SF-33 Solicitation

View the file

Other files

File Type Posted
ATTACHMENT C_MANPOWER UTILIZATION MATRIX.docx DOCX document
ATTACHMENT G_SECTIONL.docx DOCX document
REACTS Questions - Round 2 xlsx.docx DOCX document
amendment0001.pdf PDF
ATTACHMENT A-REACTS PWS.DOCX DOCX document
ATTACHMENT B_Award Fee Eval Plan.docx DOCX document
ATTACHMENT E_PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
ATTACHMENT_A-PWS.pdf PDF
ATTACHMENT F_PERFORMANCE RISK ASSESSMENT QUESTIONNAIRE.docx DOCX document
ATTACHMENT D_PAST PERFORMANCE REFERENCE MATRIX.docx DOCX document
ATTACHMENT H_SECTIONM.docx DOCX document
ATTACHMENT G_SECTIONL.docx DOCX document
REACTS Questions and Responses.xlsx XLSX spreadsheet
ATTACHMENT C_MANPOWER UTILIZATION MATRIX.docx DOCX document
REACTS PWS.DOCX DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED

ORDER UNDER DPAS (15 CFR 700)

RATING

PAGE OF

PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

ED-ESE-10-R-0017

SEALED BID (IFB)

NEGOTIATED (RFP)

EDOESE-10-000026

EDOESE-10-000026

7. ISSUED BY CODE CPOB 8. ADDRESS OFFER TO (If other than Item 7)

US Department of Education Contracts & Acq Mgt/Group B, 550 12th St SW - 7th Floor Washington DC 20202-4240

US Department of Education Contracts & Acq Mgt/Group B, 550 12th St SW - 7th Floor Washington DC 20202-4240

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and 5 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in until 3:00

PM ET

local time APR 12, (Hour) (Date)

CAUTION - LATE Submissions, Modifications, and Withdrawls: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION CALL

A. NAME

Steven Gagnon

B. TELEPHONE (NO COLLECT CALLS)

steve.gagnon@ed.gov

C. E-MAIL ADDRESS

steve.gagnon@ed.gov

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGES(S) (X) SEC. DESCRIPTION PAGE(S)

PART 1 - THE SCHEDULE PART II - CONTRACT CLAUSES

X A SOLICITATION/CONTRACT FORM 1 - 1 X I CONTRACT CLAUSES 22 - 33

X B SUPPLIES OR SERVICES AND PRICES/COSTS 2 - 6 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

X C DESCRIPTION/SPECS./WORK STATEMENT 7 - 7 X J LIST OF ATTACHMENTS 34 - 34

X D PACKAGING AND MARKING 8 - 8 PART IV - PRESENTATIONS AND INSTRUCTIONS

X E INSPECTION AND ACCEPTANCE 9 - 9 X K REPRESENTATIONS, CERTIFICATIONS AND OTHER 35 - 40

X F DELIVERIES OR PERFORMANCE 10 - 10 STATEMENTS OF OFFERORS

X G CONTRACT ADMINISTRATION DATA 11 - 11 X L INSTRS., CONDS., AND NOTICES TO OFFERORS 41 - 49

X H SPECIAL CONTRACT REQUIREMENTS 12 - 21 X M EVALUATION FACTORS FOR AWARD 50 - 53

OFFER

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all itmes upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

14. ACKNOWLEDGMENT OF AMENDMENTS AMENDMENT NO. DATE AMENDMENT NO. DATE

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

15A. NAME AND

ADDRESS OF

OFFEROR

DUNS: (Type or print)

15B. TELEPHONE NUMBER

15C. CHECK IF REMITTANCE ADDRESS IS DIFFERENT FROM

ABOVE - ENTER SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

See Schedule

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C 23004(c) ( ) 41 U.S.C 253(c) ( ) 23. SUBMIT INVOICES TO ADDRESS SHOWN IN (4 copies unless otherwise specified)

ITEM

24. ADMINISTERED BY CODE 25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER(Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official writen notice. (Must be fully completed by offeror)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA - FAR (48 CFR) 53.214(c)

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Record Exchange Technical Assistance

1.00 SE

Table of Contents

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS

B. 1 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)

B. 2 301-10 PROVISION FOR PRICING AND PAYMENT (ALTERNATE I) (AUGUST 1985)

SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C. 1 302-2 SCOPE OF WORK (FEBRUARY 1985)

SECTION D PACKAGING AND MARKING

D. 1 303-1 SHIPMENT AND MARKING (MARCH 1986)

SECTION E INSPECTION AND ACCEPTANCE

E. 1 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

E. 2 304-1 INSPECTION AND ACCEPTANCE (FEBRUARY 1985)

SECTION F DELIVERIES OR PERFORMANCE

F. 1 305-2 REPORT OF CONSULTANTS (MARCH 1986)

F. 2 305-4 PERIOD OF PERFORMANCE (MARCH 1986)

F. 3 305-6 DELIVERABLES (MARCH 1986)

F. 4 305-8 DELIVERY SCHEDULE (MARCH 1986)

SECTION G CONTRACT ADMINISTRATION DATA

G. 1 306-1a INVOICE AND CONTRACT FINANCING REQUESTS SUBMISSION (ALTERNATE I) (JAN 2007)

G. 2 306-2 ADDITIONAL REQUIREMENTS FOR CONTROL OF GOVERNMENT PROPERTY (JANUARY 1989)

G. 3 306-5 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (FEB 2006)

G. 4 306-8 CONTRACT ADMINISTRATOR (FEB 1985)

G. 5 306-13 GOVERNMENT-FURNISHED PROPERTY (MARCH 1985)

SECTION H SPECIAL CONTRACT REQUIREMENTS

H. 1 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--CENTRAL CONTRACTOR REGISTRATION (OCT

2003)

