Physical_Data_X-sections_Lakeshore.pdf
PDF 4 MB Posted
- Attached to
- ID CASCADE LS DR(1), Lakeshore Drive Phase II Federal contract opportunity
- Solicitation number
- DTFH70-16-B-00001
About this file
Physical Data_X-sections_Lakeshore
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum.LakeshoreDR.pdf | ||
| Q A_4-29.pdf | ||
| A003.pdf | ||
| A002.pdf | ||
| Q A_4-27.pdf | ||
| A001_Lakeshore.pdf | ||
| ID_CASCADE_LS_DR(1)_Plans.pdf | ||
| Physical_Data_Earthwork_Lakeshore.pdf | ||
| Physical_Data_Right_of_Way_Lakeshore.pdf | ||
| Physical_Data_Geotech_Report__02-16_Lakeshore.pdf | ||
| IFB_lakeshore.pdf | ||
| Physical_Data_SWPPP_Lakeshore.pdf | ||
| Plan_Request_Form.docx | DOCX document | |
| Preliminary_Letter.pdf | ||
| Project_Description.pdf | ||
| Preliminary_Plans.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FHWA, Western Federal Lands Highway Division
CROSS-SECTIONS
LAKESHORE DRIVE PHASE II
ID CASCADE LS DR(1)
10+00 TO 31+23
LAKESHORE DRIVE CROSS SECTIONS
Excavation = 0.00 CY
Fill = 0.00 CY
Excavation = 45.04 CY
Fill = 22.90 CY
Excavation = 72.01 CY
Fill = 35.00 CY
Excavation = 93.37 CY
Fill = 29.53 CY
Excavation = 82.06 CY
Fill = 12.53 CY
Excavation = 87.31 CY
Fill = 4.11 CY
Excavation = 91.99 CY
Fill = 0.76 CY
Excavation = 94.76 CY
Fill = 0.67 CY
Excavation = 98.67 CY
Fill = 0.81 CY
100100
100100
4850 4850
4860 4860
10+00.00
4850 4850
4860 4860
10+25.00
4850 4850
4860 4860
10+50.00
4850 4850
4860 4860
10+76.00
4850 4850
4860 4860
11+00.00
4850 4850
4860 4860
11+25.00
4860 4860
11+50.00
4860 4860
11+75.00
4860 4860
12+00.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
LAKESHORE DRIVE 10+00 TO 31+23
Sheet 1
2.00% 2.00%
1:
Des. Grade = 4855.82
Subgrade = 4854.32
Sta. 10+00.00
CL
Offset= 12.09 LT
Elev= 4854.08 Offset= 12.28 RT
Elev= 4854.01
Offset= 0.00 LT
Elev= 4854.32
2.00% 2.00%
1:
1:3.53 1:
1.
Des. Grade = 4856.67
Subgrade = 4855.17
Sta. 10+25.00
CL
Offset= 14.55 LT
Elev= 5853.88
Offset= 17.33 RT
Elev= 5853.77
Offset= 0.00 LT
Elev= 5854.17
2.00% 2.00%
1:
1:3.59 1:
1.
Des. Grade = 4857.52
Subgrade = 4856.02
Sta. 10+50.00
CL
Offset= 17.00 LT
Elev= 4855.68 Offset= 17.97 RT
Elev= 4855.61
Offset= 0.00 LT
Elev= 4856.02
2.00% 2.00%
1:
Des. Grade = 4858.41
Subgrade = 4856.91
Sta. 10+76.00
CL
Duffers Lane Approach Road
Offset= 17.01 LT
Elev= 4856.57 Offset= 17.00 RT
Elev= 4856.57
Offset= 0.00 RT
Elev= 4856.91
2.00% 2.00%
1:
1:4.64 1:
1.
Des. Grade = 4859.23
Subgrade = 4857.73
Sta. 11+00.00
CL
Offset= 17.01 LT
Elev= 4857.39 Offset= 17.06 RT
Elev= 4857.39
Offset= 0.00 RT
Elev= 4857.73
2.00% 2.00%1:6 1:5.56 1:
1.
Des. Grade = 4860.08
Subgrade = 4858.58
Sta. 11+25.00
CL
Offset= 17.00 LT
Elev= 4858.24 Offset= 17.00 RT
Elev= 4858.24
2.00% 2.00%1:6 1:6.89 1:
1.
1:16.64
Des. Grade = 4860.94
Subgrade = 4859.44
Sta. 11+50.00
CL
Offset= 17.00 LT
Elev= 4859.10 Offset= 17.00 RT
Elev= 4859.10
Offset= 0.00 RT
Elev= 4859.44
1.17% 2.00%1:6 1:9.05 1:
1.
Des. Grade = 4861.79
Subgrade = 4860.29
Sta. 11+75.00
CL
Offset= 17.00 LT
Elev= 4860.09 Offset= 17.00 RT
Elev= 4859.95
Offset= 0.00 LT
Elev= 4860.29
0.22% 2.00%1:6 1:13.16
1:
1.
Des. Grade = 4862.64
Subgrade = 4861.14
Sta. 12+00.00
CL
Offset= 17.00 LT
Elev= 4861.18
Offset= 17.00 RT
Elev= 4860.80
Offset= 0.00 RT
Elev= 4861.14
8:18 AM 3 March 2016 ]US_Sur_ft2D [c:\pw_work\chrism\dms34989\id-a2014007XA.dgn
Offset= 0.00 RT
Elev= 4858.58
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4860 4860
12+19.45
4860 4860
12+25.00
4860 4860
4870 4870
12+50.00
4860 4860
4870 4870
12+75.00
4860 4860
4870 4870
13+00.00
4860 4860
4870 4870
13+25.00
4860 4860
4870 4870
13+50.00
4860 4860
4870 4870
13+75.00
4860 4860
4870 4870
13+76.28
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
Lakeshore Drive 10+00 to 31+23
Sheet 2
1.30% 2.00%
1:2 .50
1:18.53
1:
1.
