Illinois Chief Procurement Office Emergency Purchase Statement Version 18.1
Zip: 62414State: ILCity: Beecher CityAddress: PO Box 68; 200 Jefferson St
Vendor: Durbin Enterprises, Inc.
Zip: 62702State: ILCity: SpringfieldAddress: One Natural Resources Way
Division: Office of Mines and Minerals, Abandoned Mine Land ReclaAgency: Illinois Department of Natural Resources
Reference #: B-9505 (Original B- 7969)
Emergency Purchase Details Emergency Category (select the appropriate option from the drop-down menu below):
Involving threat to public health or public safety
Reason for selection of this particular vendor:
The Division contacted four (4) firms with the experience and knowledge to perform abandoned mine land reclamation services, they received two (2) bids. The Division chose the Vendor with the lowest bid.
Description of supplies or services to be provided:
Emergency construction services. DNR requires the services of a contractor to complete subsurface borings with intent to determine if the shaft is backfilled or remains open. Drilling will consist of both vertical and inclined boreholes to various depths.
The mine shaft collapsed in October 2018 and was subsequently remediated in December 2018 by placing a concrete plug from the 3 ft to 17 ft depth. At the time of collapse the shaft was measured to be in excess of 200 ft deep, and the open hole approximately 20 ft in diameter at ground surface. At the time of remediation the open hole/shaft was measured to be 17 ft deep with a circular footprint approximately 40 ft in diameter. It’s uncertain if the open shaft filled with material or become clogged with material.
It’s noted that additional failure of material within and/or adjacent to the shaft may occur. Such failure, if deep seated, can happen rapidly, with little or no warning, creating a hole that is tens of feet wider and deeper than the original collapse. Therefore, all work within the vicinity of the shaft should be considered dangerous and the Contractor shall employ all safety procedures deemed necessary to protect personnel, equipment, and property.
Emergency Declaration made in accordance with 30 ILCS 500/20-30.
Is there an existing State contract available for the required supplies or services? Yes No
Expected Start Date: May 20, 2019 Estimated End Date*: Aug 16, 2019
Amount of this expenditure is: $33,920 Actual or Estimated*: Estimated *
*Actual end date and cost will be reported later.
Select the type of funding to be used: Federal Funds State Appropriated Funds State Grant Funds Other
Statement Page 2 of 2 State of Illinois Chief Procurement Office Emergency Purchase Statement Version 18.1
Zip: 62414State: ILCity: Beecher CityAddress: PO Box 68; 200 Jefferson St
Vendor: Durbin Enterprises, Inc.
Zip: 62702State: ILCity: SpringfieldAddress: One Natural Resources Way
Division: Office of Mines and Minerals, Abandoned Mine Land ReclaAgency: Illinois Department of Natural Resources
Reference #: B-9505 (Original B- 7969)
Signatures
I am making this statement and providing it to the CPO Office, the Auditor General, and the Procurement Policy Board in compliance with the Illinois Procurement Code and within 10 days after award of the contract.
I have authorized the emergency procurement in accordance with the requirements of the Illinois Procurement Code (30 ILCS 500) and the applicable administrative rule. I know and understand the contents of this statement and all statements herein are true and correct to the best of my knowledge.
Agency Signature: Title: Assistant Agency Procurement Officer
Printed Name: Melissa Orrill Date: May 20, 2019
EMERGENCY PURCHASE EXTENSION
Extension Page 1 of 1 State of Illinois Chief Procurement Office Emergency Purchase Statement Version 18.1
Zip: 62414State: ILCity: Beecher CityAddress: PO Box 68; 200 Jefferson St
Vendor: Durbin Enterprises, Inc.
Zip: 62702State: ILCity: SpringfieldAddress: One Natural Resources Way
Division: Office of Mines and Minerals, Abandoned Mine Land ReclaAgency: Illinois Department of Natural Resources
Reference #: B-9505 (Original B- 7969)
Extension Justification
Original Emergency Term Start Date: Original Emergency Term End Date:
Amount of original: Actual or Estimated*:
Expected Extension Start Date: Expected Extension End Date*:
Amount of extension expenditure: Actual or Estimated*:
Select the type of funding to be used: Federal Funds State Appropriated Funds State Grant Funds Other
Describe the scope of the original emergency (supply, service, etc.):
Describe the scope of the extension (supply, service, etc.). Show justification for extending the original emergency contract, and explain why the extension need cannot be met through a competitive process:
Was authorization to proceed verbally given? No Yes NA
Term of emergency procurement shall not exceed 90 days. Contract may be extended beyond 90 days if CPO determines additional time is necessary; however, prior to execution of extension, CPO must hold a public hearing and provide written determination
*Actual end date and cost will be reported later.
Signatures I am requesting an extension of the requested emergency contract. I know and understand the contents of this statement and all statements herein are true and correct to the best of my knowledge.
Agency Signature: Title:
Printed Name: Date:
Approved CPO/SPO Signature: Date:
EMERGENCY PURCHASE FINAL COST AND TERM
Final Cost and Term Page 1 of 1 State of Illinois Chief Procurement Office Emergency Purchase Statement Version 18.1
Zip: 62414State: ILCity: Beecher CityAddress: PO Box 68; 200 Jefferson St
Vendor: Durbin Enterprises, Inc.
Zip: 62702State: ILCity: SpringfieldAddress: One Natural Resources Way
Division: Office of Mines and Minerals, Abandoned Mine Land ReclaAgency: Illinois Department of Natural Resources
Reference #: B-9505 (Original B- 7969)
Final Costs and Term
Final total cost of supplies and services: $37,458.00 Final total term of contract: 05/20/2019 - 08/16/2019
I am reporting the final costs and term for the referenced emergency contract to the CPO and the Auditor General.
Agency Signature: Title: Assistant Agency Procurement Officer
Printed Name: Melissa Orrill Date: Jul 26, 2019
Page of
State of Illinois Chief Procurement Office Emergency Purchase Statement Version 18.1
EMERGENCY PURCHASE STATEMENT
Statement Page of State of Illinois Chief Procurement Office Emergency Purchase Statement Version 18.1 Emergency Purchase Details Emergency Category (select the appropriate option from the drop-down menu below):
Reason for selection of this particular vendor:
Description of supplies or services to be provided:
Is there an existing State contract available for the required supplies or services?
If Yes is checked above, explain why the existing contract does not meet the need:
Actual or Estimated*:
*Actual end date and cost will be reported later.
Select the type of funding to be used:
Signatures I am making this statement and providing it to the CPO Office, the Auditor General, and the Procurement Policy Board in compliance with the Illinois Procurement Code and within 10 days after award of the contract.
I have authorized the emergency procurement in accordance with the requirements of the Illinois Procurement Code (30 ILCS 500) and the applicable administrative rule. I know and understand the contents of this statement and all statements herein are true and correct to the best of my knowledge.
EMERGENCY PURCHASE EXTENSION
Extension Page of State of Illinois Chief Procurement Office Emergency Purchase Statement Version 18.1 Extension Justification Actual or Estimated*:
Actual or Estimated*:
Select the type of funding to be used:
Describe the scope of the original emergency (supply, service, etc.):
Describe the scope of the extension (supply, service, etc.). Show justification for extending the original emergency contract, and explain why the extension need cannot be met through a competitive process:
Was authorization to proceed verbally given?
Term of emergency procurement shall not exceed 90 days. Contract may be extended beyond 90 days if CPO determines additional time is necessary; however, prior to execution of extension, CPO must hold a public hearing and provide written determination *Actual end date and cost will be reported later.
Signatures I am requesting an extension of the requested emergency contract. I know and understand the contents of this statement and all statements herein are true and correct to the best of my knowledge.
EMERGENCY PURCHASE FINAL COST AND TERM
Final Cost and Term Page of State of Illinois Chief Procurement Office Emergency Purchase Statement Version 18.1 Final Costs and Term I am reporting the final costs and term for the referenced emergency contract to the CPO and the Auditor General.