H. 2 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (DEC 2008)

H. 3 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

H. 4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

H. 5 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2009)

H. 6 52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)

H. 7 52.237-3 CONTINUITY OF SERVICES (JAN 1991)

H. 8 52.239-1 PRIVACY OR SECURITY SAFEGUARDS (AUG 1996)

H. 9 301-20 PROHIBITION OF DISCRIMINATION AGAINST INDIVIDUALS WITH DISABILITIES (FEB 1995)

H. 10 307-2 KEY PERSONNEL DESIGNATION (MARCH 1985)

H. 11 307-3 DUAL COMPENSATION (MARCH 1985)

H. 12 307-5 PAYMENT OF TRAVEL EXPENSES AND FEES FOR ED EMPLOYEES (MARCH 1985)

H. 13 307-7a PUBLICATION AND AUDIO-VISUAL PRODUCTION (MAY 1997)

H. 14 307-8 PAYMENT OF PRINTING TO BE PERFORMED BY THE GOVERNMENT PRINTING OFFICE (APRIL 1992).. 17

H. 15 307-12 CONSENT TO SUBCONTRACT (AUGUST 1998)

H. 16 307-13 DEPARTMENT SECURITY REQUIREMENTS (JUNE 2006)

H. 17 307-14 COMPUTER SYSTEM DESIGN AND IMPLEMENTATION REQUIREMENTS (APRIL 1999)

H. 18 307-15 WITHHOLDING OF CONTRACT PAYMENTS - SECURITY (JUN 2006)

H. 19 307-17 CONFLICT OF INTEREST (AUG 2007)

H. 20 307-19 REDACTED PROPOSALS (DECEMBER 1998)

H. 21 307-24 CONSULTANT SERVICES AND CONSENT (APRIL 1986)

H. 22 316-1 ACCESSIBILITY OF SOFTWARE (OCTOBER 1999)

H. 23 3452.227-70 PUBLICATION AND PUBLICITY (AUG 1987)

SECTION I CONTRACT CLAUSES

I. 1 52.204-7 CENTRAL CONTRACTOR REGISTRATION (APR 2008)

I. 2 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2009)

I. 3 52.207-3 RIGHT OF FIRST REFUSAL OF EMPLOYMENT (MAY 20-06)

I. 4 52.209-6 PROTECTING THE GOVERNMENT´s INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (SEP 2006)

I. 5 52.215-17 WAIVER OF FACILITIES CAPITAL COST OF MONEY (OCT 1997)

I. 6 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (APR 2008)

I. 7 52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN 1999)

I. 8 52.222-3 CONVICT LABOR (JUN 2003)

I. 9 52.222-20 WALSH-HEALEY PUBLIC CONTRACTS ACT (DEC 1996)

I. 10 52.222-26 EQUAL OPPORTUNITY (MAR 2007)

I. 11 52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND

OTHER ELIGIBLE VETERANS. [SEP 2006]

I. 12 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (JUN 1998)

I. 13 52.222-37 EMPLOYMENT REPORTS ON SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND

OTHER ELIGIBLE VETERANS (SEP 2006)

I. 14 52.225-3 BUY AMERICAN ACT--FREE TRADE AGREEMENTS--ISRAELI TRADE ACT [JUN 2009]

I. 15 52.230-2 COST ACCOUNTING STANDARDS (OCT 2008)

I. 16 52.230-3 DISCLOSURE AND CONSISTENCY OF COST ACCOUNTING PRACTICES (OCT 2008)

I. 17 52.230-5 COST ACCOUNTING STANDARDS--EDUCATIONAL INSTITUTION (OCT 2008)

I. 18 52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS (MAR 2008)

I. 19 52.232-1 PAYMENTS (APR 1984)

I. 20 52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

I. 21 52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS (APR 1984)

I. 22 52.232-11 EXTRAS (APR 1984)

I. 23 52.232-23 ASSIGNMENT OF CLAIMS (JAN 1986)

I. 24 52.232-25 PROMPT PAYMENT (OCT 2008)

I. 25 52.233-1 DISPUTES (JUL 2002)

I. 26 52.233-1 I DISPUTES (JUL 2002)--ALTERNATE I (DEC 1991)

I. 27 52.233-3 PROTEST AFTER AWARD (AUG 1996)

I. 28 52.242-15 STOP-WORK ORDER (AUG 1989)

I. 29 52.243-1 I CHANGES--FIXED-PRICE (AUG 1987)--ALTERNATE I (APR 1984)

I. 30 52.247-29 F.O.B. ORIGIN (FEB 2006)

I. 31 52.247-34 F.O.B. DESTINATION (NOV 1991)

I. 32 52.248-1 VALUE ENGINEERING (FEB 2000)

I. 33 52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (SHORT FORM) (APR

1984)

