This solicitation seeks a general contractor to complete infrastructure upgrades at the Hot Springs VA Medical Center in South Dakota. The scope of work includes demolishing over 14,000 phone lines, upgrading electrical panels and generators, renovating HVAC and fire suppression systems, migrating from 50 telecommunications closets to 29 rooms, upgrading the data center, installing new cabling and outlets, and conducting asbestos abatement. The technical complexity arises from maintaining existing critical systems, phasing to minimize downtime, and reintegrating security and communications networks during construction. The contractor must furnish all labor, materials, and equipment to complete these upgrades while coordinating with facility operations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C77622B0032 0001 - 6-9-22.pdf | ||
| 36C77622B0032_1.pdf | ||
| EHRM Final Drawings Volume 1A - 2022-05-12.pdf | ||
| EHRM Final Drawings Volume 4 - 2022-05-12.pdf | ||
| Wage Rates - Fall River - 2.25.22.pdf | ||
| Campus Map - Hot Springs.pdf | ||
| HS Scope of Work - Final Revised 5-16-22.pdf | ||
| EHRM Final Drawings Volume 1B - 2022-05-12.pdf | ||
| EHRM Final Drawings Volume 3 - 2022-05-12.pdf | ||
| HS Campus Ground Infrastructure.pdf | ||
| HS Campus Ground Infrastructure 2.pdf | ||
| Specifications Volume 1 - Rev100 - 4-25-22.pdf | ||
| Cutsheets Small Diameter CAT6A - Final.zip | ZIP file | |
| Old-New TR Telecommunication Rooms.pdf | ||
| Brand Name Justification - Hot Springs.pdf | ||
| Specifications Volume 2 - Rev100 - 4-25-22.pdf | ||
| Specifications Volume 3 - Rev100 - 4-25-22.pdf | ||
| COVID-19 Safety Protocols 12-14-21.pdf | ||
| Background Report Investigation Form.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OWNER
ARCHITECT
TELECOMMUNICATIONS
ENGINEER, PROJECT LEAD
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
A&E ARCHITECTS
608 NORTH 29th STREET
BILLINGS, MT 59101
406.248.2633
BLACK HILLS VA HEALTHCARE SYSTEM
HOT SPRINGS VAMC
GDM - PUGET SOUND DISTRICT OFFICE
1584 McNEIL ST., SUITE 200
DUPONT, WA 98327
541.380.1237
GDM - PUGET SOUND DISTRICT OFFICE
1584 McNEIL ST., SUITE 200
DUPONT, WA 98327
360.539.1755
RSA
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, ALASKA 99503
907.865.0564
PROJECT TEAM
RSA
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, ALASKA 99503
907.865.0564
STRUCTURAL
KREMER, GHELEN, AND ASSOCIATES
400 COLUMBIA STREET, SUITE 240
VANCOUVER, WA 98660-3413
503.289.2661
GDM - ARCTIC DISTRICT OFFICE
1401 W 34TH AVE, SUITE 200
ANCHORAGE, ALASKA 99503
907.917.2957
CIVIL ENGINEER
GDM - COLUMBIA GORGE DISTRICT OFFICE
1000 W STEUBEN ST, UNIT THREE
BINGEN, WA 98605
541.436.4723
INDUSTRIAL HYGIENEFIRE PROTECTION ENGINEER
TERP CONSULTING
14241 E 4TH AVAENUE, SUITE 5-230
AURORA, CO 80011
720.779.0797
AB ANCHOR BOLT
ABV ABOVE
A/C AIR CONDITIONING
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT(URAL)
AWN AWNING
B/ BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM OR BENCHMARK
BRG BEARING
BTWN BETWEEN
BUR BUILT-UP ROOF
CAB CABINET
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CG CORNER GUARD
CPT CARPET
CSMT CASEMENT
CT CERAMIC TILE
D DEEP
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIM(S) DIMENSIONS
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
E EAST
EA EACH
EC EXISTING COLUMN
EJ EXPANSION JOINT
ELEC ELECTRICAL
EL ELEVATION
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR
FACP FIRE ALARM CONTROL PANEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
F.F. FINISH FLOOR
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FND FOUNDATION
FP FIRE PROTECTION
FR FRAME
FRMG FRAMING
FT FEET/FOOT OR FIRE TREATED
FTG FOOTING
FTNG FOOTING
FRP FIBERGLASS REINFORCED PANEL
FRT FIRE RETARDANT TREATED
GA GAUGE
GALV GALVANIZED
GB GYPSUM BOARD
GC GENERAL CONTRACTOR
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
GYP GYPSUM
HC HANDICAP
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HTD HEATED
HVAC HEATING/VENTILATION & AIR
CONDITIONING
ID INSIDE DIAMETER
INFO INFORMATION
ISO ISOCYANURATE
INSUL INSULATE / INSULATED / INSULATION
INT INTERIOR
INV INVERT
JT JOINT
J-BOX JUNCTION BOX
KIT KITCHEN
L LONG / LENGTH
LAM LAMINATE(D)
LAV LAVATORY
LF LINEAR FEET
LT LIGHT
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANIC(AL)
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER OR
OVERFLOW DRAIN
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OVHD OVERHEAD
PL PLATE
PLAM PLASTIC LAMINATE
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
POLY POLYESTER OR POLYOLEFIN
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED OR POINT
PVMT PAVEMENT
QT QUARRY TILE
QTR QUARTER
QTY QUANTITY
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RD ROOF DRAIN
RECY RECYCLE(D)
REF REFERENCE
REFRIG REFRIGERATOR OR
REFRIGERATION
REINF REINFORCE
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
S SOUTH
SC SOLID CORE
SCH SCHEDULE
SCHED SCHEDULED
SECT SECTION
SF SQUARE FEET
SFRM SPRAY APPLIED FIRE RESISTIVE
MATERIAL
SGL SINGLE
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SPECS SPECIFICATIONS
SOD SLAB ON DECK
SOG SLAB ON GRADE
SOH SAME OPPOSITE HAND
SS STAINLESS STEEL
ST STONE TILE
STD STANDARD
STND STANDARD
STL STEEL
STRUCT STRUCTURAL
TEMP TEMPERED
THK THICK
THRESH THRESHOLD
T.O. TOP OF
TOBM TOP OF BEAM
T.O.BM. TOP OF BEAM
T.O.P. TOP OF PLATE
T.O.S. TOP OF STEEL
T/ TOP OF
T&G TONGUE AND GROOVE
TEL TELEPHONE
THK THICK
TRANS TRANSOM
TV TELEVISION
TYP TYPICAL
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VENEER PLASTER
VR VAPOR RETARDER
VT VINYL TILE
VWC VINYL WALL COVERING
W WIDE OR WEST
W/ WITH
WC WATER CLOSET
WD WOOD
WDW WINDOW
WG WALL GUARD
WH WATER HEATER
W/IN WITHIN
W/O WITHOUT
WP WATERPROOF
WR WATER RESISTANT
WT WEIGHT
WWF WELDED WIRE FABRIC
# NUMBER OR POUND
@ AT
ARCHITECTURAL ABBREVIATIONS
TYPICAL SHEET VIEW NUMBERING LAYOUT
NUMBERING STARTS IN BOTTOM LEFT CORNER, MOVING
UPWARDS, SKIPPING NONE
ARCH E1 (30"x42")
WINDOW TAGROOM TAG
DOOR TAG KEYNOTE TAG
ASSEMBLY TAG
MATERIAL TAG
REVISION TAGREVISION CLOUD XXX
X
XX-XX
X
CEILING TAG VIEW REFERENCE
BUILDING
SECTION
WALL
SECTION
ELEVATION
GRID LINE
DETAIL
CALL OUT
INTERIOR
ELEVATION
EXTERIOR
ELEVATION
DETAIL
SECTION
#1
#2
#3
#4
POSITION OF VIEW ON SHEET
VIEW NAME
1 1/2" = 1'-0"
VIEW SCALE
VIEW NAME
A6.#1 A3.#
A3.#
A3.#
A4.#
A3.#
ROOM NAME
101.1
X
X'-X"
XXX-X
XXX
W D
HT
CASEWORK TAG
CABINET DESIGN SERIES NO.
EXPLANATION OF SYMBOLS
BLACK HILLS HEALTH CARE SYSTEM, HOT SPRINGS CAMPUS
ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES - HOT SPRINGS, SOUTH DAKOTA
PROJECT NO.: 568A-21-702
CONTRACT NO.: 36C776210069
100% CONSTRUCTION DOCUMENTS
BLACK HILLS HEALTH CARE SYSTEM, HOT SPRINGS CAMPUS
500 N. 5TH ST.
HOT SPRINGS, SD 57747
THE SCOPE OF THIS PROJECT INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING INFRASTRUCTURE
IMPROVEMENTS: ELECTRICAL (ELECTRICAL PANEL UPGRADE, POWER [NORMAL, EMERGENCY]),
BONDING, UPS, BUILDING MANAGEMENT SYSTEM INTERFACES, ASSESS FOR NEW AND UPGRADES TO EXISTING HVAC, RECONFIGURATION, EXPANSION AND RENOVATION OF EXISTING SPACE (DEMO, NEW CONSTRUCTION, FINISHES), COMMUNICATION INFRASTRUCTURE (NEW DATA OUTLETS, PATCH PANELS, UPGRADE TO CAT 6A CABLE) IN BUILDINGS AS NECESSARY, PHYSICAL SECUITY UPGRADES, ASSESS AND UPGRADE FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN BUILDINGS, HAZARDOUS MATERIAL ABATEMENT. PROJECT BUILDING LOCATION INCLUDE: BUILDINGS 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 17, 18, 20 23, 29, 43, 53, 65, AND 66.
PROJECT DESCRIPTION
"OWNER": THE OWNER IS UNITED STATES GOVERNMENT - DEPARTMENT OF BETERANS AFFAIRS AND IS REFERRED TO THROUGOUT THE CONTACT DOCUMENTS AS IF SINGULAR IN NUMBER. THE TERM "OWNER"
MEANS THE OWNER OR THE OWNER'S CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE.