1:5.83
Des. Grade = 4863.30
Subgrade = 4861.80
Sta. 12+19.45
CL
Offset= 17.00 LT
Elev= 4862.03 Offset= 17.00 RT
Elev= 4861.46
Offset= 0.00 LT
Elev= 4861.80
1.61% 2.00%
1:2 .50
1:6
Des. Grade = 4863.49
Subgrade = 4861.99
Sta. 12+25.00
CL
Offset= 17.00 LT
Elev= 4862.27 Offset= 17.00 RT
Elev= 4861.65
Offset= 0.00 LT
Elev= 4861.99
2.00% 2.00%
1:
1:6
Des. Grade = 4864.35
Subgrade = 4862.85
Sta. 12+50.00
CL
Offset= 17.00 LT
Elev= 4863.19 Offset= 17.00 RT
Elev= 4862.51
Offset= 0.00 LT
Elev= 4862.85
2.00% 2.00%
1:
1:6
Des. Grade = 4865.14
Subgrade = 4863.64
Sta. 12+75.00
CL
Offset= 17.00 LT
Elev= 4863.98 Offset= 17.00 RT
Elev= 4863.30
Offset= 0.00 LT
Elev= 4863.64
2.00% 2.00%
1:3
1:6
Des. Grade = 4865.81
Subgrade = 4864.31
Sta. 13+00.00
CL
Offset= 17.00 LT
Elev= 4864.65 Offset= 17.00 RT
Elev= 4863.97
Offset= 0.00 LT
Elev= 4864.31
2.00% 2.00% 1:4
1:10
Des. Grade = 4866.35
Subgrade = 4864.85
Sta. 13+25.00
CL
Offset= 17.00 LT
Elev= 4865.19 Offset= 17.00 RT
Elev= 4864.51
Offset= 0.00 LT
Elev= 4864.85
2.00% 2.00%1:6 1:10
Des. Grade = 4866.78
Subgrade = 4865.28
Sta. 13+50.00
CL
Offset= 17.00 LT
Elev= 4865.62
Offset= 17.00 RT
Elev= 4864.94
Offset= 0.00 LT
Elev= 4865.28
2.00% 2.00% 1:10 1:6
Des. Grade = 4867.08
Subgrade = 4865.58
Sta. 13+75.00
CL
Offset= 17.00 LT
Elev= 4865.92
Offset= 17.00 RT
Elev= 4865.24
Offset= 0.00 LT
Elev= 4865.58
2.00% 2.00% 1:10 1:6
Des. Grade = 4867.09
Subgrade = 4865.59
Sta. 13+76.28
CL
Offset= 17.00 LT
Elev= 4865.93 Offset= 17.00 RT
Elev= 4865.25
Elev= 4865.59
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4860 4860
4870 4870
14+00.00
4860 4860
4870 4870
14+25.00
4860 4860
4870 4870
4880 4880
14+50.00
4860 4860
4870 4870
4880 4880
14+75.00
4860 4860
4870 4870
15+00.00
4860 4860
4870 4870
15+25.00
4860 4860
4870 4870
15+50.00
4860 4860
4870 4870
15+75.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
Lakeshore Drive 10+00 to 31+23
Sheet 3
2.00% 2.00% 1:10 1:6
Des. Grade = 4867.25
Subgrade = 4865.75
Sta. 14+00.00
CL
Offset= 17.00 LT
Elev= 4866.09
Offset= 17.00 RT
Elev= 4865.41
Offset= 0.00 RT
Elev= 4865.75
0.72% 2.00% 1:10
1:4
Des. Grade = 4867.31
Subgrade = 4865.81
Sta. 14+25.00
CL
Offset= 17.00 LT
Elev= 4865.93
Offset= 17.00 RT
Elev= 4865.47
Offset= 0.00 RT
Elev= 4865.81
0.67% 2.00% 1:10
1:4
Des. Grade = 4867.24
Subgrade = 4865.74
Sta. 14+50.00
CL
Offset= 17.00 LT
Elev= 4865.63
Offset= 17.00 RT
Elev= 4865.40
Offset= 0.00 LT
Elev= 4865.74
2.00% 2.00% 1:10
1:3
Des. Grade = 4867.05
Subgrade = 4865.55
Sta. 14+75.00
CL
Offset= 17.00 LT
Elev= 4865.21 Offset= 17.00 RT
Elev= 4865.21
Offset= 0.00 RT
Elev= 4865.55
2.00% 2.00% 1:10
1:2.50
Des. Grade = 4866.74
Subgrade = 4865.24
Sta. 15+00.00
CL
Offset= 17.00 LT
Elev= 4864.90
Offset= 17.00 RT
Elev= 4864.90
Offset= 0.00 RT
Elev= 4865.24
2.00% 2.00% 1:10
1:2.50
Des. Grade = 4866.36
Subgrade = 4864.86
Sta. 15+25.00
CL
Offset= 17.00 LT
Elev= 4864.52
Offset= 17.00 RT
Elev= 4864.52
Offset= 0.00 RT
Elev= 4864.86
2.00% 2.00% 1:10
1:2.50
Des. Grade = 4865.99
Subgrade = 4864.49
Sta. 15+50.00
CL
Offset= 17.00 LT
Elev= 4864.15
Offset= 17.00 RT
Elev= 4864.15
Offset= 0.00 RT
Elev= 4864.49
2.00% 2.00% 1:10
1:3
Des. Grade = 4865.61
Subgrade = 4864.11
Sta. 15+75.00
CL
Offset= 17.00 LT
Elev= 4863.77
Offset= 17.00 RT
Elev= 4863.77
Elev= 4864.11
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4860 4860
4870 4870
16+00.00
4860 4860
4870 4870
16+25.00
4860 4860
4870 4870
16+31.00
4860 4860
4870 4870
16+50.00
4860 4860
4870 4870
16+75.00
4850 4850
4860 4860
17+00.00
4850 4850
4860 4860
17+25.00
4850 4850
4860 4860
17+50.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
Lakeshore Drive 10+00 to 31+23
Sheet 4
2.00% 2.00%
1:4
Des. Grade = 4865.24
Subgrade = 4863.74
Sta. 16+00.00
CL
Offset= 17.00 LT
Elev= 4863.40
Offset= 17.00 RT
Elev= 4863.40
Offset= 0.00 RT
Elev= 4863.74
2.00% 2.00%1:33.31 1:6 1:
Des. Grade = 4864.87
Subgrade = 4863.37
Sta. 16+25.00
CL
2.00%
BL
Sta. 60+28.94
Des. Grade = 4864.86
Subgrade = 4863.87 Offset= 17.00 LT
Elev= 4863.03
Offset= 17.00 RT
Elev= 4863.03
Offset= 0.00 LT
Elev= 4863.37
2.00% 2.00%
1:
1:29.50
Des. Grade = 4864.78
Subgrade = 4863.28
Sta. 16+31.00
CL
Par Drive Approach Road 2.00%
BL
Sta. 60+34.95
Des. Grade = 4864.22
Subgrade = 4862.74 Offset= 17.00 LT
Elev= 4862.94 Offset= 17.00 RT
Elev= 4862.94
Offset= 0.00 RT
Elev= 4863.28
2.00% 2.00% 1:6
1:
1:7.10
Des. Grade = 4864.49
Subgrade = 4862.99
Sta. 16+50.00
CL
2.00%
BL
Sta. 60+59.95
Des. Grade = 4862.01
Subgrade = 4859.47
Offset= 17.00 LT
Elev= 4862.65 Offset= 17.00 RT
Elev= 4862.65
Offset= 0.00 RT
Elev= 4862.99
2.00% 2.00% 1:6
1:
1:3 .80
Des. Grade = 4864.12
Subgrade = 4862.62
Sta. 16+75.00
CL
2.00%
BL
Sta. 60+84.95
Des. Grade = 4859.44
Subgrade = 4855.25
Offset= 17.00 LT
Elev= 4862.28
Offset= 17.00 RT
Elev= 4862.28
Offset= 0.00 RT
Elev= 4862.62
2.00% 2.00% 1:6
1:
1:2 .75
Des. Grade = 4863.74
Subgrade = 4862.24
Sta. 17+00.00
CL
2.00%
BL
Sta. 61+09.95
Des. Grade = 4857.27
Subgrade = 4851.64
Offset= 17.00 LT
Elev= 4861.90
Offset= 25.00 RT
Elev= 4861.74
Offset= 0.00 RT
Elev= 4862.24
2.00% 2.00%
1:
1:
2.2
1:6
Des. Grade = 4863.37
Subgrade = 4861.87
Sta. 17+25.00
CL
2.00%
BL
Sta. 61+34.95
Des. Grade = 4855.48
Subgrade = 4849.89
Offset= 17.00 LT
Elev= 4861.53 Offset= 25.00 RT
Elev= 4861.37
Offset= 0.00 LT
Elev= 4861.87
2.00% 2.00%
1:
1:
2.
1:6
Des. Grade = 4862.99
Subgrade = 4861.49
Sta. 17+50.00
CL
2.00%
BL
Sta. 61+59.95
Des. Grade = 4854.10
Subgrade = 4848.42
Offset= 17.00 LT
Elev= 4861.15 Offset= 25.00 RT
Elev= 4860.99
Offset= 0.00 LT
Elev= 4861.49
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4850 4850
4860 4860
17+75.00
4850 4850
4860 4860
18+00.00
4850 4850
4860 4860
18+25.00
4850 4850
4860 4860
18+50.00
4850 4850
4860 4860
18+75.00
4850 4850
4860 4860
19+00.00
4860 4860
4870 4870
19+25.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
Lakeshore Drive 10+00 to 31+23
Sheet 5
2.00% 2.00%
1:
1:
1.
1:6
Des. Grade = 4862.62
Subgrade = 4861.12
Sta. 17+75.00
CL
2.00%
BL
Sta. 61+84.95
Des. Grade = 4853.11
Subgrade = 4847.49
Offset= 17.00 LT
Elev= 4860.78
Offset= 25.00 RT
Elev= 4860.62
Offset= 0.00 RT
Elev= 4861.12
2.00% 2.00%
1:
1:
1.
1:6
Des. Grade = 4862.24
Subgrade = 4860.74
Sta. 18+00.00
CL
2.00%
BL
Sta. 62+09.95
Des. Grade = 4852.51
Subgrade = 4847.23
Offset= 17.00 LT
Elev= 4860.40 Offset= 25.00 RT
Elev= 4860.24
Offset= 0.00 RT
Elev= 4860.74
2.00% 2.00%
1:
1:
1.
1:6
Des. Grade = 4861.87
Subgrade = 4860.37
Sta. 18+25.00
CL
2.00%
BL
Sta. 62+34.95
Des. Grade = 4852.31
Subgrade = 4847.43
Offset= 17.00 LT
Elev= 4860.03 Offset= 25.00 RT
Elev= 4859.87
Offset= 0.00 LT
Elev= 4860.37
2.00% 2.00% 1:6
1:
1:
1.
Des. Grade = 4861.49
Subgrade = 4859.99
Sta. 18+50.00
CL
2.00%
BL
Sta. 62+59.95
Des. Grade = 4852.51
Subgrade = 4848.64
Offset= 17.00 LT
Elev= 4859.65
Offset= 20.86 RT
Elev= 4859.58
Offset= 0.00 RT
Elev= 4859.99
2.00% 2.00%
1:
1:
2.
Des. Grade = 4861.12
Subgrade = 4859.62
Sta. 18+75.00
CL
2.58%
2.00%
BL
Sta. 62+84.95
Des. Grade = 4853.10
Subgrade = 4851.09
Offset= 17.00 LT
Elev= 4859.28 Offset= 17.00 RT
Elev= 4859.28
Offset= 0.00 RT
Elev= 4859.62
2.00% 2.00% 1:6
1:
1:2 .88
Des. Grade = 4860.74
Subgrade = 4859.24
Sta. 19+00.00
CL
2.00%
BL
Sta. 63+04.05
Des. Grade = 4854.06
Subgrade = 4853.84
Offset= 17.00 LT
Elev= 4858.90 Offset= 17.00 RT
Elev= 4858.90
Offset= 0.00 RT
Elev= 4859.24
2.00% 2.00% 1:4
1:6
Des. Grade = 4860.37
Subgrade = 4858.87
Sta. 19+25.00
CL
Offset= 17.00 LT
Elev= 4858.53 Offset= 17.00 RT
Elev= 4858.53
Elev= 4858.87
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4860 4860
4870 4870
19+50.00
4860 4860
4870 4870
19+75.00
4860 4860
4870 4870
20+00.00
4860 4860
4870 4870
20+25.00
4860 4860
4870 4870
20+50.00
4860 4860
4870 4870
20+75.00
4860 4860
4870 4870
21+00.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
Lakeshore Drive 10+00 to 31+23
Sheet 6
2.00% 2.00% 1:6 1:6
Des. Grade = 4860.00
Subgrade = 4858.50
Sta. 19+50.00
CL
Offset= 17.00 LT
Elev= 4858.16 Offset= 17.00 RT
Elev= 4858.16
Offset= 0.00 RT
Elev= 4858.50
2.00% 2.00% 1:6 1:6
Des. Grade = 4859.62
Subgrade = 4858.12
Sta. 19+75.00
CL
Offset= 17.00 LT
Elev= 4857.78 Offset= 17.00 RT
Elev= 4857.78
Offset= 0.00 LT
Elev= 4858.12
2.00% 2.00% 1:6 1:4
Des. Grade = 4859.25
Subgrade = 4857.75
Sta. 20+00.00
CL
Offset= 17.00 LT
Elev= 4857.41 Offset= 17.00 RT
Elev= 4857.41
Offset= 0.00 RT
Elev= 4857.75
2.00% 2.00% 1:6
1:4
Des. Grade = 4858.87
Subgrade = 4857.37
Sta. 20+25.00
CL
Offset= 17.00 LT
Elev= 4857.03 Offset= 17.00 RT
Elev= 4857.03
Offset= 0.00 LT
Elev= 4857.37
2.00% 2.00% 1:6
1:4
Des. Grade = 4858.52
Subgrade = 4857.02
Sta. 20+50.00
CL
Offset= 17.00 LT
Elev= 4856.68
Offset= 17.00 RT
Elev= 4856.68
Offset= 0.00 RT
Elev= 4857.00
2.00% 2.00% 1:10
1:4
Des. Grade = 4858.20
Subgrade = 4856.70
Sta. 20+75.00
CL
Offset= 17.00 LT
Elev= 4856.36 Offset= 17.00 RT
Elev= 4856.36
Offset= 0.00 RT
Elev= 4856.70
2.00% 2.00% 1:10
1:4
Des. Grade = 4857.92
Subgrade = 4856.42
Sta. 21+00.00
CL
Offset= 17.00 LT
Elev= 4856.08
Offset= 17.00 RT
Elev= 4856.08
Elev= 4856.42
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4860 4860
4870 4870
21+25.00
4850 4850
4860 4860
21+50.00
4850 4850
4860 4860
21+75.00
4850 4850
4860 4860
22+00.00
4850 4850
4860 4860
22+25.00
4850 4850
4860 4860
22+50.00
4840 4840
4850 4850
4860 4860
22+75.00
4840 4840
4850 4850
4860 4860
23+00.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
Lakeshore Drive 10+00 to 31+23
Sheet 7
2.00% 2.00% 1:10
1:4
Des. Grade = 4857.69
Subgrade = 4856.19
Sta. 21+25.00
CL
Offset= 17.00 LT
Elev= 4855.85 Offset= 17.00 RT
Elev= 4855.85
Offset= 0.00 RT
Elev= 4856.00
2.00% 2.00% 1:10
1:6
Des. Grade = 4857.49
Subgrade = 4855.99
Sta. 21+50.00
CL
Offset= 17.00 LT
Elev= 4855.65
Offset= 17.00 RT
Elev= 4855.65
Offset= 0.00 RT
Elev= 4855.99
2.00% 2.00%1:6 1:10
Des. Grade = 4857.33
Subgrade = 4855.83
Sta. 21+75.00
CL
Offset= 17.00 LT
Elev= 4855.49
Offset= 17.00 RT
Elev= 4855.49
Offset= 0.00 RT
Elev= 4855.83
2.00% 2.00%
1:3
1:6
Des. Grade = 4857.21
Subgrade = 4855.71
Sta. 22+00.00
CL
Offset= 17.00 LT
Elev= 4855.37 Offset= 17.00 RT
Elev= 4855.37
Offset= 0.00 RT
Elev= 4855.71
2.00% 2.00%
1:
1:6
Des. Grade = 4857.14
Subgrade = 4855.64
Sta. 22+25.00
CL
Offset= 17.00 LT
Elev= 4855.30 Offset= 17.00 RT
Elev= 4855.30
Offset= 0.00 RT
Elev= 4855.64
2.00% 2.00%
1:
1:6
Des. Grade = 4857.10
Subgrade = 4855.60
Sta. 22+50.00
CL
Offset= 17.00 LT
Elev= 4855.26 Offset= 17.00 RT
Elev= 4855.26
Offset= 0.00 RT
Elev= 4855.60
2.00% 2.00%
1:
1:6
Des. Grade = 4857.10
Subgrade = 4855.60
Sta. 22+75.00
CL
Offset= 17.00 LT
Elev= 4855.26 Offset= 17.00 RT
Elev= 4855.26
Offset= 0.00 RT
Elev= 4855.60
2.00% 2.00%
1:
1:6
Des. Grade = 4857.13
Subgrade = 4855.63
Sta. 23+00.00
CL
Offset= 17.00 LT
Elev= 4855.29 Offset= 17.00 RT
Elev= 4855.29
Elev= 4855.63
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4850 4850
4860 4860
23+25.00
4850 4850
4860 4860
23+50.00
4850 4850
4860 4860
23+75.00
4850 4850
4860 4860
23+85.46
4850 4850
4860 4860
24+00.00