I. 34 52.249-4 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (SERVICES) (SHORT FORM) (APR

1984)

I. 35 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

I. 36 3452.202-1 DEFINITIONS (AUG 1987)

I. 37 3452.227-71 PAPERWORK REDUCTION ACT (AUG 1987)

I. 38 3452.242-73 ACCESSIBILITY OF MEETINGS, CONFERENCES, AND SEMINARS TO PERSONS WITH

DISABILITIES

I. 39 52.203-7 ANTI-KICKBACK PROCEDURES (JUL 1995)

I. 40 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY

(JAN 1997)

I. 41 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (AUG 2000)

I. 42 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (DEC 2008)

I. 43 52.215-2 AUDIT AND RECORDS--NEGOTIATION (MAR 2009)

I. 44 52.215-14 INTEGRITY OF UNIT PRICES (OCT 1997)

I. 45 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2004)

I. 46 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

I. 47 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (MAY 2004)

I. 48 52.242-13 BANKRUPTCY (JUL 1995)

I. 49 52.244-2 I SUBCONTRACTS (JUN 2007)--ALTERNATE I (JUN 2007)

I. 50 52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)

I. 51 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

I. 52 52.249-14 EXCUSABLE DELAYS (APR 1984)

I. 53 3452.208-70 PRINTING (AUG 1987)

I. 54 52.252-2a CLAUSES INCORPORATED BY REFERENCE (MAY 2001)

SECTION J LIST OF ATTACHMENTS

J. 1 309-1a LIST OF ATTACHMENTS (APRIL 1984)

SECTION K REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

K. 1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2009)

K. 2 307-17a CONFLICT OF INTEREST CERTIFICATION (AUG 2007)

K. 3 310-1 REPRESENTATION AUTHORITY (JANUARY 2005)

K. 4 310-6 DUPLICATION OF COST (MARCH 1985)

K. 5 310-10 GENERAL FINANCIAL AND ORGANIZATIONAL INFORMATION (APRIL 1984)

K. 6 310-16 POST EMPLOYMENT CONFLICT OF INTEREST (MARCH 1985)

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L. 1 SECTION L # INSTRUCTIONS, CONDITIONS, AND NOTICES

SECTION M EVALUATION FACTORS FOR AWARD

M. 1 SECTION M - EVALUATION FACTORS FOR AWARD

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

B. 1 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)

(Reference 52.215-1)

B. 2 301-10 PROVISION FOR PRICING AND PAYMENT (ALTERNATE I) (AUGUST 1985)

The total fixed price of this contract is . Payment of that amount shall be made in accordance with the incorporated General Provision entitled "Payments" or "Payments under Fixed-Price Research and Development Contracts," whichever is applicable, and with any other supplementary payment scheme which may be otherwise negotiated and specified.

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C. 1 302-2 SCOPE OF WORK (FEBRUARY 1985)

The contractor shall furnish all personnel, materials, services, and facilities necessary to perform the requirements set forth in the Statement of Work, Attachment A . This shall also be done in accordance with the specified General and Special Provisions and the contractor's final technical proposal, which are hereby incorporated by reference as a part of the contract.

SECTION D

PACKAGING AND MARKING

D. 1 303-1 SHIPMENT AND MARKING (MARCH 1986)

(a) The contract number shall be placed on or adjacent to all exterior mailing or shipping labels of deliverable items called for by the contract. (b) Ship deliverable items to: COR and U.S.

Department of Education 550 12th Street SW, Room 7154, MS 4230, Washington, DC 20202 Attn: Steven Gagnon,CS (c) Mark deliverables for: COR and Steven Gagnon, CS

SECTION E

INSPECTION AND ACCEPTANCE

E. 1 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

(a) "Definitions." "Services," as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may--

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may--

(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

(2) Terminate the contract for default.

(End of Clause)

E. 2 304-1 INSPECTION AND ACCEPTANCE (FEBRUARY 1985)

Pursuant to the inspection clause, Section I, final inspection and acceptance of all contracted items shall be made by the Contracting Officer.

SECTION F

DELIVERIES OR PERFORMANCE

F. 1 305-2 REPORT OF CONSULTANTS (MARCH 1986)

The contractor must maintain a written report for the files on the results of all consultations charged to this contract. This report must include, at a minimum: (1) the consultant's name, dates, hours and amount charged to the contract, (2) the names of the contractor or subcontractor staff to whom the services are provided, and (3) the results of the subject matter of the consultations.

F. 2 305-4 PERIOD OF PERFORMANCE (MARCH 1986)

The period of performance shall be from 12 months base period from the time of award with three 12-months options. to , inclusive of all specified deliveries and/or task work.

F. 3 305-6 DELIVERABLES (MARCH 1986)

All deliverables shall be submitted in accordance with the kinds, quantities and dates indicated in the attached Statement of Work.

