This document is an Amended Attachment 1 Cost Proposal from Earth Systems, an environmental engineering firm with operations in multiple states including North Dakota, Florida, Colorado, New Jersey, Texas, Pennsylvania, and New York. The document appears to be a rate schedule and cost proposal for environmental services, specifically focused on their Bakken region operations, with point of contact information for managers in Tioga, Watford City, and Bismarck, North Dakota.

The cost proposal includes detailed hourly rates for personnel categories ranging from Senior Project Directors at $150/hour to Administrative staff at $50/hour, and equipment rates for various machinery such as backhoes, dump trucks, and excavation equipment. The pricing covers standard, non-standard (overtime), and holiday rates for both personnel and equipment. Additional services include environmental consulting, UAS drone imaging, surveying, field screening, and specialized equipment rentals like water and soil sampling kits. The rate schedule is for 2024, with a 10% markup on materials and subcontractors, and 30-day payment terms. The document also notes that labor is billed port to port, and equipment is typically billed on an hourly use basis, with other equipment available upon request and priced on a per-site basis.

View the file

Other files

File Type Posted
Amendment+1_Signed.pdf PDF
Attachment+2+-+Change+Order+Form.docx DOCX document
Attachment+1+-+Task+Order+Form.docx DOCX document
013_State+Contr+Summ-Earth+Systems-Updated.docx DOCX document
Earth+Systems+-+signed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Personnel Category Standard Hourly Rate

Non-Standard Hourly Rate (Overtime)

Holiday Hourly Rate

Senior Project Director /Equivalent $150.00 $150.00 $150.00 Project Manager /Equivalent $140.00 $140.00 $140.00 Senior Scientist/Engineer /Equivalent $130.00 $130.00 $130.00 Scientist/Engineer /Equivalent $110.00 $110.00 $110.00 Senior Field Technician /Equivalent $90.00 $90.00 $90.00 Technician /Equivalent $85.00 $85.00 $85.00 CAD, GIS Specialist /Equivalent $50.00 $50.00 $50.00 Administrative /Equivalent $50.00 $50.00 $50.00 Lodging & Per Diem for 2 days / 1 night $150.00 $150.00 $150.00

$955.00 $955.00 $955.00

Equipment Category Standard Rate

12 HR/DAY

Non-Standard Rate (Overtime)

12 HR/DAY

Holiday Rate

12 HR/DAY

Backhoe / Excavation Equipment $1,140.00 $1,140.00 $1,140.00

Dump Truck $1,440.00 $1,440.00 $1,440.00 Containment Boom $100.00 $100.00 $100.00 Heavy Duty Service

Vehicle $250.00 $250.00 $250.00 Sorbent Boom, T-4 mini $155.00 $155.00 $155.00

Contaminated Media Disposal $30.00 $30.00 $30.00

Contaminated Media Disposal $20.00 $20.00 $20.00

Contaminated Media Disposal $30.00 $30.00 $30.00

$3,165.00 $3,165.00 $3,165.00

$4,120.00 $4,120.00 $4,120.00

Personnel Total

GRAND TOTALS (Personnel and Equipment combined)

Equipment Total

20 ton minimum 50 ft section

2500 / 3/4 ton or greater 12ct. 3"x4'

Soil land fill disposal per one ton

Water land fill disposal per one ton

Sediment land fill disposal per one ton

Drawings Clerical/office staff

In Williston, ND area

Equipment Description

4 cubic yard bucket minimum

Gathers samples Gathers samples

NOTE: Offeror's must fill in the Cost Proposal in its entireity by completing all boxes in yellow. Pricing in task orders must be quoted per the rate identified in Cost Proposal. Offeror’s may be deemed non-responsive if they fail to use the Cost Proposal provided and to fill in all requested areas. If Offeror's have any questions related to the Cost Proposal, please submit questions/clarifications by the Deadline for

Submission of Questions and Objections identified in Section 1.5 of the RFP.

GRAND TOTALS (Personnel and Equipment) WILL BE USED FOR THE COST EVALUATION

AMENDED ATTACHMENT 1 ~ COST PROPOSAL

Position Description

Senior project manager

Project organizer/creates plan Senior environmental staff, reporting/ data evaluation

Environmental staff

4501 Coleman Street Suite 103, Bismarck, ND 58503

Florida • Colorado • North Dakota • New Jersey • Texas • Pennsylvania • New York

Earth Systems 4501 Coleman Street Suite 103 Bismarck, ND 58503

North Dakota POC’s:

Chris Neubauer- Tioga & Watford City Operations Manager Spill Cleanup – Earthwork – Drone Imagery (701-934-0900) cneubauer@earthsys.net

Tim Adair- Bismarck Engineering, Testing, Environmental Consulting (701-934-1534) tadair@earthsys.net

Notes

1. Labor is billed port to port.

2. Equipment is billed on an hourly use basis unless noted otherwise.

3. Other equipment is available upon request and will be billed on a per-site basis.

Environmental Services Consultant Pool Rates 2024

Earth Systems-Bakken 2024 Rate Schedule 2024 Rate Schedule

Labor, Vehicle, and Subcontractor Markup $/Hr.

