Bid Opening date is scheduled for July 7 2016 at 2 00 pm EST.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Results_of_Bid_-_NP-GWMP_MVT(3)_Schedules_A B.pdf | ||
| Amendment_0001_-_NP-GWMP_MVT(3).pdf | ||
| Report_1_NEPA.pdf | ||
| Report_2_Boring_Logs.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-4212_-_Form.pdf | ||
| Plans_-_NP-GWMP_MVT(3).pdf | ||
| FP14_Eng.pdf | ||
| Synopsis_-_NP-GWMP_MVT(3).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION
IFB No. DTFH71- 16-B-00030
This Contract Cites
STANDARD SPECIFICATIONS (FP-14)
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NP-GWMP MVT(3)
GEORGE WASHINGTON MEMORIAL PARKWAY
MOUNT VERNON TRAIL REALIGNMENT AND
THEODORE ROOSEVELT ISLAND PARKING AREA REHABILITATION
Contract No.
PMIS No. 192828
ADDRESS:
CONTRACTOR:
STATE Virginia
COUNTY Arlington
PARK George Washington Memorial Parkway
Schedule Parking Area Roadway / Parking Area / Other Stations / SQFT Linear
Feet Route Miles
Lane Miles
A Mount Vernon Trail 1+00 To 12+75 1,175 0.22 0.22
B ■ Theodore Roosevelt Island Parking Area 36,623 0.00 0.63
Project Length Totals 0.22 0.85
For Parking Areas, Lane Miles is calculated as SQFT / 11ft (nominal) lane
TYPE OF IMPROVEMENT
Mount Vernon Trail realignment and reconstruction. Theodore Roosevelt Island Parking Area widening and rehabilitation.
Asphalt concrete pavement milling and overlay, full-depth pavement patching and reconstruction, concrete curb and gutter and concrete sidewalk replacement, drainage improvements, cobble stove paver and stone masonry installation, landscaping, and other miscellaneous work.
TABLE OF CONTENTS
Page
Notice to Bidders 1 through 2
Checklist for Bid Submission 1 through 2
*SF-1442 Solicitation, Offer, and Award 1 through 4
Bid Schedule Instructions 1 through 3
*Bid Schedule B-1 through B-7
*SF-24 Bid Bond C-1 through C-2
FEDERAL ACQUISITION REGULATION & TRANSPORTATION ACQUISITION
REGULATION SOLICITATION PROVISIONS & CONTRACT CLAUSES
Index to Federal and Transportation Acquisition Regulations 1 through 6
Representations and Certifications (OCRA online) D-1 through D-2
Instructions to Bidders E-1
*Socioeconomic Program Requirements F-1 through F-4
Minimum Wage Schedule F-5 through F-10
*General Contract Requirements G-1 through G-4
Construction Contract Requirements H-1 through H-5
Special Contract Requirements J-1 through J-34
Section K K-1 through K-3
SPECIFICATIONS On CD
Plans 1 through 60
NEPA (Categorical Exclusion Form) 1 through 8
Boring Logs 1 through 5
* Bidder’s Qualifications Form 1 through 7
* Federal Contractor Veterans’ Employment Report VETS-4212 1 through 5
*BOLD FACED ITEMS ARE TO BE INCLUDED WITH THE BID SUBMITTAL PACKAGE
NOTICE TO BIDDERS
CONTRACT FORMAT:
Bidders should note that the format of this contract is in accordance with Federal Acquisition Regulations (FAR), promulgated by the General Services Administration (GSA), effective April 1, 1984, including all applicable revisions. Applicable FAR provisions and clauses are incorporated in this contract by reference or full text as indicated in the INDEX before the D-page in this booklet.
FAR provisions and clauses incorporated by reference can be accessed on the Internet on the GSA website at www.arnet.gov/far/. Bidders are encouraged to review the documents thoroughly before bidding.
PROPOSAL BOOKLET AND OFFER SUBMITTAL:
It is the responsibility of the Bidder to verify that this proposal is complete as listed in the Table of Contents. The Bidder is responsible for submitting all required forms and documents with the offer.
Offerors should use the Checklist for Bid Submission included in this booklet to check that their bids are complete.
CONSTRUCTION CONTRACTS:
Additional guidance is given in FAR Subpart 35.005 where the majority of the project work is complex and specialized such as restoration work, bridge painting, and proprietary construction techniques (i.e. proprietary Cintec arch strengthening.) There are exceptions and they will be reviewed on a case-by-case basis.
HAZARDOUS MATERIALS IDENTIFICATION AND MATERIAL SAFETY DATA:
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data, the apparent low Offeror must submit prior to award a Material Safety Data Sheet (MSDS's) for all hazardous materials that the Offeror identifies in paragraph (b) of this clause in the D-pages of this booklet. Failure to submit MSDS's may render the Offeror ineligible for award of contract. The apparent low Offeror should submit their MSDS's within two weeks after bid opening.
FINANCING ASSISTANCE: Minority, Women-owned, and Disadvantaged Business Enterprises (DBE's). The Department of Transportation (DOT) offers working capital financing assistance for transportation related contracts. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $750,000 with interest at the prime rate. For further information, call (800) 532-1169 or 202-366-1930. Internet address: http://osdbuweb.dot.gov
INTERNET BASED DATA BASES - REQUIRED INPUT:
According to the FAR Subpart 4.1102 contractors MUST be registered in System for Award Management (SAM) prior to contract award. Access the following web site to register:
www.sam.gov
According to the FAR Subpart 4.1201 contractors MUST complete their Online Annual Representations and Certifications Application prior to contract award online at http://sam.gov/.
According to the FAR Subpart 22.1302 (b) contractors and sub-contractors MUST complete the required Annual Vets-4212 Form in order to be eligible for a contract award. It can be completed on-line at http://www.dol.gov/vets/vets4212.htm. 2015 VETS-4212 Filing Cycle Effective August 1, 2015 and ends on September 30, 2015, Customers will no longer be able to electronically file a VETS-4212 Report. Customers may still file, but must first download the form from the VETS website http://www.dol.gov/vets/vets4212.htm, fill out the form and mail or email it to: VETS-4212 Service Center C/O Department of Labor National Contact Center (DOL-NCC)15000 Conference Center Drive, Suite B0132 Chantilly, VA 20151(866) 237-0275 Or email to: vets100-customersupport@dolncc.dol.gov
PAYMENT:
Offerors are advised to review the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP), subsection 109.05, concerning direct and indirect payment included under a pay item in the bid schedule.