F. 4 305-8 DELIVERY SCHEDULE (MARCH 1986)

The following items shall be delivered under this contract: TBD at award

SECTION G

CONTRACT ADMINISTRATION DATA

G. 1 306-1a INVOICE AND CONTRACT FINANCING REQUESTS SUBMISSION (ALTERNATE I) (JAN 2007)

(A) Payments shall be rendered in accordance with the payments clause(s) of the incorporated contract clause section and with those otherwise specified rated or fixed price amounts. (B) The contractor shall submit invoices electronically as an attachment to a message to OCFOCAMINVOICING@ED.GOV.

The subject area of the message shall contain the invoice number, contract number, and contract specialist's name. The electronic copy of the invoice shall be in a format that is supported by Microsoft Office (Microsoft Word or Excel), or Adobe Acrobat (.pdf). (See Attachment C)

G. 2 306-2 ADDITIONAL REQUIREMENTS FOR CONTROL OF GOVERNMENT PROPERTY (JANUARY 1989)

(A) The contractor shall request written authorization from the contracting officer before acquiring any contractually necessary property to which the Government will have title. The request shall include complete descriptions of all individual items which will exceed $1,000 in cost, including: (a) a brief statement of function; (b) manufacturer and manufacturer's brand name, model or part number;

(c) vendor and its proposed price; (B) Management of government property in the possession of the contractor shall be in accordance with FAR Part 45. The contractor shall provide an annual report of total property acquisition cost, as required by FAR 45.505-14.

G. 3 306-5 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (FEB 2006)

(a) The Contracting Officer's Representative (COR) is responsible for the technical aspects of the project, technical liaison with the Contractor, and any other responsibilities that are specified in the contract. These responsibilities include inspecting all deliverables, including reports, and recommending acceptance or rejection to the Contracting Officer. (b) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor requests for changes shall be submitted in writing directly to the Contracting Officer or through the COR. No such changes shall be made without the written authorization of the Contracting Officer. (c) The COR's name and address: TBD at award The COR may be changed by the Government at any time, but notification of the change, including the name and address of the successor COR, will be provided to the Contractor by the Contracting Officer in writing.

G. 4 306-8 CONTRACT ADMINISTRATOR (FEB 1985)

The Contractor shall designate one individual to be contacted during the period of the contract for prompt contract administration. TBD at award

G. 5 306-13 GOVERNMENT-FURNISHED PROPERTY (MARCH 1985)

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with other incorporated property-related clauses. TBD at award

SECTION H

SPECIAL CONTRACT REQUIREMENTS

H. 1 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--CENTRAL CONTRACTOR REGISTRATION (OCT 2003)

(Reference 52.232-33)

H. 2 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (DEC 2008)

(a) Definitions. As used in this clause-- "Agent" means any individual, including a director, an officer, an employee, or an independent Contractor, authorized to act on behalf of the organization.

"Full cooperation"--

(1) Means disclosure to the Government of the information sufficient for law enforcement to identify the nature and extent of the offense and the individuals responsible for the conduct. It includes providing timely and complete response to Government auditors'' and investigators'' request for documents and access to employees with information;

(2) Does not foreclose any Contractor rights arising in law, the FAR, or the terms of the contract. It does not require--

(i) A Contractor to waive its attorney-client privilege or the protections afforded by the attorney work product doctrine; or

(ii) Any officer, director, owner, or employee of the Contractor, including a sole proprietor, to waive his or her attorney client privilege or Fifth Amendment rights; and

(3) Does not restrict a Contractor from--

(i) Conducting an internal investigation; or

(ii) Defending a proceeding or dispute arising under the contract or related to a potential or disclosed violation.

"Principal" means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a subsidiary, division, or business segment; and similar positions).

"Subcontract" means any contract entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract.

"Subcontractor" means any supplier, distributor, vendor, or firm that furnished supplies or services to or for a prime contractor or another subcontractor.

"United States," means the 50 States, the District of Columbia, and outlying areas.

(b) Code of business ethics and conduct.

(1) Within 30 days after contract award, unless the Contracting Officer establishes a longer time period, the Contractor shall--

(i) Have a written code of business ethics and conduct; and

(ii) Make a copy of the code available to each employee engaged in performance of the contract.

(2) The Contractor shall--

(i) Exercise due diligence to prevent and detect criminal conduct; and

(ii) Otherwise promote an organizational culture that encourages ethical conduct and a commitment to compliance with the law.

(3)

(i) The Contractor shall timely disclose, in writing, to the agency Office of the Inspector General (OIG), with a copy to the Contracting Officer, whenever, in connection with the award, performance, or closeout of this contract or any subcontract thereunder, the Contractor has credible evidence that a principal, employee, agent, or subcontractor of the Contractor has committed--

(A) A violation of Federal criminal law involving fraud, conflict of interest, bribery, or gratuity violations found in Title 18 of the United States Code; or

(B) A violation of the civil False Claims Act (31 U.S.C. 3729-3733).

