EarthWork_Data.pdf

PDF 1 MB Posted

Attached to
ID PFH 21(7), Warren Wagon Road
Solicitation number
DTFH7017B00023
Issued by

About this file

Earthwork Data

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR

Federal Highway Administration

Western Federal Lands Highway Division

Vancouver, Washington

DATA LISTING

EARTHWORK

FINAL

D E P A R T

M

EN

T

OF TRANSPOR

T A T

IO

N

U N

ITED

STATES OF

AME

R

IC

A

Prepared by - Marmot Team

US CUSTOMARY

(SCHEDULES A, B, C, AND D)

308+25 TO 597+65.50

WARREN WAGON ROAD

VALLEY COUNTY ID

ID PFH 21(7)

WARREN WAGON ROAD

COMMITMENT TO EXCELLENCE

FEDERAL LANDS HIGHWAY

File: c:\myfiles\pw_production\d0354125\MainEW.log 2/6/2018, 4:52:05 PM

Input File: pw:\Idaho\PFH_Warren_Wagon_Road\ID_PFH_21(7)\Development\CADD\Design\MainEW.inp Output File: MainEW.log 1 1 1 1 2 2 1 3 3 Earthwork 1 4 4 1 5 5 /* For use with the .x30 criteria files and TYPICAL SECTIONS */ 1 6 6 /* BELOW (tolerance setting)... use 0.001 for Metric projects and .03 for English projects */ 1 7 7 1 8 8 tolerance = 0.001 1 9 9 1 10 10 xs dgn = MainHAXSFinalEW.dgn 1 11 11 1 12 12 Existing Ground Line 1 13 13 soil type = RdwyExc 1 14 14 roadway exc mult factor = 1.00 1 15 15 subsoil exc mult factor = 1.00 1 16 16 fill mult factor = 1.00 1 17 17 type = line, line_string 1 18 18 lvname = x_e_ground_xs 1 19 19 co = 3,8 1 20 20 1 21 21 /* For use with subex type 1 */ 1 22 22 Existing Suitable Material 1 23 23 soil type = RdwyExc 1 24 24 roadway exc mult factor = 1.00 1 25 25 subsoil exc mult factor = 1.00 1 26 26 fill mult factor = 1.00 1 27 27 type = line 1 28 28 lvname = x_p_subex_exc1 1 29 29 co = 30 1 30 30 1 31 31 /* For use with sidewalks */ 1 32 32 Existing Suitable Material 1 33 33 soil type = SidewalkExc 1 34 34 roadway exc mult factor = 1.00 1 35 35 subsoil exc mult factor = 1.00 1 36 36 fill mult factor = 1.00 1 37 37 type = line 1 38 38 lvname = x_p_sidewalk_exc 1 39 39 co = 31 1 40 40 1 41 41 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 42 42 Existing Suitable Material 1 43 43 soil type = MseWallExc 1 44 44 roadway exc mult factor = 1.00 1 45 45 subsoil exc mult factor = 1.00 1 46 46 fill mult factor = 1.00 1 47 47 type = line, line_string 1 48 48 lvname = x_p_mse_wall_exc 1 49 49 co = 32 1 50 50 1 51 51 /* For use with subex types 1 and 2 */ 1 52 52 Existing Unsuitable Material 1 53 53 soil type = Subexcavation 1 54 54 roadway exc mult factor = 1.00 1 55 55 subsoil exc mult factor = 1.00 1 56 56 fill mult factor = 1.00 1 57 57 type = line 1 58 58 lvname = x_p_subex_exc2 1 59 59 co = 20 1 60 60 1 61 61 /* For use with all Concrete Retaining Walls */ 1 62 62 Existing Unsuitable Material 1 63 63 soil type = ConcWallStrucExc 1 64 64 roadway exc mult factor = 1.00 1 65 65 subsoil exc mult factor = 1.00 1 66 66 fill mult factor = 1.00 1 67 67 type = line 1 68 68 lvname = x_p_conc_wall_str_exc 1 69 69 co = 21

Page: 1

1 70 70 1 71 71 /* For use with REHAB typicals */ 1 72 72 Existing Unsuitable Material 1 73 73 soil type = ColdRecycle 1 74 74 roadway exc mult factor = 1.00 1 75 75 subsoil exc mult factor = 1.00 1 76 76 fill mult factor = 1.00 1 77 77 type = line, line_string 1 78 78 lvname = x_p_milling_exc 1 79 79 co = 22 1 80 80 1 81 81 /* For use with Existing Features typicals */ 1 82 82 Existing Unsuitable Material 1 83 83 soil type = ExistPavement 1 84 84 roadway exc mult factor = 1.00 1 85 85 subsoil exc mult factor = 1.00 1 86 86 fill mult factor = 1.00 1 87 87 type = line, line_string 1 88 88 lvname = x_e_pave_surface 1 89 89 co = 1 1 90 90 1 91 91 /* For use with Existing Features typicals (.x30 criteria)*/ 1 92 92 Existing Unsuitable Material 1 93 93 soil type = ExistPavementLayer2 1 94 94 roadway exc mult factor = 1.00 1 95 95 subsoil exc mult factor = 1.00 1 96 96 fill mult factor = 1.00 1 97 97 type = line, line_string 1 98 98 lvname = x_e_pave_surface2 1 99 99 co = 2 1 100 100 1 101 101 /* For use with Existing Features typicals (.x30 criteria)*/ 1 102 102 Existing Unsuitable Material 1 103 103 soil type = ExistGravel 1 104 104 roadway exc mult factor = 1.00 1 105 105 subsoil exc mult factor = 1.00 1 106 106 fill mult factor = 1.00 1 107 107 type = line, line_string 1 108 108 lvname = x_e_gravel_surface 1 109 109 co = 3 1 110 110 1 111 111 Existing Unsuitable Material 1 112 112 soil type = Topsoil 1 113 113 roadway exc mult factor = 0.000001 1 114 114 subsoil exc mult factor = 0.000001 1 115 115 fill mult factor = 0.000001 1 116 116 type = line 1 117 117 lvname = x_e_topsoil_layer 1 118 118 co = 23 1 119 119 1 120 120 /* For use with soil nail wall (.x30 criteria)*/ 1 121 121 Existing Unsuitable Material 1 122 122 soil type = SnWallStrExc 1 123 123 roadway exc mult factor = 1.00 1 124 124 subsoil exc mult factor = 1.00 1 125 125 fill mult factor = 1.00 1 126 126 type = line 1 127 127 lvname = x_p_sn_wall_str_exc 1 128 128 co = 57 1 129 129 1 130 130 /* For use with rockery wall (.x30 criteria)*/ 1 131 131 Existing Unsuitable Material 1 132 132 soil type = RockeryWallStrExc 1 133 133 roadway exc mult factor = 1.00 1 134 134 subsoil exc mult factor = 1.00 1 135 135 fill mult factor = 1.00 1 136 136 type = line 1 137 137 lvname = x_p_rk_wall_str_exc 1 138 138 co = 88 1 139 139 1 140 140 /* For use with guardwall (.x30 criteria)*/ 1 141 141 Existing Unsuitable Material

