Electrical Testing_VA Map.pdf
PDF 4 MB Posted
- Attached to
- H261--Triennial Electrical Distribution System Testing Federal contract opportunity
- Solicitation number
- 36C25021Q1081
About this file
This solicitation is for triennial electrical distribution system testing services for the Department of Veterans Affairs LTC Charles S. Kettles VA Medical Center located in Ann Arbor, Michigan. The scope of work includes maintaining, inspecting, testing, and calibrating the medical center's electrical power distribution system and components. Services such as cleaning, infrared scanning, tightening connections, exercising and testing circuit breakers, ground fault protection device testing, facility ground resistance testing, and identifying hot spots using infrared detection are required. Contractors must be certified, trained, and have experience maintaining electrical distribution systems in healthcare and other facilities. The solicitation includes details on contractor qualifications, summaries of work items, inspection and testing standards, required reports, and deliverables such as written reports and drawings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25021Q1081 0001.docx | DOCX document | |
| Appendix D - Equipment summary by drawing.xlsx | XLSX spreadsheet | |
| 36C25021Q1081.docx | DOCX document | |
| Appendix F - All fuse table section 4.2.3.2.pdf | ||
| Appendix C - Electrical Testing - Proposed Scheduled Outages.pdf | ||
| Appendix E - Campus Electrical one line drawings.pdf | ||
| Appendix E - Campus Electrical one line drawings MAP.pdf | ||
| Appendix F - All breaker summary section 4.2.1.1.pdf | ||
| Appendix F - All relay table section 4.2.2.2.pdf | ||
| Appendix D - Inventory of Items Tested_Previous Ks.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C1
| ES1 |
| ES2 |
| ES3 |
| ES4 |
| ES5 |
| ES6 |
| ES7 |
| ES8 |
| ES9 |
| ES10 |
| ES11 |
| ES12 |
| ES13 |
| ES14 |
| ES15 |
| ES16 |
| ES17 |
| ES18 |
| ES19 |
| ES20 |
| ES21 |
| ES22 |
File details come from the government source that posted it. Updated .