11.0.0.20130303.1.892433.887364
| PageCount: |
| ReferenceNumber: B-9505 (Original B- 7969) |
| CurrentPage: |
| VendorZip: 62414 |
| VendorState: IL |
| VendorCity: Beecher City |
| VendorAddress: PO Box 68; 200 Jefferson St |
| Vendor: Durbin Enterprises, Inc. |
| AgencyZip: 62702 |
| AgencyState: IL |
| AgencyCity: Springfield |
| AgencyAddress: One Natural Resources Way |
| AgencyDivision: Office of Mines and Minerals, Abandoned Mine Land Reclamation Division |
| AgencyUniversity: Illinois Department of Natural Resources |
| CurrentMasterPage: |
| MasterPageCount: |
| DropDownListQuickPurchase: Involving threat to public health or public safety |
| CheckBox1ProtectingHealth: 0 |
| CheckBox2DiscountedPrice: 0 |
| CheckBox3RareItems: 0 |
| CheckBox4Entertainment: 0 |
| CheckBox5AvoidLapsing: 0 |
| ExplanationForSelectingVendor: The Division contacted four (4) firms with the experience and knowledge to perform abandoned mine land reclamation services, they received two (2) bids. The Division chose the Vendor with the lowest bid. |
| ExplanationSuppliesServices: Emergency construction services. DNR requires the services of a contractor to complete subsurface borings with intent to determine if the shaft is backfilled or remains open. Drilling will consist of both vertical and inclined boreholes to various depths. |
The mine shaft collapsed in October 2018 and was subsequently remediated in December 2018 by placing a concrete plug from the 3 ft to 17 ft depth. At the time of collapse the shaft was measured to be in excess of 200 ft deep, and the open hole approximately 20 ft in diameter at ground surface. At the time of remediation the open hole/shaft was measured to be 17 ft deep with a circular footprint approximately 40 ft in diameter. It’s uncertain if the open shaft filled with material or become clogged with material.
It’s noted that additional failure of material within and/or adjacent to the shaft may occur. Such failure, if deep seated, can happen rapidly, with little or no warning, creating a hole that is tens of feet wider and deeper than the original collapse. Therefore, all work within the vicinity of the shaft should be considered dangerous and the Contractor shall employ all safety procedures deemed necessary to protect personnel, equipment, and property.
Emergency Declaration made in accordance with 30 ILCS 500/20-30.
| CheckBoxYes: 0 |
| CheckBoxYes: 0 |
| CheckBoxNo: 1 |
| CheckBoxNo: 0 |
| ExplanationDoesNotMeetNeed: |
| TextFieldExpectedStartDate: 2019-05-20 |
| TextFieldExpectedEndDate: 2019-08-16 |
| TextFieldAmountExpenditure: $33,920 |
| ActualOrEstimated1: Estimated * |
| CheckboxFederalFunds: 1 |
| CheckboxFederalFunds: 0 |
| CheckboxStateAppFunds: 0 |
| CheckboxStateAppFunds: 0 |
| CheckBoxStateGrantFunds: 0 |
| CheckBoxStateGrantFunds: 0 |
| CheckBoxOther: 0 |
| IfOtherExplainTextField: |
| AuthorizedSignature: |
| TitleField: Assistant Agency Procurement Officer |
| TitleField: Assistant Agency Procurement Officer |
| PrintedNameField: Melissa Orrill |
| AuthorizedDateField: 2019-05-20 |
| Start: |
| End: |
| AmountOfOriginal: |
| ActualOrEstimated2: |
| ExpectedExtensionStartDate: |
| ExpectedExtensionEnd: |
| AmtExtensionExpenditure: |
| ActualOrEstimated3: |
| CheckBoxOther22: 0 |
| IfOtherExplainTextField22: |
| TextField1: |
| TextField2: |
| CheckBoxNA: 0 |
| WhoAuthorizedWork: |
| FinalTotalCost: $37,458.00 |
| FinalTotalTerm: 05/20/2019 - 08/16/2019 |
| PrintedName: Melissa Orrill |
| Date: 2019-07-26 |