RFQ_No._DTRT57-14-Q-80078.pdf

PDF 309 KB Posted

Attached to
Fuel Storage Tank Replacement-Allentown, PA
Solicitation number
DTRT57-14-Q-80078
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Wage_Determination-Allentown.txt TXT text file
Project_Plan_Specifications_ABE-ATCT_8-29-14Clean.pdf PDF
ABE_ATCT_-_Appendix_B.pdf PDF
Typical_AST_Tank_Layout.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

DTRT-RVT-63-1206

USDOT/Volpe Center

Contracts&Program Support Services

55 Broadway RVP-31 Cambridge MA 02142-1001

RVP-31

Carl Chin 617-494-2072

109/04/2014

DTRT5714Q80078

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Please see Section C-Statement of Work

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

1 52 calendar days and complete it within ________________ ________________ calendar days after receiving

Section F, Paragraph F.2

09/17/2014

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDOT/Volpe Center Contracts&Program Support Services

55 Broadway RVP-31 Cambridge MA 02142-1001

RVP-31

Carl Chin

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 38

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

DTRT5714Q80078

Fuel Storage Tank Replacement Program-Allentown, PA

Recovery:: NON-RECOVERY

Delivery: 120 Days After Notice to Proceed

Delivery Location Code: VNTSC

U.S. DOT/Volpe Center

125 Munroe Street

Receiving Dock

Cambridge MA 02142-1001 US

FOB: Destination

Period of Performance: 09/30/2014 to 11/14/2014

0100 Perform tasks 3.1 and 3.2.1 of the statement of work

0200 Perform tasks 3.2.2, 3.2.3, 3.2.4, 3.2.5 and

3.2.6 of the statement of work

0300 Perform task 3.3 of the statement of work

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

DTRT57-14-Q-80078

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SERVICES AND PRICES

CLIN No. Description Unit Unit Price Total Price 0100 This CLIN encompasses all efforts associated with Tasks 3.1 and 3.2.1 of the Statement of Work.

Job

0200 This CLIN encompasses all efforts associated with Tasks 3.2.2, 3.2.3, and 3.2.4 of the Statement of Work.

Job

0300 This CLIN encompasses all efforts associated with Task 3.3 of the Statement of Work.

Job

THE CONTRACTOR MUST PRICE ALL CONTRACT LINE ITEMS

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 STATEMENT OF WORK/SPECIFICATIONS (APR 2006)

The Contractor shall furnish the necessary personnel, material, services, and facilities (except as otherwise specified), required to comply with the Statement of Work/Specifications, Drawings, and other documents included in Attachments J.1 through J.4.

1.0 BACKGROUND

The Federal Aviation Administration (FAA) manages and sustains active FST systems across the National Airspace System (NAS) to assure fielded systems meet operational readiness and environmental compliance requirements. Lifecycle guidelines have been established to aid in forecasting replacement requirements. Fielded FST systems are additionally exposed to influences that may generate replacement or repair requirements in advance of lifecycle guideline predictions. These include severe environmental conditions, impacts, changes in minimum regulatory standards, and similar intervening occurrences.

The FAA has identified FST systems that meet replacement criteria under lifecycle guideline or in response to intervening acts. The FST Program Office has verified that replacement of the FST systems is required to sustain critical operation capacity, preclude potential for assessment of regulatory non-compliance fines, and to assure the systems protect the surrounding natural and build environments.

This Statement of Work describes contractor requirements for this project, including:

o removal of the specified existing diesel underground fuel storage tank systems;

o provision and installation of replacement diesel fuel storage tank;

o provision and installation of diesel fuel storage tank monitoring system;

o removal and replacement of diesel fuel system service piping; and o documentation of field services.

The purpose of this effort is to provide the project management, materials, labor, equipment, tools, supplies, and field services needed to execute all project elements.

Contaminated soils are not expected to be encountered and are not considered part of this Statement of Work. Determinations on proper handling, storage, and/or disposal of contaminated soils shall be at the discretion of the Government.

The Contractor shall provide all permits, approvals and insurance coverage required by local, state and federal authorities. All work will be closely coordinated with each local authority for airport operations and will comply with all inspection requirements from project stakeholders.

2.0 GOVERNMENT FURNISHED MATERIAL (GFM) AND ASSISTANCE

GFM will not be provided by Government. All other materials and components will be provided by Contractor in accordance with an approved Project Plan.

A Government representative will provide:

o Authorized escort for all Contractor activities;

o Copies of any existing plans, drawings or other documents that describe the current system and components (electronic and hard copies);

o Authorized personnel to supervise the operation of Government equipment impacted by the project efforts (engine generator and power circuit panels are anticipated); and o Current registration for the tank system and components.

