Appendix F - All relay table section 4.2.2.2.pdf
PDF 58 KB Posted
- Attached to
- H261--Triennial Electrical Distribution System Testing Federal contract opportunity
- Solicitation number
- 36C25021Q1081
About this file
This scope of work document outlines requirements for maintenance, inspection, testing, and calibration services for the electrical power distribution system and related components at the Department of Veterans Affairs LTC Charles S. Kettles VA Medical Center in Ann Arbor, Michigan. Key requirements include that contractors must be certified electrical technicians with experience maintaining similar systems for at least five years, safety training, and access to relevant codes and standards. Services include cleaning, inspecting, testing, exercising, and calibrating transformers, switchgear, panels, generators, transfer switches, and other equipment per standards like NETA MTS. Deliverables within seven days of completion are a written report of all work, deficiencies, and recommendations in Microsoft Word format. The four-hour power outage test and electrical safety training for staff are also within the contractor's scope of work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25021Q1081 0001.docx | DOCX document | |
| Appendix F - All fuse table section 4.2.3.2.pdf | ||
| Appendix C - Electrical Testing - Proposed Scheduled Outages.pdf | ||
| Appendix D - Equipment summary by drawing.xlsx | XLSX spreadsheet | |
| 36C25021Q1081.docx | DOCX document | |
| Electrical Testing_VA Map.pdf | ||
| Appendix E - Campus Electrical one line drawings.pdf | ||
| Appendix E - Campus Electrical one line drawings MAP.pdf | ||
| Appendix F - All breaker summary section 4.2.1.1.pdf | ||
| Appendix D - Inventory of Items Tested_Previous Ks.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Protection Type (Multiple Items) Setting Setting
OVERCURRENT PROT. DEV. MANUFACTURER MODEL Existing Settings Recommended Settings
MV B32 PRI SWGR A-101 RLY REC ABB CO-8
MV B32 PRI SWGR A-102 RLY REC ABB CO-8
MV GEN SITE RLY CUTLER-H FP-6000 FUNCTION=PHASE;51P PH=1;ANSI MODERATELY INV=1;50P-1 PH=2;DELAY\, 50P-1=0 (CYCLES);
MV PRI SWGR A-101 RLY ABB CO-8 FUNCTION=PHASE;TAP (0.5-2.5A)=1.5;TIME DIAL (0.5-11)=1.0;INST (2-48A)=18;
MV PRI SWGR A-102 RLY ABB CO-8 FUNCTION=PHASE;TAP (1- 12A)=3.5;TIME DIAL (0.5-11)=1.0;INST (6 - 144A)=18;
MV PRI SWGR A-103 RLY ABB CO-8 FUNCTION=PHASE;TAP (1- 12A)=3.5;TIME DIAL (0.5-11)=1.0;INST (6 - 144A)=18;
MV PRI SWGR A-103 RLY REC ABB CO-8
MV PRI SWGR A-104 RLY ABB CO-8 FUNCTION=PHASE;TAP (1- 12A)=3.5;TIME DIAL (0.5-11)=1.0;INST (6 - 144A)=18;
MV PRI SWGR A-104 RLY REC ABB CO-8
MV PRI SWGR A-105 RLY ABB CO-8 FUNCTION=PHASE;TAP (1- 12A)=3.5;TIME DIAL (0.5-11)=1.0;INST (6 - 144A)=18;
MV PRI SWGR A-105 RLY REC ABB CO-8
MV PRI SWGR A-106 RLY ABB CO-8 FUNCTION=PHASE;TAP (1- 12A)=3.5;TIME DIAL (0.5-11)=1.0;INST (6 - 144A)=18;
MV PRI SWGR A-106 RLY REC ABB CO-8
MV TR DE 2 RLY REC SIEMENS FUNCTION=PHASE;51 (0.5-20.0 X CTR)=3;ANSI EXTREMELY INV.=2;50-1 (0.5-175 X CTR)=20;50-1 DELAY
(0-60 SEC)=0.01 (SEC);50-2 (0.5-175 X CTR)=20;50-2 DELAY (0-60 SEC)=0.01 (SEC);
MV XFMR DE 1 RLY SIEMENS FUNCTION=PHASE;51 (0.5-20.0 X CTR)=3;ANSI EXTREMELY INV.=0.9;50-1 (0.5-175 X CTR)=20;50-1 DELAY (0-
60 SEC)=0.01 (SEC);50-2 (0.5-175 X CTR)=20;50-2 DELAY (0-60 SEC)=0.01 (SEC);
MV XFMR DE 1 RLY REC SIEMENS FUNCTION=PHASE;51 (0.5-20.0 X CTR)=3;ANSI EXTREMELY INV.=2;50-1 (0.5-175 X CTR)=20;50-1 DELAY
(0-60 SEC)=0.01 (SEC);50-2 (0.5-175 X CTR)=20;50-2 DELAY (0-60 SEC)=0.01 (SEC);
MV XFMR DE 2 RLY SIEMENS FUNCTION=PHASE;51 (0.5-20.0 X CTR)=3;ANSI EXTREMELY INV.=0.9;50-1 (0.5-175 X CTR)=20;50-1 DELAY (0-
60 SEC)=0.01 (SEC);50-2 (0.5-175 X CTR)=20;50-2 DELAY (0-60 SEC)=0.01 (SEC);
All Relay Table - Section 4.2.2.2 Ann Arbor VAMC - Ann Arbor, MI
2019 E44 Electrical Evaluation - 100% Submission
EXISTING SETTINGS RECOMMENDED SETTINGS
FUNCTION=PHASE;TAP (1- 12A)=1.5;TIME DIAL (0.5-11)=1.0;INST (6 - 144A)=18;
FUNCTION=PHASE;TAP (1- 12A)=1.5;TIME DIAL (0.5-11)=1.0;INST (6 - 144A)=18;
FUNCTION=PHASE;TAP (0.5-2.5A)=1.5;TIME DIAL (0.5-11)=1.0;INST (2-48A)=18;
FUNCTION=PHASE;TAP (1- 12A)=1.5;TIME DIAL (0.5-11)=1.0;INST (6 - 144A)=18;
FUNCTION=PHASE;TAP (1- 12A)=1.5;TIME DIAL (0.5-11)=0.5;INST (6 - 144A)=18;
FUNCTION=PHASE;TAP (1- 12A)=1.5;TIME DIAL (0.5-11)=1.0;INST (6 - 144A)=18;
MV PRI SWGR A-102 RLY REC ABB CO-8 FUNCTION=PHASE;TAP (1- 12A)=1.5;TIME DIAL (0.5-11)=1.0;INST (6 - 144A)=18;
All Relay Tbl