Page: 2

1 142 142 soil type = GuardwallStrucExc 1 143 143 roadway exc mult factor = 1.00 1 144 144 subsoil exc mult factor = 1.00 1 145 145 fill mult factor = 1.00 1 146 146 type = line 1 147 147 lvname = x_p_gd_wall_str_exc 1 148 148 co = 90 1 149 149 1 150 150 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 151 151 Existing Suitable Material 1 152 152 soil type = GfmseWallExc 1 153 153 roadway exc mult factor = 1.00 1 154 154 subsoil exc mult factor = 1.00 1 155 155 fill mult factor = 1.00 1 156 156 type = line, line_string 1 157 157 lvname = x_p_gfmse_wall_excav 1 158 158 co = 208 1 159 159 1 160 160 1 161 161 1 162 162 1 163 163 /* color 15 is used for the concrete footing for Prop_Cut_Wall1 and */ 1 164 164 /* color 15,0 are used for the stem for Prop_Cut_Wall1 */ 1 165 165 /* color 0 are used for the "face" of the wall for 3D models */ 1 166 166 /* color 0 is used for the Curb Surface Symbology */ 1 167 167 1 168 168 Proposed Finish Grade 1 169 169 soil type = RdwyExc 1 170 170 roadway exc mult factor = 1.00 1 171 171 subsoil exc mult factor = 1.00 1 172 172 fill mult factor = 1.00 1 173 173 type = line 1 174 174 lvname = x_p_cutslope 1 175 175 lvname = x_p_ditchslope 1 176 176 lvname = x_p_fillslope 1 177 177 lvname = x_p_foreslope 1 178 178 lvname = x_p_pave_layer_top 1 179 179 lvname = x_p_pave_layer_top_curb3_c 1 180 180 lvname = x_p_pave_layer_top_curb3_e 1 181 181 lvname = x_p_conc_wall_below 1 182 182 lvname = x_p_conc_wall_above 1 183 183 lvname = x_p_conc_wall_gutter 1 184 184 /* lvname = x_p_conc_wall_front */ 1 185 185 lvname = x_p_curb_top 1 186 186 lvname = x_p_curb_bottom 1 187 187 lvname = x_p_curb3_top 1 188 188 lvname = x_p_curb3_back_c 1 189 189 lvname = x_p_curb3_back_e 1 190 190 lvname = x_p_curb3_face 1 191 191 lvname = x_p_curb3_under_c 1 192 192 lvname = x_p_curb3_under_e 1 193 193 lvname = x_p_parkway_top 1 194 194 lvname = x_p_sidewalk_layer_top 1 195 195 lvname = x_p_sn_wall_face 1 196 196 lvname = x_p_sn_wall_top 1 197 197 lvname = x_p_rk_wall_face 1 198 198 lvname = x_p_rk_wall_top 1 199 199 lvname = x_p_gd_wall_above 1 200 200 lvname = x_p_gd_wall_below 1 201 201 lvname = x_p_conc_median_top 1 202 202 lvname = x_p_conc_median_bottom 1 203 203 lvname = x_p_mse_wall_front 1 204 204 lvname = x_p_mse_wall_veneer 1 205 205 lvname = x_p_wall_top 1 206 206 lvname = x_p_gfmse_wall_pfg 1 207 207 lvname = x_p_rk_wall_tier 1 208 208 /* lvname = x_p_gfmse_wall_embedment_slope */ 1 209 209 1 210 210 1 211 211 /* co = 0,1,15,29,40,42,43,44,49,51,52,54,82,128,178,229,233,234,235,236,247 */ 1 212 212

Page: 3

1 213 213 Proposed Undercut 1 214 214 soil type = Topsoil 1 215 215 roadway exc mult factor = 0.000001 1 216 216 subsoil exc mult factor = 0.000001 1 217 217 fill mult factor = 0.000001 1 218 218 type = line 1 219 219 lvname=x_p_topsoil_backfill 1 220 220 co = 20 1 221 221 1 222 222 Proposed Undercut 1 223 223 soil type = Layer1 1 224 224 roadway exc mult factor = 0.000001 1 225 225 subsoil exc mult factor = 0.000001 1 226 226 fill mult factor = 0.000001 1 227 227 type = line 1 228 228 lvname = x_p_pave_layer_1 1 229 229 co = 22 1 230 230 1 231 231 Proposed Undercut 1 232 232 soil type = Layer2 1 233 233 roadway exc mult factor = 0.000001 1 234 234 subsoil exc mult factor = 0.000001 1 235 235 fill mult factor = 0.000001 1 236 236 type = line 1 237 237 lvname = x_p_pave_layer_2 1 238 238 co = 23 1 239 239 1 240 240 Proposed Undercut 1 241 241 soil type = Layer3 1 242 242 roadway exc mult factor = 0.000001 1 243 243 subsoil exc mult factor = 0.000001 1 244 244 fill mult factor = 0.000001 1 245 245 type = line 1 246 246 lvname = x_p_pave_layer_3 1 247 247 co = 24 1 248 248 1 249 249 Proposed Undercut 1 250 250 soil type = Layer4 1 251 251 roadway exc mult factor = 0.000001 1 252 252 subsoil exc mult factor = 0.000001 1 253 253 fill mult factor = 0.000001 1 254 254 type = line 1 255 255 lvname = x_p_pave_layer_4 1 256 256 co = 25 1 257 257 1 258 258 Proposed Undercut 1 259 259 soil type = Layer5 1 260 260 roadway exc mult factor = 0.000001 1 261 261 subsoil exc mult factor = 0.000001 1 262 262 fill mult factor = 0.000001 1 263 263 type = line 1 264 264 lvname = x_p_pave_layer_5 1 265 265 co = 26 1 266 266 1 267 267 /* For use with x20 sidewalks */ 1 268 268 Proposed Undercut 1 269 269 soil type = SidewalkLayer1 1 270 270 roadway exc mult factor = 0.000001 1 271 271 subsoil exc mult factor = 0.000001 1 272 272 fill mult factor = 0.000001 1 273 273 type = line 1 274 274 lvname = x_p_sidewalk_layer_1 1 275 275 co = 35 1 276 276 1 277 277 /* For use with x20 sidewalks */ 1 278 278 Proposed Undercut 1 279 279 soil type = SidewalkLayer2 1 280 280 roadway exc mult factor = 0.000001 1 281 281 subsoil exc mult factor = 0.000001 1 282 282 fill mult factor = 0.000001 1 283 283 type = line 1 284 284 lvname = x_p_sidewalk_layer_2