Baseline drawings are attached with this statement of work. Drawings are provided to identify acceptable installed system configurations and do not represent specific field conditions.

The Site Specific Project Plans will be provided as an attachment to this SOW.

3.0 TASKS

The Contractor shall provide technical and professional expertise, management, supervision, skilled labor, materials, tools, equipment and all other support necessary to perform requested services. The Contractor shall execute the approved Project Plan. All execution shall be in close coordination with the Government and shall be in a safe and acceptable manner in accordance with all applicable federal, state, local and airport requirements and generally accepted national building codes and standards.

All work shall be scheduled sequentially by the Volpe Center COR and the FAA.

3.1 The following Contractor information must be provided 15 days after notice to proceed:

Environmental Protection Plan Spill and Discharge Plan Quality Control Plan Health and Safety Plan (site specific information for each work site to be provided in amendments) List of Transportation and Disposal Agencies that will be used for this work Employee Certifications:

a. Medical Surveillances

b. Respirator Fit Tests

c. 40 hour Hazardous Waste and Safety Training/8 hour Refresher

At a minimum, the Contractor shall perform the following activities:

3.2 Replacement of Diesel Tanks

3.2.1 Temporary Fuel Supply:

o Provide and install all temporary fuel supply components in accordance with approved

Project Plan o Provide and install 250-gallon double walled temporary storage tank. Tank will be equipped with:

Manual volume gauge;

Atmospheric vent with approved cap;

Secondary leak detection; and Spill containment.

o Position tank as shown in the approved site specific project plan o Provide and install ¾ inch copper tubing to be utilized as temporary fuel oil supply and return lines. Make fuel oil supply line connection prior to existing day tank supply pump and make fuel oil return line connection at existing fitting inside engine generator room.

o Transfer fuel from existing UST to fill temporary tank NOT MORE THAN 90% of capacity o Remove and containerize remaining existing clean fuel from UST for re-use. Properly dispose sludges, solids, or other particulates found in the Diesel UST.

o Charge and Prime all new fuel lines o As part of system transition, disconnect existing fuel lines at existing joints o Connect new temporary fuel lines to the day tank supply and return fuel connections o Perform operational readiness inspection and testing o Visually inspect temporary fuel system for leaks o Perform live engine test for no less than one day tank refill cycle or 20 minutes of actual run time

Note that Government personnel will certify operation of temporary fuel system by conducting field testing that includes load conditions on emergency electrical generator. Testing will be of sufficient length to allow temporary fuel system to cycle through a complete normal operating range.

3.2.2 Remove existing Diesel UST

o Remove and dispose of the existing fuel monitoring system and all sensors/probes o Remove and dispose the underground fuel storage tank and all components of the existing FST system including piping and tank appurtenances o Backfill excavation, material shall be classified in accordance with ASTM D 2487 as

GW, GP, GM, GC, SW, SP, SM, SC, ML, MH, CL, or CH and shall be free from roots and other organic matter, trash, debris, snow, ice or frozen materials. It shall be of a quality suitable for the purpose intended and shall compact thoroughly without the presence of excessive voids when watered and compacted.

3.2.3 Install Replacement Diesel AST

o Fabricate a new reinforced concrete support pad to meet the new tank configuration in accordance approved project plan.

o Install new tank in accordance with approved Project Plan o Install spill and overfill protection o Provide and install secondarily contained fuel service lines from tank top penetrations to connection point of temporary fuel lines.

Material and placement shall be in accordance with drawing plan set Remove and replace all components of FST monitoring system Replacement system shall be Veeder-Root brand Model TLS-300C or approved equivalent Provide and install probes, sensors and remote overfill alarm in accordance with drawing plan set Contractor may utilize existing conduits but shall install new seal offs at all penetration points. Install new monitor control, communications, and power wiring as required and in accordance with manufacturer’s requirement.

Contractor shall terminate all conductors in accordance with manufacturer requirements and power conductors shall be connected at existing distribution panel/circuit for FST monitor.

o Perform integrity testing on replaced/repaired system components in accordance with regulatory requirements and manufacturers recommendations. Provide documented results to the Volpe Center COR o Return containerized fuel to new Diesel AST o Charge and prime all fuel service lines o Install new monitor system with attendant control wiring as required Veeder Root monitoring panel with leak detection sensors and volumetric probe o Perform integrity testing on system components in accordance with regulatory requirements and manufacturers recommendations

3.2.4 System Transition from Temporary to Permanent Fuel Supply o Disconnect temporary fuel lines at existing threaded connections o Connect new permanent fuel lines o Perform operational readiness inspection and testing o Visually inspect system for leaks o Perform live engine test for no less than one day tank refill cycle or 20 minutes of actual run time o Return fuel from temporary tank to new permanent tank

3.2.5 Contractors Acceptance Inspection (CAI)

A CAI shall be completed prior to the contractor leaving the site. Any deficiencies noted shall be corrected immediately and an Amended CAI will be completed to verify repairs/corrections have been completed.

