STRUCTURE SUMMARY STRUCTURE NO. 5530-001T
SERVICE ROAD BRIDGE INSPECTION DATE: 4/8/10
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... BOX GIRDER - SINGLE or SPREAD NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 174.0 FT (53.0 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 70.0 FT (21.3 M)
WEARING SURFACE: .......... OTHER DECK WIDTH: ...................... 11.7 FT (3.6 M)
ABUT. FOUNDATIONS: ........ UNKNOWN CURB TO CURB WIDTH: ..... 8.3 FT (2.5 M)
PIER FOUNDATION(S): ........ UNKNOWN YEAR BUILT: ........................ 1960 (EST.)
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... / NONE SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 6 - RESTRICTED FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1998, 2005 - NEW LMC OVERLAY; DECK & PIER REHAB. 2005 - LATEX PAINT SEAL ON
PARAPETS & NORTH ABUTMENT. 2010-NORTH APPROACH RECONSTRUCTED.
LOCATION
MAMMOTH CAVE NATIONAL PARK MILE POINT: ..................... 0.00 (KM PT 0.00)
STATE: ................................. KENTUCKY LOCATION: BETWEEN HOTEL AND VISITOR
CENTER FACILITY CARRIED: ............ PEDESTRIAN BRIDGE
FEATURE INTERSECTED: .. SERVICE ROAD AND STREAM
STRUCTURE EVALUATION SUMMARY
This concrete box girder bridge is in fair condition overall. Problems include areas of spalled concrete with exposed rebar on the underside of the deck overhangs, cracking with efflorescence and delaminated concrete on the north pier, spalling with exposed rebar on the south pier, clogging of most deck drains with soil and debris, trees growing against the box girder at the south pier, and an open light fixture with exposed wiring at the south approach. It should also be noted that the neoprene bearing pads at both abutments are deteriorating, but this condition does not appear to be causing any distress to the structure. Since the previous inspection, the north approach and railings have been reconstructed, and tree limbs in the channel and against the south pier have been removed.
Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: A. IMMEL, T. POWELL (VOLKERT, INC.)
CONDITION ASSESSMENT:
AARON IMMEL, P.E., FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., LEAD STRUCTURAL ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 7/30/10
GEORGE CHOUBAH, P.E., INSPECTION PROGRAM TEAM LEADER 703-404-6244
FIELD INSPECTION REPORT STRUCTURE NO. 5530-001T
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK
ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
(LIGHTING)
F F N N N N N N G
F G
(VEGETATION)
G G N G P N
F
F
G
F
58.1 MINOR DELAMINATION ON DECK UNDERSIDE AT DRAINS AND ON
EAST EXTERIOR SIDE OF DECK NEAR NORTH ABUTMENT. SEVERAL
MINOR DELAMINATIONS AND SPALLS WITH EXPOSED REBAR ON
UNDERSIDE OF WEST OVERHANG NEAR NORTH ABUTMENT.
MINOR DELAMINATIONS AND SPALLS ON UNDERSIDE OF EAST
OVERHANG NEAR NORTH ABUTMENT. MINOR LONGITUDINAL AND
TRANSVERSE CRACKING ON UNDERSIDE OF OVERHANGS, SOME
CRACKS WITH EFFLORESCENCE. WATER STAINING ON UNDERSIDE
OF DECK OVERHANGS. MINOR MOSS GROWTH ALONG BOTH DECK
SIDES. MINOR CRACKING AT BRIDGE END.
58.2 EXPANSION JOINT COVER OVER NORTH PIER. JOINT MATERIAL IS
DETERIORATED AT PIERS AND FALLING THROUGH AT BRIDGE
OVERHANGS. MINOR TO MODERATE CRACKING OF EXPANSION
JOINT MATERIAL OVER SOUTH ABUTMENT. JOINT MATERIAL HAS
BEEN SEALED WITH LATEX COATING. SIGNIFICANT LEAKAGE AT
ABUTMENTS AND PIERS.
58.2,7 PREVIOUSLY NOTED PONDING ALONG NORTH ABUTMENT JOINT
AND AT NORTHWEST CORNER OF PARAPET HAS BEEN REPAIRED
AS PART OF RECONSTRUCTION, SEE 222.3,4.
58.3, 222.4 LATEX OVERLAY SEAL COAT PLACED ON BRIDGE DECK AND
APPROACHES IN 2005. MINOR CRACKING OF SEAL COAT AT NORTH
END OF NORTH APPROACH.
