SER_BMS_FY15_BASE_95__SCR_-_Appendix_B.pdf
PDF 545 KB Posted
- Attached to
- NPS Southeast Region Bridge Preventive Maintenance Work Federal contract opportunity
- Solicitation number
- DTFH71-15-R-00004
About this file
Appendix B - Draft SCRs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SER_BMS_FY15_Base_RFP__Draft.pdf | ||
| SER_BMS_FY15_Base_RFQ_Final.pdf | ||
| SER_BMS_FY15_BASE_95__Plans_-_Appendix_A.pdf | ||
| SER_BMS_FY15_Base_RFQ_Synopsis_Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-1
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
SPECIAL CONTRACT REQUIREMENTS
Project SER BMS FY15_BASE
NATIONAL PARK SERVICE SOUTHEAST REGION,
BRIDGE PREVENTIVE MAINTENANCE REPAIR
The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14,) U. S. Department of Transportation, Federal Highway Administration.
DRAFT
J-2
Section 104. — CONTROL OF WORK
104.03(c). Add the following:
The as-built working drawings and final as-built drawings will be jointly reviewed for accuracy and completeness by the CO and the Contractor prior to submission of each monthly pay estimate. If the monthly review finds that the Contractor is not maintaining the as-built working drawings, payment of the Contractor’s invoice will be withheld until the as-built working drawings are brought up to date.
104.05. Add the following:
When hauling on National Park Service roads, do not exceed the load restrictions shown in Table 104-1.
Table 104-1 Load Restrictions
Single Units Gross Vehicle Weight, pounds
2 axles 40,000 3 axles 48,000 4 or more axles 52,000
Combination Units Gross Vehicle Weight, pounds
3 axles 57,000 4 axles 62,000 5 or more axles 66,000
Where the ground is saturated with water or during periods of freezing and thawing, the CO may impose further load restrictions or suspend hauling.
104.05. Add the following:
Operate loaded vehicles hauling material at speeds not exceeding 40 miles per hour or the posted speed limit, whichever is lower, and spaced at 500-foot minimum intervals. When hauling on bridges, do not exceed 25 miles per hour or the posted speed limit, whichever is lower, or operate more than 1 loaded hauling vehicle at a time.
Section 105. — CONTROL OF MATERIAL
105.02(c). Add the following:
If any material is to be excavated or disposed of from any material source outside the construction limits, other than commercially available and operated sites, provide a
J-3 certification from the State Historic Preservation Officer or Indian Tribal Council, if applicable, before work begins that states:
(1) A cultural resource survey (a survey for historical sites and archeological remains) has been performed at the proposed site; and
(2) No significant cultural resources exist in the area that will be disturbed by the Contractor.
Section 107.—LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
107.01. Add the following:
The following permits may be required for this project:
(a) Disposal permit or agreement.
(b) Erosion and sediment control.
(c) Hazardous waste permit.
This list of permits may not be all inclusive of those required for construction. No time or damages, including impact damages, will be allowed for failure to obtain necessary permits or agreements. Provide copies of these permits and agreements upon request.
107.02. Add the following after the third paragraph:
For the full duration of construction, do not disturb any vegetation or trees outside of the construction limits.
Tag trees that will be removed and obtain approval from the CO prior to removal. The CO will consult with the National Park Service (NPS) before providing tree removal approval.
Make restitution to the NPS for any trees damaged due to careless construction or inappropriate protection of existing trees. The amount of restitution for each tree will depend on the extent of damage.
Remove destroyed trees and make restitution for the loss of the trees. The value of the tree will be determined at $42.50 per square inch of trunk area (determined by diameter at 5 feet above the ground). A tree will be considered destroyed if any of the following apply:
• Any of the buttress root is debarked.
• 20 percent of the root protection area is impacted by equipment or stockpiled materials.
J-4
• Wound(s) to the tree trunk measure 20 percent or more of the total circumference of the tree.
If a tree is damaged, make restitution for the repair of the tree. The NPS will supply a resource management specialist to dress each wound. The cost will be determined at $50.00 per wound on the trunk below the 8-foot level and $80.00 per wound at and above the 8-foot level. A tree will be considered damaged if it suffers wounds to the trunk of less than 20 percent of the total circumference of the tree.
If any limbs or branches are broken or cut off without prior approval from the CO, make restitution for the repair. The NPS will supply a resource management specialist to prune and dress each wound. The cost will be determined at $75.00 per limb or branch.
Make restitution for the introduction of any exotic vegetation or pests introduced into the Park.
Examples include, but are not limited to, careless use of unclean equipment, incorrect seed mix, incorrect mulch or erosion control blanket, and/or unapproved sod. The amount of restitution will be based on the number of man-hours required to remove the exotic vegetation, or treat or eliminate exotic pests at $50.00 per man-hour and equipment rates will be assessed equal to commercial equipment rates within a 50 mile radius of the project site.
Restitution will be subtracted from the Contractor’s progress payments and will be unrecoverable.
107.08. Add the following:
Clean all equipment before entering Government property. This equipment will be subject to inspection at the CO’s discretion to preclude the introduction of exotic vegetation into the Park.
Make restitution for the removal of the exotic vegetation as described in this Section.
Section 108. — PROSECUTION AND PROGRESS
108.01. Add the following:
Construction operations are limited as follows:
No work will be permitted on Sundays or National legal holidays unless approved by the CO.
Section 109.—MEASUREMENT AND PAYMENT
109.08(b). Add the following:
Submit invoices by the 7th day after the closing date. Invoices received after the 16th day following the closing date will not be accepted for payment processing that month. Include late, unprocessed invoice submittals in the following month’s invoice.
J-5
109.08(c). Add the following:
The Government’s designated billing office is:
Federal Highway Administration Eastern Federal Lands Highway Division Loudoun Tech Center 21400 Ridgetop Circle Room 200 Sterling, Virginia 20166-6511
ATTN: CONSTRUCTION DIVISION
Section 156. — PUBLIC TRAFFIC
156.07(i). Delete the Subsection and substitute the following:
(i) Limit construction caused delays to public traffic to a maximum of 10 to 15 minutes per passage through the project.
156.08. Delete the Subsection and substitute the following:
156.08 Nighttime Operations. Nighttime operations are not permitted. Perform construction operations during the hours of daylight (one-half hour after sunrise to one-half hour before sunset).
156.09. Delete the second sentence of the first paragraph and substitute the following:
The traffic safety supervisor may be the superintendent.
Section 202.—ADDITIONAL CLEARING AND GRUBBING
202.07. Add the following:
All trees to be cut down are to be flagged and approved by the CO.
Section 301.—UNTREATED AGGREGATE COURSES
301.03. Add the following after the second paragraph:
Submit the representative 300-pound sample to the EFLHD Central Laboratory in Sevierville, Tennessee.
J-6
301.03. Add the following:
If an alternate State gradation is produced as provided in Subsection 703.05, notify the CO in writing. If the target values with respect to the State gradation are not identified, they will be the midpoint of the allowable State specification band.
Section 552.—STRUCTURAL CONCRETE
552.01. Add the following:
This work includes the sealing of the concrete bridge deck surface and the cleaning and sealing of vertical and horizontal joints.
552.11. Add the following:
(g) Sealing concrete structure surfaces. Perform surface preparation and application of an alkylalkoxysilane penetrant sealer, with 40 percent solids and active materials dispersed in water to all exposed concrete surfaces as the project plans designate in accordance with the manufacturer’s recommendations and these Specifications.
Ensure the penetrant sealer is tinted with a fugitive dye and will be distinguishable on the concrete surface a minimum of four hours after application and becomes invisible within seven days of application.
(h) Penetrant sealant materials. Furnish penetrant sealant conforming to the following:
Table 552-7
Properties of Penetrant Sealant Property Specification
Appearance White, Milky Liquid VOC content (EPA method 24) Less than 350 g/l Flash Point (ASTM 3278) Greater than 200°F SETA
Resistance to Chloride ion penetration AASHTO T259 and T260
Less than 0.52 pounds per cubic yard (criteria of 1.5) at ½ inch level
Less than 0.00 pounds per cubic yard (criteria of 0.75) at 1 inch level
Table 552-8
Testing Requirements for Penetrant Sealant Test Method Specification
Water absorption test (ASTM C 642) 0.50 percent maximum per 48 hours; 1.5 percent maximum per 50 days
NCHRP 244 Series II – cube test for Water weight gain 85 percent reduction minimum
J-7
NCHRP 244 Series II – cube test for Absorbed chloride 87 percent reduction minimum
NCHRP 244 Series IV - Southern climate test for Absorbed chloride 95 percent reduction minimum
Sealing resistance test (ASTM C 672) (non-air-entrained concrete) 0 rating “No Scaling” (100 cycles)
(i) Surface preparation. Prepare concrete surfaces to receive a penetrant sealer in accordance with these Specifications. Remove substances such as dust, grime, dirt, curing compound, form oil, stains, mineral deposits, oil, bituminous materials, debris and all other deleterious material by water blasting, wire brushing, or other methods acceptable to the CO, all in accordance with the penetrant sealer manufacturer’s recommendation.