4850 4850
4860 4860
24+25.00
4860 4860
24+50.00
4860 4860
24+73.30
4860 4860
25+00.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
Lakeshore Drive 10+00 to 31+23
Sheet 8
2.00% 2.00%
1:
1:6
Des. Grade = 4857.21
Subgrade = 4855.71
Sta. 23+25.00
CL
Offset= 17.00 LT
Elev= 4855.37 Offset= 17.00 RT
Elev= 4855.37
Offset= 0.00 LT
Elev= 4855.71
2.00% 2.00%
1:
1:6
Des. Grade = 4857.33
Subgrade = 4855.83
Sta. 23+50.00
CL
Offset= 17.00 LT
Elev= 4855.49 Offset= 17.00 RT
Elev= 4855.49
Offset= 0.00 LT
Elev= 4855.83
2.00% 2.00%
1:
1:6
Des. Grade = 4857.49
Subgrade = 4855.99
Sta. 23+75.00
CL
Offset= 17.00 LT
Elev= 4855.65 Offset= 17.00 RT
Elev= 4855.65
Offset= 0.00 RT
Elev= 4855.99
2.00% 2.00%
1:
1:6
Des. Grade = 4857.57
Subgrade = 4856.07
Sta. 23+85.46
CL
Offset= 17.00 LT
Elev= 4855.73 Offset= 17.00 RT
Elev= 4855.73
Offset= 0.00 LT
Elev= 4856.07
2.00% 2.00%
1:
1:6
Des. Grade = 4857.69
Subgrade = 4856.19
Sta. 24+00.00
CL
Offset= 17.00 LT
Elev= 4855.85 Offset= 17.00 RT
Elev= 4855.85
Offset= 0.00 RT
Elev= 4856.19
2.00% 2.00%
1:2 .50
1:6
Des. Grade = 4857.92
Subgrade = 4856.42
Sta. 24+25.00
CL
Offset= 17.00 LT
Elev= 4856.08 Offset= 17.00 RT
Elev= 4856.08
Offset= 0.00 RT
Elev= 4856.42
2.00% 2.00%
1:3
1:6
Des. Grade = 4858.20
Subgrade = 4856.70
Sta. 24+50.00
CL
Offset= 17.00 LT
Elev= 4856.36 Offset= 17.00 RT
Elev= 4856.36
Offset= 0.00 RT
Elev= 4856.70
2.00% 2.00%
1:4
1:6
Des. Grade = 4858.49
Subgrade = 4856.99
Sta. 24+73.30
CL
Offset= 17.00 LT
Elev= 4856.65 Offset= 17.00 RT
Elev= 4856.65
Offset= 0.00 RT
Elev= 4856.99
2.00% 2.00%1:6
Des. Grade = 4858.85
Subgrade = 4857.35
Sta. 25+00.00
CL
9.49%
Offset= 17.00 LT
Elev= 4857.01
Offset= 17.00 RT
Elev= 4857.01
Elev= 4857.35
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4860 4860
25+25.00
4860 4860
25+50.00
4860 4860
25+75.00
4860 4860
26+00.00
4860 4860
26+25.00
4860 4860
4870 4870
26+50.00
4860 4860
4870 4870
26+75.00
4860 4860
4870 4870
27+00.00
4860 4860
4870 4870
27+25.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
Lakeshore Drive 10+00 to 31+23
Sheet 9
2.00% 2.00% 1:101:6
Des. Grade = 4859.18
Subgrade = 4857.68
Sta. 25+25.00
CL
Offset= 17.00 LT
Elev= 4857.34
Offset= 17.00 RT
Elev= 4857.34
Offset= 0.00 LT
Elev= 4857.68
2.00% 2.00% 1:10 1:4
Des. Grade = 4859.52
Subgrade = 4858.02
Sta. 25+50.00
CL
Offset= 17.00 LT
Elev= 4857.68 Offset= 17.00 RT
Elev= 4857.68
Offset= 0.00 RT
Elev= 4858.02
2.00% 2.00% 1:10
1:3
Des. Grade = 4859.85
Subgrade = 4858.35
Sta. 25+75.00
CL
Offset= 17.00 LT
Elev= 4858.01
Offset= 17.00 RT
Elev= 4858.01
Offset= 0.00 RT
Elev= 4858.35
2.00% 2.00% 1:10
1:2.50
Des. Grade = 4860.19
Subgrade = 4858.69
Sta. 26+00.00
CL
Offset= 17.00 LT
Elev= 4858.35
Offset= 17.00 RT
Elev= 4858.35
Offset= 0.00 LT
Elev= 4858.69
2.00% 2.00% 1:10
1:2
Des. Grade = 4860.52
Subgrade = 4859.02
Sta. 26+25.00
CL
Offset= 17.00 LT
Elev= 4858.68
Offset= 17.00 RT
Elev= 4858.68
Offset= 0.00 LT
Elev= 4859.02
2.00% 2.00% 1:10
1:2
Des. Grade = 4860.86
Subgrade = 4859.36
Sta. 26+50.00
CL
Offset= 17.00 LT
Elev= 4859.02
Offset= 17.00 RT
Elev= 4859.02
Offset= 0.00 RT
Elev= 4859.36
2.00% 2.00% 1:10
1:2
Des. Grade = 4861.19
Subgrade = 4859.69
Sta. 26+75.00
CL
Offset= 17.00 LT
Elev= 4859.35 Offset= 17.00 RT
Elev= 4859.35
Offset= 0.00 RT
Elev= 4859.69
2.00% 2.00% 1:10
1:2
Des. Grade = 4861.48
Subgrade = 4859.98
Sta. 27+00.00
CL
Offset= 17.00 LT
Elev= 4859.64
Offset= 17.00 RT
Elev= 4859.64
Offset= 0.00 LT
Elev= 4859.98
2.00% 2.00%
1:2
1:6
Des. Grade = 4861.67
Subgrade = 4860.17
Sta. 27+25.00
CL
Offset= 17.00 LT
Elev= 4859.83
Offset= 17.00 RT
Elev= 4859.83
Elev= 4860.17
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4860 4860
4870 4870
27+50.00
4860 4860
4870 4870
27+75.00
4860 4860
4870 4870
28+00.00
4860 4860
28+25.00
4860 4860
28+50.00
4860 4860
28+75.00
4850 4850
4860 4860
29+00.00
4850 4850
4860 4860
29+25.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
Lakeshore Drive 10+00 to 31+23
Sheet 10
2.00% 2.00%
1:2
1:6
Des. Grade = 4861.78
Subgrade = 4860.28
Sta. 27+50.00
CL
Offset= 17.00 LT
Elev= 4859.94
Offset= 17.00 RT
Elev= 4859.94
Offset= 0.00 LT
Elev= 4860.28
2.00% 2.00%
1:2
1:6
Des. Grade = 4861.78
Subgrade = 4860.28
Sta. 27+75.00
CL
Offset= 17.00 LT
Elev= 4859.94
Offset= 17.00 RT
Elev= 4859.94
Offset= 0.00 RT
Elev= 4860.28
2.00% 2.00% 1:10
1:2
Des. Grade = 4861.70
Subgrade = 4860.20
Sta. 28+00.00
CL
Offset= 17.00 LT
Elev= 4859.86
Offset= 17.00 RT
Elev= 4859.86
Offset= 0.00 LT
Elev= 4860.20
2.00% 2.00%1:6
Des. Grade = 4861.52
Subgrade = 4860.02
Sta. 28+25.00
CL
1:4 Offset= 17.00 LT
Elev= 4859.68
Offset= 17.00 RT
Elev= 4859.68
Offset= 0.00 RT
Elev= 4860.00
2.00% 2.00% 1:6
Des. Grade = 4861.30
Subgrade = 4859.80
Sta. 28+50.00
CL
3.77%
Offset= 17.00 LT
Elev= 4859.46
Offset= 17.00 RT
Elev= 4859.46
Offset= 0.00 RT
Elev= 4859.80
2.00% 2.00%