58.6 PARAPETS AND RAILS HAVE BEEN COATED WITH PROTECTIVE
SEALANT. MINOR SCALING AND DELAMINATION OF WEST
CONCRETE RAIL, OUTSIDE FACE, NEAR SOUTH ABUTMENT. MINOR
DELAMINATION OF EAST PARAPET IN SOUTH SPAN, BELOW
FOURTH RAIL POST. MINOR TO MODERATE CRACKING OF
PARAPETS AND RAILS.
58.7 LATEX OVERLAY PLACED OVER DRAINS; HOLES PUNCHED
THROUGH OVERLAY TO ALLOW FOR DRAINAGE. MOST DECK
DRAIN OPENINGS ARE CLOGGED WITH SOIL AND DEBRIS.
PONDING WATER ALONG EAST PARAPET IN CENTER SPAN. DECK
DRAIN INSTALLED AT NORTH APPROACH, SEE 222.3,4.
1. BREASTWALLS OR COLUMNS G
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS G
4. BACKWALLS AND/OR BULKHEADS G
5. FOUNDATIONS N
6. WINGWALLS G
7. WEEP HOLES N
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR G
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION N
12. OTHER N
PIER(S)
F13. WALLS AND/OR COLUMNS
N14. PILE BENTS
F15. CAPS AND/OR BEARING SEATS
N16. FOUNDATIONS
G17. EROSION AND/OR SCOUR
G18. SETTLEMENT OR DEFLECTION
N19. OTHER
INSPECTION DATE: 4/8/10
STRUCTURE NO. 5530-001T FIELD INSPECTION REPORT
SERVICE ROAD BRIDGE
ITEM REFERENCE AND REMARKS
AVERAGE CLEAR OPENING 8.
7. NORMAL VELOCITY
ADEQUACY OF OPENING 6.
5. OTHER
4. WATERWAY OBSTRUCTIONS
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 7
G G N G N
LOW
SUFF
25 FT.
9. STREAM BED COMPOSITION :
SILT, GRAVEL
222. APPROACHES 7
OTHER 9.
ALIGNMENT 8.
SIGNS7.
SETTLEMENT 6.
EROSION5.
SURFACING4.
APPROACH GUARDRAIL 3.
2. RELIEF JOINTS
APPROACH SLABS1. N
N G G G G N G N
223. RETAINING WALL 8
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL G
N N G G N
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDSD.
APPROACH GUARDRAILSC.
TRANSITIONSB.
BRIDGE RAILINGSA. N
N N N
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
58.10 SEVERAL LIGHT FIXTURE COVERS EMBEDDED IN EAST PARAPET
ARE MISSING SOME ATTACHMENT SCREWS. SINCE PREVIOUS
INSPECTION ALL COVERS HAVE BEEN TIGHTENED. COVER
DAMAGED AT SECOND LIGHT FROM SOUTH BRIDGE END. ALL
LIGHTS ON BRIDGE ARE FUNCTIONING, BUT OPEN FIXTURE IS
PRESENT AT SOUTH APPROACH ON EAST PARAPET.
59.1 SEVERE DETERIORATION OF EDGES OF THIN NEOPRENE PADS AT
BOTH ABUTMENTS.
59.2 PRECAST CONCRETE BOX GIRDER. MINOR SPALLS WITH EXPOSED
REBAR AT SEVERAL LOCATIONS ON BOX DUE TO INSUFFICIENT
CONCRETE COVER. MINOR SPALL WITH RUST STAINING ON EAST
SIDE OF BOX NEAR SOUTH ABUTMENT. EFFLORESCENCE
LEACHING ONTO EXTERIOR FACE OF BOX FROM CONSTRUCTION
JOINT BETWEEN TOP SLAB AND WEB ON BOTH SIDES OF BOX
GIRDER NEAR NORTH ABUTMENT. MINOR GROUT DETERIORATION
ALONG BOTTOM CORNERS OF BOX. MINOR RUST STAINING FROM
REBAR CHAIRS ON UNDERSIDE OF BOX. WATER STAINING ON
SIDES OF BOX GIRDER.
59.11 SEVERAL SMALL TREES GROWING AGAINST BOTTOM OF BOX
GIRDER NEAR SOUTH PIER.
60.1 MINOR HORIZONTAL CRACKING AND SCALING OF SOUTH
BREASTWALL AND CHEEKWALLS. MODERATE STAINING OF
BREASTWALLS. NORTH BREASTWALL AND CHEEKWALLS COATED
WITH PROTECTIVE SEALANT. MINOR CONSTRUCTION DEBRIS
ACCUMULATION ON NORTH ABUTMENT BEARING SEAT.