NOTICE TO BIDDERS
PROGRESS PAYMENTS:
ALL payments will be made via Electronic Funds Transfer (EFT) as such; the payment information in the CCR must be accurate in order for contractors' invoices to be considered proper invoices for the purpose of prompt payment under DOT contracts. Contractors must input and maintain (update as necessary) their EFT information in the CCR database. Offerors are advised that under FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts, upon request, progress payments will include premiums paid by the Contractor to obtain performance and payment bonds as required under this contract. These payments shall not be made in addition to the contract price. As specified in the FP, “Section 151 - MOBILIZATION", payments for performance and payment bond premiums shall be included in mobilization.
WELFARE-TO-WORK INITIATIVE:
The President’s Welfare Reform Bill was initiated to assist welfare recipients and hopefully aid welfare recipients to find gainful employment. In support of this bill, Contractors are encouraged to hire welfare recipients whenever possible and to use welfare recipients in performance of duties on Government contracts.
INCREASING SEAT BELT USE IN THE UNITED STATES:
The President’s Executive Order 13043 dated April 16, 1997, was issued to increase the use of seat belts in the United States. In support of this Order, contractors and subcontractors are encouraged to adopt and enforce on-the-job seat belt policies for their employees when operating company-owned, rented, or personally owned vehicles.
OBTAINING BID DOCUMENTS:
Bid documents will not be mailed. All bid documents are available for direct download from the Federal Business Opportunities (FBO) website: http://www.fbo.gov/. Contractors are encouraged to register on the FBO website (for this specific project) in order to receive Email Notifications automatically when a document is added or updated for this specific project. All questions about this construction project must be emailed to the following address:
eflhd.contracts@dot.gov.
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MONITORING THE WEB PAGES
NOTED ABOVE FOR ALL CHANGES TO THE SOLICITATION AND ACTING ON SAID
CHANGES.
PLEASE NOTE: for security reasons, individuals requiring access to all government buildings must present a valid photo ID and be escorted to their destination by a Government employee. All visitors attending bid openings are urged to arrive at least 1 hour prior to schedule bid opening. All visitors must register with the receptionist in Room 100. A Government employee will collect all bids. Prior to bid opening, a Government employee will escort all bidders to the bid opening. Unescorted visitors will be denied entry and no exceptions will be made.
CHECKLIST FOR BID SUBMISSION
The following is a checklist of items included in the proposal/bid package that are required to be completed and returned (or filled in on-line) to the address in Block 7 of the Standard Form 1442, Solicitation, Offer, and Award (page 1). This checklist is for informational purposes only and is not required to be filled out by the bidder. Failure to submit a complete bid may be cause to reject your bid.
1. Bid Envelope:
a. Addressed as shown in Block 7 of SF-1442
b. In lower left corner, indicate the following: Solicitation No., Project Name & Number, mail to room
105, if proposals are hand delivered bring them to Reception Area Room 100 and a Contract Specialist will be notified.
2. Standard Form 1442: Solicitation, Offer and Award
a. Block 14: Name and Address of Bidder.
b. Block 15: Telephone Number of Bidder.
c. Block 16: Remittance Address if different from Block 14.
d. Block 19: All Amendments Acknowledged, with dates of Amendments.
e. Block 20: Bid is signed and dated.
3. Bid Schedule - (Pages B-1 through B-7)
a. Unit bid price and bid amount provided for each pay item in numbers.
b. Corrections initialed.
4. Standard Form 24, Bid Bond (Pages C-1 through C-2) (Required if bid guarantee is bid bond)
a. Date executed
b. Legal name and address of bidder.
c. Type of organization.
d. State of incorporation (if applicable).
e. Name and business address of Treasury approved surety.
f. Penal sum of bond (not less than 20% of bid total).
g. Bid identification.
h. Signature of Bidder
i. Seal, if corporation
j. Signature of Surety
k. Seal, if corporation
BIDS RECEIVED WITHOUT A VALID BID BOND WILL BE REJECTED.
5. Power of Attorney.
a. Dated on or before execution date of bond
b. Power has original signature of surety, or is embossed with surety's seal in the certification section
BIDS RECEIVED WITHOUT A VALID POWER OF ATTORNEY WILL BE REJECTED.
CHECKLIST FOR BID SUBMISSION
6. Bidder's Qualifications form (provided separately as part of the Bid Documents Package).
Form completed, signed and submitted with bid
THE FOLLOWING THREE ITEMS IF NOT SUBMITTED WITH THE BID; MUST
BE COMPLETED ELECTRONICALLY PRIOR TO CONTRACT AWARD.
7. System for Award Management (SAM): The Contractor is currently registered in the Internet-Based SAM database at http://www.sam.gov. If contractor elects to not have SAM viewed by public they must submit a copy with Bidder’s Qualification Package.
8. Online Representations and Certifications Application: The Contractor's Representations and Certifications have been input online via the Internet-Based electronic database at http://sam.gov.
9. VETS – 4212 Reporting: The Contractor has completed the annual Internet-Based reporting requirement online at http://www.dol.gov/vets/vets4212.htm.
VETS 4212 Filing Cycle Effective August 1, 2015 and ends on September 30, 2015, Customers will no longer be able to electronically file a VETS 4212 Report. Customers may still file, but must first download the form from the VETS website http://www.dol.gov/vets/programs/fcp/vets-4212.pdf, fill out the form and mail or email it to: vets-4212 Service Center, In Care of: Department of Labor National Contact Center (DOL-NCC), 15000 Conference Center Drive, Suite B0132 Chantilly, VA 20151 (866) 237-0275 Or email to: VETS4212-customersupport@dol.gov.
NOTE: THE CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY THAT ALL
DATA IN THE ABOVE DATABASES IS CORRECT EACH TIME A BID PACKAGE IS
SUBMITTED. FAILURE TO PROPERLY INPUT AND/OR UPDATE YOUR DATA
PRIOR TO CONTRACT AWARD MAY CAUSE THE BID TO BE REJECTED.
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
EFL16PP079
Federal Highway Administration
Eastern Federal Lands Highway Div.