1:
1:6
Des. Grade = 4861.14
Subgrade = 4859.64
Sta. 28+75.00
CL
Offset= 17.00 LT
Elev= 4859.30 Offset= 17.00 RT
Elev= 4859.30
Offset= 0.00 LT
Elev= 4859.64
2.00% 2.00%
1:
1:6
Des. Grade = 4861.11
Subgrade = 4859.61
Sta. 29+00.00
CL
Offset= 17.00 LT
Elev= 4859.27
Offset= 17.00 RT
Elev= 4859.27
Offset= 0.00 RT
Elev= 4859.61
2.00% 2.00%
1:
1:4
Des. Grade = 4861.22
Subgrade = 4859.72
Sta. 29+25.00
CL
Offset= 17.00 LT
Elev= 4859.38
Offset= 17.00 RT
Elev= 4859.38
Elev= 4859.72
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4850 4850
4860 4860
29+50.00
4850 4850
4860 4860
29+75.00
4850 4850
4860 4860
30+00.00
4850 4850
4860 4860
30+25.00
4850 4850
4860 4860
30+50.00
4860 4860
4870 4870
30+75.00
4860 4860
4870 4870
30+84.00
4860 4860
4870 4870
30+89.95
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
Lakeshore Drive 10+00 to 31+23
Sheet 11
2.00% 2.00%
1:
1:6
Des. Grade = 4861.46
Subgrade = 4859.96
Sta. 29+50.00
CL
Offset= 17.00 LT
Elev= 4859.62 Offset= 17.00 RT
Elev= 4859.62
Offset= 0.00 RT
Elev= 4859.96
2.00% 2.00%
1:
1:6
Des. Grade = 4861.83
Subgrade = 4860.33
Sta. 29+75.00
CL
Offset= 17.00 LT
Elev= 4859.99
Offset= 17.00 RT
Elev= 4859.99
Offset= 0.00 LT
Elev= 4860.33
2.00% 2.00%
1:
1:6
Des. Grade = 4862.33
Subgrade = 4860.83
Sta. 30+00.00
CL
Offset= 17.00 LT
Elev= 4860.49 Offset= 17.00 RT
Elev= 4860.49
Offset= 0.00 LT
Elev= 4860.83
2.00% 2.00%
1:
1:6
Des. Grade = 4862.97
Subgrade = 4861.47
Sta. 30+25.00
CL
Offset= 17.00 LT
Elev= 4861.13 Offset= 17.00 RT
Elev= 4861.13
Offset= 0.00 LT
Elev= 4861.47
2.07% 0.72%1:6 1:6
Des. Grade = 4863.73
Subgrade = 4862.23
Sta. 30+50.00
CL
Offset= 17.00 LT
Elev= 4861.88 Offset= 17.00 RT
Elev= 4862.11
Offset= 0.00 RT
Elev= 4862.23
2.42% 0.67%1:4 1:6
Des. Grade = 4864.57
Subgrade = 4863.07
Sta. 30+75.00
CL
Offset= 17.00 LT
Elev= 4862.66 Offset= 17.00 RT
Elev= 4863.18
Offset= 0.00 LT
Elev= 4863.07
2.54% 1.17% 1:
1:6
Des. Grade = 4864.87
Subgrade = 4863.37
Sta. 30+84.00
CL
Offset= 17.00 LT
Elev= 4862.93 Offset= 17.00 RT
Elev= 4863.57
Offset= 0.00 LT
Elev= 4863.37
2.63% 1.50% 1:
1:6
Des. Grade = 4865.07
Subgrade = 4863.57
Sta. 30+89.95
CL
Offset= 17.00 LT
Elev= 4863.12 Offset= 17.00 RT
Elev= 4863.82
Elev= 4863.56
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4860 4860
4870 4870
31+00.00
4860 4860
4870 4870
31+23.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
Lakeshore Drive 10+00 to 31+23
Sheet 12
2.76% 2.06% 1:
1:6
Des. Grade = 4865.40
Subgrade = 4863.90
Sta. 31+00.00
CL
Offset= 17.00 LT
Elev= 4863.43 Offset= 17.00 RT
Elev= 4864.25
Offset= 0.00 LT
Elev= 4863.90
3.00% 3.00%
1:
1:6
Des. Grade = 4866.17
Subgrade = 4864.67
Sta. 31+23.00
CL
Offset= 17.00 LT
Elev= 4864.16 Offset= 17.00 RT
Elev= 4865.18
Elev= 4864.67
ID CASCADE LS DR(1)
200+30 TO 200+70
DUFFERS LANE CROSS SECTIONS
LAKESHORE DRIVE PHASE II
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4860 4860
200+30.00
4860 4860
200+35.00
4860 4860
200+40.00
4860 4860
200+45.00
4860 4860
200+50.00
4860 4860
200+55.00
4860 4860
200+60.00
4860 4860
200+65.00
4860 4860
200+70.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
DUFFERS Lane 200+30 to 200+70
Sheet 1
LEP
Slope_Stake_Fill_L
L1
CL1
CL2
REP1
Parkway Back_L
L2
LTC
CL3
REP
REP2
L3
LBC
CL
REP3
L4
LGutter
L5
Slope_Stake_Fill_R
LEP1
LEP2
LEP3
CHNL_IN
Exterior Boundary
Exterior Boundary
0.16% 3.56%1:6
1:3 1:
Des. Grade =4858.08
Subgrade =4856.58
Sta.200+30.00
CL
Offset= 11.69 LT
Elev= 4856.56
Offset= 31.91 RT
Elev= 4855.39
Offset= 0.00 RT
Elev= 4856.58
Slope_Stake_Cut_L
LEP
L1
CL1
CL2 REP1
Parkway Back_L
L2
LTC
CL3
REP
REP2L3
LBC
CL
REP3
L4
LGutter
L5
Slope_Stake_Fill_R
LEP1
LEP2
LEP3
CHNL_IN
Exterior Boundary
Exterior Boundary
2.00% 2.00% 1:6
1:3 1:
Des. Grade =4858.29
Subgrade =4856.79
Sta.200+35.00
CL
Offset= 11.50 LT
Elev= 4856.56
Offset= 21.53 RT
Elev= 4856.30
Offset= 0.00 LT
Elev= 4856.79
Slope_Stake_Cut_L
LEP
L1
CL1
CL2
REP1
Parkway Back_L
L2
LTC
CL3
REP
REP2
L3
LBC
CL
REP3
L4
LGutter
L5
Slope_Stake_Fill_R
LEP1
LEP2
LEP3
CHNL_IN
Exterior Boundary
Exterior Boundary
2.00% 1.10%1:6
1:3 1:
Des. Grade =4858.58
Subgrade =4857.08
Sta.200+40.00
CL
Offset= 11.50 LT
Elev= 4856.85
Offset= 16.84 RT
Elev= 4856.84
Offset= 0.00 LT
Elev= 4857.08
Slope_Stake_Cut_L
LEP
Slope_Stake_Fill_L
L1
CL1
CL2
REP1
Parkway Back_L
L2
LTC
CL3
REP
REP2
L3
LBC
CL
REP3
L4
LGutter
L5
Slope_Stake_Fill_R
LEP1
LEP2
LEP3
CHNL_IN
Exterior Boundary
Exterior Boundary
2.00% 0.86%1:61:6
1:3 1:
Des. Grade =4858.96
Subgrade =4857.46
Sta.200+45.00
CL
Offset= 11.50 LT
Elev= 4857.23
Offset= 14.11 RT
Elev= 4857.28
Offset= 0.00 LT
Elev= 4857.46
LEP
Slope_Stake_Fill_L
L1
CL1
CL2
REP1
Parkway Back_L
L2
LTC
CL3
REP
REP2
L3
LBC
CL
REP3
L4
LGutter
L5
Slope_Stake_Fill_R
LEP1
LEP2
LEP3
CHNL_IN
Exterior Boundary
Exterior Boundary
2.00% 1.40%1:6
1:3 1:
Des. Grade =4859.41