"CONTRACTING OFFICER" OR "C.O.": THE OWNER'S AUTHORIZED REPRESENTATIVE RESPONSIBLE FOR
ADMINISTRATING THE CONTRACT BETWEEN THE GENERAL CONTRACTOR AND OWNER. THE TERM
INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER ACTING WIHIN THE
LIMITS OF THEIR AUTHORITY AS DELEGATED BY THE CONTRACTING OFFICER.
"WORK": THE TERM "WORK" MEANS THE CONSTRUCION AND SERVICES REQUIRED BY THE CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR TO FULFILL THE CONTRACTOR'S
OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE OR A PART OF THE PROJECT.
"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE CONTRACT
DOCUMENTS
"DRAWINGS", "SHOP DRAWINGS", OR "PLANS": THE GRAPHIC AND PICTORIAL PORTIONS OF CONTRACT
DOCUMENTS, WHENEVER LOCATED AND WHERENEVER ISSUED, SHOWNING DESIGN, LOCATIONAND
DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS, ASECTIONS, DETAILS, SCHEDULES AND DIAGRAMS.
"PROJECT SUPERVISOR" OR "SUPERVISOR": MEANS THE ON-SITE SUPERVISION REPRESENTATIVE OF THE
PROJECT.
"ARCHITECT" OR "ENGINEER": MEANS THE VA'S ARCHITECTS, ENGINEERS AND OTHER DESIGN AND ENGINEERS PROFESSIONALS FOR THIS PROJECT, AND REFERRED THROUGHOUT THE DRAWINGS AS IF
SINGULAR IN NUMBER.
"TRADE CONTRACTOR" OR "CONTRACTOS": MEANS THE ENTITY UNDER CONTRACT AGREEMENT WITH
THE GENERAL CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND OR SPECIALTY WORK IN
CONNECTION WITH THIS PROJECT.
"FURNISHED" OR "FURNISHED": MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS, TRANSPORTATION INSURANCE, FIELD MEASUREMENTS,EXPEDITING, SHIPPING, HANDLING, PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND ANY OTHER ACCESSORIES REQUIRED FOR A COMPLETE
INSTALLATION.
"INSTALL" OR "INSTALLED": MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH UNLOADING, UNPACKING, HOISTING, STORAGE, HANGERS, SUPPORTS, SLEEVES, SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL, DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLENA-UP, INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL ACCESSORIES, SERVICE AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.
"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND OTHER ITEMS REQUIRED TO
COMPLETE THE REFERENCED TASK.
"BY OWNER", "BY VAMC" OR "BY VA": MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED TO THE JOB
SITE AND INSTALLED BY THE OWNER.
"NOT IN CONTRACT" OR "N.I.C.": MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT, BUT MAY REQUIRE PROVISIONS IN THE CONSTUCTION FOR FUTURE INSALLATION AS SPECIFIFIED OR SHOWN.
OTHER DEFINITIONS OF WORDS AND TERMS USED IN THE DRAWINGS AND SPECIFICATIONS CAN BE FOUND IN THE LEGENDS AND SYSMBOLS DRAWINGS FOR EACH DISCIPLINE AND IN DISION 0 AND 1 OF THE
PROJECT MANUAL.
BASIC DEFINITIONS
1. THE CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATION AND RELATED CONTRACT DOCUMENTS, VISIT SITE OF WORK, AND RESEARCH ALL EXISTING CONDITIONS, FACILITES, RESTRICTIONS AND OTHER MATTERS WHICH CAN AFFECT THE WORK OR THE COST THEREOF;
FAILURE OR OMISSION OF ANY CONTRACTOR TO VISIT THE SITE AND ACQUAINT THEMSELVES WITH THE EXISTING CONDITIONS, SHALL IN NO WAY RELEIVE THEM FROM ANY OBLIGATION WITH RESPECT TO THEIR CONTRACT AND NO EXTRA COMPENSATION WILL BE ALLOWED BY REASON OF ANY THING OR MATTER CONCERNING WHICH THE CONTRACTOR SHOULD HAVE FULLY INFORMED THEMSELVES PRIOR TO BIDDING. GENERAL CONTRACTOR
SHALL COORDINATE ALL ASPECTS OF THE BUILDING CONSTRUCTION.
2. THE CONTRACTOR SHALL NOT CONSIDER CONSTRUCTION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH AREA AND TO FULFILL THE INTENT OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL COORDINATE ARCHITECTURAL CONSTRUCTION DRAWING AND NOTES WITH CIVIL, STRUCTURAL AND MECHANICAL, ELECTRICAL & PLUMBING NOTES AND DRAWINGS.
3. THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE TECHNICAL SPECIFICATIONS AND CONDITIONS OF THE PROJECT INCLUDED IN THE PROJECT MANUAL WHICH FORM A PART OF THE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL INFORMATION REQUIRED TO CONSTRUCT THE WORK OF THIS CONTRACT. IN THE EVENT OF A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATION NOTIFY THE COR FOR CLARIFICATION
SEVEN DAYS BEFORE BEGINNING WORK ON THE AFFECTED ACTIVITIES.
4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF THE WORK. NOTIFY THE COR OF ANY
SIGNIFICANT CHANGES IN DIMENSIONS OR CONDITIONS.
5. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY DESCRIPTION AS MAY BE NECESSARY TO COMPLETE THE SCOPE OF WORK DEFINED ON THE DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS (HOTWORK, ICRA, WEEKENDS, HOLIDAYS, SHUTDOWN, ETC), CERTIFICATES, INSPECTIONS, DEPARTMENT APPROVAL, ETC. FOR WORK PERFORMED UNDER THIS CONTRACT. PROVIDE COPIES OF ALL REQUIRED
PERMITS, CERTIFICATES, INSPECTIONS AND AGENCY APPROVALS TO THE COR.
7. FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, ALL APPLICABLE STATE AND LOCAL CODES, AND THE GENERAL
AND SUPPLEMENTARY CONDITIONS OF THE CONTRACT.
8. U.L. ASSEMBLIES DESCRIBED ARE FOR REFERENCE ONLY. THE GENERAL CONTRACTOR SHALL COORDINATE AND VERIFY THE INSTALLATION OF THE
DESCRIBED SYSTEM(S) .
9. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR THE PROPER PERFORMANCE OF THEIR WORK, COORDINATING WITH OTHER
TRADES, MEANS AND METHODS OF CONSTRUCTION, SAFETY AND SECURITY ON SITE.
10. CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR THE PERFORMANCE AND INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE PERFORMED IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS FOR FINISHES AND SUBSTRATES
AFFECTED.
11. THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN SECURITY DURING ALL CONSTRUCTION WORK.
12. PROTECT EXISTING PROPERTY DURING CONSTRUCTION. REPAIR OR REPLACE, WITHOUT ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING WORK
DAMAGED DURING THE COURSE OF CONSTRUCTION.
13. THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE COR AND ALL GOVERNMENT EMPLOYEES 14 DAYS IN ADVANCE OF BEGINNING EACH
CONSTRUCTION ACTIVITY.
14. UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE PROVIDED OR FURNISHED BY OTHERS, THEY SHALL BE PROVIDED
UNDER THIS CONTRACT.
15. ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND PROFESSIONAL MANNER CONSISTENT WITH INDUSTRY STANDARDS.
16. THE CONTRACTOR SHALL LEAVE THE SITE AND ALL BUILDINGS AND STRUCTURES IN PROPER WORKING ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE, REPLACE ANY WORK, MATERIALS, OR EQUIPMENT FURNISHED AND INSTALLED UNDER THE CONTRACT WHICH DEVELOPS DEFECTS, EXCEPT FROM ORDINARY WEAR AND TEAR, WITHIN ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER.
17. CONTRACTOR SHALL SCHEDULE, COORDINATE, AND FACILITATE ALL POWER OUTAGES AND SHUTDOWNS. POWER OUTAGES AND SHUTDOWNS MUST BE
SCHEDULED WITH THE COR ONE (1) WEEK PRIOR TO OUTAGE.
18. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO REGULATED MATERIALS ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, EQUIPMENT, AND ALL OTHER EXISTING SYSTEMS. MAKE NECESSARY PROVISIONS TO MAINTAIN THE INTEGRITY OF SAID SYSTEMS PRIOR TO THE COMMENCEMENT OF DEMOLITION, IF ANY. SEE MECHANICAL, ELECTRICAL, TELECOMMUNICATIONS, AND ARCHITECTURAL DRAWINGS FOR ANY SYSTEM OR PORTIONS THEREOF TO BE REMOVED, RELOCATED, REVISED OR ABANDONED.
19. ANY CONSTRUCTION INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO EXPENSE TO THE OWNER OR ARCHITECT
/ ENGINEER OF RECORD (EOR).
20. ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST BE MAINTAINED AT ALL TIMES. ESTABLISH PROCEDURES TO MINIMIZE CIRCULATION OF CONSTRUCTION PERSONNEL AND MATERIALS THROUGH OCCUPIED PORTIONS OF THE BUILDING. KEEP ALL AREAS ADJACENT TO THE
WORK AREA CLEAN.
21. PRIOR TO DELIVERY OF MATERIALS TO THE CONSTRUCTION ZONE AND REMOVAL OF WASTE FROM THE SITE, VERIFY WITH THE COR FOR AN ACCEPTABLE ACCESS ROUTE AND TIME. UNDER NO CIRCUMSTANCES SHALL ANY AREA OUTSIDE THE CONSTRUCTION ZONE BE USED WITHOUT PRIOR APPROVAL FROM THE COR. ALL BUILDING INTERIOR STAGING AREAS SHALL BE PROTECTED WITH FIRE RESISTANT PLYWOOD ENCLOSURES. ALL TRASH SHALL BE REMOVED FROM THE BUILDING DAILY. CONSTRUCTION MATERIALS SHALL NOT BE STORED IN CORRIDORS AT ANY TIME.
22. FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES, AND POINTS OF CONNECTION PRIOR TO START OF WORK.
23. THE DESIGN ADEQUACY, SAFETY, AND ERECTION OF BRACING, SHORING, SCAFFOLDING, AND TEMPORARY SUPPORTS AND RESTRAINS IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
24. NOTIFY THE FACILITY OF TIMES WHEN THE CONSTRUCTION NOISE WILL BE EXCESSIVE. RESCHEDULE SUCH WORK IF SO REQUIRED BY THE FACILITY.
25. NOTIFY THE COR OF ANY DISCREPANCIES DISCOVERED IN THE FIELD THAT REQUIRE CORRECTIVE ACTION.
26. FOR EXISTING FLOORS, CEILINGS, PARTITIONS, AND SERVICES TO REMAIN, PROTECT ALL FINISHES AND MATERIALS, AND REPAIR OR REPLACE ALL ITEMS THAT ARE DAMAGED OR SOILED DURING THE COURSE OF CONSTRUCTION. ALL FINISHES AND MATERIALS SHALL E PROPERLY INTEGRATED TO
NSUTE A UNIFORM APPEARANCE AND SEAMESS TRANSITION.
27. ALL ITEMS TO BE REMOVED AND REPLACED SHALL BE HANDLED WITH PROPER CARE AND STORED IN A SAFE PLACE TO PREVENT DAMAGE; WHEN
DAMAGED, REPLACE AT NO EXPENSE TO THE OWNER.
28. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED OR BRACED IN ACCORDANCE WITH PROVISIONS OF THE TECHNICAL SPECIFICATIONS.
29. ALL DRAWINGS, THOUGH NOTED TO SCALE, ARE FOR ILLUSTRATION ONLY. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS. ITEMS
WRONGLY LOCATED BY DRAWINGS SCALING SHALL BE CORRECTED.
30. SIGNAGE CONSTRUCTION, FONT AND SIZE SHALL BE CONSISTENT WITH THE FACILITY'S EXISTING SIGNAGE SYSTEMS. REFER TO SPECIFICATIONS FOR CODE REQUIRED SIGNAGE. PROVIDE ADDITIONAL SIGNAGE AS MAY BE REQUIRED BY REQUEST OF THE FIRE MARSHAL AND/OR BUILDING CODE
OFFICIAL.
31. EXERCISE CARE DURING CONSTRUCTION TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER ROUTINE, COORDINATE SEQUENCE OF WORK AND PHASING WITH THE COR TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER. MANY OF THE WORK ITEMS REQUIRE THE WORK TO BE PERFORMED ONLY
AT NIGHT, WEEKENDS, OR HOLIDAYS AT NO ADDITIONAL COST TO THE GOVERNMENT.
32. PRIOR TO DRILLING OR CORING EXISTING CONCRETE, CONTRACTOR SHALL LOCATE EXISTING REINFORCEMENT TO MAINTAIN ADEQUATE CLEARANCES FROM AND AVOID DAMAGE TO EXISTING REINFORCEMENT. CONTRACTOR SHALL USE NON-DESTRUCTIVE TESTING (NDT) TO LOCATE REINFORCEMENT.
WHENEVER FEASIBLE, CONTRACTOR SHALL USE GROUND PENETRATING RADAR (GPR) OR MEANS OTHER THAN X-RAY. WHERE X-RAY IS REQUIRED, CONTRACTOR SHALL PROVIDE WRITTEN REQUEST AT LEAST THREE (3) WEEKS PRIOR TO EVENT: WORK MAY BE REQUIRED TO BE PERFORMED OUTSIDE NORMAL WORK HOURS AND SHALL BE DOCUMENTED ON THE THREE (3) WEEK LOOK-AHEAD SCHEDULE.
33. PROTECT EXISTING FIRE SUPPRESSION SYSTEMS DURING CONSTRUCTION.
34. IN THE EVENT THE CONTRACTOR DISCOVERS HAZARDOUS MATERIALS WHICH ARE NOT AVOIDABLE BY REROUTING THE WORK AND HAVE NOT BEEN DESCRIBED IN THE CONTRACT, THE CONTRACTOR IS TO NOTIFY THE COR AND THE A/E FOR DIFFERING SITE CONDITION ACKNOWLEDGEMENT.
REMEDIATION WOULD BE COMPENSATED BY ADDITIONAL MONEY AND ADDITIONAL TIME FOR CRITICAL PATH ACTIVITIES.
35. CONTRACTOR SHALL PROVIDE STAFF THAT WILL UNDERGO TRAINING AND CERTIFICATION TO ALLOW UN-ESCORTED ACCESS TO IT CLOSETS. THE CONTRACTOR SHALL CERTIFY SUFFICIENT NUMBER OF STAFF TO ACCOMMODATE PROPOSED SCHEDULE WITHOUT RELYING ON VA STAFF TO ACCOMPANY AS ESCORTS. THIS WILL REQUIRE PIV BADGING REQUIREMENT INCLUDING BACKGROUND INVESTIGATIONS. SEE "CONTRACTOR BACKGROUND INVESTIGATIONS REQUEST" FORM. COORDINATE WITH CO/CS REGARDING SUBMITTING THE FORM.
GENERAL PROJECT NOTES
PROJECT SITE
VA MEDICAL CENTER
PROJECT VICINITY MAP
HOT SPRINGS, SD
PROJECT
NORTH
SITE LEGEND
TRUE
NORTH
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V A
M e d ic a l C e n te r
H o t S p ri n g s S
D /2
G
E N
E R
A L
I N
F O r2
.r v t
/3
/2
:0
:4
P M
00-GI-000.2
COVER SHEET VOLUME 2
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
HOT SPRINGS, SOUTH DAKOTA
568A4-21-702
Project Director
LMTMP02/23/2022
100% CD FINAL SOLUTIONARCHITECTA/E:
FULLY SPRINKLERED
VOLUME 2
MECHANICAL
Revisions: Date:
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V A
M e d ic a l C e n te r
H o t S p ri n g s S
D /2
G
E N
E R
A L
I N
F O r2
.r v t
/4
/2
:0
:5
A
M
00-GI-001
INDEX OF DRAWINGS
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
HOT SPRINGS, SOUTH DAKOTA
568A4-21-702
Project Director
TMPTMP02/23/2022
100% CD FINAL SOLUTIONARCHITECTA/E:
FULLY SPRINKLERED
DRAWING INDEX
EK-101 POWER ONE-LINE DIAGRAM EMERGENCY BRANCH -DOM
EK-102 POWER 0NE-LINE DIAGRAM NORMAL BRANCH -DOM
EK-103 POWER ONE-LINE DIAGRAM -BUILDING 12
EK-104 POWER ELEVATIONS AND DETAILS
EK-105 BUILDING 1 -PANEL SCHEDULES
EK-106 BUILDING 1 & 2 -PANEL SCHEDULES
EK-107 BUILDING 2, 3 & 4 -PANEL SCHEDULES
EK-108 BUILDING 4 -PANEL SCHEDULES
EK-109 BUILDING 6 & 7-PANEL SCHEDULES
EK-110 BUILDING 8 & 11 -PANEL SCHEDULES
EK-111 BUILDING 12 -PANEL SCHEDULES
EK-112 BUILDING 12 -PANEL SCHEDULES
EK-113 BUILDING 12 -PANEL SCHEDULES
EK-114 BUILDING 14, 17 & 18 -PANEL SCHEDULES
EK-115 BUILDING 18, 20 & 23 -PANEL SCHEDULES
EK-116 BUILDING 29 & 43 -PANEL SCHEDULES
EK-117 BUILDING 53 -PANEL SCHEDULES
EK-118 BUILDING 65 & 66 -PANEL SCHEDULES
EK-119 ELECTRICAL LOAD CALCULATIONS
EK-120 ELECTRICAL LEGEND AND NEW LIGHT FIXTURE SCHEDULE
EP-0B1 ELECTRICAL REMODEL PLAN -ARCADE
001-EP-0B1 ELECTRICAL REMODEL PLAN -BLDG 1 BASEMENT
001-EP-011 ELECTRICAL REMODEL PLAN -BLDG 1 FIRST FLOOR
001-EP-021 ELECTRICAL REMODEL PLAN -BLDG 1 SECOND FLOOR
001-EP-031 ELECTRICAL REMODEL PLAN -BLDG 1 THIRD FLOOR
002-EP-0B1 ELECTRICAL REMODEL PLAN -BLDG 2 BASEMENT
002-EP-021 ELECTRICAL REMODEL PLAN -BLDG 2 SECOND FLOOR
003-EP-0B1 ELECTRICAL REMODEL PLAN -BLDG 3
004-EP-0B1 ELECTRICAL REMODEL PLAN -BLDG 4 LAYOUTS
004-EP-0B2 ELECTRICAL REMODEL PLAN -BLDG 4 ENLARGED PLANS
005-EP-021 ELECTRICAL REMODEL PLAN -BLDG 5 SECOND FLOOR
006-EP-011 ELECTRICAL REMODEL PLAN -BLDG 6 FIRST FLOOR
007-EP-011 ELECTRICAL REMODEL PLAN -BLDG 7 FIRST FLOOR