Acquisitions Office 21400 Ridgetop Circle
EFLHD-AC
Sterling VA 20166-6511
See Block 7
Shirley Anderson eflhd.contracts@dot.gov
SEE BLOCK 10
x
06/07/2016
DTFH7116B00030
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
This Invitation for Bids is for the George Washington Memorial Parkway, Project No.
NP-GWMP MVT(3), located in Arlington County, Virginia in strict accordance with the
Solicitation/Contract instructions, notices, clauses, provisions, items listed below, and for the quantities of work actually performed at the unit prices as bid in the Bid Schedule, including all applicable Federal, State, and local taxes.
FP - Standard Specification for Construction of Roads & Bridges on Federal Highway
Projects.
Bid Schedule, Section B - pages B-1 through B-7
Special Contract Requirements, Section J - pages J-1 through J-34
Plans, Sheets 1 through 60
NEPA (Categorical Exclusion Form), pages 1 through 8
Boring Logs, pages 1 through 5
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 105 calendar days and complete it within ________________ ________________ calendar days after receiving
Continuation Sheet, Block 11
07/07/2016
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
�����./�0::/303�#73//5�20�9/3:03;�2./�=03D�3/AB83/>�#2�2./�9384/5�59/48:8/>�$/60=�81�523842�#4403>#14/�=82.�2./�2/3;5�0:�2.85�5068482#2801?�8:�2.85�0::/3�85�#44/92/>
$@�2./��0E/31;/12�81�=382817�=82.81�--------------------�4#6/1>#3�>#@5�#:2/3�2./�>#2/�0::/35�#3/�>B/����������
| � | %(�� |
| �) | �� |
| �� | ����� |
| � | �� |
| ����� ���������� | ���� | ����� |
| � | �� |
�����./�0::/303�#73//5�20�:B3185.�#1@�3/AB83/>�9/3:03;#14/�#1>�9#@;/12�$01>5�
0��#������ ��2�
| ����� | ������ | � |
| H���� | �� |
������� �)4��
3�2���%����
| �����" | ��� � ����� | ��� |
| ����������� | �� |
| ��" ���� | ���������� | |
| �������� | ����� | "��� |
����������3 4��� '5 '6 �--����7��
3�2���%���
| �� | ������ | �� | ������ | ������ | � |
| H���� | �� |
������� )4������ �$���� �� �4������
����2�� #��0 ��2�����
�)��������� )�&4'��������������� ������������ &4'���������������
�"������&��*���G��'����, Block 26
Federal Highway Administration Eastern Federal Lands Highway Division ATTN: Construction Office 21400 Ridgetop Circle Sterling, VA 20166-6511
Federal Highway Administration Eastern Federal Lands Highway Division A/P Branch, AMZ-150 P.O. Box 25710 or E-MAIL
9-AMC-AMZ-EFLINVOICES@FAA.GOV
Oklahoma City, OK 73125
EFLHD-CO
peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text peggy.schaad Typewritten Text
CONTINUATION OF SF 1442
Block 2:
This project is RESTRICTED - Bids will be accepted from Certified Small Business Concerns only.
This procurement falls under North American Industry Classification System (NAICS) code 237310 - Highway, Street, and Bridge Construction (see FAR Subpart 19.10)
Facsimile and electronic bids will not be accepted.
PHYSICAL DATA AVAILABLE FOR REVIEW
1. Manual on Uniform Traffic Control Devices for Streets and Highways, 2009 Edition, published by the Federal Highway Administration. http://mutcd.fhwa.dot.gov.
2. National Park Service Sign Manual, revised - January 1988, United States Department of the Interior. http://flh.fhwa.dot.gov/resources/design/library.
3. NEPA (Categorical Exclusion Form).
4. Boring Logs.
Block 9:
In accordance with FAR Provision 52.236-27, Site Visit, a Government representative can be available to show the project to prospective bidders. All requests for site visits see Section E of the solicitation and e-mail all questions concerning this construction project to the following e-mail address eflhd.contracts@dot.gov. Interested parties must provide the Solicitation Number and the relevant project name with all requests and questions.
∗Block 11:
If Schedule A (Base Contract) and Schedule B (Government Option 1) are awarded at the same time:
The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 60 and less than or equal to ( < ) 105.
If Schedules A and B are NOT awarded at the same time:
The performance period for the completion of Schedule A will be either 95 calendar days or the Total Calendar Days Bid on Line (3) of the Bid Summary Sheet, whichever is less.
The performance period for the completion of Schedule B will be 40 calendar days.
The completion time for the contract will be the time offered by the successful bidder, not to exceed the maximum time above. Work restrictions can be found in SCR Sections 108 and 156.
http://flh.fhwa.dot.gov/resources/design/library mailto:eflhd.contracts@dot.gov
CONTINUATION OF SF 1442
Notice to Proceed will be issued within 30 days following receipt of acceptable performance and payment bonds. (Actual Notice to Proceed date will be 10 days from issuance or the date specified in the Notice.)
Block 12A:
Furnish performance and payment bonds in accordance with FAR Clause 52.228-15.
Block 13:
A bid guarantee in the amount of not less than 20 percent of the bid price or $3 million, whichever is less, is required with this bid. If the bidder fails to provide the required bid guarantee, such failure may require rejection of the bid. Reference FAR Provision 52.228-1, Bid Guarantee.
Block 17:
Amounts should be completed as follows:
Schedule A - $ Schedule B (Option 1) - $
DO NOT INCLUDE ANY CONTRACT ADMINISTRATION COSTS IN BLOCK 17.
Other:
The estimated price is expected to fall within the price range of $250,000 to $1,000,000.
Responsibility of bidders shall be evaluated in accordance with the information provided on the Bidder's Qualification Form, which can be downloaded from FHWA web site. FP-14 versions can be downloaded at the FHWA web site. FHWA web site is http://flh.fhwa.dot.gov/resources/specs/ then click on “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects”.
http://flh.fhwa.dot.gov/resources/specs/
BID SCHEDULE INSTRUCTIONS
PROJECT: NP-GWMP MVT(3)
BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to
Bidders. While preparing the bid, comply with the following:
COMPLETING THE BID SCHEDULE
Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Bid Total by adding the amounts of the several items, and show in the block provided on Page B-4 for Schedule A and Page B-6 for Schedule B. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.
To be eligible for award, bidders must submit prices for each pay item.
Review Subsection 109.05 of the FP (standard specifications book) regarding scope of payment for direct and indirect payment work.