Subgrade =4857.91
Sta.200+50.00
CL
Offset= 11.50 LT
Elev= 4857.68
Offset= 12.67 RT
Elev= 4857.68
Offset= 0.00 RT
Elev= 4857.91
LEP
Slope_Stake_Fill_L
L1
CL1
CL2
REP1
Parkway Back_L
L2
LTC
CL3
REP
REP2
L3
LBC
CL
REP3
L4
LGutter
L5
Slope_Stake_Fill_R
LEP1
LEP2
LEP3
CHNL_IN
Exterior Boundary
Exterior Boundary
2.00% 2.00%1:6
1:3 1:
Des. Grade =4859.88
Subgrade =4858.38
Sta.200+55.00
CL
Offset= 11.50 LT
Elev= 4858.15
Offset= 12.30 RT
Elev= 4858.07
Offset= 0.00 RT
Elev= 4858.38
LEPSlope_Stake_Fill_L
L1
CL1
CL2
REP1
Parkway Back_L
L2
LTC
CL3
REP
REP2
L3
LBC
CL
REP3
L4
LGutter
L5
Slope_Stake_Fill_R
LEP1
LEP2
LEP3
CHNL_IN
Exterior Boundary
Exterior Boundary
2.00% 2.00%1:6 1:3
1:
Des. Grade =4860.35
Subgrade =4858.85
Sta.200+60.00
CL
Offset= 11.50 LT
Elev= 4858.62
Offset= 12.30 RT
Elev= 4858.54
Offset= 0.00 RT
Elev= 4858.85
LEP
Slope_Stake_Fill_L
L1
CL1
CL2
REP1
Parkway Back_L
L2
LTC
CL3
REP
REP2
L3
LBC
CL
REP3
L4
LGutter
L5
Slope_Stake_Fill_R
LEP1
LEP2
LEP3
CHNL_IN
Exterior Boundary
Exterior Boundary
2.00% 2.00%1:6 1:3
1:
Des. Grade =4860.81
Subgrade =4859.31
Sta.200+65.00
CL
Offset= 11.50 LT
Elev= 4859.08
Offset= 12.30 RT
Elev= 4859.01
Offset= 0.00 RT
Elev= 4859.31
LEP
Slope_Stake_Fill_L
L1
CL1
CL2
REP1
Parkway Back_L
L2
LTC
CL3
REP
REP2
L3
LBC
CL
REP3
L4
LGutter
L5
Slope_Stake_Fill_R
LEP1
LEP2
LEP3
CHNL_IN
Exterior Boundary
Exterior Boundary
2.00% 2.00%1:6 1:3
1:
Des. Grade =4861.28
Subgrade =4859.78
Sta.200+70.00
CL
Offset= 11.50 LT
Elev= 4859.55
Offset= 12.30 RT
Elev= 4859.47
Elev= 4859.78
LAKESHORE DRIVE PHASE II
ID CASCADE LS DR(1)
300+30 TO 303+25
PAR DRIVE CROSS SECTIONS
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4860 4860
4870 4870
300+20.00
4860 4860
4870 4870
300+25.00
4860 4860
4870 4870
300+30.00
4860 4860
4870 4870
300+35.00
4860 4860
4870 4870
300+40.00
4860 4860
4870 4870
300+45.00
4860 4860
4870 4870
300+50.00
4860 4860
4870 4870
300+55.00
4860 4860
4870 4870
300+60.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
PAR DRIVE CROSS SECTIONS 300+00 TO 303+25
Sheet 1
1.68% 1.36%
Des. Grade =4864.40
Subgrade =4862.90
Sta.300+20.00
CL
Offset= 29.82 LT
Elev= 4862.40
Offset= 26.35 RT
Elev= 4863.26
Offset= 0.00 LT
Elev= 4862.90
1.76% 1.28%1:10.38 1:447.09
Des. Grade =4864.35
Subgrade =4862.85
Sta.300+25.00
CL
Offset= 21.55 LT
Elev= 4862.47 Offset= 19.75 RT
Elev= 4863.10
Offset= 0.00 RT
Elev= 4862.85
1.79% 0.99%1:8.53 1:8.86
Des. Grade =4864.33
Subgrade =4862.83
Sta.300+30.00
CL
Offset= 16.88 LT
Elev= 4862.53
Offset= 15.74 RT
Elev= 4862.98
Offset= 0.00 LT
Elev= 4862.83
1.86% 0.37% 1:6.2 51:7.03
Des. Grade =4864.33
Subgrade =4862.83
Sta.300+35.00
CL
Offset= 13.89 LT
Elev= 4862.57
Offset= 13.16 RT
Elev= 4862.88
Offset= 0.00 RT
Elev= 4862.83
1.99% 0.62% 1:5.9 71:6.35
Des. Grade =4864.35
Subgrade =4862.85
Sta.300+40.00
CL
Offset= 12.04 LT
Elev= 4862.61
Offset= 11.64 RT
Elev= 4862.78
Offset= 0.00 LT
Elev= 4862.85
2.03% 1.74% 1:5.9 71:6.07
Des. Grade =4864.37
Subgrade =4862.87
Sta.300+45.00
CL
Offset= 11.13 LT
Elev= 4862.65 Offset= 11.02 RT
Elev= 4862.68
Offset= 0.00 LT
Elev= 4862.87
2.00% 2.00% 1:6 1:6
Des. Grade =4864.40
Subgrade =4862.90
Sta.300+50.00
CL
Offset= 11.00 LT
Elev= 4862.68
Offset= 11.00 RT
Elev= 4862.68
Offset= 0.00 RT
Elev= 4862.90
2.00% 2.00% 1:6 1:6
Des. Grade =4864.42
Subgrade =4862.92
Sta.300+55.00
CL
Offset= 11.00 LT
Elev= 4862.70 Offset= 11.00 RT
Elev= 4862.70
Offset= 0.00 LT
Elev= 4862.92
2.00% 2.00% 1:6 1:6
Des. Grade =4864.45
Subgrade =4862.95
Sta.300+60.00
CL
Offset= 11.00 LT
Elev= 4862.73
Offset= 11.00 RT
Elev= 4862.73
Elev= 4862.95
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4860 4860
4870 4870
300+65.00
4860 4860
4870 4870
300+70.00
4860 4860
4870 4870
300+75.00
4860 4860
4870 4870
300+80.00
4860 4860
4870 4870
300+85.00
4860 4860
4870 4870
300+90.00
4860 4860
4870 4870
300+95.00
4860 4860
4870 4870
301+00.00
4860 4860
4870 4870
301+05.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
PAR DRIVE CROSS SECTIONS 300+00 TO 303+25
Sheet 2
2.00% 2.00%1:6 1:6
Des. Grade =4864.47
Subgrade =4862.97
Sta.300+65.00
CL
Offset= 11.00 LT
Elev= 4862.75
Offset= 11.00 RT
Elev= 4862.75
Offset= 0.00 RT
Elev= 4863.00
2.00% 2.00%1:6 1:6
Des. Grade =4864.50
Subgrade =4863.00
Sta.300+70.00
CL
Offset= 11.00 LT
Elev= 4862.78
Offset= 11.00 RT
Elev= 4862.78
Offset= 0.00 LT
Elev= 4863.00
2.00% 2.00%1:6 1:6
Des. Grade =4864.51
Subgrade =4863.01
Sta.300+75.00
CL
Offset= 11.00 LT
Elev= 4862.79 Offset= 11.00 RT
Elev= 4862.79
Offset= 0.00 LT
Elev= 4863.01
2.00% 2.00%1:6 1:6
Des. Grade =4864.52
Subgrade =4863.02
Sta.300+80.00
CL
Offset= 11.00 LT
Elev= 4862.80
Offset= 11.00 RT
Elev= 4862.80
Offset= 0.00 LT
Elev= 4863.02
2.00% 2.00%1:6 1:6
Des. Grade =4864.52
Subgrade =4863.02
Sta.300+85.00
CL
Offset= 11.00 LT
Elev= 4862.80
Offset= 11.00 RT
Elev= 4862.80