Page: 4

1 285 285 co = 36 1 286 286 1 287 287 /* For use with x20 sidewalks */ 1 288 288 Proposed Undercut 1 289 289 soil type = SidewalkLayer3 1 290 290 roadway exc mult factor = 0.000001 1 291 291 subsoil exc mult factor = 0.000001 1 292 292 fill mult factor = 0.000001 1 293 293 type = line 1 294 294 lvname = x_p_sidewalk_layer_3 1 295 295 co = 37 1 296 296 1 297 297 /* For use with x20 sidewalks */ 1 298 298 Proposed Undercut 1 299 299 soil type = SidewalkLayer4 1 300 300 roadway exc mult factor = 0.000001 1 301 301 subsoil exc mult factor = 0.000001 1 302 302 fill mult factor = 0.000001 1 303 303 type = line 1 304 304 lvname = x_p_sidewalk_layer_4 1 305 305 co = 38 1 306 306 1 307 307 /* For use with x20 subex criteria */ 1 308 308 Proposed Undercut 1 309 309 soil type = SubExBackfill 1 310 310 roadway exc mult factor = 0.000001 1 311 311 subsoil exc mult factor = 0.000001 1 312 312 fill mult factor = 0.00001 1 313 313 type = line, line_string 1 314 314 lvname = x_p_subex_backfill1 1 315 315 co = 40 1 316 316 1 317 317 /* For use with subex type 2 */ 1 318 318 Proposed Undercut 1 319 319 soil type = RdwyExc 1 320 320 roadway exc mult factor = 0.000001 1 321 321 subsoil exc mult factor = 0.000001 1 322 322 fill mult factor = 0.00001 1 323 323 type = line, line_string 1 324 324 lvname = x_p_subex_backfill2 1 325 325 co = 41 1 326 326 1 327 327 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 328 328 Proposed Undercut 1 329 329 soil type = SelectWallBackfill 1 330 330 roadway exc mult factor = 0.000001 1 331 331 subsoil exc mult factor = 0.000001 1 332 332 fill mult factor = 0.00001 1 333 333 type = line, line_string 1 334 334 lvname = x_p_mse_wall_backfill1 1 335 335 co = 51 1 336 336 1 337 337 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 338 338 Proposed Undercut 1 339 339 soil type = SelectWallBackfill 1 340 340 roadway exc mult factor = 0.000001 1 341 341 subsoil exc mult factor = 0.000001 1 342 342 fill mult factor = 0.00001 1 343 343 type = line, line_string 1 344 344 lvname = x_p_mse_wall_backfill2 1 345 345 co = 52 1 346 346 1 347 347 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 348 348 Proposed Undercut 1 349 349 soil type = GranularBackfill 1 350 350 roadway exc mult factor = 0.000001 1 351 351 subsoil exc mult factor = 0.000001 1 352 352 fill mult factor = 0.00001 1 353 353 type = line, line_string 1 354 354 lvname = x_p_mse_wall_backfill3 1 355 355 co = 53 1 356 356

Page: 5

1 357 357 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 358 358 Proposed Undercut 1 359 359 soil type = LevelingPad 1 360 360 roadway exc mult factor = 0.000001 1 361 361 subsoil exc mult factor = 0.000001 1 362 362 fill mult factor = 0.00001 1 363 363 type = line, line_string 1 364 364 lvname = x_p_mse_wall_backfill4 1 365 365 co = 56 1 366 366 1 367 367 /* For use with Prop_MSE_Wall1 (mse fill wall) */ 1 368 368 Proposed Undercut 1 369 369 soil type = RdwyExc 1 370 370 roadway exc mult factor = 0.000001 1 371 371 subsoil exc mult factor = 0.000001 1 372 372 fill mult factor = 0.00001 1 373 373 type = line, line_string 1 374 374 lvname = x_p_mse_wall_backfill5 1 375 375 co = 57 1 376 376 1 377 377 /* For use with all Concrete Retaining Walls */ 1 378 378 Proposed Undercut 1 379 379 soil type = Pervious 1 380 380 roadway exc mult factor = 0.000001 1 381 381 subsoil exc mult factor = 0.000001 1 382 382 fill mult factor = 0.00001 1 383 383 type = line, line_string 1 384 384 lvname = x_p_conc_wall_backfill 1 385 385 co = 54 1 386 386 1 387 387 /* For use with all Concrete Retaining Walls */ 1 388 388 Proposed Undercut 1 389 389 soil type = FoundationFill 1 390 390 roadway exc mult factor = 0.000001 1 391 391 subsoil exc mult factor = 0.000001 1 392 392 fill mult factor = 0.00001 1 393 393 type = line, line_string 1 394 394 lvname = x_p_conc_wall_foundation 1 395 395 co = 58 1 396 396 1 397 397 /* For use with CFL Parapet Wall */ 1 398 398 Proposed Undercut 1 399 399 soil type = SelectWallBackfill 1 400 400 roadway exc mult factor = 0.000001 1 401 401 subsoil exc mult factor = 0.000001 1 402 402 fill mult factor = 0.00001 1 403 403 type = line, line_string 1 404 404 lvname = x_p_conc_wall_backfill2 1 405 405 co = 52 1 406 406 1 407 407 /* For use with all Parapet Walls */ 1 408 408 Proposed Undercut 1 409 409 soil type = Pervious /* CFL - Use - WallBackfill */ 1 410 410 roadway exc mult factor = 0.000001 1 411 411 subsoil exc mult factor = 0.000001 1 412 412 fill mult factor = 0.00001 1 413 413 type = line, line_string 1 414 414 lvname = x_p_conc_wall_backfill 1 415 415 co = 56 1 416 416 1 417 417 1 418 418 /* For use with REHAB typicals */ 1 419 419 Proposed Undercut 1 420 420 soil type = ColdRecycle 1 421 421 roadway exc mult factor = 0.00001 1 422 422 subsoil exc mult factor = 0.00001 1 423 423 fill mult factor = 0.00001 1 424 424 type = line, line_string 1 425 425 lvname = x_p_milling_backfill 1 426 426 co = 57 1 427 427 1 428 428 /* For use with REHAB typicals */

Page: 6

1 429 429 Proposed Undercut 1 430 430 soil type = PavedShoulder 1 431 431 roadway exc mult factor = 0.00001 1 432 432 subsoil exc mult factor = 0.00001 1 433 433 fill mult factor = 0.00001 1 434 434 type = line, line_string 1 435 435 lvname = x_p_pave_shd_backfill 1 436 436 co = 58 1 437 437 1 438 438 /* For use with REHAB typicals */ 1 439 439 Proposed Undercut 1 440 440 soil type = PreLevel 1 441 441 roadway exc mult factor = 0.00001 1 442 442 subsoil exc mult factor = 0.00001 1 443 443 fill mult factor = 0.00001 1 444 444 type = line, line_string 1 445 445 lvname = x_p_rehab_prelevel 1 446 446 co = 59 1 447 447 1 448 448 /* For use with CFL Type 3 curb special aggregate shoulder backfill (.x30 criteria)*/ 1 449 449 Proposed Undercut 1 450 450 soil type = ShoulderBackfill 1 451 451 roadway exc mult factor = 0.00001 1 452 452 subsoil exc mult factor = 0.00001 1 453 453 fill mult factor = 0.00001 1 454 454 type = line, line_string 1 455 455 lvname = x_p_shoulder_backfill 1 456 456 co = 72 1 457 457 1 458 458 /* For use with CFL paved ditches (.x30 criteria)*/ 1 459 459 Proposed Undercut 1 460 460 soil type = PavedDitchBackfill 1 461 461 roadway exc mult factor = 0.00001 1 462 462 subsoil exc mult factor = 0.00001 1 463 463 fill mult factor = 0.00001 1 464 464 type = line, line_string 1 465 465 lvname = x_p_pave_ditch_layer_1 1 466 466 co = 27 1 467 467 1 468 468 /* For use with soil nail wall (.x30 criteria)*/ 1 469 469 Proposed Undercut 1 470 470 soil type = BackfillMaterial 1 471 471 roadway exc mult factor = 0.000001 1 472 472 subsoil exc mult factor = 0.000001 1 473 473 fill mult factor = 0.00001 1 474 474 type = line, line_string 1 475 475 lvname = x_p_sn_wall_backfill 1 476 476 co = 55,175 1 477 477 1 478 478 /* For use with soil nail wall (.x30 criteria)*/ 1 479 479 Proposed Undercut 1 480 480 soil type = Concrete 1 481 481 roadway exc mult factor = 0.000001 1 482 482 subsoil exc mult factor = 0.000001 1 483 483 fill mult factor = 0.00001 1 484 484 type = line, line_string 1 485 485 lvname = x_p_sn_wall_back 1 486 486 co = 53 1 487 487 1 488 488 /* For use with soil nail wall (.x30 criteria)*/ 1 489 489 Proposed Undercut 1 490 490 soil type = BackfillMaterial 1 491 491 roadway exc mult factor = 0.000001 1 492 492 subsoil exc mult factor = 0.000001 1 493 493 fill mult factor = 0.00001 1 494 494 type = line, line_string 1 495 495 lvname = x_p_sn_wall_curb_backfill 1 496 496 co = 16,175 1 497 497 1 498 498 /* For use with soil nail wall (.x30 criteria)*/ 1 499 499 Proposed Undercut 1 500 500 soil type = SNFoundationFill

Page: 7

1 501 501 roadway exc mult factor = 0.000001 1 502 502 subsoil exc mult factor = 0.000001 1 503 503 fill mult factor = 0.00001 1 504 504 type = line, line_string 1 505 505 lvname = x_p_sn_foundation_backfill 1 506 506 co = 58 1 507 507 1 508 508 /* For use with rockery wall (.x30 criteria)*/ 1 509 509 Proposed Undercut 1 510 510 soil type = WallBackfill 1 511 511 roadway exc mult factor = 0.000001 1 512 512 subsoil exc mult factor = 0.000001 1 513 513 fill mult factor = 0.00001 1 514 514 type = line, line_string 1 515 515 lvname = x_p_rk_wall_backfill 1 516 516 co = 55,175 1 517 517 1 518 518 /* For use with rockery wall (.x30 criteria)*/ 1 519 519 Proposed Undercut 1 520 520 soil type = Rock 1 521 521 roadway exc mult factor = 0.000001 1 522 522 subsoil exc mult factor = 0.000001 1 523 523 fill mult factor = 0.00001 1 524 524 type = line, line_string 1 525 525 lvname = x_p_rk_wall_back 1 526 526 co = 45 1 527 527 1 528 528 /* For use with rockery wall (.x30 criteria)*/ 1 529 529 Proposed Undercut 1 530 530 soil type = FoundationFill 1 531 531 roadway exc mult factor = 0.000001 1 532 532 subsoil exc mult factor = 0.000001 1 533 533 fill mult factor = 0.00001 1 534 534 type = line, line_string 1 535 535 lvname = x_p_rk_foundation_backfill 1 536 536 co = 58 1 537 537 1 538 538 /* For use with Rockery Wall, (.x30 criteria)) */ 1 539 539 Proposed Undercut 1 540 540 soil type = GranularRockBd 1 541 541 roadway exc mult factor = 0.000001 1 542 542 subsoil exc mult factor = 0.000001 1 543 543 fill mult factor = 0.00001 1 544 544 Do not include in mass ordinate 1 545 545 type = line, line_string 1 546 546 lvname = x_p_rk_wall_backfill2 1 547 547 co = 52 1 548 548 1 549 549 /* For use with guardwall (.x30 criteria)*/ 1 550 550 Proposed Undercut 1 551 551 soil type = StructuralBackfill 1 552 552 roadway exc mult factor = 0.000001 1 553 553 subsoil exc mult factor = 0.000001 1 554 554 fill mult factor = 0.00001 1 555 555 type = line, line_string 1 556 556 lvname = x_p_gd_wall_backfill1 1 557 557 co = 50 1 558 558 1 559 559 /* For use with guardwall (.x30 criteria)*/ 1 560 560 Proposed Undercut 1 561 561 soil type = BackfillMaterial 1 562 562 roadway exc mult factor = 0.000001 1 563 563 subsoil exc mult factor = 0.000001 1 564 564 fill mult factor = 0.00001 1 565 565 type = line, line_string 1 566 566 lvname = x_p_gd_wall_backfill2 1 567 567 co = 55 1 568 568 1 569 569 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 570 570 Proposed Undercut 1 571 571 soil type = GabionRock 1 572 572 roadway exc mult factor = 0.000001

Page: 8

1 573 573 subsoil exc mult factor = 0.000001 1 574 574 fill mult factor = 0.00001 1 575 575 type = line, line_string 1 576 576 lvname = x_p_gfmse_wall_gabion 1 577 577 co = 78 1 578 578 1 579 579 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 580 580 Proposed Undercut 1 581 581 soil type = SelectWallBackfill 1 582 582 roadway exc mult factor = 0.000001 1 583 583 subsoil exc mult factor = 0.000001 1 584 584 fill mult factor = 0.00001 1 585 585 type = line, line_string 1 586 586 lvname = x_p_gfmse_wall_backfill1 1 587 587 co = 6 1 588 588 1 589 589 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 590 590 Proposed Undercut 1 591 591 soil type = GranularBackfill 1 592 592 roadway exc mult factor = 0.000001 1 593 593 subsoil exc mult factor = 0.000001 1 594 594 fill mult factor = 0.00001 1 595 595 type = line, line_string 1 596 596 lvname = x_p_gfmse_wall_backfill2 1 597 597 co = 36 1 598 598 1 599 599 /* For use with Prop GFMSE Walls (.x30 criteria) */ 1 600 600 Proposed Undercut 1 601 601 soil type = GranularBackfill 1 602 602 roadway exc mult factor = 0.000001 1 603 603 subsoil exc mult factor = 0.000001 1 604 604 fill mult factor = 0.00001 1 605 605 type = line, line_string 1 606 606 lvname = x_p_gfmse_wall_embedment_slope 1 607 607 lvname = x_p_gfmse_wall_backfill3 1 608 608 co = 16,100 1 609 609 1 610 610 /* For use with Prop_SMSE_Wall (mse wall facing, (.x30 criteria)) */ 1 611 611 Proposed Undercut 1 612 612 soil type = WallFacing 1 613 613 roadway exc mult factor = 0.000001 1 614 614 subsoil exc mult factor = 0.000001 1 615 615 fill mult factor = 0.00001 1 616 616 Do not include in mass ordinate 1 617 617 type = line, line_string 1 618 618 lvname = x_p_mse_wall_facing 1 619 619 1 620 620 /* For use with all walls with Foundation Fill adhoc, (.x30 criteria)) */ 1 621 621 Proposed Undercut 1 622 622 soil type = FoundationFill 1 623 623 roadway exc mult factor = 0.000001 1 624 624 subsoil exc mult factor = 0.000001 1 625 625 fill mult factor = 0.00001 1 626 626 Do not include in mass ordinate 1 627 627 type = line, line_string 1 628 628 lvname = x_p_mse_wall_foundation 1 629 629 co = 58 1 630 630 1 631 631 /* For use with Parapet walls (.x30 criteria)) */ 1 632 632 Proposed Undercut 1 633 633 soil type = Pervious 1 634 634 roadway exc mult factor = 0.000001 1 635 635 subsoil exc mult factor = 0.000001 1 636 636 fill mult factor = 0.00001 1 637 637 Do not include in mass ordinate 1 638 638 type = line, line_string 1 639 639 lvname = x_p_conc_wall_front 1 640 640 co = 82 1 641 641 1 642 642 /* For use with Riprap Fills (.x30 criteria)) */ 1 643 643 Proposed Undercut 1 644 644 soil type = Riprap

Page: 9

1 645 645 roadway exc mult factor = 0.000001 1 646 646 subsoil exc mult factor = 0.000001 1 647 647 fill mult factor = 0.000001 1 648 648 type = line 1 649 649 lvname = p_hyd_rock_riprap 1 650 650 co = 0 1 651 651 1 652 652 Excavation Limits 1 653 653 type = line 1 654 654 lvname = x_p_exc_limit 1 655 655 co = 0 1 656 656 1 657 657 1 658 658 /* Skip Areas 1 659 659 from 489+31.28 R 1 to 489+75.36 R 1 1 660 660 from 10+200.00 R 1 to 10+300.00 R 1 1 661 661 from 10+500.00 R 1 to 10+600.00 R 1 1 662 662 */ 1 663 663 1 664 664 Write Earthwork Shapes 1 665 665 plot param 1 666 666 lvname = x_ew_shapes 1 667 667 co = 0 1 668 668 wt = 0 1 669 669 lc = 0 1 670 670 Stratify Shape Color 1 671 671 1 672 672 Combine common exc + subgrade exc 1 673 673 1 674 674 Add Accumulated Unadjusted Volume Column 1 675 675 1 676 676 End Area Decimal Places = 2 1 677 677 1 678 678 1 679 679 1 680 680 /************ The following code creates a column based ASCII file for importing 1 681 681 /************ into an Excel spreadsheet initially created by S. Pratt 3/24/2006 1 682 682 /************ The name of this file is ^WFL_earthwork.xls^ and can be found on 1 683 683 /************ under the WFL server X:\V8_Resource\X_30\Standards\Bin 1 684 684 /************ Instructions for using the spreadsheet can be found on it's 1st tab 1 685 685 /************ The syntax and spreadsheet is used for creating SUBTOTALS of various 1 686 686 /************ volumes for placement at the bottom of Plan/Profile sheets.

1 687 687 /************ The code below is WFL specific. FOR .X30 CRITERIA USAGE!