(ii) The Government, to the extent permitted by law and regulation, will safeguard and treat information obtained pursuant to the Contractor?s disclosure as confidential where the information has been marked "confidential" or "proprietary" by the company. To the extent permitted by law and regulation, such information will not be released by the Government to the public pursuant to a Freedom of Information Act request, 5 U.S.C. Section 552, without prior notification to the Contractor. The Government may transfer documents provided by the Contractor to any department or agency within the Executive Branch if the information relates to matters within the organization?s jurisdiction.

(iii) If the violation relates to an order against a Governmentwide acquisition contract, a multi-agency contract, a multiple-award schedule contract such as the Federal Supply Schedule, or any other procurement instrument intended for use by multiple agencies, the Contractor shall notify the OIG of the ordering agency and the IG of the agency responsible for the basic contract.

(c) Business ethics awareness and compliance program and internal control system. This paragraph (c) does not apply if the Contractor has represented itself as a small business concern pursuant to the award of this contract or if this contract is for the acquisition of a commercial item as defined at FAR 2.101. The Contractor shall establish the following within 90 days after contract award, unless the Contracting Officer establishes a longer time period:

(1) An ongoing business ethics awareness and compliance program.

(i) This program shall include reasonable steps to communicate periodically and in a practical manner the Contractor?s standards and procedures and other aspects of the Contractor?s business ethics awareness and compliance program and internal control system, by conducting effective training programs and otherwise disseminating information appropriate to an individual?s respective roles and responsibilities.

(ii) The training conducted under this program shall be provided to the Contractor?s principals and employees, and as appropriate, the Contractor?s agents and subcontractors.

(2) An internal control system.

(i) The Contractor?s internal control system shall--

(A) Establish standards and procedures to facilitate timely discovery of improper conduct in connection with Government contracts; and

(B) Ensure corrective measures are promptly instituted and carried out.

(ii) At a minimum, the Contractor?s internal control system shall provide for the following:

(A) Assignment of responsibility at a sufficiently high level and adequate resources to ensure effectiveness of the business ethics awareness and compliance program and internal control system.

(B) Reasonable efforts not to include an individual as a principal, whom due diligence would have exposed as having engaged in conduct that is in conflict with the Contractor?s code of business ethics and conduct.

(C) Periodic reviews of company business practices, procedures, policies, and internal controls for compliance with the Contractor?s code of business ethics and conduct and the special requirements of Government contracting, including--

(1) Monitoring and auditing to detect criminal conduct;

(2) Periodic evaluation of the effectiveness of the business ethics awareness and compliance program and internal control system, especially if criminal conduct has been detected; and

(3) Periodic assessment of the risk of criminal conduct, with appropriate steps to design, implement, or modify the business ethics awareness and compliance program and the internal control system as necessary to reduce the risk of criminal conduct identified through this process.

(D) An internal reporting mechanism, such as a hotline, which allows for anonymity or confidentiality, by which employees may report suspected instances of improper conduct, and instructions that encourage employees to make such reports.

(E) Disciplinary action for improper conduct or for failing to take reasonable steps to prevent or detect improper conduct.

(F) Timely disclosure, in writing, to the agency OIG, with a copy to the Contracting Officer, whenever, in connection with the award, performance, or closeout of any Government contract performed by the Contractor or a subcontract thereunder, the Contractor has credible evidence that a principal, employee, agent, or subcontractor of the Contractor has committed a violation of Federal criminal law involving fraud, conflict of interest, bribery, or gratuity violations found in Title 18 U.S.C. or a violation of the civil False Claims Act (31 U.S.C. 3729-3733).

(1) If a violation relates to more than one Government contract, the Contractor may make the disclosure to the agency OIG and Contracting Officer responsible for the largest dollar value contract impacted by the violation.

(2) If the violation relates to an order against a Governmentwide acquisition contract, a multi-agency contract, a multiple-award schedule contract such as the Federal Supply Schedule, or any other procurement instrument intended for use by multiple agencies, the contractor shall notify the OIG of the ordering agency and the IG of the agency responsible for the basic contract, and the respective agencies'' contracting officers.

(3) The disclosure requirement for an individual contract continues until at least 3 years after final payment on the contract.

(4) The Government will safeguard such disclosures in accordance with paragraph (b)(3)(ii) of this clause.

(G) Full cooperation with any Government agencies responsible for audits, investigations, or corrective actions.

(d) Subcontracts.

(1) The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts that have a value in excess of $5,000,000 and a performance period of more than 120 days.

(2) In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.

(End of clause)

H. 3 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days

H. 4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 48 months

H. 5 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2009)

"Commercially available off-the-shelf (COTS) item"--

(1) Means any item of supply that is--

(i) A commercial item (as defined in paragraph (1) of the definition at 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C.

App. 1702), such as agricultural products and petroleum products. Per 46 CFR 525.1 (c)(2), "bulk cargo" means cargo that is loaded and carried in bulk onboard ship without mark or count, in a loose unpackaged form, having homogenous characteristics. Bulk cargo loaded into intermodal equipment, except LASH or Seabee barges, is subject to mark and count and, therefore, ceases to be bulk cargo.

"Employee assigned to the contract" means an employee who was hired after November 6, 1986, who is directly performing work, in the United States, under a contract that is required to include the clause prescribed at 22.1803. An employee is not considered to be directly performing work under a contract if the employee--

(1) Normally performs support work, such as indirect or overhead functions; and

(2) Does not perform any substantial duties applicable to the contract.

"Subcontract" means any contract, as defined in 2.101, entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.

"Subcontractor" means any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime Contractor or another subcontractor.

"United States", as defined in 8 U.S.C. 1101(a)(38), means the 50 States, the District of Columbia, Puerto Rico, Guam, and the U.S. Virgin Islands.

(b) Enrollment and verification requirements.

(1) If the Contractor is not enrolled as a Federal Contractor in E-Verify at time of contract award, the Contractor shall--

(i) Enroll. Enroll as a Federal Contractor in the EVerify program within 30 calendar days of contract award;

(ii) Verify all new employees. Within 90 calendar days of enrollment in the E-Verify program, begin to use EVerify to initiate verification of employment eligibility of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); and

(iii) Verify employees assigned to the contract. For each employee assigned to the contract, initiate verification within 90 calendar days after date of enrollment or within 30 calendar days of the employee?s assignment to the contract, whichever date is later (but see paragraph (b)(4) of this section).

(2) If the Contractor is enrolled as a Federal Contractor in E-Verify at time of contract award, the Contractor shall use E-Verify to initiate verification of employment eligibility of--

(i) All new employees.

(A) Enrolled 90 calendar days or more. The Contractor shall initiate verification of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or

(B) Enrolled less than 90 calendar days. Within 90 calendar days after enrollment as a Federal Contractor in E-Verify, the Contractor shall initiate verification of all new hires of the Contractor, who are working in the United States, whether or not assigned to the contract, within 3 business days after the date of hire (but see paragraph (b)(3) of this section); or

(ii) Employees assigned to the contract. For each employee assigned to the contract, the Contractor shall initiate verification within 90 calendar days after date of contract award or within 30 days after assignment to the contract, whichever date is later (but see paragraph (b)(4) of this section).

(3) If the Contractor is an institution of higher education (as defined at 20 U.S.C. 1001(a)); a State or local government or the government of a Federally recognized Indian tribe; or a surety performing under a takeover agreement entered into with a Federal agency pursuant to a performance bond, the Contractor may choose to verify only employees assigned to the contract, whether existing employees or new hires. The Contractor shall follow the applicable verification requirements at (b)(1) or (b)

(2) respectively, except that any requirement for verification of new employees applies only to new employees assigned to the contract.

(4) Option to verify employment eligibility of all employees. The Contractor may elect to verify all existing employees hired after November 6, 1986, rather than just those employees assigned to the contract. The Contractor shall initiate verification for each existing employee working in the United States who was hired after November 6, 1986, within 180 calendar days of--

(i) Enrollment in the E-Verify program; or

(ii) Notification to E-Verify Operations of the Contractor?s decision to exercise this option, using the contact information provided in the E-Verify program Memorandum of Understanding (MOU).

(5) The Contractor shall comply, for the period of performance of this contract, with the requirements of the E-Verify program MOU.

(i) The Department of Homeland Security (DHS) or the Social Security Administration (SSA) may terminate the Contractor?s MOU and deny access to the E-Verify system in accordance with the terms of the MOU. In such case, the Contractor will be referred to a suspension or debarment official.

(ii) During the period between termination of the MOU and a decision by the suspension or debarment official whether to suspend or debar, the Contractor is excused from its obligations under paragraph

(b) of this clause. If the suspension or debarment official determines not to suspend or debar the Contractor, then the Contractor must reenroll in EVerify.

(c) Web site. Information on registration for and use of the E-Verify program can be obtained via the Internet at the Department of Homeland Security Web site: http://www.dhs.gov/E-Verify.

(d) Individuals previously verified. The Contractor is not required by this clause to perform additional employment verification using E-Verify for any employee--

(1) Whose employment eligibility was previously verified by the Contractor through the E-Verify program;

(2) Who has been granted and holds an active U.S. Government security clearance for access to confidential, secret, or top secret information in accordance with the National Industrial Security Program Operating Manual; or

(3) Who has undergone a completed background investigation and been issued credentials pursuant to Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors.

(e) Subcontracts. The Contractor shall include the requirements of this clause, including this paragraph (e) (appropriately modified for identification of the parties), in each subcontract that--

(1) Is for--

(i) Commercial or noncommercial services (except for commercial services that are part of the purchase of a COTS item (or an item that would be a COTS item, but for minor modifications), performed by the COTS provider, and are normally provided for that COTS item); or

(ii) Construction;

(2) Has a value of more than $3,000; and

(3) Includes work performed in the United States.

(End of clause)

H. 6 52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)

The Contractor will be required to design, develop, or operate a system of records on individuals, to accomplish an agency function subject to the Privacy Act of 1974, Public Law 93-579, December 31, 1974 (5 U.S.C. 552a) and applicable agency regulations. Violation of the Act may involve the imposition of criminal penalties.