Offset= 0.00 LT
Elev= 4863.02
2.00% 2.00%1:6 1:6
Des. Grade =4864.51
Subgrade =4863.01
Sta.300+90.00
CL
Offset= 11.00 LT
Elev= 4862.79 Offset= 11.00 RT
Elev= 4862.79
Offset= 0.00 LT
Elev= 4863.01
2.00% 2.00%1:6 1:6
Des. Grade =4864.49
Subgrade =4862.99
Sta.300+95.00
CL
Offset= 11.00 LT
Elev= 4862.77 Offset= 11.00 RT
Elev= 4862.77
Offset= 0.00 RT
Elev= 4862.99
2.00% 2.00%1:6 1:6
Des. Grade =4864.46
Subgrade =4862.96
Sta.301+00.00
CL
Offset= 11.00 LT
Elev= 4862.74
Offset= 11.00 RT
Elev= 4862.74
Offset= 0.00 LT
Elev= 4862.96
2.00% 2.00%1:6 1:6
Des. Grade =4864.43
Subgrade =4862.93
Sta.301+05.00
CL
Offset= 11.00 LT
Elev= 4862.71 Offset= 11.00 RT
Elev= 4862.71
Elev= 4862.93
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4860 4860
4870 4870
301+10.00
4860 4860
4870 4870
301+15.00
4860 4860
4870 4870
301+20.00
4860 4860
4870 4870
301+25.00
4860 4860
4870 4870
301+30.00
4860 4860
4870 4870
301+35.00
4860 4860
4870 4870
301+40.00
4860 4860
301+45.00
4860 4860
301+50.00
4860 4860
301+55.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
PAR DRIVE CROSS SECTIONS 300+00 TO 303+25
Sheet 3
2.00% 2.00%1:6 1:6
Des. Grade =4864.38
Subgrade =4862.88
Sta.301+10.00
CL
Offset= 11.00 LT
Elev= 4862.66
Offset= 11.00 RT
Elev= 4862.66
Offset= 0.00 LT
Elev= 4862.88
2.00% 2.00%1:6 1:6
Des. Grade =4864.33
Subgrade =4862.83
Sta.301+15.00
CL
Offset= 11.00 LT
Elev= 4862.61
Offset= 11.00 RT
Elev= 4862.61
Offset= 0.00 LT
Elev= 4862.83
2.00% 2.00%1:6 1:6
Des. Grade =4864.27
Subgrade =4862.77
Sta.301+20.00
CL
Offset= 11.00 LT
Elev= 4862.55
Offset= 11.00 RT
Elev= 4862.55
Offset= 0.00 RT
Elev= 4862.77
2.00% 2.00%1:6 1:6
Des. Grade =4864.20
Subgrade =4862.70
Sta.301+25.00
CL
Offset= 11.00 LT
Elev= 4862.48
Offset= 11.00 RT
Elev= 4862.48
Offset= 0.00 LT
Elev= 4862.70
2.00% 2.00%1:6 1:6
Des. Grade =4864.14
Subgrade =4862.64
Sta.301+30.00
CL
Offset= 11.00 LT
Elev= 4862.42
Offset= 11.00 RT
Elev= 4862.42
Offset= 0.00 LT
Elev= 4862.64
2.00% 2.00%1:6 1:6
Des. Grade =4864.08
Subgrade =4862.58
Sta.301+35.00
CL
Offset= 11.00 LT
Elev= 4862.36
Offset= 11.00 RT
Elev= 4862.36
Offset= 0.00 LT
Elev= 4862.58
2.00% 2.00%1:6 1:6
Des. Grade =4864.02
Subgrade =4862.52
Sta.301+40.00
CL
Offset= 11.00 LT
Elev= 4862.30 Offset= 11.00 RT
Elev= 4862.30
Offset= 0.00 LT
Elev= 4862.52
2.00% 2.00%1:6 1:6
Des. Grade =4863.95
Subgrade =4862.45
Sta.301+45.00
CL
Offset= 11.00 LT
Elev= 4862.23
Offset= 11.00 RT
Elev= 4862.23
Offset= 0.00 LT
Elev= 4862.45
2.00% 2.00%1:6
Des. Grade =4863.89
Subgrade =4862.39
Sta.301+50.00
CL
1:
1.
Offset= 11.00 LT
Elev= 4862.17
Offset= 11.52 RT
Elev= 4862.10
Offset= 0.00 LT
Elev= 4862.39
2.00% 2.00%1:6
1:
Des. Grade =4863.83
Subgrade =4862.33
Sta.301+55.00
CL
Offset= 11.00 LT
Elev= 4862.11 Offset= 11.52 RT
Elev= 4862.04
Elev= 4862.33
Excavation = 8.03 CY
Fill = 0.03 CY
Excavation = 8.16 CY
Fill = 0.00 CY
Excavation = 8.36 CY
Fill = 0.00 CY
Excavation = 8.48 CY
Fill = 0.00 CY
Excavation = 8.55 CY
Fill = 0.00 CY
Excavation = 8.50 CY
Fill = 0.00 CY
Excavation = 8.49 CY
Fill = 0.00 CY
Excavation = 8.63 CY
Fill = 0.05 CY
Excavation = 8.70 CY
Fill = 0.11 CY
Excavation = 8.46 CY
Fill = 0.15 CY
100100
100100
4860 4860
301+60.00
4860 4860
301+65.00
4860 4860
301+70.00
4860 4860
301+75.00
4860 4860
301+80.00
4860 4860
301+85.00
4860 4860
301+90.00
4860 4860
301+95.00
4860 4860
302+00.00
4860 4860
302+05.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
PAR DRIVE CROSS SECTIONS 300+30 TO 303+25
Sheet 4
2.00% 2.00%1:6
1:
Des. Grade =4863.77
Subgrade =4862.27
Sta.301+60.00
CL
Offset= 11.00 LT
Elev= 4862.05 Offset= 11.52 RT
Elev= 4861.98
Offset= 0.00 LT
Elev= 4862.27
2.00% 2.00%1:6
1:
Des. Grade =4863.70
Subgrade =4862.20
Sta.301+65.00
CL
Offset= 11.00 LT
Elev= 4861.98
Offset= 11.52 RT
Elev= 4861.91
Offset= 0.00 RT
Elev= 4862.20
2.00% 2.00%1:6
1:
Des. Grade =4863.64
Subgrade =4862.14
Sta.301+70.00
CL
Offset= 11.00 LT
Elev= 4861.92 Offset= 11.52 RT
Elev= 4861.85
Offset= 0.00 LT
Elev= 4862.14
2.00% 2.00%1:6
1:
Des. Grade =4863.58
Subgrade =4862.08
Sta.301+75.00
CL
Offset= 11.00 LT
Elev= 4861.86
Offset= 11.52 RT
Elev= 4861.79
Offset= 0.00 RT
Elev= 4862.08
2.00% 2.00%1:6
1:
Des. Grade =4863.52
Subgrade =4862.02
Sta.301+80.00
CL
Offset= 11.00 LT
Elev= 4861.80
Offset= 11.52 RT
Elev= 4861.73
Offset= 0.00 LT
Elev= 4862.02
2.00% 2.00%1:6
1:
Des. Grade =4863.45
Subgrade =4861.95
Sta.301+85.00
CL
Offset= 11.00 LT
Elev= 4861.73
Offset= 11.52 RT
Elev= 4861.66
Offset= 0.00 LT
Elev= 4861.95
2.00% 2.00%1:6
1:
Des. Grade =4863.39
Subgrade =4861.89
Sta.301+90.00
CL
Offset= 11.00 LT
Elev= 4861.67 Offset= 11.52 RT
Elev= 4861.60
Offset= 0.00 LT
Elev= 4861.89
2.00% 2.00%1:6
1:
Des. Grade =4863.33
Subgrade =4861.83
Sta.301+95.00
CL
Offset= 11.00 LT
Elev= 4861.61
Offset= 11.52 RT
Elev= 4861.54
Offset= 0.00 RT
Elev= 4861.83
2.00% 2.00%1:6
1:
