ABE_ATCT_-_Appendix_B.pdf

PDF 32 KB Posted

Attached to
Fuel Storage Tank Replacement-Allentown, PA
Solicitation number
DTRT57-14-Q-80078
Issued by

About this file

Attachment J.4 Site Survey

View the file

Other files

File Type Posted
Wage_Determination-Allentown.txt TXT text file
Project_Plan_Specifications_ABE-ATCT_8-29-14Clean.pdf PDF
RFQ_No._DTRT57-14-Q-80078.pdf PDF
Typical_AST_Tank_Layout.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Name:

331 Airport Drive

0 LF

0.3 CY to be installed

(to replace removed asphalt)

0 EA 0

CIVIL INSTALLATION Baseline Quantity Actual Quantity

1 EA 2

Remove conduit/s? NO Remove fuel oil control valve/s? NO

0 EA 0

0 EA

0 EA 0

ELECTRICAL DEMOLITION Baseline Quantity Actual Quantity 0 EA 0Remove DDCP fuel control panel/s? NO

6 LF 0

Tank Replacement

0 EA 0Close in Place Underground Piping? NO

26 LF

Remove vent line/s? NO

2500-gal

0 EA 1

0 EA 1

0 EA 0

MECHANICAL DEMOLITION Baseline Quantity Actual Quantity

0 EA 1

Tank Repair

Remove entire daytank control panel/s? NO Remove Pump motor starter/s? NO

0 EA 0

0 EA 0

Remove Fuel Tank Monitor/s? YES Remove ERMS Connection/s? NO Site Specific Electrical Demolition:

Gravel Removal? YES

Asphalt Trenching Installation? YES

0 CY 10 CY

0 CY 0.5 CY

1-1000 EA

Site Specific Mechanical Demolition:

Mode of transportation to the facility for equipment delivery? Truck

Asphalt Trenching removal? YES

Concrete Trenching removal? YES

Remove submersible pump/s? NO wall and will cut across an asphalt driveway, a concrete sidewalk, underneath radiator water lines, and a water pipe support post.

Asphalt and Concrete removal will be required. Concrete curb repair may also be necessary.

Bollard removal? YES Site Specific Civil Demolition:

0 EA

Baseline Quantity Actual Quantity

0 LF

0.3 CY to be removed

12' X 2' X 4"

Close in Place Underground Tank/s? NO

Remove manway and piping containment/equipment sump/s? YES Remove fill port and spill bucket/s? YES

Remove outside fuel piping - approximately 50 feet - supply and return piping inside a secondary containment plastic pipe. Each line is approx 50-feet Will remove above ground portion of vent line, as requested.

If yes coverage requirements:

Soil Excavation to Remove or Expose Piping? YES

Remove tank/s? YES

Site Specific challenges: AST will be installed in same location after current UST is removed. Piping will be underground from the AST to outside the EG room

Remove fuel lines? YES

GENERAL REQUIREMENTS/LOGISTICS

If yes are they utilizing a local firm? The contractor will contact the State "One Call" utility locator. Also, the contractor will utilize a third party utility locator to conduct GPR and EMI.

Temporary Facilities Required? NO

Surveying & Utility locating required? Yes. GPR and EMI will be conducted prior to construction activities taking place. This will be initiated by the removal/install contractor.

If yes Amount:

SITE WORK

Bond Required by local municipality? NO Specific Insurance required? NO

0 LF

0.12 CY to be removed

68.5" X 2' X 4"

0 CY 2.5 CY

0 CF 1 CYConcrete Support Slab Removal? YES

Soil Excavation to Remove or Expose tank? YES

Latitude Longitude

Remove manway lid/s? YES

Remove Daytanks? NO 0 EA

CIVIL DEMOLITION

AST UST 1-UST 1-AST

SITE SURVEY CHECKLIST Location Identifier Facility Identifier

Address City

State

Date Facility POC

Alan Laird Daytime Phone: 610-264-2220 Type of FST Number of Tanks to be removed Number of tanks to be installed

PA

7/29/2014

ABE

ATCT

Allentown

40.658466 -75.441668

ELECTRICAL DEMOLITION Baseline Quantity Actual Quantity

Install New Permanent Daytank System? NO

Install New Permanent fuel supply/overfill piping from MT to DT? YES

Install Power Conductors? NO 60 LF 0

Install service platform? YES Basic Mechanical

20 LF 75 LF

0 EA 0

Install daytank control panel/s? NO

Install Fuel Tank Monitor/s? YES

0 EA 0

1 1

Tank Repair

Tank Replacement Gallons: 250 250

1 EA 0

26 LF

20 LF

(Total for 1 supply and 1 return hose)

Install Temporary fuel supply system? YES

AST Gallons: 1,000-gallon

Install New Permanent fuel supply/Return piping from DT to EG? YES

0 EA 0

Install Temporary fuel supply Piping? YES

Install New Permanent secondary containment piping from MT to DT? YES 20 LF 66 LF

35 LF 0

0 EA 0

0 EA 0

Baseline Quantity Actual Quantity

Baseline Quantity Actual Quantity

0 LF

0.12 CY to be installed

(to replace removed concrete)

0 EA 0

74 LF

112 LF

(Total for 1 supply and 1 return hose)

8 LF 0

10 TONS 12 TONS

Self-compacting gravel to be used to fill UST excavation. Additional stone to be installed to get AST location level with grade - Approx 2 TONS (added to total above).

Top Soil Installation? NO Gravel Installation? YES

0 LF 0

0 CY

2.5 CY for AST pad

0.5 CY for Stairs/Platform pad

0 EA

MECHANICAL INSTALLATION Baseline Quantity Actual Quantity

0 LF 0

Concrete Support Slab installation? YES

Site Specific Mechanical Installation:

Install manway and piping containment sump/s? NO

Install pump/s? NO

5Bollard Installation? YES Site Specific Civil Installation:

Concrete Trenching Installation? YES Select backfill installation? YES

Paint Bollards? YES

20 LF 20 LF

Install piping Labels? YES Install valve tags? NO

0 EA

Install New Permanent vent piping? NO Install New Permanent Daytank vent piping? YES 0 LF 16 LF

New fuel hoses to be installed from MT to inside EG Room wall at secondary containment termination boot.

Install New fuel cooler? NO

Install Control/Comm wiring? NO

Install actuated fuel oil control valve/s? NO Install conduit/s? YES

Install fuel control panel/s? NO

Install fill port and spill bucket/s? NO Install manway lid/s? NO

Replace supply and return fuel piping inside EG room. Return fuel piping will be sized larger than the diameter of the supply piping.

Paint piping? YES

The overfill alarm will require the installation of a separate electrical circuit breaker inside the electrical panel box.

Site Specific Electrical Installation:

Install a new Veeder-Root TLS 300C monitoring system. Monitor install location will be in current monitoring system location. Vent louver conduit will need to be rerouted to enable Veeder Root installation.

ERMS Connection/s to be Coordinated by FAA. POC for Coordination:

1 EA

No

00 EA

ELECTRICAL INSTALLATION

Install motor starter/s? NO

Install New Permanent Tank? YES Gallons: GPM Rating: 0

Sheet1

File details come from the government source that posted it. Updated .