008-EP-011 ELECTRICAL REMODEL PLAN -BLDG 8 FIRST FLOOR
010-EP-0B1 BUILDING 10 ELECTRICAL PLANS
011-EP-0B1 ELECTRICAL REMODEL PLAN -BLDG 11
012-EP-0B1 ELECTRICAL REMODEL PLAN -BLDG 12 BASEMENT
012-EP-0B1A ELECTRICAL REMOD -BLDG 12 BASEMENT A ENLARGED
012-EP-0B1D ELECTRICAL REMODEL -BLDG 12 BASEMENT C/D
012-EP-001 ELECTRICAL REMODEL PLAN -BLDG 12 GROUND FLOOR
012-EP-001A ELECTRICAL REMOD -BLDG 12 GROUND FLOOR A ENLARGED
012-EP-001B ELECTRICAL REMOD -BLDG 12 GROUND FLOOR B ENLARGED
012-EP-001D ELECTRICAL REMOD -BLDG 12 GROUND FLOOR C/D ENLARGED
012-EP-011 ELECTRICAL REMODEL PLAN -BLDG 12 FIRST FLOOR
012-EP-011A ELECTRICAL REMOD -BLDG 12 FIRST FLOOR A ENLARGED
012-EP-011D ELECTRICAL REMOD -BLDG 12 FIRST FLOOR C/D ENLARGED
012-EP-021 ELECTRICAL REMODEL PLAN -BLDG 12 SECOND FLOOR
012-EP-021D ELECTRICAL REMOD -BLDG 12 SECOND FLOOR C/D ENLARGED
012-EP-031 ELECTRICAL REMODEL PLAN -BLDG 12 THIRD FLOOR
012-EP-031B ELECTRICAL REMOD -BLDG 12 THIRD FLOOR B ENLARGED
012-EP-041 ELECTRICAL REMODEL PLAN -BLDG 12 FOURTH FLOOR
014-EP-0G1 ELECTRICAL REMODEL PLAN -BLDG 14
017-EP-011 ELECTRICAL REMODEL PLAN -BLDG 17 FIRST FLOOR
018-EP-011 ELECTRICAL REMODEL PLAN -BLDG 18
020-EP-011 ELECTRICAL REMODEL PLAN -BLDG 20
023-EP-0B1 ELECTRICAL REMODEL PLAN -BLDG 23
029-EP-0B1 ELECTRICAL REMODEL PLAN -BLDG 29
043-EP-011 ELECTRICAL REMODEL PLAN -BLDG 43
053-EP-0B1 ELECTRICAL REMODEL PLAN -BLDG 53
065-EP-011 ELECTRICAL REMODEL PLAN -BLDG 65
065-EP-012 ENLARGED ELECTRICAL REMODEL PLAN -ROOM 109
065-EP-012.1 VA MCR POWER DETAILS
065-EP-013 ENLARGED LIGHTING REMODEL PLAN -ROOM 109
066-EP-011 ELECTRICAL REMODEL PLAN -BLDG 66
GENERAL
CIVIL
ARCHITECTURAL - DEMOLITION
ARCHITECTURAL - NEW CONSTRUCTION
STRUCTURAL
MECHANICAL
VOLUME 1
VOLUME 3
SHEET NO. SHEET NAME
11-AE-502 11-PLAN AND SECTION DETAILS
12-AE-101 12-BASEMENT & GROUND FLOOR OVERALL LIFE SAFETY PLAN
12-AE-102 12-FIRST & SECOND FLOOR OVERALL LIFE SAFETY PLAN
12-AE-103 12-THIRD AND FOURTH FLOOR OVERALL LIFE SAFETY PLANS
12-AE-201 12-BASEMENT FLOOR PLAN
12-AE-201A 12-BASEMENT FLOOR ENLARGED PLANS SECTOR A
12-AE-201CD 12-BASEMENT FLOOR ENLARGED PLANS SECTORS C AND D
12-AE-202 12-GROUND FLOOR PLAN
12-AE-202A 12-GROUND FLOOR ENLARGED PLAN SECTOR A
12-AE-202BCD 12-GROUND FLOOR ENLARGED PLANS SECTORS B, C, AND D
12-AE-203 12-FIRST FLOOR PLAN
12-AE-203A 12-FIRST FLOOR ENLARGED PLAN - SECTOR A
12-AE-203BCD 12-FIRST FLOOR ENLARGED PLANS - SECTORS B, C, AND D
12-AE-204 12-SECOND FLOOR PLAN
12-AE-204A 12-SECOND FLOOR ENLARGED PLANS SECTOR A
12-AE-204BCD 12-SECOND FLOOR ENLARGED PLANS - SECTORS B, C, AND D
12-AE-205 12-THIRD AND FOURTH FLOOR PLANS
12-AE-205BCD 12-THIRD FLOOR ENLARGED PLANS SECTORS B, C, AND D
12-AE-206 12-FOURTH FLOOR ENLARGED PLAN
12-AE-301 12-ENLARGED PBX FLOOR PLAN & RCP
12-AE-302 12-ENLARGED TR PLANS
12-AE-601 12-ENLARGED TR ELEVATIONS
12-AE-602 12-ENLARGED TR ELEVATIONS
12-AE-603 12-ENLARGED TR ELEVATIONS
14-AE-201 14- FLOOR PLANS
18-AE-201 18-FLOOR PLANS
43-AE-201 43 - FIRST FLOOR PLANS
53-AE-201 53-FLOOR PLANS
53-AE-301 ENLARGED FLOOR PLANS & ELEVATIONS
65-AE-201 65-FLOOR PLAN
65-AE-301 65-FLOOR PLANS
66-AE-201 66-FLOOR PLAN
66-AE-202 ENLARGED FLOOR PLANS
66-AE-401 66-ELEVATIONS AND SECTION
66-AE-501 66-PLAN AND SECTION DETAILS
66-AE-601 TR ELEVATIONS
SHEET NO. SHEET NAME
00-DOM-AE-101 00-DOM-FLOOR PLANS
01-AE-101 01-BASEMENT & FIRST FLOOR LIFE SAFETY PLAN
01-AE-102 01-SECOND & THIRD FLOOR LIFE SAFETY PLANS
01-AE-200 01-BASEMENT FLOOR PLAN
01-AE-201 01-FIRST FLOOR PLAN
01-AE-202 01-SECOND FLOOR PLAN
01-AE-203 01-THIRD FLOOR PLAN
01-AE-204 01-ROOF PLAN AND ROOF DETAILS
01-AE-205 01-SLAB EDGE PLANS
01-AE-401 01-OVERALL ELEVATIONS
01-AE-402 01-ENLARGED ELEVATIONS
01-AE-501 01-WALL SECTIONS
01-AE-502 01-WALL SECTIONS
01-AE-503 01-SECTION DETAILS
01-AE-504 01-SECTION DETAILS
01-AE-505 01-PLAN DETAILS
01-AE-601 01-TR ELEVATIONS
01-AE-602 01-TR ELEVATIONS
01-AE-801 01-STAIR SECTIONS
01-AE-802 01-STAIR DETAILS
02-AE-200 02-FLOOR PLANS
02-AE-601 02-ENLARGED TR PLANS & INTERIOR ELEVATIONS
03-AE-201 03-BASEMENT, FIRST, AND SECOND FLOOR PLANS
03-AE-202 03-TR PLANS AND ELEVATIONS
04-AE-200 04-BASEMENT, FIRST, & SECOND FLOOR PLANS
05-AE-201 05-BASEMENT, FIRST. & SECOND FLOOR PLANS
05-AE-601 05-ENLARGED TR & ELEVATIONS
06-AE-200 06-BASEMENT, FIRST, & SECOND FLOOR PLANS
06-AE-601 ENLARGED TR PLANS & ELEVATIONS
07-AE-200 07-BASEMENT, FIRST, & SECOND FLOOR PLANS
07-AE-201 07- ENLARGED TR PLANS & ELEVATIONS
08-AE-200 08-BASEMENT, FIRST, AND SECOND FLOOR PLANS
08-AE-201 08-ENLARGED TR PLANS AND INTERIOR ELEVATIONS
09-AE-201 09-FLOOR & ROOF PLANS
10-AE-200 10-FLOOR PLANS
11-AE-200 11-GROUND, FIRST, AND SECOND FLOOR PLANS
11-AE-301 11-ENLARGED PLANS & INT ELEVATIONS
11-AE-501 11-EXTERIOR SECTIONS AND ELEVATIONS
SHEET NO. SHEET NAME
01-AD-201 01-BASEMENT & FIRST FLOOR DEMOLITION PLANS
01-AD-202 01-SECOND AND THIRD FLOOR DEMOLITION PLANS
02-AD-201 02-DEMOLITION PLANS
03-AD-201 03-DEMOLITION FLOOR PLANS
04-AD-201 BUILDING 4 DEMOLITION FLOOR PLANS
05-AD-201 05-DEMOLITION FLOOR PLANS
06-AD-201 06-DEMOLITION PLANS
07-AD-201 07-DEMOLITION FLOOR PLANS
08-AD-201 08-DEMOLITION FLOOR PLANS
10-AD-201 DEMOLITION FLOOR PLANS
11-AD-201 11-DEMOLITION PLANS
12-AD-201A 12-DEMOLITION BASEMENT FLOOR ENLARGED PLAN SECTOR A
12-AD-201B 12-DEMOLITION BASEMENT FLOOR ENLARGED PLAN SECTOR D
12-AD-202A 12-DEMOLITION GROUND FLOOR ENLARGED PLAN SECTOR A
12-AD-202BCD 12-DEMOLITION GROUND FLOOR ENLARGED PLAN SECTORS B, C, AND D
12-AD-203 12-DEMOLITION FIRST FLOOR ENLARGED PLAN SECTOR A
12-AD-204 12-DEMOLITION SECOND FLOOR ENLARGED PLAN SECTOR A
12-AD-205D 12-DEMOLITION THIRD FLOOR ENLARGED PLAN SECTORS B, C, AND D
12-AD-206 12-DEMOLTION FOURTH FLOOR ENLARGED PLAN SECTOR D
14-AD-201 14- DEMOLITION FLOOR PLANS
53-AD-201 53-DEMOLITION FLOOR PLANS
65-AD-201 65-DEMOLITION PLAN