SCHEDULES OF WORK
The Bid Schedule is comprised of the following separate schedules and options of work:
Schedule A (Base Contract) - Pages B-1 thru B-4
Schedule B (Government Option 1) - Pages B-5 thru B-6
The Government will award the project as a Base Contract (Schedule A) with the option to award Schedule B (Government Option 1); see FAR Clauses 52.217-4 and 52.217-5.
The purpose of the multiple schedules and options is to give the Government maximum flexibility in completing the project in a timely manner and at a cost-effective price, by proper utilization of available funds and upon receipt of all required funding. If complete funding is in place at the time of award of Schedule A (Base Contract), the Government may award Schedule B (Government Option 1) at that time. If funding for Schedule B (Government Option 1) is received after award of Schedule A (Base Contract), the Government has the right to exercise Schedule B (Government Option 1) at the unit prices bid no later than contract completion date of Schedule A (Base Contract).
BIDDING OF CALENDAR DAYS / COMPLETION OF WORK
Determine the number of calendar days necessary to complete all contract work from Notice To Proceed to contract completion if all schedules and options are awarded at the same time.
Specify the number of calendar days (NOT to exceed the maximum number of calendar days shown in Block 11 of the SF-1442) in the space provided on the Bid Summary page. If a minimum number of calendar days is provided in Block 11 of the SF-1442, do not specify a number of calendar days lower than the minimum. Failure to specify a number of calendar days for contract completion indicates the bidder accepts the maximum contract time provided in Block 11 of the SF-1442.
If the Government awards the contract as Schedule A + B, the performance period to complete all contract work will be the Total Calendar Days Bid submitted by the successful Bidder on Line (3) of the Bid Summary page.
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be either 95 calendar days or the Total Calendar Days Bid submitted by the successful Bidder on Line (3) of the Bid Summary page, whichever is less.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 40 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
In developing a construction schedule to determine the number of calendar days included in their bid, bidders should consider and include any work limitations shown in Sections 108 and 156 of the FP and Special Contract Requirements (SCR’s). Specific work limitations may be (but are not limited to): National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. Bidders are advised to consider those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc). Bidders are also advised to consider time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCR’s). The total calendar days bid should also include any work limitations and any delay days or Contractor/supplier winter shutdowns required due to weather sensitive work items.
For the purposes of calculating calendar days, bidders are to assume that the award of the contract and approval of the Contractor’s Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-15) may result in the start of construction activities to be no earlier than mid-July 2016. See Subsection 108.01 of the SCR’s for additional details.
When evaluating the bids, the Government will consider the Contract Administrative Cost for the project to be $1,000 per calendar day bid. The Contract Administrative Cost is only used to determine the Evaluation Total Price of Project.
Fill in the Bid Total(s), the Total Calendar Days Bid, and the Contract Administrative Costs as directed on the Bid Summary page. Fill in the Evaluation Total Price of Project in the space provided on the Bid Summary page.
The contract administration cost is used for evaluation and ranking purposes only. Do not include any contract administration costs when filling out Block 17 of the SF-1442. The amount in Block 17 should be completed as follows:
Schedule A - $ .
Schedule B - $ .
BASIS FOR AWARD
The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation Total Price of Project, which is defined as:
Schedule A (Base Contract) Bid Total + Schedule B (Government Option 1) Bid Total + Contract Administrative Cost for Total Calendar Days Bid.
B I D S C H E D U L E B-1 Schedule A Base Contract
Project No: NP-GWMP MVT(3)
Name: George Washington Memorial Parkway
Item No. Quantity Unit Unit Price Amount
15101-0000
Line A0020 100% LPSM $ $
15201-0000
Line A0040 100% LPSM $ $
15401-0000
Line A0060 100% LPSM $ $
15705-1700
Line A0080 1,880 LNFT $ $
20103-0000
Line A0100 775 SQYD $ $
20217-0000
Line A0120 100 LNFT $ $
20220-1000
Line A0140 1 EACH $ $
20301-0100
Line A0160 7 EACH $ $
20301-1400
Line A0180 1 EACH $ $
20301-2400
Line A0200 2 EACH $ $
20301-2700
Line A0220 1 EACH $ $
20302-0300
Line A0240 1,200 LNFT $ $
20302-2600
Line A0260 2,700 LNFT $ $
20303-1600
Line A0280 1,350 SQYD $ $
20303-3200
Line A0300 20 SQYD $ $
20303-3700
Line A0320 1 SQYD $ $
20401-0000
Line A0340 440 CUYD $ $
20402-0000
Line A0360 48 CUYD $ $
20701-1000
Line A0380 165 SQYD $ $
25102-0200
Line A0400 9 TON $ $
REMOVAL OF PAVEMENT MARKINGS
ROADWAY EXCAVATION
SUBEXCAVATION
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR TESTING
SOIL EROSION CONTROL, FILTER BERM
CLEARING AND GRUBBING
TREE ROOT PRUNING
SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
PLACED RIPRAP, METHOD A, CLASS 2
REMOVAL OF PAVEMENT MARKINGS
REMOVAL OF PAVEMENT, ASPHALT
REMOVAL OF SIDEWALK, CONCRETE
REMOVAL, INDIVIDUAL TREE