Senior II- (Geologist/Engineer/Scientist/ Project Manager) $150 Senior I- (Geologist/Engineer/Scientist/ Project Manager) $130 Geophysicist $140 UAS Pilot $135 Project Manager $140 Staff Engineer/Scientist $110 Associate Engineer/Scientist/Sr Technician $90 Field Technician $85 Superintendent $100 Foreman $90 Administrative Support $50 Finish Operator $70 Operator $65 Laborer / CAD / GIS Specialist $50 Per Diem Overnight-Project Specific (Over Night) $150 Per Diem Day-Project Specific (Day) $80 1-Ton Work Truck (per hour) $30 3/4 Ton Work Truck (per hour) $25 1/2 Ton Work Truck (per hour) $20 Materials and Subcontractor Markup 10% Payment Terms (Days) 30

Machinery & Equipment $/Hr.

Skid Steer $75 Skid Steer + Hydraulic Attachment $95 Mini-Excavator $80 Backhoe $95 Backhoe + Hydraulic Attachment $120 Loader 1.7-4.25CY $105 Loader 4.5-6.5CY $140 Excavator (Cat 313-320 Series/ Comparable Models) $130 Excavator (Cat 326-330 Series/ Comparable Models) $150 Excavator (Cat 349 Series/ Comparable Models) $170 Bulldozer (Cat D4-D5 Series/ Comparable Models) $130 Bulldozer (Cat D6N-D6T Series/ Comparable Models) $160 Bulldozer (Cat D8R-D8T Series/ Comparable Models) $195 Telehandler 6k $85 Telehandler 8k $85 Telehandler 10k $95 Motor Grader (Cat 14M/ Comparable Models) $135 Motor Grader (Cat 16M/ Comparable Models) $150 Scraper (Cat 627 G Series) $245 Scraper (Cat 627 K Series) $260 Vibratory Drum Compactor (66") $95 Vibratory Drum Compactor (84") $110 UTV (4-wheel drive) $30 GeoProbe-Direct Push Technology Drilling Rig (per day) $1,500 Tractor $75 Tractor + Disc $85 Tractor + Hydraulic Attachment $110 Hydro-vac $325 Utility Trailer / Dump Trailer / Tilt Deck Trailer $40 Gooseneck Trailer 25 feet $45 Gooseneck Trailer >25 feet $50 Heavy Haul Low Boy Trailer + Truck $205 Generator <15kW (per day) $185 Poly Fuse Machine (412) $185 Light Plant (per day) $145 2-Inch Trash Pump (per day) $110 3-Inch Trash Pump (per day) $160

Environmental Services - By Quote Weed Spraying By Quote Electrical Conductivity (EM) Survey By Quote Electrical Resistivity Tomography (ERT) Survey By Quote Emissions Testing By Quote

Environmental Equipment per day Water & Soil Sampling

Groundwater Well Sampling Kit (submersible/peristaltic pump, tubing, water level meter) $175 Water Sampling Kit (Bottle ware, Coolers, Ice, Decontamination Supplies, Shipping) $160 Soil Sampling Kit (Bottle ware, Coolers, Ice, Decontamination Supplies, Shipping) $160

PID $110

EC Meter + Chloride Strips $70

YSI $125

TENORM Meter $125 Air Sampling Equipment (Multi-Gas Monitor Probe With Pump) $50 Hanby TPH-Water Test Kit (per day) $125 Hanby TPH-Water Test Reagent (per sample) $45 Petro-Flag TPH Soil Analyzer (per day) $125 Petro-Flag TPH Soil Test Reagent (per sample) $45

Quadcopter with Standard Camera (Photos) $275 Quadcopter with Multi-Spectral Sensor (Mapping & Analysis) $750

Geode Sub-Meter GPS Rover Unit + Tablet $175 EM31 with Mesa 2 Tablet and Geode Sub-Meter GPS $1,150

UAS Drone Imaging

Surveying Equipment

Air/Soil/Water/Gas Field Screening

Table A-1 mailto:cneubauer@earthsys.net

Cost Cover Page.pdf
Earth Systems, LLC
Cost Proposal.pdf
Cost Proposal.pdf
Cost Proposal_2024_final.pdf
Scan_0001.pdf
Cost Proposal
Copy of Attachment+1+-+Cost+Proposal_final.pdf
Cost Proposal

File details come from the government source that posted it. Updated .