66-AD-201 66-FIRST FLOOR DEMOLITION PLAN
END OF VOLUME 4
END OF VOLUME 3
SHEET NO. SHEET NAME
CI0001 GENERAL NOTES
RC0001 EXISTING CONDITIONS PLAN
CS0001 SECONDARY FIBER OPTICS SITE PLAN
CU0100 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0101 SECONDARY FIBER OPTICS PLAN AND PROFILE
CG0100 BUILDING 1 TELECOM GRADING PLAN
CG0101 BUILDING 1 TELECOM EROSION CONTROL PLAN
CG0200 BUILDING 66 TELECOM GRADING PLAN
CG0300 BUILDING 11 TELECOM GRADING PLAN
CJ0001 DETAILS
CJ0002 DETAILS
CJ0003 DETAILS
SHEET NO. SHEET NAME
00-SN-001 STRUCTURAL NOTES
00-SN-002 STRUCTURAL NOTES
01-SF-100 01- PLANS
01-SD-100 DETAILS
01-SD-101 DETAILS
01-SD-102 DETAILS
11-SF-100 11 - PLANS
11-SD-100 DETAILS
66-SF-100 66 - PLANS
66-SD-100 DETAILS
TELECOMMUNICATIONS
ARCHITECTURAL - NEW CONSTRUCTION (CONTINUED)
END OF VOLUME 1
VOLUME 2
SHEET NO. SHEET NAME
001-TN-0B1 TELECOM REMODEL PLAN -BLDG 1 BASEMENT
001-TN-0B1.1 TELECOM DISTANCE ASSESMENT -BLDG 1 BASEMENT
001-TN-011 TELECOM REMODEL PLAN -BLDG 1 FIRST FLOOR
001-TN-021 TELECOM REMODEL PLAN -BLDG 1 SECOND FLOOR
001-TN-031 TELECOM REMODEL PLAN -BLDG 1 THIRD FLOOR
002-TN-0B1 TELECOM REMODEL PLAN -BLDG 2 SUB-BASEMENT/BASEMENT
002-TN-0B1.1 TELECOM DISTANCE ASSESMENT -BLDG 2 BASEMENT
002-TN-011 TELECOM REMODEL PLAN -BLDG 2 FIRST & SECOND FLOORS
002-TN-021.1 TELECOM DISTANCE ASSESMENT -BLDG 2 SECOND FLOOR
003-TN-0B1 TELECOM REMODEL PLAN -BLDG 3 FLOOR LAYOUTS
003-TN-0B1.1 TELECOM DISTANCE ASSESMENT -BLDG 3 FIRST FLOOR
005-TN-011 TELECOM REMODEL PLAN -BLDG 5
005-TN-011.1 TELECOM DISTANCE ASSESMENT -BLDG 5 SECOND FLOOR
006-TN-0B1 TELECOM REMODEL PLANS -BLDG 6
006-TN-011.1 TELECOM DISTANCE ASSESMENT -BLDG 6 FIRST FLOOR
007-TN-B1 TELECOM REMODEL PLAN -BLDG 7 BASEMENT
007-TN-011.1 TELECOM DISTANCE ASSESMENT -BLDG 7 FIRST FLOOR
008-TN-B1 TELECOM REMODEL PLAN -BLDG 8 BASEMENT
008-TN-011 TELECOM DISTANCE ASSESMENT -BLDG 8 FIRST & SECOND FLOOR
008-TN-011.1 TELECOM DISTANCE ASSESMENT -BLDG 8
009-TN-B1 TELECOM REMODEL PLAN -BLDG 9
010-TN-001 TELECOM REMODEL PLAN -BLDG 10
011-TN-0B1 TELECOM REMODEL PLAN -BLDG 11
011-TN-0B1.1 TELECOM DISTANCE ASSESMENT -BLDG 11 BASEMENT
012-TJ-0B1A TELECOM REMODEL PLAN -BLDG 12 BASEMENT A ENLARGED
012-TJ-0B1C TELECOM REMODEL PLAN -BLDG 12 BASEMENT C/D ENLARGED
012-TJ-001A TELECOM REMODEL PLAN -BLDG 12 GROUND A ENLARGED
012-TJ-001B TELECOM REMODEL PLAN -BLDG 12 GROUND B ENLARGED
012-TJ-001C TELECOM REMODEL PLAN -BLDG 12 GROUND C/D ENLARGED
012-TJ-011A TELECOM REMODEL PLAN -BLDG 12 FIRST FLOOR A ENLARGED
012-TJ-011B TELECOM REMODEL PLAN -BLDG 12 FIRST FLOOR B ENLARGED
012-TJ-011C TELECOM REMODEL PLAN -BLDG 12 FIRST FLOOR C/D ENLARGED
012-TJ-021A TELECOM REMODEL PLAN -BLDG 12 SECOND FLOOR A ENLARGED
012-TJ-021B TELECOM REMODEL PLAN -BLDG 12 SECOND FLOOR B ENLARGED
012-TJ-021C TELECOM REMODEL PLAN -BLDG 12 SECOND FLR C/D ENLARGED
012-TJ-031B TELECOM REMODEL PLAN -BLDG 12 THIRD FLOOR B ENLARGED
012-TJ-031C TELECOM REMODEL PLAN -BLDG 12 THIRD FLOOR C/D ENLARGED
012-TN-0B1 TELECOM REMODEL PLAN -BLDG 12 BASEMENT
012-TN-0B1.1 TELECOM DISTANCE ASSESMENT -BLDG 12 BASEMENT
012-TN-001 TELECOM REMODEL PLAN -BLDG 12 GROUND
012-TN-001.1 TELECOM DISTANCE ASSESSMENT -BLDG 12 GND FLR
012-TN-001.2 TELECOM DISTANCE ASSESSMENT -BLDG 12 GND FLR
012-TN-001.3 TELECOM DISTANCE ASSESSMENT -BLDG 12 GND FLR
012-TN-011 TELECOM REMODEL PLAN -BLDG 12 FIRST FLOOR
012-TN-011.1 TELECOM DISTANCE ASSESSMENT -BLDG 12 1ST FLR
012-TN-011.2 TELECOM DISTANCE ASSESSMENT -BLDG 12 1ST FLR
012-TN-021 TELECOM REMODEL PLAN -BLDG 12 SECOND FLOOR
012-TN-021.1 TELECOM DISTANCE ASSESSMENT -BLDG 12 2ND FLR
012-TN-031 TELECOM REMODEL PLAN -BLDG 12 THIRD FLOOR
012-TN-031.1 TELECOM DISTANCE ASSESSMENT -BLDG 12 3RD FLR
012-TN-041 TELECOM REMODEL PLAN -BLDG 12 FOURTH FLOOR
012-TN-041.1 TELECOM DISTANCE ASSESSMENT -BLDG 12 4TH FLR
013-TN-011 TELECOM REMODEL PLAN -BLDG 13 FIRST FLOOR
014-TN-0G1 TELECOM REMODEL PLAN -BLDG 14
014-TN-0G1.1 TELECOM DISTANCE ASSESMENT -BLDG 14 FIRST FLOOR
017-TN-011 TELECOM REMODEL PLAN -BLDG 17 FIRST FLOOR
017-TN-011.1 TELECOM DISTANCE ASSESMENT -BLDG 17 FIRST FLOOR
018-TN-011 TELECOM REMODEL PLAN -BLDG 18
018-TN-011.1 TELECOM DISTANCE ASSESMENT -BLDG 18
020-TN-011 TELECOM REMODEL PLAN -BLDG 20
020-TN-011.1 TELECOM DISTANCE ASSESMENT -BLDG 20
023-TN-0B1 TELECOM REMODEL PLAN -BLDG 23
023-TN-0B1.1 TELECOM DISTANCE ASSESSMENT -BLDG 23
029-TN-0B1 TELECOM REMODEL PLAN -BLDG 29
029-TN-0B1.1 TELECOM DIST ASSESSMENT-BLDG 29 BASEMENT
043-TN-011 TELECOM REMODEL PLAN -BLDG 43
043-TN-011.1 TELECOM DISTANCE ASSESSMENT -BLDG 43
053-TN-0B1 TELECOM REMODEL PLAN -BLDG 53
053-TN-021.1 TELECOM DISTANCE ASSESSMENT -BLDG 53
065-TN-011 TELECOM REMODEL PLAN -BLDG 65
065-TN-011.1 TELECOM DISTANCE ASSESSMENT -BLDG 65
065-TN-012 ENLARGED TELECOM REMODEL PLAN -ROOM 109
065-TN-012.1 VA MCR DETAILS
065-TN-012.2 VA MCR DETAILS
065-TN-012.3 VA MCR DETAILS
066-TN-011 TELECOM REMODEL PLAN -BLDG 66
066-TN-011.1 TELECOM DISTANCE ASSESMENT -BLDG 66
SHEET NO. SHEET NAME
00-GI-000.3 COVER SHEET VOLUME 3
00-GI-001 INDEX OF DRAWINGS
001-ED-0B1 ELECTRICAL DEMOLITION PLAN -BLDG 1 BASEMENT & 1ST FLOOR
001-ED-021 ELECTRICAL DEMOLITION PLAN -BLDG 1 SECOND & THIRD FLOOR
002-ED-0B1 ELECTRICAL DEMOLITION PLAN -BLDG 2 BASEMENT
002-ED-021 ELECTRICAL DEMOLITION PLAN -BLDG 2 SECOND FLOOR
003-ED-0B1 ELECTRICAL DEMOLITION PLAN -BLDG 3
004-ED-0B1 ELECTRICAL DEMO PLAN -BLDG 4 LAYOUTS
004-ED-0B2 ELECTRICAL DEMOLITION PLAN -BLDG 4 ENLARGED PLANS
005-ED-021 ELECTRICAL DEMOLITION PLAN -BLDG 5 SECOND FLOOR
006-ED-0B1 ELECTRICAL DEMOLITION PLANS -BLDG 6
006-ED-0B2 ENLARGED ELECTRICAL DEMOLITION PLANS -BLDG 6
007-ED-0B1 ELECTRICAL DEMOLITION PLANS - BLDG 7
008-ED-011 ELECTRICAL DEMOLITION PLAN - BLDG 8 FIRST FLOOR
011-ED-0B1 ELECTRICAL DEMOLITION PLAN -BLDG 11
012-ED-0B1 ELECTRICAL DEMOLITION -BLDG 12 BASEMENT
