SER_BMS_FY15_BASE_95__Plans_-_Appendix_A.pdf
PDF 12 MB Posted
- Attached to
- NPS Southeast Region Bridge Preventive Maintenance Work Federal contract opportunity
- Solicitation number
- DTFH71-15-R-00004
About this file
Appendix A - Draft Plans and Location Map
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SER_BMS_FY15_Base_RFQ_Final.pdf | ||
| SER_BMS_FY15_Base_RFP__Draft.pdf | ||
| SER_BMS_FY15_BASE_95__SCR_-_Appendix_B.pdf | ||
| SER_BMS_FY15_Base_RFQ_Synopsis_Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
R01
-N o v -2
:2
A M
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
STATE PROJECT
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
EMA
SE
BRP-1215 9Dan WestonOA
DW
NPS
NO.
PMIS NO.
SER BMS FY15_BASE
NPS SOUTHEAST REGION
November, 2014
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
GENERAL NOTES AND INDEX
DRAWING TITLE
INDEX OF DRAWINGS
BRIDGE DRAWING NO.
GENERAL NOTES:
SPECIFICATIONS:
Construction:
Design:
MATERIALS:
AASHTO LRFD Bridge Design Specifications, 2012
SCOPE OF WORK:
Concrete:
Reinforcing Steel:
Joint Sealant:
ASTM D 5893, type SL.
Furnish low-modulus silicone joint sealant conforming to
BRIDGE PREVENTIVE MAINTENANCE
Field verify all dimensions.
Bridges on Federal Highway Projects, FP-14
Standard Specifications for Construction of Roads and
NATIONAL PARK SERVICE SOUTHEAST REGION
OA DW No scale
Provide 2" cover for reinforcing steel unless otherwise noted.
Grade 60 deformed.
Furnish reinforcing steel conforming to AASHTO M 31, f’c = 4000 psi at 28 days.
Furnish class A(AE) for concrete Weep Hole Detail
Bridge Approach Settlement Repair
Concrete Repair Details - 2
Concrete Repair Details - 1
Timber Runner Installation
Vertical Joint Repair Details
Expansion Joint Details (Asphaltic Plug)
Expansion Joint Details (Bridge)
General Notes and Index
A C
T U
A L F I L E R S
E R B
M S F
Y
B A
S E
G E
N
N O
T E S .D
G N install timber running planks and other work.
deck surface; reset rocker bearings; clean and paint bearings;
replace bridge expansion joints; repair bridge approach; seal members; clean and seal concrete cracks; clean, reseal, and
Repair concrete spalls and deteriorated concrete bridge
R02
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
EMA
BRP-1215 9Dan Weston
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Notes:
COMPRESSION SEAL DETAIL
CLJoint
(Typ.)
Existing concrete
CLJoint
(Typ.)
Existing concrete
Backer rod joint sealant
Low modulus silicone
CL
(Typ.)
Existing concrete
Strip seal
M in
R e c e s s
W
HORIZONTAL JOINT DETAIL
Install new expansion joint material per manufacturer’s recommendation.
(Typ.)
Grind chamfer
5’’ = 1’-0’’ laitance with oil-free compressed air.
Remove existing joint material. Clean joint opening of debris and remove
STRIP SEAL EXPANSION JOINT DETAIL
Compression seal
Joint
(Typ.)
Anchorage
OALE
2.
1.
(See Note 3)
Preformed joint filler
Remove and replace deteriorated preformed joint filler as directed by CO.
(BRIDGE)
EXPANSION JOINT DETAILS
A C
T U
A L F I L E R S
E R B
M S F
Y
B A
S E
E X
P J N
T
D T S .D
G N
STATE PROJECT
SHEET
NO.
REGION
SE
NPS
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
EMA Dan Weston
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
BRP-1215 9
m in m in
1’-8"
10"
R03
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
EMA
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
CLJoint
Notes:
Finish surface to the same grade and slope as surrounding existing surfaces.
Saw cut asphalt and remove pavement
ASPHALTIC PLUG JOINT
Existing opening galvanized nails at 1’-0’’ max.
16d or larger common with predrilled holes at 1’-0’’ maximum butted segments, centered over joint galvanized plate, placed in 4’-0’’ long
’’ x 8’’ AASHTO M270 grade 364
Backer rod
Sealed expansion gap
(Typ.)
Existing wearing surface
Asphaltic binder
Existing concrete remove existing joint material.
Note location and skew of existing deck expansion joint, and remove.
Saw cut existing pavement to concrete deck (minimum 2’’)
Place new steel plate over joint, secure in place with galvanized nails.
recommendation.
