About this file
This document is an Amended Attachment 1 Cost Proposal from Earth Systems, an environmental engineering firm with operations in multiple states including North Dakota, Florida, Colorado, New Jersey, Texas, Pennsylvania, and New York. The document appears to be a rate schedule and cost proposal for environmental services, specifically focused on their Bakken region operations, with point of contact information for managers in Tioga, Watford City, and Bismarck, North Dakota.
The cost proposal includes detailed hourly rates for personnel categories ranging from Senior Project Directors at $150/hour to Administrative staff at $50/hour, and equipment rates for various machinery such as backhoes, dump trucks, and excavation equipment. The pricing covers standard, non-standard (overtime), and holiday rates for both personnel and equipment. Additional services include environmental consulting, UAS drone imaging, surveying, field screening, and specialized equipment rentals like water and soil sampling kits. The rate schedule is for 2024, with a 10% markup on materials and subcontractors, and 30-day payment terms. The document also notes that labor is billed port to port, and equipment is typically billed on an hourly use basis, with other equipment available upon request and priced on a per-site basis.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment+1_Signed.pdf | ||
| Attachment+2+-+Change+Order+Form.docx | DOCX document | |
| Attachment+1+-+Task+Order+Form.docx | DOCX document | |
| 013_State+Contr+Summ-Earth+Systems-Updated.docx | DOCX document | |
| Earth+Systems+-+signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Personnel Category Standard Hourly Rate
Non-Standard Hourly Rate (Overtime)
Holiday Hourly Rate
Senior Project Director /Equivalent $150.00 $150.00 $150.00 Project Manager /Equivalent $140.00 $140.00 $140.00 Senior Scientist/Engineer /Equivalent $130.00 $130.00 $130.00 Scientist/Engineer /Equivalent $110.00 $110.00 $110.00 Senior Field Technician /Equivalent $90.00 $90.00 $90.00 Technician /Equivalent $85.00 $85.00 $85.00 CAD, GIS Specialist /Equivalent $50.00 $50.00 $50.00 Administrative /Equivalent $50.00 $50.00 $50.00 Lodging & Per Diem for 2 days / 1 night $150.00 $150.00 $150.00
$955.00 $955.00 $955.00
Equipment Category Standard Rate
12 HR/DAY
Non-Standard Rate (Overtime)
12 HR/DAY
Holiday Rate
12 HR/DAY
Backhoe / Excavation Equipment $1,140.00 $1,140.00 $1,140.00
Dump Truck $1,440.00 $1,440.00 $1,440.00 Containment Boom $100.00 $100.00 $100.00 Heavy Duty Service
Vehicle $250.00 $250.00 $250.00 Sorbent Boom, T-4 mini $155.00 $155.00 $155.00
Contaminated Media Disposal $30.00 $30.00 $30.00
Contaminated Media Disposal $20.00 $20.00 $20.00
Contaminated Media Disposal $30.00 $30.00 $30.00
$3,165.00 $3,165.00 $3,165.00
$4,120.00 $4,120.00 $4,120.00
Personnel Total
GRAND TOTALS (Personnel and Equipment combined)
Equipment Total
20 ton minimum 50 ft section
2500 / 3/4 ton or greater 12ct. 3"x4'
Soil land fill disposal per one ton
Water land fill disposal per one ton
Sediment land fill disposal per one ton
Drawings Clerical/office staff
In Williston, ND area
Equipment Description
4 cubic yard bucket minimum
Gathers samples Gathers samples
NOTE: Offeror's must fill in the Cost Proposal in its entireity by completing all boxes in yellow. Pricing in task orders must be quoted per the rate identified in Cost Proposal. Offeror’s may be deemed non-responsive if they fail to use the Cost Proposal provided and to fill in all requested areas. If Offeror's have any questions related to the Cost Proposal, please submit questions/clarifications by the Deadline for
Submission of Questions and Objections identified in Section 1.5 of the RFP.
GRAND TOTALS (Personnel and Equipment) WILL BE USED FOR THE COST EVALUATION
AMENDED ATTACHMENT 1 ~ COST PROPOSAL
Position Description
Senior project manager
Project organizer/creates plan Senior environmental staff, reporting/ data evaluation
Environmental staff
4501 Coleman Street Suite 103, Bismarck, ND 58503
Florida • Colorado • North Dakota • New Jersey • Texas • Pennsylvania • New York
Earth Systems 4501 Coleman Street Suite 103 Bismarck, ND 58503
North Dakota POC’s:
Chris Neubauer- Tioga & Watford City Operations Manager Spill Cleanup – Earthwork – Drone Imagery (701-934-0900) cneubauer@earthsys.net
Tim Adair- Bismarck Engineering, Testing, Environmental Consulting (701-934-1534) tadair@earthsys.net
Notes
1. Labor is billed port to port.
2. Equipment is billed on an hourly use basis unless noted otherwise.
3. Other equipment is available upon request and will be billed on a per-site basis.
Environmental Services Consultant Pool Rates 2024
Earth Systems-Bakken 2024 Rate Schedule 2024 Rate Schedule
Labor, Vehicle, and Subcontractor Markup $/Hr.