012-ED-0B1D ELECTRICAL DEMOLITION -BLDG 12 BASEMENT C/D
012-ED-001 ELECTRICAL DEMOLITION -BLDG 12 GROUND FLOOR
012-ED-001A ELECTRICAL DEMO -BLDG 12 GROUND A ENLARGED
012-ED-001D ELECTRICAL DEMO -BLDG 12 GROUND C/D ENLARGED
012-ED-011 ELECTRICAL DEMOLITION PLAN -BLDG 12 FIRST FLOOR
012-ED-011A ELECTRICAL DEMO -BLDG 12 FIRST FLOOR A ENLARGED
012-ED-011D ELECTRICAL DEMO -BLDG 12 FIRST FLOOR C/D ENLARGED
012-ED-021 ELECTRICAL DEMOLITION PLAN -BLDG 12 SECOND FLOOR
012-ED-021D ELECTRICAL DEMO -BLDG 12 SECOND FLOOR C/D ENLARGED
012-ED-031 ELECTRICAL DEMOLITION PLAN -BLDG 12 THIRD FLOOR
012-ED-031B ELECTRICAL DEMO PLAN -BLDG 12 THIRD FLOOR ENLARGED
012-ED-041 ELECTRICAL DEMO PLAN -BLDG 12 FOURTH FLOOR
013-ED-011 ELECTRICAL DEMOLITION PLAN -BLDG 13 FIRST FLOOR
014-ED-0G1 ELECTRICAL DEMOLITION PLAN -BLDG 14
017-ED-011 ELECTRICAL DEMOLITION PLAN -BLDG 17 FIRST FLOOR
018-ED-011 ELECTRICAL DEMOLITION PLAN -BLDG 18
020-ED-011 ELECTRICAL DEMOLITION PLAN -BLDG 20
023-ED-0B1 ELECTRICAL DEMOLITION PLAN -BLDG 23
029-ED-0B1 ELECTRICAL DEMOLITION PLAN -BLDG 29
043-ED-011 ELECTRICAL DEMOLITION PLAN -BLDG 43
053-ED-0B1 ELECTRICAL DEMOLITION PLAN -BLDG 53
065-ED-011 ELECTRICAL DEMOLITION PLAN -BLDG 65
065-ED-012 ENLARGED ELECTRICAL DEMOLITION PLAN -ROOM 109
065-ED-013 ENLARGED LIGHTING DEMOLITION PLAN -ROOM 109
ELECTRICAL
VOLUME 4
SHEET NO. SHEET NAME
00-GI-000.3 COVER SHEET VOLUME 3
00-GI-001 INDEX OF DRAWINGS
001-TD-0B1 TELECOM DEMOLITION PLAN -BLDG 1 BASEMENT
001-TD-011 TELECOM DEMOLITION PLAN -BLDG 1 FIRST FLOOR
001-TD-021 TELECOM DEMOLITION PLAN -BLDG 1 SECOND FLOOR
001-TD-031 TELECOM DEMOLITION PLAN -BLDG 1 THIRD FLOOR
002-TD-0B1 TELECOM DEMO PLAN -BLDG 2 SUB-BASEMENT/BASEMENT
002-TD-011 TELECOM DEMOLITION PLAN -BLDG 2 FIRST & SECOND FLOORS
003-TD-0B1 TELECOM DEMOLITION PLAN -BLDG 3 FLOOR LAYOUTS
005-TD-011 TELECOM DEMOLITION PLAN -BLDG 5
006-TD-0B1 TELECOM DEMOLITION PLANS -BLDG 6
006-TD-011 TELECOM DEMOLITION PLAN -BLDG 6 FIRST FLOOR
007-TD-0B1 TELECOM DEMOLITION PLAN -BLDG 7
007-TD-011 ENLARGED TELECOM DEMOLITION PLAN -BLDG 7
008-TD-0B1 TELECOM DEMOLITION PLAN -BLDG 8 BASEMENT
008-TD-011 TELECOM DEMOLITION PLAN -BLDG 8 FIRST & SECOND FLOOR
009-TD-0B1 TELECOM DEMOLITION PLAN -BLDG 9
010-TD-001 TELECOM DEMOLITION PLAN -BLDG 10
011-TD-0B1 TELECOM DEMOLITION PLAN -BLDG 11
012-TD-0B1 TELECOM DEMOLITION PLAN -BLDG 12 BASEMENT
012-TD-0B1A TELECOM DEMO -BLDG 12 BASEMENT A ENLARGED
012-TD-0B1C FILE A TELECOM DEMO -BLDG 12 BASEMENT C/D ENLARGED
012-TD-001 TELECOM DEMOLITION PLAN -BLDG 12 GROUND
012-TD-001A TELECOM DEMO PLAN -BLDG 12 GROUND A ENLARGED
012-TD-001B TELECOM DEMO PLAN -BLDG 12 GROUND B ENLARGED
012-TD-001C TELECOM DEMO PLAN-BLDG 12 GROUND C/D ENLARGED
012-TD-011 TELECOM DEMOLITION PLAN -BLDG 12 FIRST FLOOR
012-TD-011A TELECOM DEMO PLAN -BLDG 12 FIRST FLOOR A ENLARGED
012-TD-011B TELECOM DEMO PLAN -BLDG 12 FIRST FLOOR B ENLARGED
012-TD-011C TELECOM DEMO PLAN -BLDG 12 FIRST FLOOR C/D ENLARGED
012-TD-021 TELECOM DEMOLITION PLAN -BLDG 12 SECOND FLOOR
012-TD-021A TELECOM DEMO PLAN -BLDG 12 SECOND FLOOR A ENLARGED
012-TD-021B TELECOM DEMO PLAN -BLDG 12 SECOND FLOOR B ENLARGED
012-TD-021C TELECOM DEMO PLAN -BLDG 12 SECOND FLOOR C/D ENLARGED
012-TD-031 TELECOM DEMOLITION PLAN -BLDG 12 THIRD FLOOR
012-TD-031B TELECOM DEMO PLAN -BLDG 12 THIRD FLOOR B ENLARGED
012-TD-031C TELECOM DEMO PLAN -BLDG 12 THIRD FLOOR C/D ENLARGED
012-TD-041 TELECOM DEMOLITION PLAN -BLDG 12 FOURTH FLOOR
013-TD-011 TELECOM DEMOLITION PLAN -BLDG 13 FIRST FLOOR
014-TD-0G1 TELECOM DEMOLITION PLAN -BLDG 14
017-TD-011 TELECOM DEMOLITION PLAN -BLDG 17 FIRST FLOOR
018-TD-011 TELECOM DEMOLITION PLAN -BLDG 18
020-TD-011 TELECOM DEMOLITION PLAN -BLDG 20
023-TD-0B1 TELECOM DEMOLITION PLAN -BLDG 23
029-TD-0B1 TELECOM DEMOLITION PLAN -BLDG 29
043-TD-011 TELECOM DEMOLITION PLAN -BLDG 43
053-TD-0B1 TELECOM DEMOLITION PLAN -BLDG 53
065-TD-011 TELECOM DEMOLITION PLAN -BLDG 65
065-TD-012 ENLARGED TELECOM DEMOLITION PLAN -ROOM 109
066-TD-011 TELECOM DEMOLITION PLAN -BLDG 66
SHEET NO. SHEET NAME
TJ-001 GENERAL TELECOM NOTES
TK-101 TELEPHONE BACKBONE CABLING PLAN
TK-102 TELECOM SCHEDULES
TK-103 VOICE GATEWAY 1 SCHEDULE
TK-104 VOICE GATEWAY 2 SCHEDULE
TK-105 VOICE GATEWAY 3 SCHEDULE
TK-106 TELECOM DUCTBANK AND MAN HOLE ONE LINE
TK-107 DUCT BANK SCHEDULE
TK-108 PATCH PANEL SCHEDULES
SHEET NO. SHEET NAME
MK-001 MECHANICAL GENERAL INFORMATION
MK-002 MECHANICAL SITE PLAN
MK-003 DETAILS
MK-004 MECHANICAL SCHEDULES
MK-005 MECHANICAL CONTROLS INFORMATION
001-MD-0B1 01-BASEMENT HVAC DEMOLITION PLANS
001-MD-011 01-FIRST FLOOR HVAC DEMOLITION PLANS
001-MD-021 01-SECOND FLOOR HVAC DEMOLITION PLANS
001-MD-031 01-THIRD FLOOR HVAC DEMOLITION PLANS
002-MD-0B1 02-BASEMENT HVAC DEMOLITION PLANS
003-MD-011 03-FIRST FLOOR HVAC DEMOLITION PLANS
004-MD-0B1 04-HVAC DEMOLITION FLOOR PLANS
004-MD-0B2 04-ENLARGED HVAC DEMOLITION PLANS
005-MD-021 05-SECOND FLOOR HVAC DEMOLITION PLANS
006-MD-011 06-FIRST FLOOR HVAC DEMOLITION PLANS
SHEET NO. SHEET NAME
00-GI-000.1 COVER SHEET VOLUME 1
00-GI-001 INDEX OF DRAWINGS
00-GI-002 PROJECT CODE SUMMARY
00-GI-003 GENERAL NOTES
00-GI-004 PROJECT SITE PLAN
00-GI-005 PROJECT ASSEMBLY TYPES
00-GI-006 DOOR SCHEDULE AND DETAILS
00-GI-007 PARTITION DETAILS
00-GI-008 FIRE PROTECTION
END OF VOLUME 2
Revisions: Date:
SHEET NO. SHEET NAME
00-HA-000.1 GENERAL NOTES & QUANTITIES FOR HAZARDS ABATEMENT PLANS
000-HA-0B1 00-BASEMENT & FIRST FLOOR HAZARDS ABATEMENT PLANS
001-HA-0B1 01-BASEMENT HAZARDS ABATEMENT PLANS
001-HA-011 01-FIRST FLOOR HAZARDS ABATEMENT PLANS
001-HA-021 01-SECOND FLOOR HAZARDS ABATEMENT PLANS
001-HA-031 01-THIRD FLOOR HAZARDS ABATEMENT PLANS
002-HA-0B1 02-BASEMENT & SUB-BASEMENT HAZARDS ABATEMENT PLANS
002-HA-011 02-FIRST & SECOND FLOOR HAZARDS ABATEMENT PLANS
003-HA-0B1 03-BUILDING 03 HAZARDS ABATEMENT PLANS
004-HA-0B1 04-BUILDING 04 HAZARDS ABATEMENT PLANS
005-HA-0B1 05-BUILDING 05 HAZARDS ABATEMENT PLANS
006-HA-0B1 06-BUILDING 06 HAZARDS ABATEMENT PLANS
007-HA-0B1 07-BUILDING 07 HAZARDS ABATEMENT PLANS
008-HA-0B1 08-BUILDING 08 HAZARDS ABATEMENT PLANS
009-HA-0B1 09-BUILDING 09 HAZARDS ABATEMENT PLANS
010-HA-0B1 10-BUILDING 10 HAZARDS ABATEMENT PLANS
011-HA-0B1 11-BUILDING 11 HAZARDS ABATEMENT PLANS
012-HA-0BA 12-BASEMENT HAZARDS ABATEMENT PLANS
012-HA-0BD 12-BASEMENT SECTOR D HAZARDS ABATEMENT PLANS
012-HA-0GA 12-GROUND FLOOR SECTOR A HAZARDS ABATEMENT PLANS
012-HA-0GB 01-BASEMENT & FIRST FLOOR HAZARDS ABATEMENT PLANS
012-HA-0GCD 12-GROUND FLOOR SECTORS C&D HAZARDS ABATEMENT PLANS
012-HA-01A 12-FIRST FLOOR SECTOR A HAZARDS ABATEMENT PLANS
012-HA-01B 12-FIRST FLOOR SECTOR B HAZARDS ABATEMENT PLANS
012-HA-01CD 12-FIRST FLOOR SECTORS C&D HAZARDS ABATEMENT PLANS
012-HA-02A 12-SECOND FLOOR SECTOR A HAZARDS ABATEMENT PLANS
012-HA-02B 12-SECOND FLOOR SECTOR B HAZARDS ABATEMENT PLANS
012-HA-02CD 12-SECOND FLOOR SECTORS C&D HAZARDS ABATEMENT PLANS
012-HA-03BCD 12-THIRD FLOOR HAZARDS ABATEMENT PLANS
012-HA-04 12-FOURTH FLOOR HAZARDS ABATEMENT PLANS
013-HA-011 13-BUILDING 13 HAZARDS ABATEMENT PLANS
014-HA-0G1 14-BUILDING 14 HAZARDS ABATEMENT PLANS
017-HA-011 14-BUILDING 14 HAZARDS ABATEMENT PLANS
018-HA-011 01-BASEMENT & FIRST FLOOR HAZARDS ABATEMENT PLANS
020-HA-0B1 20-BUILDING 20 HAZARDS ABATEMENT PLANS
023-HA-0B1 23-BUILDING 23 HAZARDS ABATEMENT PLANS
029-HA-0B1 29-BUILDING 29 HAZARDS ABATEMENT PLANS
043-HA-011 43-BUILDING 43 HAZARDS ABATEMENT PLANS
053-HA-0G1 53-BUILDING 53 HAZARDS ABATEMENT PLANS
065-HA-011 65-BUILDING 65 HAZARDS ABATEMENT PLANS
066-HA-011 66-BUILDING 66 HAZARDS ABATEMENT PLANS
GENERAL
SHEET NO. SHEET NAME
007-MD-011 07-FIRST FLOOR HVAC DEMOLITION PLANS
008-MD-011 08-FIRST FLOOR HVAC DEMOLITION PLANS
010-MD-0B1 10-BASEMENT HVAC DEMOLITION PLANS
011-MD-001 11-GROUND FLOOR HVAC DEMOLITION PLANS
012-MD-0B1 12-BASEMENT HVAC DEMOLITION PLANS - SECTOR A
012-MD-001 12-GROUND FLOOR HVAC DEMOLITION PLANS - SECTOR C/D
012-MD-011 12-FIRST FLOOR HVAC DEMOLITION PLANS - SECTOR A
012-MD-012 12-FIRST FLOOR HVAC DEMOLITION PLANS - SECTOR C/D
012-MD-021 12-SECOND FLOOR HVAC DEMOLITION PLANS - SECTOR C/D
012-MD-031 12-THIRD FLOOR HVAC DEMOLITION PLANS - SECTOR C/D
012-MD-041 12-FOURTH FLOOR HVAC DEMOLITION PLANS - SECTOR C/D
014-MD-001 14-GROUND FLOOR HVAC DEMOLITION PLANS
018-MD-011 18-FIRST FLOOR HVAC DEMOLITION PLANS
023-MD-0B1 23-BASEMENT HVAC DEMOLITION PLANS
053-MD-011 53-FIRST FLOOR HVAC DEMOLITION PLANS
065-MD-011 65-FIRST FLOOR HVAC DEMOLITION PLANS
001-MH-0B1 01-BASEMENT HVAC PLANS
001-MH-011 01-FIRST FLOOR HVAC PLANS
001-MH-021 01-SECOND FLOOR HVAC PLANS
001-MH-031 01-THIRD FLOOR HVAC PLANS
001-MH-041 01-ROOF HVAC PLANS
002-MH-0B1 02-BASEMENT HVAC PLANS
002-MH-021 02-SECOND FLOOR AND ROOF HVAC PLANS
003-MH-0B1 03-BASEMENT AND FIRST FLOOR HVAC PLANS
004-MH-0B1 04-HVAC FLOOR PLANS
004-MH-0B2 04-ENLARGED HVAC PLANS
005-MH-0B1 05-BASEMENT AND SECOND FLOOR HVAC PLANS
006-MH-0B1 06-BASEMENT AND FIRST FLOOR HVAC PLANS
007-MH-011 07-FIRST FLOOR HVAC PLANS
008-MH-011 08-FIRST FLOOR HVAC PLANS
010-MH-0B1 10-BASEMENT HVAC PLANS
011-MH-001 11-GROUND FLOOR HVAC PLANS
012-MH-0B1 12-BASEMENT HVAC PLANS - SECTOR A
012-MH-001 12-GROUND FLOOR HVAC PLANS - SECTOR A
012-MH-002 12-GROUND FLOOR HVAC PLANS - SECTOR C/D
012-MH-011 12-FIRST FLOOR HVAC PLANS - SECTOR A
012-MH-012 12-FIRST FLOOR HVAC PLANS - SECTOR C/D
012-MH-021 12-SECOND FLOOR HVAC PLANS - SECTOR A
012-MH-022 12-SECOND FLOOR HVAC PLANS - SECTOR C/D
012-MH-031 12-THIRD FLOOR HVAC PLANS - SECTOR C/D
012-MH-041 12-FOURTH FLOOR AND ROOF HVAC PLANS - SECTOR C/D
014-MH-001 14-GROUND FLOOR HVAC PLANS
018-MH-011 18-FIRST FLOOR AND MEZZANINE HVAC PLANS
023-MH-011 23-BASEMENT AND FIRST FLOOR HVAC PLANS
053-MH-011 53-FIRST FLOOR AND ROOF HVAC PLANS
065-MH-011 65-FIRST FLOOR HVAC PLANS
066-MH-011 66-FIRST FLOOR HVAC PLANS
SHEET NO. SHEET NAME
TK-109 PATCH PANEL SCHEDULES
TK-110 PATCH PANEL SCHEDULES
TK-111 PATCH PANEL SCHEDULES
TK-112 PATCH PANEL SCHEDULES
TK-113 PATCH PANEL SCHEDULES
TK-114 PATCH PANEL SCHEDULES
TK-115 PATCH PANEL SCHEDULES
TK-116 PATCH PANEL SCHEDULES
TK-117 PATCH PANEL SCHEDULES
TK-118 PATCH PANEL SCHEDULES
TK-119 PATCH PANEL SCHEDULES
TK-120 PATCH PANEL SCHEDULES
TK-121 PATCH PANEL SCHEDULES
TK-122 PATCH PANEL SCHEDULES
TK-123 PATCH PANEL SCHEDULES
TK-124 PATCH PANEL SCHEDULES
TK-125 PATCH PANEL SCHEDULES
TK-126 TELECOM GROUNDING DETAILS
TK-127 TELECOM GROUNDING DETAILS
TK-128 FIBER SITE REMODEL ONE LINE -PRIMARY PATHWAYS
TK-129 FIBER SITE REMODEL ONE LINE -SECONDARY PATHWAYS
TK-130 ANALOG SITE REMODEL
TK-131 TELECOM RACK BONDING DETAILS
TK-132 TELECOM RACK BONDING DETAILS
TK-133 TELECOM RACK BONDING DETAILS
TK-134 TELECOM DETAILS
TK-135 NEW PATCH PANEL SCHEDULE -BLDG 1
TK-136 NEW PATCH PANEL SCHEDULE -BLDG 1 & 2
TK-137 NEW PATCH PANEL SCHEDULE -BLDG 3 & 5
TK-138 NEW PATCH PANEL SCHEDULE -BLDG 6, 7, 8, & 11
TK-139 NEW PATCH PANEL SCHEDULE -BLDG 12
TK-140 NEW PATCH PANEL SCHEDULE -BLDG 12
TK-141 NEW PATCH PANEL SCHEDULE -BLDG 12
TK-142 NEW PATCH PANEL SCHEDULE -BLDG 12
TK-143 NEW PATCH PANEL SCHEDULE -BLDG 12
TK-144 NEW PATCH PANEL SCHEDULE -BLDG 14, 17, 18, 20, 23, 29 & 43
TK-145 NEW PATCH PANEL SCHEDULE -BLDG 53, 65 & 66
TS-001 TELECOM SITE PLAN
TS-002 EXISTING BLOW IN FIBER SITE PLAN
VOLUME 2 - CONTINUED VOLUME 3 - CONTINUED
MECHANICAL
SHEET NO. SHEET NAME
00-GI-000.2 COVER SHEET VOLUME 2
00-GI-001 INDEX OF DRAWINGS
HAZARD ABATEMENT
#9071 05/02/2022
S T A T E O F S O U T H D A K O T A
A H
ERA
PRO J EC T DES I G
N E
R
Christopher T. Ottosen
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
C :\U se rs
\C hr is \O ne D riv e
- H
TR
W L
LC
\H
TR
W
\P ro je ct s\
\2
2-
-H ot S pr in gs S ou th
D ak ot a
VA
E
H R
M \C
AD
\D es ig n\
-0
1- H
A.