3.3 Documentation and Training

3.3.1 Familiarization Training/O&M Manual

Contractor will provide system familiarization training for FAA technical operations personnel.

Training may include a combination of lecture and hands on demonstration. Training will be conducted at the installation facility. The familiarization training shall not be scheduled until the installation activities have been fully completed and the new system is in end state configuration. A single training session will be scheduled.

The system familiarization training will reinforce Sequence of Operations and utilize any Operations and Maintenance Manual as course materials. At the conclusion of the training, the attendees will be able to:

o Identify the location and function of all fuel system components o Configure the system for normal and emergency operations o Generate and review system status reports (diesel fuel storage tank monitoring system only) o Perform manufacturer required maintenance procedures

An O&M Manual shall be delivered to the site at the time of Familiarization Training. The O&M Manual shall consist of data/information and all manuals provided by the equipment manufacturers for all the materials and equipment that make up the FST system.

3.3.2 As-Built Drawings

Contractor shall document the installed location of system components including measurements of conduit, wiring, piping and other materials. This documentation will be in the form of an as-built drawing. This as-built drawing may be created utilizing the existing FAA system drawings as baseline. As-built drawing shall be to scale and provided in a format compatible with Microstation and as a pdf file.

3.3.3 Closure Reporting and Documentation

Contractor shall provide a Project Closure Report to include material purchase listings, warranty information and other guarantee cards provided by manufacturers. Contemporaneous photographs of the project execution shall be provided and annotated as to activity or sequence shown.

If specified by local or federal regulation, a closure report meeting all aspects of the prescribed content shall be prepared.

Contractor will prepare new or amended tank registration documentation in accordance with local or State regulations. Contractor will provide documentation to FAA for filing with appropriate regulatory communities.

4.0 PERIOD OF PERFORMANCE

Date of award to November 21, 2014.

Field services must be scheduled to avoid periods of anticipated inclement weather. Contractor shall consider the potential for fielding multiple crews at concurrent locations to minimize length of field services to the degree practicable.

5.0 REFERENCE INFORMATION:

The Contractor will comply with direction within the SOW and all applicable local, state, and federal regulation governing Fuel Storage, Fuel Supply, and Fuel Flow Controls at FAA facilities. NFPA, BOCA and other applicable standards shall apply.

6.0 QUALITY ASSURANCE

The Federal Government expects the final product will be of high quality and fully functional. The Contractor will be bound by the contents of this statement of work. Any deviations, including those recommended by the Government during the production and review process, must be approved by the Contracting Officer.

7.0 PROJECT SCHEDULE

The Contractor shall prepare for approval an execution schedule. The schedule shall consider the availability of local Government escorts for all activities.

8.0 DELIVERABLES

The Contractor shall provide the following deliverables, and shall be due based on the provided timelines:

Deliverable Due Project Schedule (4 copies updated weekly or as conditions change)

15 days from notice to proceed

Environmental Protection Plan 15 days from notice to proceed

Spill and Discharge Plan 15 days from notice to proceed

Quality Control Plan 15 days from notice to proceed

Health and Safety Plan 15 days from notice to proceed

List of Transportation and Disposal Agencies 15 days from notice to proceed

Employee Certifications: Medical Surveillances, Respirator Fit Tests, 40 hour Hazardous Waste and Safety Training/8 hour Refresher

15 days from notice to proceed

Diesel fuel storage systems meeting the approved system configuration requirements

Installations shall be scheduled as soon as possible based on site conditions

Operations and Maintenance Manual including data/information provided by the equipment manufacturers (2 Copies for each location)

15 days following project completion

Familiarization training 15 days following project completion

As-built drawings delivered in Microstation and as pdf. 30 days following project completion

Closure reporting and tank registration documents as required 30 days following project completion

9.0 MEETINGS:

Meetings may take place on a weekly basis.

10.0 SECURITY AND SAFETY:

Security requirements, operational procedures, and coordination of work will be per FAA current standards. These items include, but are not limited to, the following:

o Sites operate 24 hours a day, seven days a week. Sites may be located in high traffic zone and access to facility may only be available during periods of slow air traffic. Schedule must be closely coordinated and advanced notice must be given to the Volpe Center COR at least seven

(7) days prior to any work outside of the approved schedule.

o Several of the work sites may be located inside the Aircraft Operating Area of active airports.

Access to the site is limited and must be scheduled to avoid interruption of normal air traffic.

Persons or vehicles entering the Aircraft Operating Area are subject to search and persons operating vehicles in the Aircraft Operating Area may be subject to specialized training requirements.

o An advance list of Contractor personnel shall be provided to the Volpe Center COR 10 days prior to working on-site. Contractor shall be responsible for obtaining security badges and clearances for all personnel. Badging shall be coordinated with the Volpe Center COR, and deliveries shall be scheduled in advance with the Volpe Center COR. The Contractor shall be responsible for the conduct of contractor personnel present on-site.

o The Contractor shall use great care and caution while working within the existing equipment, mechanical and electrical rooms, so as not to disrupt the function and operations of the FAA facility. The Contractor shall coordinate work with the Volpe Center COR.

o Existing FAA air traffic equipment shall remain operational throughout the life of this contract.

The Contractor shall be responsible for the continuous protection of this equipment from physical and electrical damage because of incidental or accidental negligence, such as, but not limited to, disruption of power to the units. The Contractor shall notify the Volpe Center COR immediately if such damage or disruption of power should occur. The loss of these systems and equipment for any amount of time will jeopardize the safety of the flying public.

11.0 SUSTAINABLE ACQUISITION REQUIREMENTS:

To the maximum extent possible and consistent with FAR Part 23 and during the performance of the work under this SOW, the Government requires the Contractor to provide or use products that are energy efficient (ENERGY STAR® or Federal Energy Management Agency Program-designated), water-efficient, biobased, environmentally preferable (e.g., EPEAT-registered or non-toxic or less toxic alternatives), non-ozone depleting, or made with recovered materials. Unless otherwise identified in this SOW, each recovered materials or biobased product provided and delivered must meet, but may exceed, the minimum recovered materials or biobased content of an Environmental Protection Agency (EPA)-designated or US Department of Agriculture-designated product. The sustainable acquisition requirements specified herein apply only to products that are required to be (1) delivered to the Government during contract performance; (2) acquired by the contractor for use in performing services (including construction) at a Federally-controlled facility; (3) furnished by the contractor for use by the Government; or (4) specified in the design of a building or work or incorporated during its construction, renovation, or maintenance.

12.0 Locations of FST Tank Sites:

Allentown Airport (ABE) 135 Fashion Drive Allentown, PA 18109 Replace Diesel UST with Diesel AST

SECTION D - PACKAGING AND MARKING

D.1 PRESERVATION AND PACKAGING (DEC 1998)

Preservation, packing, and packaging of articles called for herein shall be in accordance with good commercial practices to assure delivery at destination.

SECTION E - INSPECTION AND ACCEPTANCE

E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses, by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this /these address(es):

http://acquisition.gov/far/index.html (FAR) http://www.dot.gov/ost/m60/tamtar/tar.htm (TAR) https://one.dot.gov/ost/m1/m60/Shared%20Documents/Transportation%20Acquisition%20Manual/tam.ht m (TAM)

NUMBER TITLE DATE

52.246-12 INSPECTION OF CONSTRUCTION AUG 1996

SECTION F - DELIVERIES OR PERFORMANCE

F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses, by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this /these address(es):

NUMBER TITLE DATE

52.242-14 SUSPENSION OF WORK APR 1984

F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days. The time stated for completion shall include final cleanup of the premises.

F.3 PLACE OF DELIVERY/PERFORMANCE (DEC 1998)

The place of delivery/performance called for under this contract shall be:

Allentown Airport (ABE) 135 Fashion Drive Allentown, PA 18109 http://acquisition.gov/far/index.html http://www.dot.gov/ost/m60/tamtar/tar.htm https://one.dot.gov/ost/m1/m60/Shared%20Documents/Transportation%20Acquisition%20Manual/tam.htm

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 TAR 1252.242-73 CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE (OCT

1994)

A. The Contracting Officer may designate Government personnel to act as the Contracting Officer's Representative (COR) to perform functions under the contract such as review and/or inspection and acceptance of supplies and services, including construction and other functions of a technical nature. The Contracting Officer will provide a written notice of such designation to the Contractor within five working days after contract award or for construction, not less than five working days prior to giving the Contractor the notice to proceed. The designation letter will set forth the authorities and limitations of the COR under the contract.

B. The Contracting Officer cannot authorize the COR or any other representative to sign documents (i.e., contracts, contract modifications, etc.) that require the signature of the Contracting Officer.

G.2 RESPONSIBILITY FOR CONTRACT ADMINISTRATION (APR 2006)

Contracting Officer: The Contracting Officer (CO) has the overall responsibility for this contract. The CO alone, without delegation, is authorized to take actions on behalf of the Government to amend, modify, or deviate from the contract terms, conditions, requirements, specifications, details and/or delivery schedules. However, the CO may delegate certain other responsibilities to his/her authorized representatives.

Administrative Contracting Officer: An Administrative Contracting Officer (ACO) may be designated by the Contracting Officer. The duties of an ACO include but are not limited to: analyzing and making recommendations on the Contractor's proposals, offers, or quotations upon request of the Contracting Officer and approving Contractor's invoices in accordance with the terms of the contract.

Contracting Officer's Representative: A Contracting Officer's Representative (COR) will be designated by the Contracting Officer. The responsibilities of the COR include but are not limited to: inspecting and monitoring the Contractor's work; determining the adequacy of performance by the Contractor in accordance with the terms and conditions of this contract; acting as the Government's representative in charge of work at the site to ensure compliance with contract requirements in so far as the work is concerned; and advising the Contracting Officer of any factors which may cause delay in performance of the work. The COR does not have the authority to make new assignments of work or to issue directions that cause an increase or decrease in the price of this contract or otherwise affect any other contract terms.

The Contracting Officer, Administrative Contracting Officer, and Technical Representatives are located at:

U.S. Department of Transportation RITA/John A. Volpe National Transportation System Center 55 Broadway Cambridge, MA 02142-1001

G.3 VOUCHER REVIEW (MAY 1999)

The Government may at its sole discretion arrange for a Contractor to review vouchers and supporting data submitted for payment under the provisions of this contract. The Contractor reviewing vouchers and supporting data will perform this function in accordance with contract provisions which prohibit disclosure of proprietary financial data or use of such data for any purpose other than to perform accounts payable services.

G.4 PAYMENTS (MAY 2007)

A. An electronic version (e.g., in PDF format) of an invoice or contract financing request shall be submitted covering the amount claimed to be due, services rendered, and cost incurred hereunder. The electronic version of the invoice, http://www.gsa.gov/portal/forms/download/115462, shall be submitted to the DOT/FAA Enterprise Services Center at the following e-mail address: volpeinvoices@faa.gov. A cover email must accompany each invoice and identify the required fields listed below:

Invoice Date:

Supplier Name:

Invoice Amount:

Invoice Number:

Contract#/Purchase Order #:

Task:

Modification #:

Terms/Discount:

Performance Period:

Notes:

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 TYPE OF CONTRACT (DEC 1998)

This is a Firm-Fixed Price contract in accordance with Federal Acquisition Regulation (FAR) 16.202.

H.2 GPO PRINTING REQUIREMENT (DEC 1998)

All printing funded by this contract will be accomplished in conformance with Title 44, United States Code, regulations of the Joint Committee on Printing, applicable provisions of appropriation acts, and applicable regulations issued by the Government Printing Office and the Department of Transportation.

H.3 CONTRACTOR RESPONSIBILITY (DEC 1998)

The Contractor shall without additional expense to the Government, be responsible for all damage to persons or property that occur as a result of its fault or negligence in connection with the prosecution of the work, and shall be responsible for the proper care and protection of work performed. Breakage or loss of office equipment or other property including that of a Government employee, which may occur in or about the building as a result of a fault or negligence in the Contractor's operations or fault or negligence in the actions of the Contractor's agent, subcontractors or its employees shall be made good by the Contractor at its expense.

http://www.gsa.gov/portal/forms/download/115462 mailto:volpeinvoices@faa.gov

H.4 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (DEC 1998)

In accordance with FAR 52.228-5, Insurance - Work on a Government Installation, in Section I, insurance of the following types and minimum amounts shall be procured and maintained during the entire period of performance under this contract:

(a) Workman's Compensation and Employees Liability Insurance - as specified by applicable statute, but not less than $100,000.

(b) General Liability Insurance - Bodily Injury Liability - $500,000 per occurrence.

(c) Automobile Liability Insurance - $200,000 per person, $500,000 per occurrence bodily injury, $20,000 per occurrence property damage.

H.5 HOURS OF WORK (JUN 2007)

Contractor and subcontractor employees performing work under this contract on Government premises shall adhere to the established business hours, except as may be required by this contract to accomplish the performance of the work, or except as may be required by the Contracting Officer designated representative. The normal working hours are Monday through Thursday. The normal working hours are Monday through Friday (7:00am to 3:30pm). Noise restrictions should not apply.

H.6 PERFORMANCE AND PAYMENT BONDS (DEC 1998)

(a) For contracts not exceeding $25,000.00, the offeror to whom award is made is not required to furnish Performance and Payment Bonds.

(b) For contracts in excess of $25,000.00, or modified to exceed $25,000.00, the offeror to whom award is made is required to furnish performance and payment bonds in accordance with the following:

(1) Performance and payment bonds shall be furnished within the time period specified in block (12B on Standard Form 1442 - Solicitation, Offer, and Award (Page 1 of the solicitation)

(2) Performance and payment bonds shall be on Standard Form 25 - Performance Bond and Standard Form 25-A - Payment Bond.