H. 7 52.237-3 CONTINUITY OF SERVICES (JAN 1991)

(a) The Contractor recognizes that the services under this contract are vital to the Government and must be continued without interruption and that, upon contract expiration, a successor, either the Government or another contractor, may continue them. The Contractor agrees to--

(1) Furnish phase-in training; and

(2) Exercise its best efforts and cooperation to effect an orderly and efficient transition to a successor.

(b) The Contractor shall, upon the Contracting Officer's written notice,

(1) furnish phase-in, phase-out services for up to 90 days after this contract expires and

(2) negotiate in good faith a plan with a successor to determine the nature and extent of phase-in, phase-out services required. The plan shall specify a training program and a date for transferring responsibilities for each division of work described in the plan, and shall be subject to the Contracting Officer's approval. The Contractor shall provide sufficient experienced personnel during the phase-in, phase-out period to ensure that the services called for by this contract are maintained at the required level of proficiency.

(c) The Contractor shall allow as many personnel as practicable to remain on the job to help the successor maintain the continuity and consistency of the services required by this contract. The Contractor also shall disclose necessary personnel records and allow the successor to conduct on-site interviews with these employees. If selected employees are agreeable to the change, the Contractor shall release them at a mutually agreeable date and negotiate transfer of their earned fringe benefits to the successor.

(d) The Contractor shall be reimbursed for all reasonable phase-in, phase-out costs (i.e., costs incurred within the agreed period after contract expiration that result from phase-in, phase-out operations) and a fee (profit) not to exceed a pro rata portion of the fee (profit) under this contract.

H. 8 52.239-1 PRIVACY OR SECURITY SAFEGUARDS (AUG 1996)

(a) The Contractor shall not publish or disclose in any manner, without the Contracting Officer''s written consent, the details of any safeguards either designed or developed by the Contractor under this contract or otherwise provided by the Government.

(b) To the extent required to carry out a program of inspection to safeguard against threats and hazards to the security, integrity, and confidentiality of Government data, the Contractor shall afford the Government access to the Contractor''s facilities, installations, technical capabilities, operations, documentation, records, and databases.

(c) If new or unanticipated threats or hazards are discovered by either the Government or the Contractor, of if existing safeguards have ceased to function, the discoverer shall immediately bring the situation to the attention of the other party.

H. 9 301-20 PROHIBITION OF DISCRIMINATION AGAINST INDIVIDUALS WITH DISABILITIES (FEB 1995)

The contractor shall comply with all applicable requirements of the Americans with Disabilities Act of 1990 including Section 302, which provides that: "No individual shall be discriminated against on the basis of disability in the full and equal enjoyment of the goods, services, facilities, privileges, advantages, or accommodations of any place of public accommodation by any person who owns, leases (or leases to), or operates a place of public accommodation." Failure to comply with the Americans with Disabilities Act of 1990, as amended, shall be considered a failure to comply with the terms of this contract.

H. 10 307-2 KEY PERSONNEL DESIGNATION (MARCH 1985)

In accordance with the contract clause entitled "Key Personnel", the following key personnel are considered to be essential to the work being performed: To be filled at Award

H. 11 307-3 DUAL COMPENSATION (MARCH 1985)

If a project staff member, subcontractor, or consultant is involved in two or more projects, at least one of which is supported by Federal funds, he/she may not be compensated for more than 100 percent of his/her time during any part of the period of dual involvement. That is, an individual is prohibited from receiving double payment for any given period of work.

H. 12 307-5 PAYMENT OF TRAVEL EXPENSES AND FEES FOR ED EMPLOYEES (MARCH 1985)

The Contractor shall not use any contract funds, or funds from other sources, to pay the travel expenses of, or a fee to, ED employees for lectures, attending program functions, or any other activities in connection with this contract.

H. 13 307-7a PUBLICATION AND AUDIO-VISUAL PRODUCTION (MAY 1997)

Except as provided below, neither the development or production of any publication or audiovisual product is authorized. In the event that development or production of any publication or audiovisual product subsequently becomes a contract requirement (expressed or implied), the contractor shall obtain approval in writing from the Contracting Officer. Until the contractor obtains such Contracting Officer approval, no costs for development or production of the publication or audiovisual product shall be allowable. The following items are excepted from the approval requirements of this clause:

1. Up to 50 copies of progress and final reports. The Contractor shall ensure that any publication or audiovisual product developed or produced under this contract is compatible with the Department of Education's responsibilities under the Sections 504 and 508 of the Rehabilitation Act of 1973,29 U.S.C.

794 and 794d, as amended, to ensure the accessibility of its programs and activities to individuals with disabilities. The contractor shall not distribute or release to the public any publication or audiovisual product developed or produced under this contract without written authorization of the Contracting Officer. To obtain this authorization, the contractor shall submit 2 copies of the publication or audiovisual product to the Contracting Officer. Since the Contracting Officer must obtain internal public affairs or other clearances, the Contractor should plan at least 45 days to obtain authorization from the Contracting Officer. Except as may be provided elsewhere, the contractor may develop and produce at its own expense, results of work under this contract (see Publication and Publicity).

H. 14 307-8 PAYMENT OF PRINTING TO BE PERFORMED BY THE GOVERNMENT PRINTING OFFICE (APRIL 1992)

The General Provisions of this contract set forth the Department's policy regarding printing to be performed in order to meet the terms of the contract. Should the services of the Government Printing Office (GPO) be required, the contractor shall request to the Department of Education to requisition those, subject to the contractor's provision of a completed SF-1, Printing and Binding Requisition to the Public Printer. Payment to the GPO shall be made directly by the Department and charged to the Contract.

H. 15 307-12 CONSENT TO SUBCONTRACT (AUGUST 1998)

Consent is hereby given to the contractor to subcontract with to be filled at award in the amount stated in its final proposal revision.

H. 16 307-13 DEPARTMENT SECURITY REQUIREMENTS (JUNE 2006)

The Contractor and its subcontractors shall comply with Department Security policy requirements as set forth in: A. The Statement of Work of this contract; B. The Privacy Act of 1974 (P.L. 93-579, U.S.C. 552a); C. The U. S. Department of Education Handbook for Information Assurance Security Policy, OCIO-01 (March 2006); and D. The U.S. Department of Education Departmental Directive OM:5-101, "Contractor Employee Personnel Security Screenings."

The Contractor may request copies of the above referenced documents by contacting the Contract Specialist via phone at 202-540-9215 or via e-mail at steve.gagnon@ed.gov . Contractor employee positions required under this contract and their designated risk levels: High Risk (HR): Moderate Risk (MR): Low Risk (LR): All contractor employees must undergo personnel security screening if they will be employed for thirty (30) days or more, in accordance with Departmental Directive OM:5-101, "Contractor Employee Personnel Screenings." The type of screening and the timing of the screening will depend upon the nature of the contractor position, the type of data to be accessed, and the type of information technology (IT) system access required.

Personnel security screenings will be commensurate with the risk and magnitude of harm the individual could cause. The contractor shall: - Ensure that all non-U.S. citizen contractor employees are lawful permanent residents of the United States or have appropriate work authorization documents as required by the Department of Homeland Security, Bureau of Immigration and Appeals, to work in the United States. - Ensure that no employees are assigned to High

Risk designated positions prior to a completed preliminary screening. - Submit all required personnel security forms to the Contracting Officer's Representative (COR) within 24 hours of an assignment to a Department contract and ensure that the forms are complete. - Ensure that no contractor employee is placed in a higher risk position than that for which he or she was previously approved, without the approval of the Contracting Officer or his or her representative, the Department Personnel Security Officer, and the Computer Security Officer.

- Ensure that all contractor employees occupying High Risk designated positions submit forms for reinvestigation every five (5) years for the duration of the contract or if there is a break in service to a Department contract of 365 days or more. - Report to the COR all instances of individuals seeking to obtain unauthorized access to any departmental IT system, or sensitive but unclassified and/or Privacy Act protected information. - Report to the COR any information that raises an issue as to whether a contractor employee's eligibility for continued employment or access to Department IT systems, or sensitive but unclassified and/or Privacy Act protected information, promotes the efficiency of the service or violates the public trust. - Withdraw from consideration under the contract any employee receiving an unfavorable adjudication determination. - Officially notify each contractor employee if he or she will no longer work on a Department contract. - Abide by the requirements in Departmental Directive OM:5-101, "Contractor Employee Personnel Screenings." Further information including definitions of terms used in this clause and a list of required investigative forms for each risk designation are contained in Departmental Directive OM:5-101, "Contractor Employee Personnel Screenings." Failure to comply with the contractor personnel security requirements may result in a termination of the contract for default.

H. 17 307-14 COMPUTER SYSTEM DESIGN AND IMPLEMENTATION REQUIREMENTS (APRIL 1999)

1. System Development Standards Information systems shall be developed in accordance with the ED "Software Life Cycle Management and Documentation Manual". This manual covers all aspects of developing an information system. All phases of the system development process are covered, from definition of the requirements through post installation review. The standards address the manual processes of collecting, processing and disseminating data as well as the automated functions. This process requires the preparation of a statement of requirements, assessment of alternative solution and cost/benefit analyses of these alternatives prior to preparation of system design specifications, programming/debugging and implementation of the system. 2. Project Documentation Plans In accordance with system development standards, the project documentation plan shall be revised at the completion of each critical phase of development and implementation. 3. Data Control and Validation All data must be key verified unless specified otherwise in the Statement of Work/Performance Work Statement. Also, unless specified otherwise in the Statement of Work/Performance Work Statement, data are acceptable if there is an error rate of less than 1% of the data elements. 4. Programming Language The contractor shall use the programming language specified in the Statement of Work/ Performance Work Statement, or the programming language otherwise approved by the contracting officer.

5. System Documentation Computer systems/data bases developed under this contract shall be documented in accordance with the ED "Software Life Cycle Management and Documentation Manual". 6. Computer Software (a) All computer software development under this contract becomes the property of the U.S. Government. In addition, unless specifically exempted by the Contracting Officer, all computer software used by the Contractor on this contract must be delivered to the Government without limitation on the rights of usage and with sufficient documentation to permit the Government to modify and enhance the software with the assistance of the Contractor. 7.