dw g 5/
2/
:1 9:
P
M
00-HA-000.1
EHRM INFRASTRUCTURE
UPGRADES
HOT SPRINGS, SOUTH DAKOTA
568A4-21-702
Project Director
CTOCTO02/23/2022
100% CD FINAL SOLUTION
FULLY SPRINKLERED
Revisions: Date:
HTRW, LLC
HAZARDOUS BUILDING MATERIALS CONSULTING
11471 BUSINESS BLVD., #773442, EAGLE RIVER, AK 99577
(907) 917-3801 · (917) 203-7517 (FAX) · CONTACT@HTRW-LLC.COM
HTRW, LLC
TOXIC
RADIOACTIVE
GDM
1000 W STEUBEN STR, UNIT 3
BINGEN,WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
GENERAL NOTES
1. THE WORK OF THE ELECTRONIC HEALTH RECORDS MODERNIZATION INFRASTRUCTURE UPGRADES PROJECT IS SCHEDULED TO
DISTURB "COMMON HAZARDOUS BUILDING MATERIALS". "COMMON HAZARDOUS BUILDING MATERIALS" IS INTENDED TO INCLUDE ASBESTOS-CONTAINING MATERIALS, LEAD-CONTAINING MATERIALS, MERCURY-CONTAINING MATERIALS, PCB-CONTAINING LIGHT BALLASTS, OZONE DEPLETING SUBSTANCES (ODS), AND MATERIALS WITH RADIOACTIVE COMPONENTS. OTHER HEALTH, SAFETY, AND ENVIRONMENTAL HAZARDS MAY BE PRESENT AT THIS SITE AND ARE ADDRESSED ELSEWHERE IN THE CONTRACT DOCUMENTS. THE PRIMARY INTENT OF THE HAZARDS ABATEMENT PORTION OF THE WORK IS TO SATISFY THE HEALTH, SAFETY, AND ENVIRONMENTAL REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION, HOWEVER, THE HAZARDS ABATEMENT DRAWINGS AND SPECIFICATIONS
MAY INCLUDE MORE STRINGENT REQUIREMENTS.
2. THE HAZARDS ABATEMENT DRAWINGS ARE INTENDED TO PROVIDE INFORMATION ON WHICH "COMMON HAZARDOUS BUILDING MATERIALS" WILL BE DISTURBED, WHERE THOSE MATERIALS ARE LOCATED, AND THE ESTIMATED QUANTITIES OF THOSE MATERIALS TO BE REMOVED. THE EXACT EXTENT OF THE HAZARDS ABATEMENT PORTION OF THE WORK MAY VARY ON THE CONTRACTOR'S CHOICE OF MEANS AND METHODS TO COMPLETE THE WORK, HOWEVER, IF ADDITIONAL QUANTITIES OF MATERIALS REQUIRE REMOVAL DUE TO THE CONTRACTOR'S CHOICE OF MEANS AND METHODS, THAT WORK SHALL COME AT NO ADDITIONAL COST TO THE OWNER. THE CONTENT OF THE HAZARDS ABATEMENT DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE A BASELINE FOR BIDDING PURPOSES ONLY, AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONDUCT ALL HAZARDS ABATEMENT WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND LAWS OF THE AUTHORITY HAVING JURISDICTION.
3. ALL CONTRACTORS AND SUBCONTRACTORS WORKING AT THIS SITE MUST REVIEW THE HAZARDOUS MATERIALS ASSESSMENT AND HAZARDS ABATEMENT DRAWINGS AND SPECIFICATIONS TO FAMILIARIZE THEMSELVES WITH THE "COMMON HAZARDOUS BUILDING MATERIALS" PRESENT AT THE SITE AND HOW THOSE MATERIALS MAY AFFECT THEIR WORK. IT IS THE RESPONSIBILITY OF ALL TRADES TO COORDINATE THE WORK OF THIS PROJECT ACROSS ALL DISCIPLINES AND TO CONDUCT THEIR WORK WITHOUT DISTURBING THE VARIOUS "COMMON HAZARDOUS BUILDING MATERIALS" UNLESS THOSE PERSONNEL ARE QUALIFIED TO PERFORM SUCH WORK. IF ELEMENTS OF THE WORK CAN BE CONDUCTED WITHOUT DISTURBING THE VARIOUS "COMMON HAZARDOUS BUILDING MATERIALS", AND IF THAT WORK WOULD NOT RESULT IN ADDITIONAL COSTS TO THE OWNER TO AVOID THOSE "COMMON HAZARDOUS BUILDING MATERIALS", THEN THOSE MATERIALS SHALL BE AVOIDED. DUE TO THE POTENTIAL TO CONTACT ASBESTOS-CONTAINING MATERIALS THROUGHOUT THIS SITE, ALL PERSONNEL PERFORMING WORK AT THIS SITE ARE REQUIRED TO HAVE A MINIMUM OF "TWO-HOUR ASBESTOS AWARENESS" TRAINING. ONLY PERSONNEL WHO ARE TRAINED AND STATE-ACCREDITED AS AN EPA WORKER OR EPA CONTRACTOR/SUPERVISOR ARE PERMITTED TO DISTURB ASBESTOS-CONTAINING MATERIALS.
4. THE HAZARDS ABATEMENT DRAWINGS DO NOT DEPICT NON-HAZARDOUS BUILDING MATERIALS-RELATED SCOPES OF WORK. THE LOCATIONS OF MATERIALS DEPICTED BY THE HAZARDS ABATEMENT DRAWINGS ARE SCHEMATIC REPRESENTATIONS ONLY, AND NOT ALL "COMMON HAZARDOUS BUILDING MATERIALS" ARE SHOWN BY THE HAZARDS ABATEMENT DRAWINGS. ALTHOUGH EVERY EFFORT WAS MADE TO IDENTIFY THE "COMMON HAZARDOUS BUILDING MATERIALS" IN THE PROJECT AREAS, SOME MATERIALS MAY NOT HAVE BEEN IDENTIFIED. THE "COMMON HAZARDOUS BUILDING MATERIALS" AT THIS SITE ARE TYPICALLY IN GOOD CONDITION, HOWEVER, ISOLATED AREAS OF "WEAR AND TEAR" DAMAGE ARE ASSUMED TO BE SCATTERED THROUGHOUT THE SITE.
ADDITIONALLY, IT IS ASSUMED THAT SOME DEBRIS FROM DAMAGED "COMMON HAZARDOUS BUILDING MATERIALS" MAY BE PRESENT ON TOP OF CEILINGS, ON ABOVE-CEILING COMPONENTS, IN CHASES, IN ENCLOSED OR OTHERWISE CONCEALED OR INACCESSIBLE AREAS, AND OTHER AREAS WHICH ARE NOT ROUTINELY CLEANED. THERE IS NO REQUIREMENT TO REMOVE PRE-EXISTING ASBESTOS-CONTAINING DUSTS OR DEBRIS OR CONTAMINATION FROM THE BUILDINGS UNLESS THE CONTRACTOR DETERMINES THAT TO BE A MORE COST-EFFECTIVE MEANS OF COMPLETING THE WORK OR IF THOSE MATERIALS ARE OTHERWISE AFFECTED BY THE
SCOPE OF WORK.
5. LEAD-CONTAINING MATERIALS ARE PRESENT THROUGHOUT THE SITE, INCLUDING ON ALL PAINTED SURFACES, GLAZED CERAMIC TILES OR FIXTURES, IN METALLIC FORM SUCH AS IN SOLDER, AND IN OTHER MISCELLANEOUS MATERIALS. THE LOCATIONS OF THESE MATERIALS ARE GENERALLY NOT SHOWN BY THE HAZARDS ABATEMENT DRAWINGS. DISTURBANCE OF LEAD-CONTAINING MATERIALS ARE SUBJECT TO REGULATION BY 29 CFR 1926.62, AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE “TRIGGER TASKS” AND OTHER REQUIREMENTS OF 29 CFR 1926.62 TO DETERMINE WHICH PORTIONS APPLY, IF ANY, TO EACH UNIQUE WORK TASK REQUIRED BY THIS PROJECT. SIMILARLY, ALL LEAD-CONTAINING WASTE STREAMS SHALL BE TCLP TESTED IN ACCORDANCE WITH 40 CFR 261 TO DETERMINE DISPOSAL REQUIREMENTS. ALTERNATIVELY, THE CONTRACTOR MAY ELECT TO HAVE THEIR DESIGNATED IH TECHNICIAN COLLECT BULK SAMPLES OF EACH AFFECTED PAINT TO DETERMINE IF “DETECTABLE LEVELS OF LEAD” ARE PRESENT IN THE PAINTS. ANY RESULTS WHICH INDICATE LEAD ABOVE THE LIMITS OF DETECTION SHALL BE CONSIDERED AS HAVING “DETECTABLE LEVELS OF LEAD” AND THEREFORE SUBJECT TO BOTH THE MONITORING AND TESTING REQUIREMENTS OF THIS
CONTRACT. THE MAXIMUM LIMIT OF DETECTION SHALL BE 60 PPM.
6. DUSTS THROUGHOUT THE BUILDINGS ARE ASSUMED TO CONTAIN MEASURABLE CONCENTRATIONS OF VARIOUS REGULATED AIR CONTAMINANTS, SUCH AS THOSE FOUND IN 29 CFR 1910.1000, AND IT IS THE CONTRACTORS RESPONSIBILITY TO ASSESS EACH WORK AREA TO DETERMINE WETHER ADDITIONAL WORKER OR SITE PROTECTION IS NEEDED TO ENSURE COMPLIANCE WITH THE REGULATIONS OF THE AUTHORITY HAVING JURISDICTION AND OTHER PERFORMANCE REQUIREMENTS OF THE CONTRACT.
7. ALL FINAL VISUAL INSPECTIONS AND MONITORING ARE TO BE PERFORMED BY THE DEPARTMENT OF VETERANS AFFAIRS
PROFESSIONAL INDUSTRIAL HYGIENIST IN ACCORDANCE WITH THE SPECIFICATIONS.
8. THE CONTRACTOR'S…