60.4 MINOR MAP CRACKING WITH EFFLORESCENCE AND MINOR
DELAMINATION ON NORTH ABUTMENT BACKWALL.
60.13 MODERATE CRACKING OF NORTH PIER FINISH COAT WITH
MODERATE EFFLORESCENCE. NORTH PIER IS DELAMINATED
THROUGHOUT. SPALLING WITH EXPOSED REBAR (1'-6" LONG X 2"
WIDE) ON WEST COLUMN OF SOUTH PIER; THREE MINOR SPALLS
WITH EXPOSED REBAR NEAR TOP OF COLUMN.
60.15 SPALL (12" DIAMETER X 2" DEEP) WITH EXPOSED REBAR ON SOUTH
FACE OF SOUTH PIER CAP. SPALL ON NORTH FACE OF SOUTH
PIER CAP WITH EXPOSED REBAR. WATER LEACHING ONTO
BEARING SEAT AREA OF NORTH PIER.
61.2 MINOR SCOUR WITH SEVERAL TREES SLIGHTLY UNDERMINED.
61.4 PREVIOUSLY NOTED TREE LIMBS IN CHANNEL AND LEANING
AGAINST EAST COLUMN OF SOUTH PIER HAVE BEEN REMOVED.
FIELD INSPECTION REPORT STRUCTURE NO. 5530-001T
ADDITIONAL ITEM REFERENCE AND REMARKS
222.3 DELAMINATED CONCRETE (18" HIGH X 12" WIDE) IN EAST APPROACH PARAPET UNDER RAIL POST NEAR SOUTH
PIER. MINOR TO MODERATE CRACKING OF PARAPETS.
222.3,4 NORTH APPROACH HAS BEEN RECONSTRUCTED SINCE PREVIOUS INSPECTION. RECONSTRUCTION CONSISTS OF NEW STONE PARAPET ENDS, PAINTED STEEL RAILING, AND DECK DRAIN. WATER PONDING AT SOUTH
APPROACH.
223.1 INTERLOCKING BLOCK RETAINING WALL RECENTLY CONSTRUCTED AT NORTH APPROACH.
STRUCTURE LOAD RATING STRUCTURE NO. 5530-001T
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H
HS
TYPE 3
TYPE 3S2
TYPE 3-3
DESIGN LOADING: OTHER OR UNKNOWN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: LOAD CAPACITY IS ADEQUATE FOR PEDESTRIAN LOADING AND LIGHT SERVICE VEHICLES.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5530-001T
STRUCTURE IDENTIFICATION
(201) PARK: MAMMOTH CAVE NATIONAL PARK (1) STATE: ....................................... 214 - KENTUCKY (KY)
(202) STRUCTURE NAME: .......... SERVICE ROAD BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 4 - TRAIL BRIDGE (3) COUNTY CODE: ........................ 061 - EDMONSON
(204) STRUCTURE NUMBER: ..... 5530-001T (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 0 (6) FEATURES INTERSECTED:....... SERVICE ROAD AND STREA
(207) ROAD SECTION NO: .......... 001T (7) FACILITY CARRIED: .................. PEDESTRIAN BRIDGE
(208) NPS ROAD CLASS: ............ 6 - RESTRICTED (8) STATE STRUCTURE NO: .......... 5530001T0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ BETWEEN HOTEL AND VISIT
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ (11) MILE POINT: ............................. 0.00 (KM PT 0.00)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
06 - BOX GIRDER - SINGLE or SPREAD
70.0 FT (21.3 M)
174.0 FT (53.0 M)
0 - UNKNOWN
0 - UNKNOWN
0 - UNKNOWN
0 - UNKNOWN
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 9 - OTHER
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - OTHER OR UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING:
INSPECTION DATES
(90) INSPECTION DATE: 4/10 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5530-001T
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 37°11'10.50"
(17) LONGITUDE: ......................... 86°06'04.40"
(19) DETOUR LENGTH: ............... 0 MI (0 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 3 - PEDESTRIAN-BICYCLE
(42B) SERVICE UNDER: .............. 0 - OTHER
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 99.9 FT (99.9 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH: ........... 8.3 FT (2.5 M)
(52) DECK WIDTH: ............................ 11.7 FT (3.6 M)
(32) APPR. ROADWAY WIDTH: ........ 9.0 FT (2.7 M)
(213) APPR. PAVEMENT WIDTH: ..... 0.0 FT (0.0 M)
LEFT SHOULDER: .................. 0.0 FT (0.0 M)
RIGHT SHOULDER: ................ 0.0 FT (0.0 M)
(33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(34) SKEW ANGLE: ............................ 0 °
(35) DECK FLARE?: ........................... NO
(47) TOTAL HORIZ. CLEARANCE: .... 8.3 FT (2.5 M)
(50) SIDEWALKS:
LEFT : ...................................... 0.0 FT (0.0 M)
RIGHT : ................................... 0.0 FT (0.0 M)
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION: ......... 2 - MOUNTED ON PARAPET
MATERIAL: .............................. 5 - STEEL/ALUMINUM
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL
(215) BRIDGE RAIL HEIGHT: ............ 3.67 FT (1.12 M)
(53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 19.92 FT (6.07 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL:
(36) TRAFFIC SAFETY FEAT: ... NNNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
5 - Stable; scour within limits of
2 - REHAB/RECONSTRUCTION
C - MODERATE
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1998, 2005 - NEW LMC OVERLAY; DECK & PIER REHAB. 2005 - LATEX PAINT SEAL ON PARAPETS & NORTH ABUTMENT. 2010-NORTH
APPROACH RECONSTRUCTED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5530-001T
PHOTOGRAPHS STRUCTURE NO. 5530-001T
PHOTO #1 - LOOKING SOUTH TOWARD HOTEL
FLOW
PHOTO #2 - EAST (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOP SIDE VIEW
LOOKING SOUTH
PHOTO #4 - GENERAL UNDERSIDE VIEW OF
CENTER SPAN LOOKING SOUTH
PHOTO #5 - PONDING AT SOUTH APPROACH
PHOTO #6 - OPEN LIGHT FIXTURE AT SOUTH APPROACH; NOTE
CRACKING OF PARAPET
PHOTO #7 - TYPICAL CONDITION OF
EXPANSION JOINT MATERIAL, SOUTH
ABUTMENT EXPANSION JOINT SHOWN
PHOTO #8 - DAMAGE TO SECOND LIGHT
COVER FROM SOUTH BRIDGE END; NOTE
CRACKING OF PARAPET
PHOTO #9 - DELAMINATION OF EAST PARAPET IN SOUTH SPAN
PHOTO #10 - TYPICAL SOIL AND DEBRIS ACCUMULATION IN DECK
DRAINS
PHOTO #11 - PONDING ALONG EAST PARAPET IN CENTER SPAN
PHOTO #12 - GENERAL VIEW OF RECONSTRUCTION OF NORTH
APPROACH
PHOTO #13 - DECK DRAIN AT NORTH APPROACH
PHOTO #14 - GENERAL VIEW OF SOUTH ABUTMENT
PHOTO #15 - TYPICAL DETERIORATION OF BEARING PADS AT
ABUTMENTS, SOUTH ABUTMENT SHOWN
PHOTO #16 - SPALL WITH RUST STAINING ON EAST SIDE OF BOX
GIRDER NEAR SOUTH ABUTMENT
PHOTO #17 - GENERAL VIEW OF SOUTH PIER
PHOTO #18 - SPALLING WITH EXPOSED
REBAR ON NORTH FACE OF SOUTH PIER CAP
PHOTO #19 - SPALLING WITH EXPOSED
REBAR ON SOUTH FACE OF SOUTH PIER CAP;
NOTE DETERIORATION OF EXPANSION JOINT
MATERIAL AND LEAKAGE
PHOTO #20 - SPALLING WITH EXPOSED
REBAR ON WEST COLUMN OF SOUTH PIER
PHOTO #21 - TREES GROWING AGAINST BOTTOM OF BOX GIRDER
NEAR SOUTH PIER
PHOTO #22 - TYPICAL DETERIORATION OF EXPANSION JOINT
MATERIAL IN OVERHANGS, WEST OVERHANG AT NORTH PIER SHOWN
PHOTO #23 - GENERAL VIEW OF NORTH PIER;
NOTE LEAKAGE AND CRACKING WITH
EFFLORESCENCE
PHOTO #24 - CRACKING WITH
EFFLORESCENCE AND DELAMINATION OF
NORTH PIER COLUMNS
PHOTO #25 - LEAKAGE AND STAINING ON SIDES OF BOX GIRDER,
WEST SIDE SHOWN
PHOTO #26 - GENERAL VIEW OF NORTH ABUTMENT; NOTE DEBRIS
ACCUMULATION AND LEAKAGE
PHOTO #27 - SPALLING WITH EXPOSED REBAR ON WEST DECK
OVERHANG NEAR NORTH ABUTMENT
PHOTO #28 - GENERAL VIEW OF RETAINING WALL AT NORTHEAST
APPROACH
PHOTO #29 - UPSTREAM CHANNEL
PHOTO #30 - DOWNSTREAM CHANNEL