REMOVAL OF BOLLARD
REMOVAL OF INLET
REMOVAL OF SIGN
REMOVAL OF STRUCTURE
REMOVAL OF CURB AND GUTTER, CONCRETE
B-2 Schedule A Base Contract
Project No: NP-GWMP MVT(3)
Name: George Washington Memorial Parkway
Item No. Quantity Unit Unit Price Amount
25125-0000
Line A0420 5 EACH $ $
30101-4000
Line A0440 660 TON $ $
30110-0000
Line A0460 6 TON $ $
40101-0100
Line A0480 7 TON $ $
40101-0500
Line A0500 9 TON $ $
40301-0100
Line A0520 215 TON $ $
40301-0100
Line A0540 180 TON $ $
41301-0000
Line A0560 375 SQYD $ $
60201-0500
Line A0580 4 LNFT $ $
60403-1700
Line A0600 1 EACH $ $
60901-1700
Line A0620 235 LNFT $ $
60902-1100
Line A0640 1,000 LNFT $ $
61102-0545
Line A0660 1,400 LNFT $ $
61112-0000
Line A0680 1 EACH $ $
61501-0100
Line A0700 17 SQYD $ $
61506-2000
Line A0720 70 SQYD $ $
62013-2000
Line A0740 30 SQYD $ $
62401-0300
Line A0760 890 SQYD $ $
62516-4000
Line A0780 185 SQYD $ $
STONE MASONRY WALL
FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH
MULCHING, HAND METHOD
WATER FOUNTAIN
SIDEWALK, CONCRETE
PAVING, COBBLESTONE (PADS)
ASPHALT PAVEMENT MILLING
15-INCH PIPE CULVERT
INLET, FLH TYPE 6A
AGGREGATE BASE GRADING C OR D
AGGREGATE SURFACE COURSE
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, <0.3 MILLION ESAL, PG 64-22
CURB, CONCRETE, 18-INCH DEPTH
CURB AND GUTTER, CONCRETE, 13-INCH DEPTH
1-INCH WATERLINE (POLYETHYLENE)
BOULDER
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, <0.3 MILLION ESAL, PG 64-22
ASPHALT CONCRETE PAVEMENT, TYPE 1, 3/8-INCH NMSA, 1.5-INCH DEPTH-SURFACE
ASPHALT CONCRETE PAVEMENT, TYPE 1, 1/2-INCH NMSA, 2-INCH DEPTH-BASE
B-3 Schedule A Base Contract
Project No: NP-GWMP MVT(3)
Name: George Washington Memorial Parkway
Item No. Quantity Unit Unit Price Amount
62603-0100
Line A0800 3 EACH $ $
62617-0550
Line A0820 1 EACH $ $
62622-0100
Line A0840 26 EACH $ $
62622-0350
Line A0860 39 EACH $ $
62701-0000
Line A0880 1,675 SQYD $ $
63301-1000
Line A0900 3 EACH $ $
63304-0900
Line A0920 10 SQFT $ $
63316-1000
Line A0940 9 EACH $ $
63401-0300
Line A0960 3,825 LNFT $ $
63401-0400
Line A0980 1,290 LNFT $ $
63405-0850
Line A1000 4 EACH $ $
63405-0855
Line A1020 2 EACH $ $
63503-0300
Line A1040 90 LNFT $ $
63503-0400
Line A1060 630 LNFT $ $
63504-1000
Line A1080 110 SQFT $ $
63506-0500
Line A1100 260 HOUR $28.00 $7,280.00
TEMPORARY TRAFFIC CONTROL, FLAGGER
PAVEMENT MARKINGS, TYPE B, BROKEN
PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
PAVEMENT MARKINGS, TYPE B, SPEED HUMP MARKINGS
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
VIBURNUM ACERIFOLIUM, MAPLELEAF VIBURNUM, 42-INCH TO 48-INCH HEIGHT, BALLED
AND BURLAPPED
SOD
SIGN SYSTEM, GOVERNMENT FURNISHED SIGN
SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
REMOVE AND RESET SIGN
PAVEMENT MARKINGS, TYPE B, SOLID
CERCIS CANADENSIS, EASTERN REDBUD, 1-INCH TO 1 1/2-INCH CALIPER, BALLED AND
BURLAPPED
QUERCUS PHELLOS, WILLOW OAK, 2-INCH TO 2 1/2-INCH CALIPER, BALLED AND
BURLAPPED
VIBURNUM DENTATUM, ARROWWOOD VIBURNUM, 24-INCH TO 30-INCH HEIGHT, BALLED
AND BURLAPPED
B-4 Schedule A Base Contract
Project No: NP-GWMP MVT(3)
Name: George Washington Memorial Parkway
Item No. Quantity Unit Unit Price Amount
63602-6020
Line A1120 1 EACH $ $
63701-0000
Line A1140 1 EACH $ $
64502-0000
Line A1160 1 EACH $ $
64603-0500
Line A1180 10 EACH $ $
65001-1000
Line A1200 100% LPSM $ $
SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
FIELD OFFICE
LOCATE UTILITIES
FIXTURE, BICYCLE STORAGE RACK
CONSTRUCT AND MAINTAIN DIVERSION
Schedule Total:
Submitted by:
B-5Schedule B Government Option 1
Project No: NP-GWMP MVT(3)
Name: George Washington Memorial Parkway
Item No. Quantity Unit Unit Price Amount
15101-0000
Line B0020 100% LPSM $ $
15201-0000
Line B0040 100% LPSM $
15401-0000
Line B0060 100% LPSM $ $
15705-1700
Line B0080 1,110 LNFT $ $
20303-1600
Line B0100 4,500 SQYD $ $
20401-0000
Line B0120 120 CUYD $ $
20402-0000
Line B0140 72 CUYD $ $
20701-1000
Line B0160 135 SQYD $ $
30101-4000
Line B0180 375 TON $ $
40101-0100
Line B0200 365 TON $ $
40101-0500
Line B0220 485 TON $ $
63401-0300
Line B0240 2,650 LNFT $ $
63405-0850
Line B0260 4 EACH $ $
63503-0300
Line B0280 40 LNFT $ $
63503-0400
Line B0300 990 LNFT $ $
63504-1000
Line B0320 62 SQFT $ $
63506-0500
Line B0340 100 HOUR $28.00 2,800.00$
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR TESTING
SOIL EROSION CONTROL, FILTER BERM
REMOVAL OF PAVEMENT, ASPHALT
ROADWAY EXCAVATION
PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
SUBEXCAVATION
SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
AGGREGATE BASE GRADING C OR D
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, <0.3 MILLION ESAL, PG 64-22
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, <0.3 MILLION ESAL, PG 64-22
PAVEMENT MARKINGS, TYPE B, SOLID
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
B-6Schedule B Government Option 1
Project No: NP-GWMP MVT(3)
Name: George Washington Memorial Parkway
Item No. Quantity Unit Unit Price Amount
63701-0000
Line B0360 1 EACH $ $
FIELD OFFICE
Schedule Total:
Submitted by:
B - 7
BID SUMMARY
Project NP-GWMP MVT(3)
(1) Schedule A (Base Contract) Bid Total (from Page B-4) = (1) $____________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-6) = (2) $____________________
Contract Administrative Cost for Total Calendar Days Bid
If Schedule A (Base Contract) and Schedule B (Government Option 1) are awarded at the same time, input the number of calendar days necessary to complete all contract work (Schedules A and B) from Notice to Proceed (or date specified in the Notice to Proceed) to the completion of all contract work.
