DTMA92R2013-0007_Amendment_0002.pdf
PDF 84 KB Posted
- Attached to
- STATE OF MAINE BERTHING UPGRADE
- Solicitation number
- DTMA-92-R-2013-0007
About this file
Amendment 0002 answers two questions inadvertently left off Amendment 0001. Contractors MUST sign date and return BOTH amendments with proposals 25 April by 1400 hours EDT. No further questions will be addressed.
View the file
Other files
Show 40 more
Latest 50 of 64 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTMA-92-R-2013-0007
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Norfolk VA 23505-1204 Building 19 Suite 300
00092
7737 Hampton Blvd
MAR-380.2
Atlantic Div. Acquisition Office U. S. DOT Maritime Administration
NORFOLK VA 23505-1204
Building 19 Suite 300
00092
7737 Hampton Blvd
MAR-380-2
Atlantic Div. Acquisition Office U.S.DOT/ Maritime Administration
02/11/20130002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/11/2013
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0002 answers two questions that were inadvertently left off Amendment 0001.
Contractors are reminded to sign, date and return both Amendments 0001 and 0002 with proposals 25 April at 1400 hours EDT.
Question 1
For decorative Bulkhead Liner panels in way of ship's hull, and other interior structural steel bulkheads, would you accept the USCG B-15 approved 19 mm Thermax / Fipro system ?
The 19 mm thick panels do not require a steel stud wall, are secured in top and bottom tracks, and use non-progressive Omega joinery.
The answer is "Yes;" Marad will accept this.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
LAUREL BISHOP
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
DTMA-92-R-2013-0007/0002
In light of SOW 61 and Q 27, (see below) the Thermax panels have a Thermal Conductivity of (dry acc DIN 52612) = 0.16 W/mk If a different Thermal Conductivity quotient is deemed to be required, would you accept fiberglass insulation installed in the cavity between steel bulkhead and the 19 mm Thermax panel.
The answer is "yes;" the paneling against the hull must have the same thermal rating as the existing panel against the hull.
Question 2 As an alternate to the standard -60 surface finish of the hard-core Thermax / Fipro panels, would you accept a -18 Laminate finish with AEON technology which outperforms traditional laminate on wear resistance, as well as scratch / scuff / mar resistance ?
The answer is "yes;" this is acceptable to Marad.
Period of Performance: 09/02/2013 to 12/02/2013
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .