englewood 112519 (Specs).pdf
PDF 9 MB Posted
- Attached to
- 2026 Crosswalk Construction Program
- Solicitation number
- 112619
- Issued by
- Bergen County, New Jersey
About this file
This is a specifications document for the City of Englewood, New Jersey's 2026 Crosswalk Improvement Program, a construction project submitted through BidNet Direct. The project encompasses the design and installation of solar-powered rapid rectangular flashing beacons (RRFBs) at crosswalk locations throughout the city. The specifications detail requirements for solar-powered beacon systems including mounting configurations, battery systems, operational specifications, and lighting standards compliant with R920-F specifications. The beacons must feature weatherproof, gasketed hinged housings capable of withstanding winds up to 241 kph, encrypted technology for system updates, and adjustable nighttime dimming settings. The document indicates an August 2026 project completion date and references New Jersey Department of Transportation supplementary specifications for state aid projects.
The contract requires bidders to comply with New Jersey prevailing wage requirements under N.J.S.A. 34:11-56.25 and related regulations, with mandatory submission of certified payroll documentation and affirmative action compliance reporting for projects exceeding $50,000 in total cost. Bidders must provide statements of experience and qualifications, contact information, and signed certifications affirming wage rate compliance and proper worker classification. The document references multiple New Jersey statutes governing equal employment opportunity, prevailing wage payment, apprenticeship requirements, and construction contract administration. Bid packets and supporting documents are to be submitted through the city's designated submission process, with contact available through fvolcy@cityofenglewood.org and the BidNet Direct platform for bulletin and addenda access.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY ENOLBI
MAR
rovement
CONTRACT CO
D
TO
FICATIONS
CONTRACT MENTS 79
TО
www.bidnetdirect.com//englewood
I
BULLETINS/ADDENDA
fvolcy@cityofenglewood.org
EQUAL EMPLOYMENT OPPORTUNITY
work as they ay lly erstand the facilities, difficulties a d restri ng www.elec.state.nj.u
TRAC
CON
cilities tilities ple
Alternative Dispute Resolution
IAL PROVISIO
R
SECURITY REQUIRED
LIQUIDATED DAMAGES
SAFETY REQUIREMENTS
ENTS
SPECIFICATIONS FOR STATE AID PROJECTS,
SUPPLEMENTARY SPEC
DETECTABLE RFACES
ROJECTS.
N.J.D.O.T SUPPLEMENTARY
Safety Red http://access-board.gov/adaag/dws/manufacturers.htm
SECTION NO. TITL OF SECTIO PAGE
1.01 Scope of Work
1.03 Utility Company Notification
Protection of Traffic (cont.)
1.07 Damages and Repairs to Existing Piping and S
1.08 Payment
LIZATIO
2.02 Shop Drawings And/Or Descriptive Literature
en
2.04 Payment
ntro ccess
Di d Grubbing
9.04 Payment
15.06 Sheeting and Bracing
15.07 Dewatering
15.08 Excavation near structures, pipes, utilities, et
15.09 Bridging Trenches
15.10 Рayment
17.03 Payment
Aggregate for Light Weight Concrete:
Air Entraining Admixture:
Bar Reinforcement:
Non-S
Expansion Joint Fillers:
Integral Hardener:
ng leveling plates):
Waterstops:
21.06 Strength
21.07 Proportions
21.08 Mixing
Required cover
21.09 Placing
21.10 Inspection And Testing
21.11 Concreting In Cold Weather
Requirements
22.04 Transportation and Delivery of Mixture
Temperature 1
22.06 Payment
G
24.02 Requirements
24.03 Stockpiles
24.07 Blast Furnace Slag
24.08 Boiler Slag
24.09 Dense Graded Aggregate
24.10 Fine Aggregate
25.04 equirements
25.05 Payment
on
SIDEW
28.01 Scope
31.04 Equipment
3 ruction
31.08 Рayment
36.01 Scope
36.03 n
36.04 Payment
G
40.04 Payment
41.02 Payment:
42.02 Рayment
SECTION 50-SOLAR POWERED RAP
50.03 Mounting
50.04 Configuration
50.05 Solar/Battery System
50.06 Operational Specifications
50.08 Payment
R920-F
R920 F approval compliant chromaticity
High-power
Side-emitting simple green powder light night alternating, steady signs
Nighttime dimming:
settings
Adjust ing display daytime intensity intensity during bright daytime intensity battery extremely
Encrypted technology update settings any systems signal range:
deg optimal energy battery system
Battery design yrs
Weatherproof, gasketed hinged yellow green powder lightweight system
(-40 mph (241 kph) speed per message warranty, excluding ite IM pedestrian
D
August
2026 CROSSWALK
of:
(S
"N.J.S.A.54:32B-1 et seq.
