A003_Spruce.pdf

PDF 20 KB Posted

Attached to
WA NPS OLYM 2015(4), Spruce Railroad Trail Segment C Federal contract opportunity
Solicitation number
DTFH70-16-B-00011
Issued by
Department of Transportation Federal Highway Administration

About this file

Amendment A003

View the file

Other files for this federal contract opportunity

Other files attached to WA NPS OLYM 2015(4), Spruce Railroad Trail Segment C, newest first.
File Type Posted
BidSum_Spruce_RR.pdf PDF
Q A_7-28.pdf PDF
A002.pdf PDF
Q A_7-20.pdf PDF
A001_Spruce.pdf PDF
XS_May2016.pdf PDF
2016-01-15_Illumination_Memo.pdf PDF
Spruce_Tunnel-Portal_Structure_Technical_Memorandum_3-30-16.pdf PDF
SWPPP_WA_NPS_OLYM_2015(4)_Spruce_Railroad_Trail_Segment_C.pdf PDF
Spruce_Tunnels_-_GRR_02.02.2016_rev2_text_and_pictures.pdf PDF
IFB__SpruceRR.pdf PDF
Plans_SpruceRR.pdf PDF
GM03-16_Spruce_RR_Trail_Segment_C_WA_NPS_OLYM_2015(4)__Geotech_Recomm_8Jan2016.pdf PDF
Helgeson_Asbestos_Disposal_Record.pdf PDF
Plan_Request_form_SpruceRR.pdf PDF
Helgeson_Hazardous_Materials_Survey.pdf PDF
PROJECT_DESCRIPTION_WA_NPS_OLYM_2015(4)_.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A003 07/29/2016 N/A WA NPS OLYM 2015(4),

Spruce Railroad Trail Segment C

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-16-B-00011

9B. DATED (SEE ITEM 11)

07/01/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA NPS OLYM 2015(4), Spruce Railroad Trail Segment C

See page 2 for revisions.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A003, dated 7/29/16 WA NPS OLYM 2015(4) Solicitation No. DTFH70-16-B-00011 Spruce Railroad Trail Segment C

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Page Section/Table Revision F-20 566.04 Composition (Shotcrete Mix Design) Deletes Table 566-1

ENCLOSURES

Pages F-20

F-20 DIVISION 550

Special Contract Requirements Project: WA NPS OLYM 2015(4), Spruce Railroad Trail Segment C, Spruce Railroad Trail Segment C

Section 566. — SHOTCRETE

04/01/16–FP14

566.01 Delete the second sentence of this Subsection and substitute the following:

Shotcrete aggregate grading is Grading Designation B on Table 703-11.

566.04 Composition (Shotcrete Mix Design). Add the following at the end of this Subsection:

(h) The exact proportions of cement, fine aggregate, coarse aggregate, fibers (steel and synthetic), microsilica, admixtures, and water will be determined by the Contractor, subject to approval by the Engineer, prior to shotcreting and subject to adjustments in the field.

Select mixture proportions during preconstruction testing on the basis of compressive strength tests of specimens continuously moist-cured until testing. Adjust mix and accelerator portion of shotcrete as required to provide necessary immediate ground support and control of the ground while maintaining 28-day compressive strength development requirements.

(i) Admixtures will have a documented minimum five-year history of satisfactory performance in similar applications.

Revised by Amendment A003

SF30amd_WORD
Amd_Page_2
F-20

File details come from the government source that posted it. Updated .