PROJECT_DESCRIPTION_WA_NPS_OLYM_2015(4)_.docx

DOCX document 36 KB Posted

Attached to
WA NPS OLYM 2015(4), Spruce Railroad Trail Segment C Federal contract opportunity
Solicitation number
DTFH70-16-B-00011
Issued by
Department of Transportation Federal Highway Administration

About this file

Project Description WA NPS OLYM 2015(4)

View the file

Other files for this federal contract opportunity

Other files attached to WA NPS OLYM 2015(4), Spruce Railroad Trail Segment C, newest first.
File Type Posted
BidSum_Spruce_RR.pdf PDF
A003_Spruce.pdf PDF
Q A_7-28.pdf PDF
A002.pdf PDF
Q A_7-20.pdf PDF
A001_Spruce.pdf PDF
XS_May2016.pdf PDF
2016-01-15_Illumination_Memo.pdf PDF
Spruce_Tunnel-Portal_Structure_Technical_Memorandum_3-30-16.pdf PDF
Helgeson_Asbestos_Disposal_Record.pdf PDF
Plan_Request_form_SpruceRR.pdf PDF
Helgeson_Hazardous_Materials_Survey.pdf PDF
SWPPP_WA_NPS_OLYM_2015(4)_Spruce_Railroad_Trail_Segment_C.pdf PDF
Spruce_Tunnels_-_GRR_02.02.2016_rev2_text_and_pictures.pdf PDF
IFB__SpruceRR.pdf PDF
Plans_SpruceRR.pdf PDF
GM03-16_Spruce_RR_Trail_Segment_C_WA_NPS_OLYM_2015(4)__Geotech_Recomm_8Jan2016.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA NPS OLYM 2015(4), Spruce Railroad Trail Segment C, Clallam County, Washington

The work consists of grading, excavation, parking area construction, tunnel work, culvert portals, clearing and other small items of work.

Project length: .56 Miles

Tentative Fixed Completion Date: Spring 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $1 million to $2 million

Location: 20 Miles West of Port Angeles, Washington

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

One Schedule Base

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no)
Yes
153 Contractor Quality Control and Assurance

(yes/no)

Yes
154 Contractor Sampling & Testing (yes/no)
Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no)
Yes
157 Soil Erosion & Sediment Control (erosion control devices)

Silt Fence Fiber Roll

DIVISION 200 – Earthwork

201 Clearing & Grubbing

2.4 AC

202 Additional Clearing & Grubbing (clearing & grubbing) Removal, Individual Tree

33 EA

203 Removal of Structures & Obstructions (structures, demolition) Structure Concrete

2 EA

55 SY

204 Excavation Unclassified borrow Granular Backfill Select borrow Rock Excavation

430CY

4541 CY

170 CY

935 CY

50 CY

207 Geotextile Geogrid

6450 SY

1750 SY

208 Structure Excavation
20 CY

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Riprap
15 CY
255 Mechanically Stabilized Earth Wall
745 SF
257 Contactor-Designed Retaining Walls (contractor completed designs)
LS
260 Rock Bolts
400 lf

DIVISION 300 – Aggregate and Base Courses

302 Minor Crushed Aggregate
2500 T

DIVISION 400 – Asphalt Pavements & Surface Treatments

403 Asphalt Concrete
225 T

DIVISION 500 – Rigid Pavement

552 Structural Concrete
34 CY
557 Timber Structures (structures, timber)
300 LF
566 Shotcrete
150 CY

DIVISION 600 – Incidental Construction

602 Culverts 18” Culverts 30”

89 LF

34 LF

603 Structural Arch Plate
75 LF

605 Underdrains Geocomposite Sheet Drains 60 lf

145 SY

609 Wheelstop, Concrete
20 EA
619 Fence, Type Cedar, 6’
220 LF
622 Rental Equipment (yes/no)
Yes
623 General Labor (yes/no)
Yes
624 Topsoil (landscaping & related items)
5460 SY

625 Mulching, Dry Method Mulching, Hydraulic Method

1.1 AC

0.2 AC

633 Sign System Delineator Remove and reset sign

6 SF

18 EA

1 EA

634 Permanent Pavement Markings (traffic pavement markings)
850 LF
635 Temporary Traffic Control
LS
647 Landscape Logs
35 EA

File details come from the government source that posted it. Updated .