Amendment_0003_-_NP-MACA_001T(1).pdf
PDF 103 KB Posted
- Attached to
- Mammoth Cave National Park Federal contract opportunity
- Solicitation number
- DTFH71-17-B-00012
About this file
The Bid Opening date of March 9, 2017, at 2:00 p.m. EST will remain the same.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO_-_Schedule_A_-_MACA_001T(1).pdf | ||
| Amendment_0002_-_NP-MACA_001T(1).pdf | ||
| Amendment_0001_-_NP-MACA_001T.pdf | ||
| Report_2_Boring_Log.pdf | ||
| IFB_Solicitation_-_NP-MACA_001T(1).pdf | ||
| VETS-4212_-_Form.pdf | ||
| Report_1_NEPA.pdf | ||
| Plans_-_NP-MACA_001T(1).pdf | ||
| FP14_Eng.pdf | ||
| Appendix_KY_DEP_Section_401.pdf | ||
| Report_3c_Bridge_Inspection_STR_5530-001T_(02-23-2016).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Report_3b_Bridge_Inspection_STR_5530-001T_(02-18-2014).pdf | ||
| Report_3a_Bridge_Inspection_STR_5530-001T_(04-08-2010).pdf | ||
| Synopsis_-_NP-MACA_001T(1).doc | DOC document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
DTFH7117B00012
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
NP-MACA 001T(1)03/02/20170003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/05/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project: NP-MACA 001T(1) - Mammoth Cave NP - Visitor Center Bridge
The purpose of this Amendment is to:
Provide a summary of responses to questions/clarifications asked by potential bidders.
The Bid Opening date of March 9, 2017, at 2:00 p.m. EST will remain the same.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0003
Info Page 1 of 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project NP-MACA 001T(1)
Mammoth Cave National Park Visitor Center Pedestrian Bridge
Solicitation: DTFH71-17-B-00012
The purpose of this Amendment is to:
Provide a summary of responses to questions/clarifications asked by potential bidders.
The Bid Opening date of March 9, 2017, at 2:00 p.m. will remain the same.
Questions / Clarifications
Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.
Questions can be submitted at any time, but questions submitted within 7 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.
The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.
The Government’s direct response to the sender may also have been updated below for better clarity.
1. We will need more room for our equipment and access between the access road and the Visitor Center. Is it ok to temporarily widen the road and utilize the area between the existing sidewalk and anything we tear out (trees, handrail, sidewalk, etc.) we replace?
Is it ok to tear out the exposed aggregate drive and asphalt drive and build flat pads for our cranes and reconstruct the drives after completed? Same question for the sidewalks.
Response: This will be considered by the CO during construction, provided that the widening area and impacts are reasonable.
If portions of the existing sidewalks, drives, handrails, trees, etc., that are not designated for replacement are removed and/or damaged for the convenience of the Contractor’s operations, they will need to be replaced at no additional cost to the Government. Please see Subsections 107.02 and 109.05(b) of the FP (standard specifications book). In addition, please refer to Subsection 615.03 of Special Contract Requirements (SCRs - page J-15) for matching sidewalk requirements.
Info Page 2 of 2
2. Is it an issue to remove additional trees?
Response: Additional tree removal will be considered by the CO during construction, provided that they are identified and removed outside of the bat restriction timeframe.
Please see previous response above.
3. Would you accept structural steel beams?
Response: Structural steel beams will not be an acceptable alternative.
4. Can we exceed the disturbed limits and set a crane on the cave entrance side of the bridge?
Response: A crane will not be allowed on the cave entrance side of the bridge.
5. A beam supplier posed the question, does the color need to be included in the precast beams?
Response: Yes, the concrete color is required as specified in Section 552 of the SCR’s (J- 10 through J-13 of the Solicitation Booklet) and Question 1 of the Amendment 2 Questions/Clarifications document.