(3) The penal amounts of the bonds shall be as follows:

(i) Performance Bond: 100% of the contract price and if the contract price increases, an additional amount equal to 100 percent of the increase;

(ii) Payment Bond: 100% of the contract price and if the contract price increases, an additional amount equal to 100 percent of the increase.

(iii) The amount of the payment bond must be no less than the amount of the performance bond.

H.7 PERFORMANCE OF WORK AND SAFETY PROVISIONS ON GOVERNMENT

PREMISES (APR 2003)

(a) Any work under this contract which is performed by the contractor or any of its subcontractors on premises that are under direct control of the Government, is subject to the following provisions:

(1) Performance of work on Government premises shall be confined to the area(s) specified by the CO or designee. In performance of this work, the contractor shall: (a) conform to all safety rules and requirements as in effect during the term of the contract; and (b) take such additional precautions as the contracting officer may reasonably require for safety and accident prevention purposes.

(2) The contractor shall designate to the CO or designee, in writing, an on-the-premises representative to serve as point of contact.

(3) Any violation of applicable safety rules and requirements shall be promptly corrected as directed by the CO.

H.8 SAFETY AND ACCIDENT PREVENTION (JULY 2003)

In performing any work under this contract on premises which are under the direct control of the Government, the contractor shall (a) conform to all safety rules and requirements as in effect during the term of the contract; and (b) take such additional precautions as the Contracting Officer may reasonably require for safety and accident prevention proposes. The Contractor agrees to take all reasonable steps and precautions to prevent accidents and preserve the life and health of contractor and Government personnel performing or in any way coming in contact with the performance of the contract on such premises. Any violation of such rules and requirements, unless promptly corrected as directed by the Contracting Officer, shall be grounds for termination of this contract.

H.9 SAFETY AND HEALTH (JULY 2003)

(a) In accordance with FAR 52.236-13, "Accident Prevention", referenced in Section I, reports on accidents shall be provided as follows:

The Contractor shall immediately notify and promptly report to the Contracting Officer or his representative, an accident or incident or exposure resulting in fatality, disabling occupational injury or occupational disease or contamination of property arising out of work performed under this contract.

Provided, however, the Contractor will not be required to include in any report an expression of opinion as to the fault or negligence of any employee. In addition, the Contractor shall comply with any illness, incident and industry experience reporting requirements set forth in the Schedule of the contract. The Contractor will investigate all such work related incidents or accidents to persons and property to the extent necessary to positively conclude what cause or causes resulted in said accident or incident, and furnish the Contracting Officer with a report, in such form as the Contracting Officer may require, of the investigative findings, together with proposed and/or completed corrective actions.

(b) Information on the Code of Federal Regulations (CFR) requirements ' pertaining to safety and health standards, 29 CFR 1910 and 29 CFR 1926 for OSHA General Industry Safety and Health Standards and OSHA Construction Industry Standards, respectively, is available as follows:

(1) OSHA Publication 2207, which includes a combination of the CFR requirements as they relate to construction safety and health, for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402.

U.S. Department of Labor Occupational Safety & Health Administration JFK Federal Building, Room E340 Boston, Massachusetts 02203

H.10 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REQUIREMENTS

All rulings and interpretations of the Davis-Bacon and related acts contained in 29 CFR Parts 1 and 5 are herein incorporated by reference in this contract.

H.11 SALES TAX EXEMPTION (SEP 1999)

A. The Volpe National Transportation Systems Center, as part of the Department of Transportation, an agency of the United States, is an exempt purchaser. Accordingly, all purchases of personal property by this organization are exempt from state and local taxation.

B. The Contractor may be provided with Tax Exemption certificates for the purpose of obtaining an exemption under this procurement for materials and equipment purchased under this procurement.

Notwithstanding the terms of the Federal, State, and Local Taxes clause, the Contractor shall state separately on its vouchers the amount of state sales tax, and the Government agrees to either to pay the amount of the tax to the Contractor or, where the amount of the tax exceeds $250.00 to provide evidence necessary to sustain the exemption.

SECTION I - CONTRACT CLAUSES

I.1 FAR 52.252.2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses, by reference, with the same force and effect as if they were given in full text. Upon request, the CO will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://acquisition.gov/far/index.html (FAR) http://www.dot.gov/ost/m60/tamtar/tar.htm (TAR) https://one.dot.gov/ost/m1/m60/Shared%20Documents/Transportation%20Acquisition%20Manual/tam.ht m (TAM)