The total calendar days bid to complete all contract work must be greater than or equal to ( > ) 60 and less than or equal to ( < ) 105.
(3) calendar days x $1,000 per calendar day = (3) $____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) $____________________
DO NOT INCLUDE ANY CONTRACT ADMINISTRATION COSTS IN BLOCK 17 OF THE SF-1442
Maximum Time Allowed for Each Schedule of Work if Awarded Separately
If Schedules A and B are NOT awarded at the same time:
The performance period for the completion of Schedule A will be either 95 calendar days or the Total Calendar Days Bid on Line (3) above, whichever is less.
The performance period for the completion of Schedule B will be 40 calendar days.
20%�12�� ���������
2%/,*$7,21�
:H�� WKH�3ULQFLSDO� DQG�6XUHW\�LHV�� DUH� ILUPO\�ERXQG�WR�WKH�8QLWHG�6WDWHV�RI�$PHULFD��KHUHLQDIWHU�FDOOHG�WKH�*RYHUQPHQW��LQ�WKH�DERYH�SHQDO�VXP���)RU SD\PHQW� RI� WKH� SHQDO� VXP�� ZH� ELQG� RXUVHOYHV�� RXU� KHLUV�� H[HFXWRUV�� DGPLQLVWUDWRUV�� DQG� VXFFHVVRUV�� MRLQWO\� DQG� VHYHUDOO\�� � +RZHYHU�� ZKHUH� WKH 6XUHWLHV�DUH�FRUSRUDWLRQV�DFWLQJ�DV�FR�VXUHWLHV��ZH��WKH�6XUHWLHV��ELQG�RXUVHOYHV�LQ�VXFK�VXP��MRLQWO\�DQG�VHYHUDOO\��DV�ZHOO�DV��VHYHUDOO\��RQO\�IRU�WKH SXUSRVH�RI�DOORZLQJ�D� MRLQW�DFWLRQ�RU�DFWLRQV�DJDLQVW�DQ\�RU�DOO� RI�XV�� �)RU�DOO�RWKHU�SXUSRVHV��HDFK�6XUHW\�ELQGV�LWVHOI��MRLQWO\�DQG�VHYHUDOO\�ZLWK�WKH 3ULQFLSDO��IRU�WKH�SD\PHQW�RI�WKH�VXP�VKRZQ�RSSRVLWH�WKH�QDPH�RI�WKH�6XUHW\�� �,I�QR�OLPLW�RI�OLDELOLW\�LV�LQGLFDWHG��WKH�OLPLW�RI�OLDELOLW\�LV�WKH�IXOO�DPRXQW
RI�WKH�SHQDO�VXP�
&21',7,216�
7KH�3ULQFLSDO�KDV�VXEPLWWHG�WKH�ELG�LGHQWLILHG�DERYH�
7+(5()25(�
7KH�DERYH�REOLJDWLRQ�LV�YRLG�LI�WKH�3ULQFLSDO����D��XSRQ�DFFHSWDQFH�E\�WKH�*RYHUQPHQW�RI�WKH�ELG�LGHQWLILHG�DERYH��ZLWKLQ�WKH�SHULRG�VSHFLILHG�WKHUHLQ�IRU DFFHSWDQFH� �VL[W\������GD\V�LI�QR�SHULRG�LV�VSHFLILHG���H[HFXWHV�WKH�IXUWKHU�FRQWUDFWXDO�GRFXPHQWV�DQG�JLYHV�WKH�ERQG�V��UHTXLUHG�E\�WKH�WHUPV�RI�WKH ELG�DV�DFFHSWHG�ZLWKLQ�WKH�WLPH�VSHFLILHG��WHQ������GD\V�LI�QR�SHULRG�LV�VSHFLILHG��DIWHU�UHFHLSW�RI�WKH�IRUPV�E\�WKH�SULQFLSDO��RU��E��LQ�WKH�HYHQW�RI�IDLOXUH WR� H[HFXWH� VXFK� IXUWKHU� FRQWUDFWXDO� GRFXPHQWV�DQG�JLYH�VXFK�ERQGV��SD\V� WKH�*RYHUQPHQW� IRU�DQ\�FRVW�RI�SURFXULQJ� WKH�ZRUN�ZKLFK�H[FHHGV� WKH
DPRXQW�RI�WKH�ELG�
(DFK� 6XUHW\�H[HFXWLQJ� WKLV� LQVWUXPHQW�DJUHHV� WKDW� LWV�REOLJDWLRQ� LV�QRW� LPSDLUHG�E\�DQ\�H[WHQVLRQ�V��RI� WKH� WLPH� IRU� DFFHSWDQFH�RI� WKH�ELG� WKDW� WKH 3ULQFLSDO�PD\�JUDQW�WR�WKH�*RYHUQPHQW���1RWLFH�WR�WKH�VXUHW\�LHV��RI�H[WHQVLRQ�V��DUH�ZDLYHG���+RZHYHU��ZDLYHU�RI�WKH�QRWLFH�DSSOLHV�RQO\�WR�H[WHQVLRQV DJJUHJDWLQJ�QRW�PRUH�WKDQ�VL[W\������FDOHQGDU�GD\V�LQ�DGGLWLRQ�WR�WKH�SHULRG�RULJLQDOO\�DOORZHG�IRU�DFFHSWDQFH�RI�WKH�ELG�
:,71(66�
7KH�3ULQFLSDO�DQG�6XUHW\�LHV��H[HFXWHG�WKLV�ELG�ERQG�DQG�DIIL[HG�WKHLU�VHDOV�RQ�WKH�DERYH�GDWH�
67$1'$5'�)250�����5(9��������
3UHVFULEHG�E\�*6$���)$5�����&)5���������D�
$87+25,=('�)25�/2&$/�5(352'8&7,21
3UHYLRXV�HGLWLRQ�LV�XVDEOH
35,1&,3$/
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
6,*1$785(�6�
1$0(�6��
�7\SHG�
&RUSRUDWH
6HDO
�6HDO� �6HDO� �6HDO�
,1',9,'8$/�685(7<�,(6�
�6HDO� �6HDO�
3.�� ��
%,'�%21'
�6HH�LQVWUXFWLRQ�RQ�UHYHUVH�
'$7(�%21'� (;(&87('��0XVW�QRW�EH�ODWHU� WKDQ�ELG
RSHQLQJ�GDWH�
7<3(�2)�25*$1,=$7,21� ��;��RQH�
,1',9,'8$/
-2,17� 9(1785(
3$571(56+,3
&25325$7,21
67$7(�2)� ,1&25325$7,21
35,1&,3$/��/HJDO�QDPH�DQG�EXVLQHVV�DGGUHVV�
685(7<�,(6���1DPH�DQG�EXVLQHVV�DGGUHVV�
PENAL SUM OF BOND
3(5&(17 2)�%,' 35,&(
$02817� 127� 72�(;&(('
0,//,21�6� 7+286$1'�6� +81'5('�6� &(176
%,'�,'(17,),&$7,21
%,'�'$7(
)25��&RQVWUXFWLRQ�
6XSSOLHV��RU�6HUYLFHV�
,19,7$7,21� 12�
&25325$7(�685(7<�,(6�
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
&RUSRUDWH
6HDO
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
3XEOLF�UHSRUWLQJ�EXUGHQ�IRU�WKLV�FROOHFWLRQ�RI�LQIRUPDWLRQ�LV�HVWLPDWHG�WR�DYHUDJH����PLQXWHV�SHU�UHVSRQVH��LQFOXGLQJ�WKH�WLPH�IRU�UHYLHZLQJ�LQVWUXFWLRQV��VHDUFKLQJ�H[LVWLQJ�GDWD VRXUFHV��JDWKHULQJ�DQG�PDLQWDLQLQJ�WKH�GDWD�QHHGHG��DQG�FRPSOHWLQJ�DQG�UHYLHZLQJ�WKH�FROOHFWLRQ�RI�LQIRUPDWLRQ�� �6HQG�FRPPHQWV�UHJDUGLQJ�WKLV�EXUGHQ�HVWLPDWH�RU�DQ\�RWKHU DVSHFW�RI�WKLV�FROOHFWLRQ�RI�LQIRUPDWLRQ��LQFOXGLQJ�VXJJHVWLRQV�IRU�UHGXFLQJ�WKLV�EXUGHQ��WR�WKH�)$5�6HFUHWDULDW��095���)HGHUDO�$FTXLVLWLRQ�3ROLF\�'LYLVLRQ��*6$��:DVKLQJWRQ��'& debbie C-1
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 67$1'$5'�)250�����5(9���������%$&.
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
&RUSRUDWH
6HDO
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
&RUSRUDWH
6HDO
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
&RUSRUDWH
6HDO
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
&RUSRUDWH
6HDO
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
&RUSRUDWH
6HDO
1$0(� $''5(66
6,*1$785(�6�
1$0(�6�� 7,7/(�6�
�7\SHG�
67$7(�2)� ,1&� /,$%,/,7<�/,0,7� ���
&RUSRUDWH
6HDO
(e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitation listed therein. where more than one corporate surety is involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designed "SURETY(IES)" on the face of the form, insert only the letter identification of the sureties.
(b) Where individual sureties are involved, a completed Affidavit of Individual surety (Standard Form 28), for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal";
and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."
debbie C-2
CONTRACT CLAUSES INDEX
FEDERAL ACQUISITION REGULATION (FAR) TRANSPORTATION ACQUISITION REGULATION (TAR)
(Updated thru FAC 2005-88 on 05/16/2016)
FAR & TAR CLAUSES INCORPORATED BY REFERENCE
CLAUSE TITLE DATE REMARKS
52.202-1 DEFINITIONS Nov-13 52.203-3 GRATUITIES Apr-84 52.203-5 COVENANT AGAINST CONTINGENT FEES May-14 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT Sep-06 52.203-7 ANTI-KICKBACK PROCEDURES May-14 52.203-8 CANCEL & RECOVER OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY May-14 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY May-14 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACT Sep-07 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS Oct-10 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT Oct-15 52.203-14 DISPLAY OF HOTLINE POSTER(S) Oct-15 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER May-11 52.204-7 SYSTEM FOR AWARD MANAGEMENT Jul-13 Contractor Mandatory Internet Data Input 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS Oct-15 Contractor Mandatory Internet Data Input 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS Jan-14 Contractor Mandatory Internet Data Input
52.209-6
PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS
DEBARRED, SUSPENDED OR PROPOSED FOR DEBARMENT Oct-15
52.209-11
REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY
CONVICTION UNDER ANY FEDERAL LAW Feb-16
52.214-5 SUBMISSION OF BIDS Mar-97 If applicable 52.214-19 CONTRACT AWARD -- SEALED BIDDING-CONSTRUCTION Aug-96 If applicable 52.214-26 ALT 1 AUDIT AND RECORDS -- SEALED BIDDING (ALT 1 - (MAR 09)) Oct-10 If applicable 52.214-27 PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA - MODIFICATIONS - SEALED BIDDING Aug-11 52.214-28 SUBCONTRACTOR COST OR PRICE DATA -- MODIFICATIONS--SEALED BIDDING Oct-10 52.214-29 ORDER OF PRECEDENCE - SEALED BIDDING Jan-86 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE Apr-91 52.214-35 SUBMISSION OF OFFERS IN THE U.S. CURRENCY Apr-91 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE Nov-11 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS Oct-14 52.219-9 ALT 1 SMALL BUSINESS SUBCONTRACTING PLAN (ALT 1 - (Oct 01)) Oct-15 Large Business Mandatory Submittal Requirement 52.219-14 LIMITATIONS ON SUBCONTRACTING Nov-11 52.219-16 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN Jan-99 52.222-3 CONVICT LABOR Jun-03 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS -- OVERTIME COMPENSATION May-14 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS - SECONDARY SITE OF THE WORK May-14 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS May-14 Contractor Mandatory Wage Rates Posting
52.252-2 Clauses Incorporated By Reference (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. The full text of a clause may be accessed electronically at this address: www.arnet.gov/far/
(End of Clause)
(Updated thru FAC 2005-88 on 05/16/2016)
52.222-7 WITHHOLDING OF FUNDS May-14 52.222-8 PAYROLLS AND BASIC RECORDS May-14 Contractor Weekly Payroll Submittals 52.222-9 APPRENTICES AND TRAINEES Jul-05 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS Feb-88 52.222-11 SUBCONTRACTS (LABOR STANDARDS) May-14 52.222-12 CONTRACT TERMINATION -- DEBARMENT May-14 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS May-14 52.222-14 DISPUTES CONCERNING LABOR STANDARDS Feb-88 52.222-15 CERTIFICATION OF ELIGIBILITY May-14 52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES Feb-16 52.222-21 PROHIBITION OF SEGREGATED FACILITIES Feb-99 52.222-26 EQUAL OPPORTUNITY Apr-15 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION Apr-15 52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, & OTHER EL Oct-15 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES Jul-14 52.222-37 EMPLOYMENT REPORTS ON VERTERANS Feb-16 52.222-38 COMPLIANCE WITH VETERANS' EMPLOYMENT REPORTING REQUIREMENTS Feb-16 Contractor Annual Mandatory Reporting Requirement 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT Mar-15 52.222-50 COMBATING TRAFFICKING IN PERSONS Feb-09 If applicable 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 Dec-15 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACT Sep-13 http://www.biopreferred.gov 52.223-5 POLLUTION PREVENTION AND RIGHT TO KNOW INFORMATION May-11 52.223-6 DRUG-FREE WORKPLACE May-01 Contractor Annual Contractor Reporting Reqt 52.223-10 WASTE REDUCTION PROGRAM May-11 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION CONTRACTS May-08 Mandatory 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING Aug-11 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES Jun-08 52.227-1 AUTHORIZATION AND CONSENT Dec-07 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT Dec-07 52.227-4 PATENT INDEMNITY-CONSTRUCTION CONTRACTS Dec-07 52.227-14 RIGHTS IN DATA - GENERAL May-14 52.227-17 RIGHTS IN DATA - SPECIAL WORKS Dec-07 52.228-1 BID GUARANTEE Sep-96 52.228-2 ADDITION BOND SECURITY Oct-97 Contractor Submittal Requirement 52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION Jan-97 52.228-11 PLEDGES OF ASSETS Jan-12 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS May-14 52.228-14 IRREVOCABLE LETTER OF CREDIT Nov-14 Contractor Submittal Requirement 52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION Oct-10 52.229-2 NORTH CAROLINA STATE AND LOCAL SALES AND USE TAX Apr-84 52.229-3 FEDERAL, STATE, AND LOCAL TAXES Feb-13 52.230-2 COST ACCOUNTING STANDARDS Oct-15 If applicable 52.230-3 DISCLOSURE AND CONSISTENCY OF COST ACCOUNTING PRACTICES Oct-15 If applicable 52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS Jun-10 Contractor Submittal Requirement 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS May-14 52.232-13 NOTICE OF PROGRESS PAYMENTS Apr-84 52.232-16 PROGRESS PAYMENT Apr-12 52.232-17 INTEREST May-14 52.232-18 AVAILABILITY OF FUNDS Apr-84 52.232-23 ASSIGNMENT OF CLAIMS May-14
(Updated thru FAC 2005-88 on 05/16/2016)
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS May-14 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD MANAGEMENT Jul-13 52.233-1 ALT 1 DISPUTES (ALT-1, DEC-91) May-14 52.233-3 PROTEST AFTER AWARD Aug-96 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM Oct-04 52.236-2 DIFFERING SITE CONDITIONS Apr-84 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK Apr-84 52.236-5 MATERIAL AND WORKMANSHIP Apr-84 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR Apr-84 52.236-7 PERMITS AND RESPONSIBILITIES Nov-91 52.236-8 OTHER CONTRACTS Apr-84 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES & IMPROVEMENTS Apr-84 52.236-10 OPERATIONS AND STORAGE AREAS Apr-84 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION Apr-84 52.236-12 CLEANING UP Apr-84 52.236-13 ACCIDENT PREVENTION Nov-91 Contractor Submittal Requirement 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS Apr-84 52.236-17 LAYOUT OF WORK Apr-84 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION Feb-97 52.236-26 PRECONSTRUCTION CONFERENCE Feb-95 52.242-13 BANKRUPTCY Jul-95 52.242-14 SUSPENSION OF WORK Apr-84 52.243-4 CHANGES Jun-07 If applicable 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS Feb-16 52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES Apr-12 52.246-12 INSPECTION OF CONSTRUCTION Aug-96 52.246-21 WARRANTY OF CONSTRUCTION Mar-94 52.248-3 ALT 1 VALUE ENGINEERING - CONSTRUCTION (ALT-1, APR-84) Oct-15 52.249-2 ALT 1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (ALT-I, Sep-96) Apr-12 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) Apr-84 52.253-1 COMPUTER GENERATED FORMS Jan-91
TAR CLAUSES INCORPORATED BY REFERENCE
1252.211-70 INDEX FOR SPECIFICATIONS Apr-05 1252.242-73 CONTRACTING OFFICERS TECHNICAL REPRESENTATIVE Oct-94
FAR & TAR PROVISIONS INCORPORATED BY REFERENCE
52.217-3 EVALUATION EXCLUSIVE OF OPTION Apr-84 52.217-4 EVALUATION OF OPTIONS EXERCISED AT TIME OF CONTRACT AWARD Jun-88 52.217-5 EVALUATION OF OPTIONS Jul-90 52-217-7 OPTION FOR INCREASED QUANTITY -- SEPARATELY PRICED LINE ITEM Mar-89
(Updated thru FAC 2005-88 on 05/16/2016)
FAR & TAR CLAUSES INCORPORATED BY FULL TEXT
CLAUSE TITLE DATE SECTION SECTION TYPE REMARKS
52.203-17
CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM
EMPLOYEES OF WHISTELBLOWER RIGHTS Apr-14 G GEN'L CONTRACT REQS.
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS Jul-13 G GEN'L CONTRACT REQS. If Applicable 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK Apr-84 H CONSTR. CONTRACTS REQS Government Fill In 52.211-12 LIQUIDATED DAMAGES - CONSTRUCTION Sep-00 H CONSTR. CONTRACTS REQS Government Fill In 52.211-18 VARIATION IN ESTIMATED QUANTITY Apr-84 H CONSTR. CONTRACTS REQS
52.222-23
NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY FOR CONSTRUCTION Feb-99 F SOCIOECON PROG REQS Contractor Reporting Reqs
52.223-3 ALT I HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (ALT-I, JUL-95) Jan-97 G GEN'L CONTRACT REQS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .