SF 30 - Amendment 001.pdf

PDF 501 KB Posted

Attached to
Recovery, Design-Build Foothills Parkway
Solicitation number
DTFH71-09-R-00007
Issued by

About this file

All Phase One SOQs must be received no later than 2 00 p.m. local time on Thursday August 27 2009 in order to be considered for further evaluation.

View the file

Other files

File Type Posted
SF 30 - Amend 005.pdf PDF
SF 30 - Amendment 004.pdf PDF
SF 30 - Amendment 003.pdf PDF
SF 30 - Amendment 002.pdf PDF
Request for Qualifications —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable debbie debbie pschaad Line

Amendment No. 001 2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 001 Foothills Parkway Design-Build Project FOOT 8E17

Great Smoky Mountains National Park Solicitation: DTFH71-09-R-00007 Request for Qualifications (RFQ)

The purpose of this Amendment is to:

1) Revise RFQ Subsection Experience of the Evaluation and Weighting Criteria Section to clarify and revise the experience requirements of key personnel.

Solicitation Provision changes

1. Delete RFQ Subsection Experience of the Evaluation and Weighting Criteria Section and substitute the following:

1. Experience (Total Maximum Score = 30). The Government will review and evaluate the Offeror's personnel and highway and bridge design experience, including technical and geographical similarities between the Offeror's design experience and the work described in this solicitation.

Submit documentation for all key design and construction personnel to be involved in the design and construction of the project, indicating their specific experience within the past five (5) years performing technically the same or similar bridge, highway, geotechnical, field survey and mapping, erosion control, permitting, project management, construction, landscape restoration, and QA/QC work for EFLHD, NPS, Tennessee Department of Transportation (TDOT) and/or similar Department of Transportation (DOT) or agencies. Submit documentation for the following key personnel, demonstrating a minimum of three (3) years experience within the past five (5) years performing technically the same or similar proposed design and construction work, including experience on curved bridges and in steep terrain environments:

Design-Build Project Manager - The Contractor’s principal point of contact for all activities throughout the entire design-build process.

Designer of Record - The Contractor’s single point of responsibility for all design procedures and decisions. This individual shall be a registered, licensed Professional Engineer in the State of Tennessee.

Project Engineer - The Contractor’s on-site engineer, responsible for all engineering decisions, judgments and work at the site. This individual shall be a

Amendment No. 001 3 registered, licensed Professional Engineer. In addition to the experience described above, the Project Engineer must have experience in post-tensioning and grouting operations including at least one (1) year in responsible charge of post-tensioning related engineering activities.

Construction Superintendent - The Contractor’s authorized representative in charge of the construction work. This individual shall be a registered, licensed Professional Engineer. In lieu of a Professional Engineer license, the Construction Superintendent must have at least ten (10) years of bridge construction experience in which three (3) years is in post-tensioned concrete construction. The Construction Superintendent must have experience in post-tensioning and grouting operations including at least one (1) year in responsible charge of post-tensioning related operations.

Quality Management Manager - The Contractor’s single point of responsibility for all quality management procedures and decisions. The Contractor may separate the design and construction Quality Management Manager responsibilities by assigning a Design Manager separate from the Construction Manager. The Quality Management Manager may not also serve as the Project Engineer or Construction Superintendent.

Bridge Engineer - The Contractor’s representative in charge of the bridge design.

This individual shall be a registered, licensed Professional Engineer in the State of Tennessee. In addition to the experience described above, the Bridge Engineer must have experience in post-tensioning and grouting operations. This experience should include one (1) year in responsible charge of the construction inspection of post-tensioned bridge construction and be able to demonstrate knowledge of the importance of post-tensioning and grouting.

Geotechnical Engineer - The Contractor’s representative in charge of the bridge foundation design, retaining walls design, slide repair/stabilization and geotechnical design analysis. This individual shall be a registered, licensed Professional Engineer in the State of Tennessee.

Safety Engineer - The Contractor’s representative in charge of safety with authority to halt work if warranted by safety violations.

Obligation to keep team intact:

In connection with the services covered by this procurement process, any in-house personnel, subcontractors, and outside associates or consultants will be limited to the individuals or firms that are specifically identified during the RFQ submittal process.

The contractor shall obtain the Contracting Officer’s written consent before making any substitution for these designated in-house personnel, subcontractors, associates, or consultants.

Amendment 1.pdf
Amendment No. 1
Fire Island National Seashore
J Pages.pdf
Special Contract Requirements
Division 100
Division 150
Division 200
Division 301
Division 600
Division 700
Amendment #2.pdf
Amendment No. 2
Natchez Trace Parkway
Amendment #1.pdf
Amendment No. 1
Great Smoky Mountains National Park
Solicitation Provision changes
Special Contract Requirements changes
Amendment 2_Final (4).pdf
Section 705.—ROCK
Amendment 001_Final.pdf
June 3, 2008 Pre-Proposal Meeting and Field Review
Part 5. Add the following to the Special Contract Requirements:
109.06. Delete Price Form 02A, 02B, 02C, and 02D of the Special Contract Requirements and substitute the attached forms (See attached files).
BK_1442 for VI John 001.pdf
Amendment 001 A-1
AND AWARD
DTFH71-09-B-00017
IDCode:
Page: 1
Pages: 3
AmendNo: 001
EffDate: 08/13/09
ReqNo:
ProjNo: PRA-FOOT 8E17
IssCode:
IssuedBy: Eastern Federal Lands Highway Division

21400 Ridgetop Circle Sterling, VA 20166

AdmCode:
AdminBy:
ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolAmdNo:
AmendDate: 07/02/09
ModNo:
ModDate:
NoCopies:
Amended: Off
ApprData:
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript:

The purpose of this Amendment is to:

1) Revise RFQ Subsection Experience of the Evaluation and Weighting Criteria Section to clarify and revise the experience requirements of key personnel.

All Phase One SOQs must be received no later than 2:00 p.m. local time on Thursday, August 27, 2009 in order to be considered for further evaluation.

SignName:
SignTitl:
ContDate:
CoName:
CoTitle:
CODate:
SolChgYs: Yes
SolChgNo: Off
OffrExt: Off
OffrNoEx: No
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Yes
Text1:
Text2:

File details come from the government source that posted it. Updated .