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

NUMBER TITLE DATE

52.202-1 DEFINITIONS NOV 2013

52.203-3 GRATUITIES APR 1984

52.203-5 COVENANT AGAINST CONTINGENT FEES MAY 2014

52.203-7 ANTI-KICKBACK PROCEDURES MAY 2014

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY

OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY MAY 2014

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR

IMPROPER ACTIVITY MAY 2014

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE

CERTAIN FEDERAL TRANSACTIONS OCT 2010

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS

AND REQUIREMENT TO INFORM EMPLOYEES OF

WHISTLEBLOWER RIGHTS APR 2014

52.204-1 APPROVAL OF CONTRACT

http://acquisition.gov/far/index.html http://www.dot.gov/ost/m60/tamtar/tar.htm

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POST-

CONSUMER FIBER CONTENT PAPER MAY 2011

52.204-7 SYSTEM FOR AWARD MANAGEMENT JUL 2013

52.204-9 PERSONAL IDENTITY VERIFICATION OF

CONTRACTOR PERSONNEL JAN 2011

52.204-10 REPORTING EXECUTIVE COMPENSATION

AND FIRST-TIER SUBCOTRACT AWARDS JUL 2013

52.204-12 DATA UNIVERSAL NUMBERING SYSTEM NUMBER

MAINTENANCE DEC 2012

52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED,

SUSPENDED, OR PROPOSED FOR DEBARRMENT AUG 2013

52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH

LANGUAGE APR 1991

52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY APR 1991

52.215-2 AUDIT AND RECORDS – NEGOTIATION OCT 2010

52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT OCT 1997

FORMAT

52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING

DATA AND DATA OTHER THAN CERTIFIED COST OR

PRICING DATA OCT 2010

ALTERNATE I OCT 2010

52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING

DATA AND DATA OTHER THAN CERTIFIED COST OR

PRICING DATA-MODIFICATIONS OCT 2010

ALTERNATE I OCT 2010

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS MAY 2014

52.219-14 LIMITATIONS ON SUBCONTRACTING NOV 2011

52.219-28 POST AWARD SMALL BUSINESS PROGRAM

REPRESENTATION JUL 2013

52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES FEB 1997

52.222-3 CONVICT LABOR JUN 2003

52.222-4 CONTRACT WORK HOURS AND SAFETY

STANDARDS ACT - OVERTIME COMPENSATION MAY 2014

52.222-5 CONSTRUCTION WAGE RATES-SECONDARY SITE

OF THE WORK MAY 2014

52.222-6 CONSTRUCTION WAGE RATES REQUIREMENTS MAY 2014

52.222-7 WITHHOLDING OF FUNDS MAY 2014

52.222-8 PAYROLLS AND BASIC RECORDS MAY 2014

52.222-9 APPRENTICES AND TRAINEES JUL 2005

52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS FEB 1988

52.222-11 SUBCONTRACTS (LABOR STANDARDS) MAY 2014

52.222-12 CONTRACT TERMINATION – DEBARMENT MAY 2014

52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE

REQUIREMENTS AND RELATED REGULATIONS MAY 2014

52.222-14 DISPUTES CONCERNING LABOR STANDARDS FEB 1988

52.222-15 CERTIFICATION OF ELIGIBILITY MAY 2014

52.222-21 PROHIBITION OF SEGREGATED FACILITIES FEB 1999

52.222-26 EQUAL OPPORTUNITY MAR 2007

52.222-27 AFFIRMATIVE ACTION COMPLIANCE

REQUIREMENTS FOR CONSTRUCTION FEB 1999

52.222-35 EQUAL OPPORTUNITY FOR VETERANS SEP 2010

52.222-36 AFFIRMATIVE ACTION FOR WORKERS

WITH DISABILITIES OCT 2010

52.222-37 EMPLOYMENT REPORTS ON VETERANS SEP 2010

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE

NATIONAL LABOR RELATIONS ACT DEC 2010

52.222-50 COMBATING TRAFFICKING IN PERSONS FEB 2009

52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND

MATERIAL SAFETY DATA JAN 1997

ALTERNATE I JAN 1995

52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW

INFORMATION MAY 2011

52.223-6 DRUG-FREE WORKPALCE MAY 2001

52.223-15 ENERGY EFFICIENCY IN ENERGY CONSUMING

PRODUCTS DEC 2007

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN

TEXT MESSAGING WHILE DRIVING AUG 2011

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES JUN 2008

52.227-1 AUTHORIZATION AND CONSENT DEC 2007

52.227-4 PATENT INDEMNITY - CONSTRUCTION CONTRACTS DEC 2007

52.227-11 PATENT RIGHTS-OWNERSHIP BY THE CONTRACTOR MAY 2014

52.228-2 ADDITIONAL BOND SECURITY OCT 1997

52.228-5 INSURANCE - WORK ON A GOVERNMENT JAN 1997

INSTALLATION

52.228-11 PLEDGES OF ASSETS JAN 2012

52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS

FOR BONDS MAY 2014

52.228-14 IRREVOCABLE LETTER OF CREDIT MAY 2014

52.228-15 PERFORMANCE AND PAYMENT BONDS –

CONSTRUCTION OCT 2010

52.229-3 FEDERAL, STATE, AND LOCAL TAXES FEB 2013