Senior II- (Geologist/Engineer/Scientist/ Project Manager) $150 Senior I- (Geologist/Engineer/Scientist/ Project Manager) $130 Geophysicist $140 UAS Pilot $135 Project Manager $140 Staff Engineer/Scientist $110 Associate Engineer/Scientist/Sr Technician $90 Field Technician $85 Superintendent $100 Foreman $90 Administrative Support $50 Finish Operator $70 Operator $65 Laborer / CAD / GIS Specialist $50 Per Diem Overnight-Project Specific (Over Night) $150 Per Diem Day-Project Specific (Day) $80 1-Ton Work Truck (per hour) $30 3/4 Ton Work Truck (per hour) $25 1/2 Ton Work Truck (per hour) $20 Materials and Subcontractor Markup 10% Payment Terms (Days) 30
Machinery & Equipment $/Hr.
Skid Steer $75 Skid Steer + Hydraulic Attachment $95 Mini-Excavator $80 Backhoe $95 Backhoe + Hydraulic Attachment $120 Loader 1.7-4.25CY $105 Loader 4.5-6.5CY $140 Excavator (Cat 313-320 Series/ Comparable Models) $130 Excavator (Cat 326-330 Series/ Comparable Models) $150 Excavator (Cat 349 Series/ Comparable Models) $170 Bulldozer (Cat D4-D5 Series/ Comparable Models) $130 Bulldozer (Cat D6N-D6T Series/ Comparable Models) $160 Bulldozer (Cat D8R-D8T Series/ Comparable Models) $195 Telehandler 6k $85 Telehandler 8k $85 Telehandler 10k $95 Motor Grader (Cat 14M/ Comparable Models) $135 Motor Grader (Cat 16M/ Comparable Models) $150 Scraper (Cat 627 G Series) $245 Scraper (Cat 627 K Series) $260 Vibratory Drum Compactor (66") $95 Vibratory Drum Compactor (84") $110 UTV (4-wheel drive) $30 GeoProbe-Direct Push Technology Drilling Rig (per day) $1,500 Tractor $75 Tractor + Disc $85 Tractor + Hydraulic Attachment $110 Hydro-vac $325 Utility Trailer / Dump Trailer / Tilt Deck Trailer $40 Gooseneck Trailer 25 feet $45 Gooseneck Trailer >25 feet $50 Heavy Haul Low Boy Trailer + Truck $205 Generator <15kW (per day) $185 Poly Fuse Machine (412) $185 Light Plant (per day) $145 2-Inch Trash Pump (per day) $110 3-Inch Trash Pump (per day) $160
Environmental Services - By Quote Weed Spraying By Quote Electrical Conductivity (EM) Survey By Quote Electrical Resistivity Tomography (ERT) Survey By Quote Emissions Testing By Quote
Environmental Equipment per day Water & Soil Sampling
Groundwater Well Sampling Kit (submersible/peristaltic pump, tubing, water level meter) $175 Water Sampling Kit (Bottle ware, Coolers, Ice, Decontamination Supplies, Shipping) $160 Soil Sampling Kit (Bottle ware, Coolers, Ice, Decontamination Supplies, Shipping) $160
PID $110
EC Meter + Chloride Strips $70
YSI $125
TENORM Meter $125 Air Sampling Equipment (Multi-Gas Monitor Probe With Pump) $50 Hanby TPH-Water Test Kit (per day) $125 Hanby TPH-Water Test Reagent (per sample) $45 Petro-Flag TPH Soil Analyzer (per day) $125 Petro-Flag TPH Soil Test Reagent (per sample) $45
Quadcopter with Standard Camera (Photos) $275 Quadcopter with Multi-Spectral Sensor (Mapping & Analysis) $750
Geode Sub-Meter GPS Rover Unit + Tablet $175 EM31 with Mesa 2 Tablet and Geode Sub-Meter GPS $1,150
UAS Drone Imaging
Surveying Equipment
Air/Soil/Water/Gas Field Screening
Table A-1 mailto:cneubauer@earthsys.net
| Cost Cover Page.pdf |
| Earth Systems, LLC |
| Cost Proposal.pdf |
| Cost Proposal.pdf |
| Cost Proposal_2024_final.pdf |
| Scan_0001.pdf |
| Cost Proposal |
| Copy of Attachment+1+-+Cost+Proposal_final.pdf |
| Cost Proposal |
File details come from the government source that posted it. Updated .