1 688 688 /************ The file that gets created is named ^earthwork.txt^ 1 689 689 1 690 690 1 691 691 1 692 692 write column base ascii file = MainEW.txt 1 693 693 1 694 694 column 2 formula = abs( ["RdwyExc", Common Exc, Unadjusted Volumes] + 1 695 695 ["RdwyExc", Subgrade Exc, Unadjusted Volumes] ) 1 696 696 column 2 number of decimal place = 2 1 697 697 column 2 total length = 10 1 698 698 1 699 699 column 3 formula = abs( ["RdwyExc", Fill, Unadjusted Volumes] ) 1 700 700 column 3 number of decimal place = 2 1 701 701 column 3 total length = 10 1 702 702 1 703 703 column 4 formula = abs( ["Subexcavation", Common Exc, Unadjusted Volumes] +

Page: 10

1 704 704 ["Subexcavation", Subgrade Exc, Unadjusted Volumes] + 1 705 705 ["Subexcavation", Subsoil Exc, Unadjusted Volumes] ) 1 706 706 column 4 number of decimal place = 2 1 707 707 column 4 total length = 10 1 708 708 1 709 709 column 5 formula = abs( ["SubExBackfill", Fill, Unadjusted Volumes] ) 1 710 710 column 5 number of decimal place = 2 1 711 711 column 5 total length = 10 1 712 712 1 713 713 column 6 formula = abs( ["Topsoil", Common Exc, Unadjusted Volumes] + 1 714 714 ["Topsoil", Subgrade Exc, Unadjusted Volumes] + 1 715 715 ["Topsoil", Subsoil Exc, Unadjusted Volumes] ) 1 716 716 column 6 number of decimal place = 2 1 717 717 column 6 total length = 10 1 718 718 1 719 719 column 7 formula = abs( ["Topsoil", Common Exc, Unadjusted Volumes] + 1 720 720 ["Riprap", Subgrade Exc, Unadjusted Volumes] + 1 721 721 ["Riprap", Subsoil Exc, Unadjusted Volumes] ) 1 722 722 column 7 number of decimal place = 2 1 723 723 column 7 total length = 10 1 724 724 1 725 725 1 726 726 Process Earthwork for Baseline = WWR 1 727 727 job number = wwr 1 728 728 1 729 729 beg sta = 308+25.00 R 1 1 730 730 end sta = 597+65.50 R 1

0 0 731 END_OF_FILE

COMPUTING EARTHWORKS FOR BASELINE = WWR

COMPUTING EARTHWORKS FOR JOB = WWR

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Page: 11

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

308+25.00 RDWYEXC

Excavation 30.48 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.36 0 0 1.00 0 0

TOPSOIL

Excavation 0.51 0 0 0.00 0 Subsoil Exc 0.36 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.57 0 0 0.00 0 0

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.95 0 0 0.00 0 0

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.21 0 0 0.00 0 0

SIDEWALKLAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.89 0 0 0.00 0 0

SIDEWALKLAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.89 0 0 0.00 0 0

308+50.00 RDWYEXC

Excavation 26.39 26 26 1.00 26 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 26 0

TOPSOIL

Excavation 1.20 1 0 0.00 1 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 26 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.39 4 0 0.00 26 4

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.79 6 0 0.00 26 6

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.15 15 0 0.00 26 15

SIDEWALKLAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.97 1 0 0.00 26 1

SIDEWALKLAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.40 3 0 0.00 26 3

308+53.67 RDWYEXC

Excavation 26.05 4 4 1.00 30 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 30 0

TOPSOIL

Excavation 1.34 0 0 0.00 1 Subsoil Exc 0.00 0 0 0.00 0

Page: 12

Fill 0.00 0 0 0.00 30 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.39 1 0 0.00 30 5

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.79 1 0 0.00 30 7

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.23 2 0 0.00 30 17

SIDEWALKLAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.11 0 0 0.00 30 1

SIDEWALKLAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.68 1 0 0.00 30 4

308+65.00 RDWYEXC

Excavation 24.28 11 11 1.00 41 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.01 0 0 1.00 41 0

TOPSOIL

Excavation 1.93 1 0 0.00 2 Subsoil Exc 0.01 0 0 0.00 0 Fill 0.00 0 0 0.00 41 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.39 2 0 0.00 41 7

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.79 3 0 0.00 41 10

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.43 7 0 0.00 41 24

SIDEWALKLAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.53 1 0 0.00 41 2

SIDEWALKLAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.85 2 0 0.00 41 6

308+89.00 RDWYEXC

Excavation 22.87 21 21 1.00 62 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.58 0 0 1.00 62 0

TOPSOIL

Excavation 1.68 1 0 0.00 3 Subsoil Exc 0.58 0 0 0.00 0 Fill 0.00 0 0 0.00 62 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.44 4 0 0.00 62 11

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.08 6 0 0.00 62 16

LAYER3

Excavation 0.00 0 0 0.00 0

Page: 13

Fill 17.88 15 0 0.00 62 39

SIDEWALKLAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.61 2 0 0.00 62 4

SIDEWALKLAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 2.99 4 0 0.00 62 10

309+00.00 RDWYEXC

Excavation 15.96 8 8 1.00 70 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 70 0

TOPSOIL

Excavation 1.01 0 0 0.00 3 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 70 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.44 2 0 0.00 70 13

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.08 3 0 0.00 70 19

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.07 7 0 0.00 70 46

SIDEWALKLAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 1 0 0.00 70 5

SIDEWALKLAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 1 0 0.00 70 11

309+23.33 RDWYEXC

Excavation 13.61 13 13 1.00 83 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.12 0 0 1.00 83 0

TOPSOIL

Excavation 1.08 1 0 0.00 4 Subsoil Exc 0.12 0 0 0.00 0 Fill 0.00 0 0 0.00 83 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 4 0 0.00 83 17

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.09 6 0 0.00 83 25

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.25 16 0 0.00 83 62

309+50.00 RDWYEXC

Excavation 12.16 13 13 1.00 96 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.08 0 0 1.00 96 0

TOPSOIL

Excavation 1.18 1 0 0.00 5 Subsoil Exc 0.08 0 0 0.00 0 Fill 0.00 0 0 0.00 96 0 Mass ordinate for TOPSOIL = 0

Page: 14

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 4 0 0.00 96 21

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.11 7 0 0.00 96 32

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.47 18 0 0.00 96 80

309+70.00 RDWYEXC

Excavation 12.18 9 9 1.00 105 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.02 0 0 1.00 105 0

TOPSOIL

Excavation 0.65 1 0 0.00 6 Subsoil Exc 0.02 0 0 0.00 0 Fill 0.00 0 0 0.00 105 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 3 0 0.00 105 24

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.12 5 0 0.00 105 37

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.36 14 0 0.00 105 94

309+77.50 RDWYEXC

Excavation 11.97 3 3 1.00 108 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.96 1 1 1.00 107 1

TOPSOIL

Excavation 0.99 0 0 0.00 6 Subsoil Exc 0.72 0 0 0.00 0 Fill 0.00 0 0 0.00 107 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 2 0 0.00 107 26

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.80 2 0 0.00 107 39

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.89 5 0 0.00 107 99

309+84.13 RDWYEXC

Excavation 12.40 3 3 1.00 111 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.34 1 1 1.00 109 2

TOPSOIL

Excavation 0.63 0 0 0.00 6 Subsoil Exc 0.41 0 0 0.00 0 Fill 0.00 0 0 0.00 109 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 2 0 0.00 109 28

LAYER2

Page: 15

Fill 6.81 2 0 0.00 109 41

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.90 4 0 0.00 109 103

309+89.50 RDWYEXC

Excavation 12.87 3 3 1.00 114 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.03 1 1 1.00 111 3

TOPSOIL

Excavation 0.59 0 0 0.00 6 Subsoil Exc 0.46 0 0 0.00 0 Fill 0.00 0 0 0.00 111 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 2 0 0.00 111 30

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.81 1 0 0.00 111 42

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.91 3 0 0.00 111 106

310+00.00 RDWYEXC

Excavation 14.76 5 5 1.00 119 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.24 1 1 1.00 115 4

TOPSOIL

Excavation 0.53 0 0 0.00 6 Subsoil Exc 0.22 0 0 0.00 0 Fill 0.00 0 0 0.00 115 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 2 0 0.00 115 32

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.09 3 0 0.00 115 45

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.77 7 0 0.00 115 113

310+50.00 RDWYEXC

Excavation 16.29 29 29 1.00 148 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.17 0 0 1.00 144 4

TOPSOIL

Excavation 1.04 1 0 0.00 7 Subsoil Exc 0.17 0 0 0.00 0 Fill 0.00 0 0 0.00 144 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 8 0 0.00 144 40

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.13 13 0 0.00 144 58

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.34 33 0 0.00 144 146

Page: 16

311+00.00 RDWYEXC

Excavation 21.18 35 35 1.00 183 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.22 0 0 1.00 179 4

TOPSOIL

Excavation 2.09 3 0 0.00 10 Subsoil Exc 0.22 0 0 0.00 0 Fill 0.00 0 0 0.00 179 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 8 0 0.00 179 48

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.13 13 0 0.00 179 71

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.76 34 0 0.00 179 180

311+50.00 RDWYEXC

Excavation 23.04 41 41 1.00 224 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.17 0 0 1.00 220 4

TOPSOIL

Excavation 2.29 4 0 0.00 14 Subsoil Exc 0.17 0 0 0.00 0 Fill 0.00 0 0 0.00 220 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 8 0 0.00 220 56

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.13 13 0 0.00 220 84

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.76 35 0 0.00 220 215

312+00.00 RDWYEXC

Excavation 22.84 42 42 1.00 266 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.17 0 0 1.00 262 4

TOPSOIL

Excavation 2.08 4 0 0.00 18 Subsoil Exc 0.17 0 0 0.00 0 Fill 0.00 0 0 0.00 262 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 8 0 0.00 262 64

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.13 13 0 0.00 262 97

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.76 35 0 0.00 262 250

312+46.07 RDWYEXC

Excavation 19.45 36 36 1.00 302 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 298 4

TOPSOIL

Page: 17

Excavation 0.53 2 0 0.00 20 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 298 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 8 0 0.00 298 72

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.03 12 0 0.00 298 109

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.70 30 0 0.00 298 280

312+50.00 RDWYEXC

Excavation 19.47 3 3 1.00 305 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 301 4

TOPSOIL

Excavation 0.54 0 0 0.00 20 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 301 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 1 0 0.00 301 73

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.03 1 0 0.00 301 110

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.71 2 0 0.00 301 282

312+54.50 RDWYEXC

Excavation 19.47 3 3 1.00 308 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 304 4

TOPSOIL

Excavation 0.55 0 0 0.00 20 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 304 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 1 0 0.00 304 74

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.03 1 0 0.00 304 111

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.72 3 0 0.00 304 285

313+00.00 RDWYEXC

Excavation 26.44 39 39 1.00 347 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.08 0 0 1.00 343 4

TOPSOIL

Excavation 2.36 3 0 0.00 23 Subsoil Exc 0.08 0 0 0.00 0 Fill 0.00 0 0 0.00 343 0 Mass ordinate for TOPSOIL = 0

LAYER1

Page: 18

Fill 4.45 7 0 0.00 343 81

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.03 12 0 0.00 343 123

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.20 29 0 0.00 343 314

313+31.00 RDWYEXC

Excavation 27.05 31 31 1.00 378 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.05 0 0 1.00 374 4

TOPSOIL

Excavation 2.80 3 0 0.00 26 Subsoil Exc 0.05 0 0 0.00 0 Fill 0.00 0 0 0.00 374 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 5 0 0.00 374 86

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.07 8 0 0.00 374 131

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.34 20 0 0.00 374 334

313+50.00 RDWYEXC

Excavation 37.78 23 23 1.00 401 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.05 0 0 1.00 397 4

TOPSOIL

Excavation 3.99 2 0 0.00 28 Subsoil Exc 0.05 0 0 0.00 0 Fill 0.00 0 0 0.00 397 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 3 0 0.00 397 89

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.06 5 0 0.00 397 136

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.33 12 0 0.00 397 346

313+63.50 RDWYEXC

Excavation 22.88 15 15 1.00 416 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.11 0 0 1.00 412 4

TOPSOIL

Excavation 3.33 1 0 0.00 29 Subsoil Exc 0.11 0 0 0.00 0 Fill 0.00 0 0 0.00 412 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 2 0 0.00 412 91

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.09 4 0 0.00 412 140

Page: 19

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.58 9 0 0.00 412 355

313+69.00 RDWYEXC

Excavation 22.47 4 4 1.00 420 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.11 0 0 1.00 416 4

TOPSOIL

Excavation 3.27 1 0 0.00 30 Subsoil Exc 0.11 0 0 0.00 0 Fill 0.00 0 0 0.00 416 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 1 0 0.00 416 92

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.10 1 0 0.00 416 141

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.61 4 0 0.00 416 359

313+77.75 RDWYEXC

Excavation 16.38 6 6 1.00 426 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.08 1 1 1.00 421 5

TOPSOIL

Excavation 1.06 1 0 0.00 31 Subsoil Exc 0.11 0 0 0.00 0 Fill 0.00 0 0 0.00 421 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.00 2 0 0.00 421 94

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.82 2 0 0.00 421 143

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.96 6 0 0.00 421 365

313+95.75 RDWYEXC

Excavation 16.19 11 11 1.00 437 Subsoil Exc 0.00 0 0 1.00 0 Fill 9.76 6 6 1.00 426 11

TOPSOIL

Excavation 1.04 1 0 0.00 32 Subsoil Exc 0.11 0 0 0.00 0 Fill 0.00 0 0 0.00 426 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.21 6 0 0.00 426 100

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.82 5 0 0.00 426 148

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.96 11 0 0.00 426 376

314+00.00 RDWYEXC

Page: 20

Excavation 16.83 3 3 1.00 440 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.14 1 1 1.00 428 12

TOPSOIL

Excavation 1.37 0 0 0.00 32 Subsoil Exc 0.82 0 0 0.00 0 Fill 0.00 0 0 0.00 428 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.98 1 0 0.00 428 101

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.94 1 0 0.00 428 149

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.77 3 0 0.00 428 379

314+03.00 RDWYEXC

Excavation 15.75 2 2 1.00 442 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.09 0 0 1.00 430 12

TOPSOIL

Excavation 1.29 0 0 0.00 32 Subsoil Exc 0.78 0 0 0.00 0 Fill 0.00 0 0 0.00 430 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 1 0 0.00 430 102

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.13 1 0 0.00 430 150

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.76 2 0 0.00 430 381

314+50.00 RDWYEXC

Excavation 12.82 24 24 1.00 466 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 1 1 1.00 453 13

TOPSOIL

Excavation 0.94 2 0 0.00 34 Subsoil Exc 0.00 1 0 0.00 1 Fill 0.00 0 0 0.00 453 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 8 0 0.00 453 110

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.13 12 0 0.00 453 162

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.10 32 0 0.00 453 413

314+70.00 RDWYEXC

Excavation 11.68 9 9 1.00 475 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 462 13

TOPSOIL

Excavation 0.90 1 0 0.00 35 Subsoil Exc 0.00 0 0 0.00 1

Page: 21

Fill 0.00 0 0 0.00 462 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 3 0 0.00 462 113

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.13 5 0 0.00 462 167

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.90 13 0 0.00 462 426

314+80.50 RDWYEXC

Excavation 11.08 4 4 1.00 479 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.00 0 0 1.00 466 13

TOPSOIL

Excavation 1.83 0 0 0.00 35 Subsoil Exc 1.56 0 0 0.00 1 Fill 0.00 0 0 0.00 466 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.89 2 0 0.00 466 115

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.82 3 0 0.00 466 170

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.30 7 0 0.00 466 433

314+96.50 RDWYEXC

Excavation 11.35 7 7 1.00 486 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.68 1 1 1.00 472 14

TOPSOIL

Excavation 2.80 1 0 0.00 36 Subsoil Exc 0.59 1 0 0.00 2 Fill 0.00 0 0 0.00 472 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.89 5 0 0.00 472 120

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.82 4 0 0.00 472 174

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.30 11 0 0.00 472 444

315+00.00 RDWYEXC

Excavation 11.38 1 1 1.00 487 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 473 14

TOPSOIL

Excavation 0.97 0 0 0.00 36 Subsoil Exc 0.00 0 0 0.00 2 Fill 0.00 0 0 0.00 473 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 1 0 0.00 473 121

Page: 22

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.13 1 0 0.00 473 175

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.13 2 0 0.00 473 446

315+04.50 RDWYEXC

Excavation 11.31 2 2 1.00 489 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.01 0 0 1.00 475 14

TOPSOIL

Excavation 0.97 0 0 0.00 36 Subsoil Exc 0.01 0 0 0.00 2 Fill 0.00 0 0 0.00 475 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 1 0 0.00 475 122

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.13 1 0 0.00 475 176

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 3 0 0.00 475 449

315+50.00 RDWYEXC

Excavation 12.06 20 20 1.00 509 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.01 0 0 1.00 495 14

TOPSOIL

Excavation 0.93 2 0 0.00 38 Subsoil Exc 0.01 0 0 0.00 2 Fill 0.00 0 0 0.00 495 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 7 0 0.00 495 129

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.13 12 0 0.00 495 188

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.08 31 0 0.00 495 480

315+56.50 RDWYEXC

Excavation 12.43 3 3 1.00 512 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.61 0 0 1.00 498 14

TOPSOIL

Excavation 2.28 0 0 0.00 38 Subsoil Exc 0.59 0 0 0.00 2 Fill 0.00 0 0 0.00 498 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.14 1 0 0.00 498 130

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.82 2 0 0.00 498 190

LAYER3

Page: 23

Fill 18.80 4 0 0.00 498 484

315+80.50 RDWYEXC

Excavation 14.38 12 12 1.00 524 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.36 0 0 1.00 510 14

TOPSOIL

Excavation 2.41 2 0 0.00 40 Subsoil Exc 0.36 0 0 0.00 2 Fill 0.00 0 0 0.00 510 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.14 6 0 0.00 510 136

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.82 6 0 0.00 510 196

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.80 17 0 0.00 510 501

315+86.00 RDWYEXC

Excavation 14.36 3 3 1.00 527 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.06 0 0 1.00 513 14

TOPSOIL

Excavation 0.82 0 0 0.00 40 Subsoil Exc 0.06 0 0 0.00 2 Fill 0.00 0 0 0.00 513 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 1 0 0.00 513 137

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.13 1 0 0.00 513 197

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.95 4 0 0.00 513 505

316+00.00 RDWYEXC

Excavation 14.74 8 8 1.00 535 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.09 0 0 1.00 521 14

TOPSOIL

Excavation 0.78 0 0 0.00 40 Subsoil Exc 0.09 0 0 0.00 2 Fill 0.00 0 0 0.00 521 0 Mass ordinate for TOPSOIL = 0

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.45 2 0 0.00 521 139

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.12 4 0 0.00 521 201

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.82 9 0 0.00 521 514

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.