52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS MAY 2014

52.232-17 INTEREST MAY 2014

52.232-23 ASSIGNMENT OF CLAIMS MAY 2014

52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS MAY 2014

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER –

SYSTEM FOR AWARD MANAGEMENT JUL 2013

52.233-1 DISPUTES MAY 2014

52.233-3 PROTEST AFTER AWARD AUG 1996

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT OCT 2004

CLAIM

52.236-2 DIFFERING SITE CONDITIONS APR 1984

52.236-3 SITE INVESTIGATION AND CONDITIONS

AFFECTING THE WORK APR 1984

52.236-5 MATERIAL AND WORKMANSHIP APR 1984

52.236-6 SUPERINTENDANCE BY THE CONTRACTOR APR 1984

52.236-7 PERMITS AND RESPONSIBILITIES NOV 1991

52.236-8 OTHER CONTRACTS APR 1984

52.236-9 PROTECTION OF EXISTING VEGETATION,

STRUCTURES, EQUIPMENT, UTILITIES,

AND IMPROVEMENTS APR 1984

52.236-10 OPERATIONS AND STORAGE AREAS APR 1984

52.236-11 USE AND POSSESSION PRIOR TO COMPLETION APR 1984

52.236-12 CLEANING UP APR 1984

52.236-13 ACCIDENT PREVENTION NOV 1991

52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES APR 1984

52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS APR 1984

52.236-17 LAYOUT OF WORK APR 1984

52.236-21 SPECIFICATIONS AND DRAWINGS FOR

CONSTRUCTION FEB 1997

52.236-26 PRECONSTRUCTION CONFERENCE FEB 1995

52.242-13 BANKRUPTCY JUL 1995

52.243-4 CHANGES JUN 2007

52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS MAY 2014

52.246-21 WARRANTY OF CONSTRUCTION MAR 1994

52.248-3 VALUE ENGINEERING-CONSTRUCTION OCT 2010

52.249-2 TERMINATION FOR CONVENIENCE OF THE APR 2012

GOVERNMENT (FIXED-PRICE)

ALTERNATE I SEP 1996

ALTERNATE II SEP 1996

ALTERNATE III SEP 1996

52.249-3 TERMINATION FOR CONVENIENCE OF THE

GOVERNMENT (DISMANTLING, DEMOLITION, OR

REMOVAL OF IMPROVEMENTS) APR 2012

ALTERNATE I SEP 1996

52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) APR 1984

TRANSPORTATION ACQUISITION REGULATION (48 CFR CHAPTER 12)

NUMBER TITLE DATE

1252.223-71 ACCIDENT AND FIRE REPORTING APR 2005

1252.223-73 SEAT BELT USE POLICIES AND PROGRAMS APR 2005

1252.236-70 SPECIAL PRECAUTIONS FOR WORK AT OCT 1994

OPERATING AIRPORTS

1252.237-70 QUALIFICATIONS OF CONTRACTOR EMPLOYEES APR 2005

1252.242-72 DISSEMINATION OF CONTRACT INFORMATION OCT 1994

1252.245-70 GOVERNMENT PROPERTY REPORTS OCT 1994

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

I.2 FAR 52.204-1 APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of the Contracting Officer and shall not be binding until so approved.

I.3 FAR 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

(a) The Contractor shall make the following notifications in writing:

(1) When the Contractor becomes aware that a change in its ownership has occurred, or is certain to occur, that could result in changes in the valuation of its capitalized assets in the accounting records, the Contractor shall notify the Administrative Contracting Officer (ACO) within 30 days.

(2) The Contractor shall also notify the ACO within 30 days whenever changes to asset valuations or any other cost changes have occurred or are certain to occur as a result of a change in ownership.

(b) The Contractor shall -

(1) Maintain current, accurate, and complete inventory records of assets and their costs;

(2) Provide the ACO or designated representative ready access to the records upon request;

(3) Ensure that all individual and grouped assets, their capitalized values, accumulated depreciation or amortization, and remaining useful lives are identified accurately before and after each of the Contractor's ownership changes; and

(4) Retain and continue to maintain depreciation and amortization schedules based on the asset records maintained before each Contractor ownership change.

(c) The Contractor shall include the substance of this clause in all subcontracts under this contract that meet the applicability requirement of FAR 15.408(k).

I.4 FAR 52.225-9 BUY AMERICAN -CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the https://acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/ manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

[Contracting Officer to list applicable excepted materials or indicate “none”]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable.

This is the start of the file's text. The full file is on GovTribe.