N.J.S.A. 34:11-56.48)
STATE 0 LOSURE
(Please attach additional sheets if more space is needed):
Π
N.J.S.A. 19:44A-20.27;
미 state.nj.us
N.J.S.A. 19:44A-20.27)
N.J.S.A. 40A:11-2.1)
N.J.S.A. 52:34-15) a.
미
Π
N.J.S.A. 40A:11-20)
0A:11-16, N.J.S.A. 40A:11-16)
N.J.S.A. 40A:11-16)
40A:
N.J.S.A. 34:11-56.25 et seq.)
N.J.A.C. 12:60-1.4
N.J.S.A. 34:11-56.25
N.J.S.A. 40A:11-18, N.J.S.A. 40A:11-18)
QUALIFICATIONS (CONTINUED)
PHONE NUMBER(S)
& EMAIL ADDRESS(ES)
STATEMENT OF EXPERIENCE AND QUALIFICATIONS (CONTINUED)
FINAL COST
1, BID PACKET CERTIFICATION
N.J.S.A. 2A:44-143 et. seg.
N.J.S.A. 2A:44-143 et. seg.
2026 CROSSWALK IMPROVEMENT PROGRAM
T DOCUMENTS
D ($
)ss.:
Partnership
City of Englewood
General Requirements provided however, that for construction projects with a total cost of less than $50,000,. the initial and monthly
Project Manning Reports shall not be submitted except when requested by the Affirmative
Action Office
N.J.S.A. 10:5-31 et seg., N.J.A.C. 17:27-7.
N.J.A.C. 17:27-7.3:
f r o m t h e f ul l w e a k l y s e a n e d b y a n y p e r s o n a n d th at n o d e d u c t i o n s h u v e b e e n m a d e ei th er d ir ua tl y c e th e tu li g e n е d d a t o in di re at ly f r o m t he f al l w a g e s c a n e d b y a n y pe rs on ot he r th an p er mi ss ib le d ed uc ti on s a s d ef in ed in t he
N e w
Pr ev ai li ng
W a g e
A ot N.
JS
.A
:1 1- .2 et a e q an d Re gu )a ti on
N.
J.
AC
c t s e q an d th e Pu ym en t o f
W a a
W a g e s L aw
N J S A e t s u q
T hu t a n y p ay ro ll s ot he rw is e u n d e r t hi s c o n t r u c t r eq ui re d t o b e s ub mi tt ed f or t he a b o v e p er io d a r e o o r r e e a n d c om pl ie te th nt th e w a g e r at es f o r l nb er er s o r m e c h a n i e s co nt ai ne d t h e r e i n a r e n o t l a s t h a n t h e ap pl ic ab le a n d c o m p l e t e th at t he w a g e r a t e s fo r la be re rs r m e c h a n i a s co nt ai ne d th er ei n a r e n o t l e s t ha n th e ap pl ic ab le w ru le s o c n t a m e d i n e n y w a g e d et er mi na ti on in oc rp or st ed i t o t h e co nt ra ct th at th cl as si fi ca ti on s su t fo rt h t h u r c i n
(3 Th et u m y a pp re nt io es c op lo ye d n t he a b o v e p e i o d a r e d ul y r e g a a y i
Le be r, B u r e a u o f
A pp re nt ic es hi p a n d
T ra in in g a n d u nr ol le d i n a c er ti fi e
Un at ed
S ta te s
R E M A R K S
P L E A S E
T H E
T Y P E
O F B E N E F I T
N O T E
T H E
T O T A L
C O S T i p p r o g r a m
W H E R E
F R
W H E R E
F R
B E N E F T
A R E
P A I D
T O
A P P R O V E D
P L A N S
F U N D S
O G R A M S
I n a d d i t h e ba si c ur ly w a g e ra te s pa id t e ac h la bo re r o r m ec ha ni i n th e e b u s
Y E A R
P E R
E M P L O Y E E m a d e w h e n d u e t o a
Se ct io n 4( 0) b el ow
E a c h l a b o r o r o r m e c h a a i c l is to d i n t h e u b o v e r e f e r e m e e d p a v r o l l h a s b e e n p a s d i s in di ua to d o s
E a c h l a b o r e r o r m e c h n a i e l ut ed i n t he u b o v e r ef er en ce d pa yr ol l h a s b et n pa sd i us m d i u n t e d o n th e pa yr ol l, a n a m c u n t n o t l es s th an t he s u m o f t he a pp li ca bl e b a s i o h ou rl y w a g e r u t e p l u s t he s m o u n t o f th e re qu ir ed f ri ng e be no fi ts a s li st ed i n th e co nt ra ct ex ce pt a s n o t e d i n Sc et io n 4( c) b e l o w
N A M E
A N I C
S I G N A T U R E
T H E
F A L S I F I C A T I O N O F
A N Y O F
A B O V E
S T A T E M E N T S
M A Y
T H E
File details come from the government source that posted it. Updated .