Clean and prepare exposed surface according to manufacturer’s
5’’ = 1’-0’’ according to manufacturer’s recommendation.
Install new backer rod and fill the expansion gap with asphaltic binder
(ASPHALTIC PLUG)
EXPANSION JOINT DETAILS
recommendation.
Place aggregate-binder mixture according to manufacturer’s recommendation.
Prepare surface for aggregate-binder mixture according to manufacturer’s mixture
Aggregate-binder
9.
8.
7.
6.
5.
4.
3.
2.
1.
the installation.
Provide an authorized representative of the manufacturer to oversee
A C
T U
A L F I L E R S
E R B
M S F
Y
B A
S E
A S
P H
L T P
L U
G .D
G N
STATE PROJECT
SHEET
NO.
REGION
SE
NPS
EMA Dan WestonOA DW
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R04
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
EMA
BRP-1215 9Dan Weston
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d of wall
Front face
Preformed joint fillerConcrete wall
Stone masonry
JointCL
A A
SECTION A-A
(Vertical Masorny Wall) Clean and Reseal Joint
JointCL groundline
Existing
Existing exp. joint
(varies)
& sealant with backer rod
Preformed exp. jt. filler w/stone facia
Existing wingwall wall w/stone facia
Existing approach retaining
Notes:
Existing stone parapet or wall to existing ground.
Remove existing joint filler and other loose materials from top of parapet the configuration of the wall as required.
Clean wall surfaces. Install preformed joint filler conforming to
VERTICAL JOINT REPAIR DETAILS
No scaleLE OA
Color of sealant to match surrounding stones.
Install backer rod and joint sealant as per manufacturer’s requirements.4.
3.
2.
1.
Backer rod of backer rod according to Section 712.01.
Measure joint opening width after cleaning to select size joint sealant
Low modulus silicone
A C
T U
A L F I L E R S
E R B
M S F
Y
B A
S E
V E
R T J T
D T S .D
G N
STATE PROJECT
SHEET
NO.
REGION
SE
NPS
EMA Dan Weston
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R05
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
EMA
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
TIMBER RUNNER INSTALLATION
REMOVE AND REPLACE RUNNER TYPICAL SECTION
RUNNER INSTALLATION TYPICAL SECTION
CLStructure
CLStructure
(See Note 2)
Timber runner (Typ.)
(See Note 1)
Timber runner (Typ.)
Notes:
Clean deck surface and install new timber running planks.
and install new running planks.
Remove existing timber running planks. Clean deck surface2.
1.
TIMBER RUNNER LAYOUT
Stagger end joint plank length at bridge ends
8’-0’’ minimum plank length with odd
3’-0" min.
(Typ.)
Bridge end deck
Existing timber railing
Existing timber deck
Existing timber curb
Existing timber
1" = 1’-0"
A C
T U
A L F I L E R S
E R B
M S F
Y
B A
S E
T I
M B
E R
R U
N N
E R
D T S .D
G N
STATE PROJECT
SHEET
NO.
REGION
SE
NPS
EMA Dan WestonOA DW
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R06
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
EMA
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d concrete Face of existing
’’ Saw cut4
Depth of concrete repair determined in the field by the CO.
Depth of concrete rebars may vary. Removal areas will be
Location of concrete repair and cracking are approximate.
VERTICAL CONCRETE REPAIR
Existing reinforcement
Notes:
Existing reinforcement
HORIZONTAL CONCRETE REPAIR
concrete Face of existing
’’ Saw cut4
Depth of concrete repair
OVERHEAD CONCRETE REPAIR
Depth of concrete repair
’’ Saw cut4 concrete Face of existing
Existing reinforcement
CONCRETE REPAIR DETAILS - 1
depth of rebar allows
" Under cut all sides where2
Class A(AE) concrete Non-shrink grout or
Class A(AE) concrete Non-shrink grout or depth of rebar allows
" Under cut all sides where2
Class A(AE) concrete Non-shrink grout or
2.
1.
for additional information is destoryed, see "CONCRETE REPAIR DETAILS - 2" sheet
If bond between existing concrete and reinforcing steel
Not to scale top cut, where depth of rebar allows
’’ Under cut all sides, except2
A C
T U
A L F I L E R S
E R B
M S F
Y
B A
S E
C O
N C
R E P
D T .D
G N
STATE PROJECT
SHEET
NO.
