AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 04/20/2017 N/A See Block 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH7017B00023

9B. DATED (SEE ITEM 11)

04/02/2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ID PFH 21(7), Warren Wagon Road

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A002, dated 04/20/2017 ID PFH 21(7) Solicitation No. DTFH7017B00023 Warren Wagon Road

REVISIONS ARE AS FOLLOWS:

CONTRACT CLAUSES

Page C-83. Revises FAR Clause 52.236-4, Physical Data to add physical data:

9) Cross Sections

10) Earthwork Data

SPECIAL CONTRACT REQUIREMENTS

Page F-60, Subsection 623.04, Measurement. Revises measurement of Special Labor, Slope Scaling.

ENCLOSURES

Pages:

C-83

F-60 Cross Sections Earthwork Data

C-83

Contract Clauses Project: ID PFH 21(7), Warren Wagon Road Revised by Amendment A002

4) ID PFH21(7)_HydraulicsReport_all_FINAL

5) ID PFH21(7)_AOPReportFinal_all_20171130

6) WWRDeadhorseCrkBrdgReplacePlans

7) Government’s initial Stormwater Pollution Prevention Plan (Government’s initial

SWPPP) or Erosion and Sediment Control Plan (ESCP)

8) ID PFH21(7)_UtilityAgreements

9) Cross Sections

10) Earthwork Data

52.236-5 Material and Workmanship (Apr 1984)

(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.

(b) The Contractor shall obtain the Contracting Officer’s approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer’s approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.

(c) All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.

52.236-6 Superintendence by the Contractor (Apr 1984)

At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.

52.236-7 Permits and Responsibilities (Nov 1991)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

52.236-8 Other Contracts (Apr 1984)

The Government may undertake or award other contracts for additional work at or near the site of the work under this contract. The Contractor shall fully cooperate with the other contractors and with

F-60 DIVISION 600

Special Contract Requirements Project: ID PFH 21(7) Warren Wagon Road

(i) Break non-transportable rocks into manageable pieces for hauling. Break rocks using mechanical methods approved by the CO. Blasting is not allowed.

(j) Adjust operations and allow emergency traffic through the work site according to Subsection 156.04.

(k) Re-establish the existing ditch line by removing debris generated from slope scaling and vegetation removal. Dispose of the removed debris according to Subsection 203.05(a).

Measurement

623.04 Add the following:

Do not measure temporary traffic, utility, and environmental protection related to Section 623 work.

Do not measure tree and shrub removal and cleanup and removal of the scaled material to the designated disposal area(s) related to Section 623 work.

Do not measure hours for the Scaling Foremen.

Do not measure hours for safety scaling work; or hours for on-slope scalers/apprentices during open road periods.

Do not measure special labor hours when the Scaling Foreman is not overseeing the scalers/apprentices.

Measure special labor hours by the actual hours of production time of each scaler/apprentice for all unstable slopes, rounded to the nearest half hour at the end of each shift.

Hour measurements for special labor starts when aeach scaler/apprentice is equipped and begins to climb the rockfall mitigation slope; and ends when theeach scaler/apprentice has descended the rockfall mitigation slope.

Revised by Amendment A002

SF30amd_WORD
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A002
Amd_Page_2_Master
CONTRACT CLAUSES
C-83
F-60 A002
Cross Sections(R)
EarthWork Data
MainEW
Apch331EW
Apch337EW
Apch370EW
Apch393EW
Apch469EW
Apch470EW
Apch593EW