EMG Professional Rate Schedule Demo 02192021.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
Emergency Commercial Demolition: 6651 E Vernor
Solicitation number
300000152308741
Issued by
Michigan

About this file

This is a contractor rate schedule submitted by Doe Demolition, Inc., a demolition contractor based in Detroit, Michigan (48226 Fifth Street), for a state and local contract opportunity in Michigan. The rate schedule establishes pricing for emergency commercial demolition services at 6651 E Vernor. The contractor, led by President Jane D. Doe (jane.doe@doedemolition.com, 313.313.3113), has submitted hourly rates for demolition services including administration, supervisor oversight, laborer costs, and equipment operation. Additional demolition-related services priced include regulated and non-regulated material trucking, asbestos-containing material disposal per ton, construction and demolition debris disposal per ton, and air monitoring services per parcel.

The rate schedule also includes pricing for backfill, grade, and site finalization services, with hourly rates for administration, supervisor, laborer, and equipment categories, as well as per-ton pricing for backfill material (below 12 inches) and topfill material (top 12 inches). All listed rates in the submitted schedule are currently shown at $0.00, indicating that specific pricing has not yet been populated in this template version. The schedule establishes the service categories and unit types that will govern compensation for this emergency demolition project, pending submission of actual rates by the contractor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Rate Schedule

Organization Name:Doe Demolition, Inc.
Business Address:1234 Fifth Street, 48226
Point(s)-of-Contact:Jane D. Doe, President
E-mail Address(es):jane.doe@doedemolition.com
Phone #(s):313.313.3113
Service TypeUnit TypeUnit Rate
DEMOLITION
AdministrationHourly$0.00
SupervisorHourly$0.00
LaborerHourly$0.00
EquipmentHourly$0.00
Trucking: Regulated MaterialHourly$0.00
Trucking: Non-Regulated MaterialHourly$0.00
Disposal: Asbestos Containing MaterialPer Ton$0.00
Disposal: Construction & DemolitionPer Ton$0.00
Air MonitoringPer Parcel$0.00
BACKFILL, GRADE, & SITE FINALIZATION
AdministrationHourly$0.00
SupervisorHourly$0.00
LaborerHourly$0.00
EquipmentHourly$0.00
Backfill Material (Below 12 inches)Per Ton$0.00
Topfill Material (Top 12 inches)Per Ton$0.00

File details come from the government source that posted it. Updated .