Use approved water blasting equipment to clean existing concrete surfaces. Use water blasting equipment which is specifically manufactured to clean concrete surfaces. Use equipment that has a minimum rated nozzle capacity of 3,200 pounds per square inch using the spray head proposed for use in the work. Water used for blasting shall meet the requirements in Subsections 725.01(a).
During the cleaning operation, exercise sufficient care to minimize the removal of the concrete matrix. Furnish hand tools, power grinders, and other similar equipment to remove materials which cannot be removed by water blasting without abrading the concrete matrix beyond acceptable limits. Wash concrete surfaces cleaned by methods other than water blasting with water blasting equipment as the final cleaning operation.
Limit the duration of water blasting to provide a light abraded surface. Do not allow surface abrasion to exceed 0.016 inch. The CO will not require further cleaning of stains still apparent after abrading to a depth of 0.016 inch. Avoid exposure of coarse aggregate by water blasting.
Provide a surface finish to all concrete repair areas that matches the existing concrete in texture, color, and appearance.
Re-clean finished concrete surfaces which become contaminated before applying the penetrant sealer at no expense to the Government prior to applying the penetrant sealer.
(j) Application of sealant materials. Apply the penetrant sealer only to surfaces which have been prepared in accordance with these Specifications and approved by the CO. For application of the penetrant sealer, meet the Specifications and the penetrant sealer manufacturer’s recommendations. Prior to application of any penetrant sealer cure concrete for a minimum of 21 days. Coordinate the application of the penetrant sealer so that concrete surfaces prepared to receive penetrant sealer are sealed with the penetrant sealer within ten days after completion of the surface preparation and prior to contamination of the prepared surfaces.
Apply the penetrant sealer using any suitable air or airless sprayer with an operating pressure of approximately 20 pounds per square inch. Apply the penetrant sealer material only when the ambient air temperature is between 50° and 90° F. Apply the penetrant sealer only to concrete
J-8 surfaces which have dried a minimum of 48 hours after water last contacted the concrete surfaces. Do not apply the penetrant sealer when winds are blowing 25 miles per hour or more, during rainfall, or when water spray or mist is present.
Apply the penetrant sealer only to concrete surfaces that have been prepared in accordance with the requirements and limitations set forth in these Specifications. Determine the actual coverage rate in square feet per gallon on the basis of field trials. Conduct a field trial to determine the coverage rate at the beginning of any penetrant sealer application operation. For each field trial, determine the optimum coverage rate for 500 square feet of surface area. Maintain the penetrant sealer application rate between 155 and 225 square feet covered per gallon of penetrant sealer used. Apply the penetrant sealer in a uniform manner without pudding and skips. Redistribute any penetrant sealer which is applied and subsequently puddles in low areas over the concrete surfaces by use of a squeegee.
Generally, begin the application of the penetrant at the lowest elevation and proceed upward toward higher elevations.
Maintain operating pressures in the sprayers used for application of the penetrant sealer material sufficiently low so that atomization or misting of the material does not occur.
(k) Control of sealant materials. Deliver the penetrant sealer to the project in the unopened, sealed containers with the manufacturer’s label identifying the product and with numbered seals intact. Ensure that each container is clearly marked by the manufacturer with the manufacturer’s name and address, product name, date of manufacture, and expiration date.
Store materials delivered to the job site in original unopened containers within and appropriate storage facility. Use a storage facility that provides protection from the elements, and safe and secure storage of the materials. Do not return unused material in opened containers to storage for later use. The contractor may either apply such material to appropriate areas on concrete surfaces or remove and dispose of it at locations off site that the contractor supplies.
Section 564.—BEARING DEVICES
564.01. Add the following:
This work includes the design of bridge lifting procedure, furnishing of all labor, tools and equipment for jacking and supporting the existing beams to reset the bearings.
564.03(a). Delete the first sentence and substitute the following:
(a) Drawings. Prepare and submit drawings for the bearings, the proposed jacking system, and temporary support procedure according to subsection 104.03 and section 18 of the AASHTO Standard Specifications for Highway Bridges Division II, Volume II. Show all the details of the bearings including the material proposed for use. Obtain CO’s approval before beginning fabrication and any work.
J-9
Section 604.—MANHOLES, INLETS, AND CATCH BASINS
604.01. Add the following:
This work includes replacing the metal grate for existing inlets as directed by the CO.
604.03. Add the following:
Do not replace existing metal frame.
Section 635. — TEMPORARY TRAFFIC CONTROL
635.03. Add the following:
(j) As a minimum, provide the following temporary traffic control:
(1) Construction signing;
(2) Type 3 barricades;
(3) Channelizing devices; and
(4) Other miscellaneous temporary traffic control devices that may be required by the
CO.
Section 637. — FACILITIES AND SERVICES
637.04(b). Delete the Subsection and substitute the following:
(b) Cellular telephone. Furnish two durable hand held digital/cellular wireless telephones for the use of the CO. Furnish cellular telephone(s) that are similar or compatible with the Contractor’s key field personnel (Project Superintendent, Traffic Control Supervisor, etc.) to enable the direct communication between the CO and the Contractor’s key field personnel.
Furnish each cellular telephone(s) with the following minimum capabilities:
(1) Direct Connect feature, or equivalent, to communicate onsite with Contractor’s key field personnel;
(2) Voicemail capable of answering, recording, storing, and playing back messages at least 30 minutes in length;
(3) Hands free device that can be used safely and effectively while driving, and is acceptable by the local law enforcement agencies;
J-10
(4) Customized communication configuration, independent of the other units, so that the CO may limit any features if necessary;
(5) Carrying case that can be worn on the belt and is appropriate for use on construction projects; and
(6) Other necessary cellular telephone accessories including a cigarette lighter power adapter/charger.
Furnish a cellular telephone plan that provides the necessary amount of monthly Direct Connect airtime and monthly Digital/Cellular airtime for use on the project. Ensure that each unit has unlimited Direct Connect capabilities and each unit is equipped with unlimited airtime, roaming, and local and long distance airtime necessary per month for official business only. Provide phones that work properly at the project site and at the Contractor’s and Government field office locations.
If any cellular telephone provided becomes defective, is stolen, or for any other reason does not function as intended, replace the unit with an equal or better unit at no additional cost to the Government. Replace any defective unit within eight hours after being notified by the
CO.
The Contractor will retain ownership of all cellular telephone units supplied by the Contractor. The CO will notify the Contractor when the unit is no longer needed and request its removal.
Section 703. — AGGREGATE
703.05(a). Delete items (3) and (4).
703.05(b). Add the following:
(3) Plasticity index, AASHTO T 90 3 max.
703.05(b). Add the following:
Furnish material with a minimum California bearing ratio of 70 percent, as determined by AASHTO T 193 at 95 percent of maximum dry density in accordance with AASHTO T 180 (Method D).
703.05(b)(1). Add the following:
At the option of the Contractor, the gradation only of the aggregate base may conform to the requirements of the state in which the park requiring the work is located.
| Section 104. — CONTROL OF WORK |
| Section 105. — CONTROL OF MATERIAL |
| Section 107.—LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC |
| Section 108. — PROSECUTION AND PROGRESS |
| Section 109.—MEASUREMENT AND PAYMENT |
| Section 156. — PUBLIC TRAFFIC |
| Section 301.—UNTREATED AGGREGATE COURSES |
| Section 552.—STRUCTURAL CONCRETE |
| Table 552-7 |
| Properties of Penetrant Sealant |
| Table 552-8 |
| Testing Requirements for Penetrant Sealant |
| Section 564.—BEARING DEVICES |
| Section 604.—MANHOLES, INLETS, AND CATCH BASINS |
| Section 637. — FACILITIES AND SERVICES |
| Section 703. — AGGREGATE |
File details come from the government source that posted it. Updated .