REGION
SE
NPS
EMA Dan WestonOA DW
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R07
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
EMA
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
CONCRETE REPAIR DETAILS - 2
VERTICAL CONCRETE REPAIR
concrete Face of existing
’’ Saw cut4
’’ Min.2 top cut
’’ Under cut all sides except2
Existing reinforcement
Cathodic Anode
2’’ x 2’’, w2 x w2
Welded wire fabric
2’’ Min. clr.
surface
Existing concrete
Epoxy resin
CONCRETE CRACK REPAIR
(Typ.)
Injection port crack
Existing
Note:
Depth of concrete repair reinforcement
" min. clr. below4
OVERHEAD CONCRETE REPAIR
’’ Under cut all sides2
2’’ Min. clr. ’’ Saw cut4 concrete Face of existing
’’ Min.2 11Existing reinforcement
Cathodic Anode
2’’ x 2’’, w2 x w2
Welded wire fabric
’’ Under cut all sides2
2’’ Min. clr.
’’ Saw cut4 concrete Face of existing
’’ Min.2 11Existing reinforcement
Cathodic Anode
2’’ x 2’’, w2 x w2
Welded wire fabric
HORIZONTAL CONCRETE REPAIR
Depth of concrete repair reinforcement
" min. clr. above4 according to manufacture’s recommendations, as approved by CO.
Install Cathodic Anodes for corrosion protection on repair areas with machine bolts.
Fasten welded wire fabric to existing reinforcement/concrete
Notes:
determined in the field by the CO.
Depth of concrete rebars may vary. Removal areas will be
Location of concrete repair and cracking are approximate.
Not to scale
= 300 lbs.
direction. Min. pull out tension @ max. spacing of 1’-0" in each (length varies) with sleeve anchor
’’ dia. Galvanized machine bolt4
= 300 lbs.
direction. Min. pull out tension @ max. spacing of 1’-0" in each (length varies) with sleeve anchor
’’ dia. Galvanized machine bolt4
Class A(AE) concrete Non-shrink grout or
Class A(AE) concrete Non-shrink grout or
Class A(AE) concrete Non-shrink grout or
3.
2.
1.
= 300 lbs.
direction. Min. pull out tension @ max. spacing of 1’-0’’ in each (length varies) with sleeve anchor
’’ dia. Galvanized machine bolt4
Depth of concrete repair and Crack Repair.
561- Structural Concrete Injection
Conform concrete crack repair to Section reinforcement
" min. clr. to4
A C
T U
A L F I L E R S
E R B
M S F
Y
B A
S E
C O
N C
R E P
D T .D
G N
STATE PROJECT
SHEET
NO.
REGION
SE
NPS
EMA Dan WestonOA DW
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
x x x x x x
R08
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
EMA
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
BRIDGE APPROACH SETTLEMENT REPAIR
SECTION A-APARTIAL PLAN AT APPROACH AND ABUTMENT END
’’ = 1’-0’’2 1Scale
4’-0", Full depth reconstruction
A A
Existing pavement
(match existing)
HACP surface course
(match existing)
HACP base course
Aggregate base (match existing) s lo p e t o d r a in m in
V a r ie s
Type II-A
Geotextile backfill
Granular 1’-0"
CL
1’-7"
Underdrain
(See Note 1) existing inlet or daylight at sideslope
4’’ Perforated underdrain connect to
4’-0"
Scale 1’’ = 1’-0’’
CLUnderdrain
Note:
1.Slope underdrain a min. of 2%.
As shown approach slab
Bridge or concrete approach slab
Bridge or concrete
Egde of roadway pavement depth existing pavement
Saw cut and remove full
1’-2"
A C
T U
A L F I L E R S
E R B
M S F
Y
B A
S E
B R
D
A P P
R S
E T
T L
R E P .D
G N
STATE PROJECT
SHEET
NO.
REGION
SE
NPS
EMA Dan WestonOA DW
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R09
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
EMA
-N o v -2
M
P R
O J E
C T
S n p s s e r b m s f y b a s e B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
WEEP HOLE DETAIL
A
A
ELAVATION
Notes:
3.
2.
1.
to the CO for approval.
Submit details of the filter, including installations techniques, The sketch of the weep hole filter is for illustration only.
inside of the weep holes.
Remove all dirt, laitance, or other loose matter from manufacturer’s recommendations.
Install prefabricated weep hole filter according to the
SECTION A-A
Face of abutment
Face of abutment
Removable filter
Filter housing
CLWeep hole
Weep holeCL
No scale
A C
T U
A L F I L E R S
E R B
M S F
Y
B A
S E
W E
E P
H O
L E
D T .D
G N
STATE PROJECT
SHEET
NO.
REGION
SE
NPS
EMA Dan WestonOA DW
BRIDGE DRAWING
of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
File details come from the government source that posted it. Updated .