Des. Grade =4863.29
Subgrade =4861.79
Sta.302+00.00
CL
Offset= 11.00 LT
Elev= 4861.57
Offset= 11.52 RT
Elev= 4861.50
Offset= 0.00 RT
Elev= 4861.79
2.00% 2.00%1:6
1:
Des. Grade =4863.27
Subgrade =4861.77
Sta.302+05.00
CL
Offset= 11.00 LT
Elev= 4861.55
Offset= 11.52 RT
Elev= 4861.48
Offset= 0.00 RT
Elev= 4861.77
9:43 AM 2 March 2016 ]US_Sur_ft2D [c:\pw_work\chrism\dms34990\id-a2014007YB.dgn
Excavation = 8.19 CY
Fill = 0.19 CY
Excavation = 7.97 CY
Fill = 0.24 CY
Excavation = 7.27 CY
Fill = 0.32 CY
Excavation = 6.61 CY
Fill = 0.48 CY
Excavation = 6.31 CY
Fill = 0.60 CY
Excavation = 6.03 CY
Fill = 0.51 CY
Excavation = 5.63 CY
Fill = 0.34 CY
Excavation = 5.13 CY
Fill = 0.26 CY
Excavation = 5.06 CY
Fill = 0.28 CY
100100
100100
4860 4860
302+10.00
4860 4860
302+15.00
4860 4860
302+20.00
4860 4860
302+25.00
4860 4860
302+30.00
4860 4860
302+35.00
4860 4860
302+40.00
4860 4860
4870 4870
302+45.00
4860 4860
4870 4870
302+50.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
PAR DRIVE CROSS SECTIONS 300+30 TO 303+25
Sheet 5
2.00% 2.00%1:6
1:
Des. Grade =4863.28
Subgrade =4861.78
Sta.302+10.00
CL
Offset= 11.00 LT
Elev= 4861.56
Offset= 11.52 RT
Elev= 4861.49
Offset= 0.00 RT
Elev= 4861.78
2.00% 2.00%1:6
1:
Des. Grade =4863.32
Subgrade =4861.82
Sta.302+15.00
CL
Offset= 11.00 LT
Elev= 4861.60 Offset= 11.52 RT
Elev= 4861.53
Offset= 0.00 RT
Elev= 4861.82
2.00% 2.00%1:6
1:
Des. Grade =4863.38
Subgrade =4861.88
Sta.302+20.00
CL
Offset= 11.00 LT
Elev= 4861.66 Offset= 11.52 RT
Elev= 4861.59
Offset= 0.00 RT
Elev= 4861.88
2.00% 2.00%1:6
1:
Des. Grade =4863.46
Subgrade =4861.96
Sta.302+25.00
CL
Offset= 11.00 LT
Elev= 4861.74
Offset= 11.52 RT
Elev= 4861.67
Offset= 0.00 RT
Elev= 4861.96
2.00% 2.00%1:6
1:
Des. Grade =4863.57
Subgrade =4862.07
Sta.302+30.00
CL
Offset= 11.00 LT
Elev= 4861.85
Offset= 11.52 RT
Elev= 4861.78
Offset= 0.00 RT
Elev= 4862.07
2.00% 2.00%1:6
1:
1:2.23
Des. Grade =4863.71
Subgrade =4862.21
Sta.302+35.00
CL
Offset= 11.00 LT
Elev= 4861.99
Offset= 11.52 RT
Elev= 4861.92
Offset= 0.00 LT
Elev= 4862.21
2.00% 2.00%1:6 1:6
Des. Grade =4863.87
Subgrade =4862.37
Sta.302+40.00
CL
Offset= 11.00 LT
Elev= 4862.15
Offset= 11.00 RT
Elev= 4862.09
Offset= 0.00 RT
Elev= 4862.37
2.00% 2.00%1:6 1:6
Des. Grade =4864.05
Subgrade =4862.55
Sta.302+45.00
CL
Offset= 11.00 LT
Elev= 4862.33 Offset= 11.00 RT
Elev= 4862.27
Offset= 0.00 LT
Elev= 4862.55
2.00% 2.00%1:6 1:6
Des. Grade =4864.27
Subgrade =4862.77
Sta.302+50.00
CL
Offset= 11.00 LT
Elev= 4862.55
Offset= 11.00 RT
Elev= 4862.49
Offset= 0.00 RT
Elev= 4862.77
9:46 AM 2 March 2016 ]US_Sur_ft2D [c:\pw_work\chrism\dms34990\id-a2014007YB.dgn
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4860 4860
4870 4870
302+55.00
4860 4860
4870 4870
302+60.00
4860 4860
4870 4870
302+65.00
4860 4860
4870 4870
302+70.00
4860 4860
4870 4870
302+75.00
4860 4860
4870 4870
302+80.00
4860 4860
4870 4870
302+85.00
4860 4860
4870 4870
302+90.00
4860 4860
4870 4870
302+95.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
PAR DRIVE CROSS SECTIONS 300+00 TO 303+25
Sheet 6
2.00% 2.00%1:6 1:6
Des. Grade =4864.50
Subgrade =4863.00
Sta.302+55.00
CL
Offset= 11.00 LT
Elev= 4862.78 Offset= 11.00 RT
Elev= 4862.72
Offset= 0.00 RT
Elev= 4863.00
2.00% 2.00%1:6 1:6
Des. Grade =4864.76
Subgrade =4863.26
Sta.302+60.00
CL
Offset= 11.00 LT
Elev= 4863.04 Offset= 11.00 RT
Elev= 4862.98
Offset= 0.00 RT
Elev= 4863.26
2.00% 2.00%1:6 1:6
Des. Grade =4865.05
Subgrade =4863.55
Sta.302+65.00
CL
Offset= 11.00 LT
Elev= 4863.33 Offset= 11.00 RT
Elev= 4863.27
Offset= 0.00 RT
Elev= 4863.55
2.00% 2.00%1:6
Des. Grade =4865.36
Subgrade =4863.86
Sta.302+70.00
CL
Offset= 11.00 LT
Elev= 4863.64
Offset= 11.00 RT
Elev= 4863.37
Offset= 0.00 RT
Elev= 4863.86
2.00% 2.00%1:6
Des. Grade =4865.70
Subgrade =4864.20
Sta.302+75.00
CL
Offset= 11.00 LT
Elev= 4863.98 Offset= 11.00 RT
Elev= 4863.75
Offset= 0.00 RT
Elev= 4864.20
2.00% 2.00%1:6
Des. Grade =4866.06
Subgrade =4864.56
Sta.302+80.00
CL
Offset= 11.00 LT
Elev= 4864.34 Offset= 11.00 RT
Elev= 4864.06
Offset= 0.00 LT
Elev= 4864.56
2.00% 2.00%1:6
Des. Grade =4866.45
Subgrade =4864.95
Sta.302+85.00
CL
Offset= 11.00 LT
Elev= 4864.73
Offset= 11.00 RT
Elev= 4864.48
Offset= 0.00 RT
Elev= 4864.95
2.00% 2.00%1:6
Des. Grade =4866.86
Subgrade =4865.36
Sta.302+90.00
CL
Offset= 11.00 LT
Elev= 4865.14 Offset= 11.00 RT
Elev= 4864.89
Offset= 0.00 RT
Elev= 4865.36
2.00% 2.00%1:6
Des. Grade =4867.29
Subgrade =4865.79
Sta.302+95.00
CL
Offset= 11.00 LT
Elev= 4865.57 Offset= 11.00 RT
Elev= 4865.32
Elev= 4865.79
100100
100100
10:54 AM 28 July 2011 ]B.XS20P [c:\myfiles\pw_production\d0107577\Work_dd.cel
4870 4870
303+00.00
4870 4870
303+05.00
4870 4870
303+10.00
4870 4870
303+15.00
4870 4870
303+20.00
4870 4870
303+25.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
PAR DRIVE CROSS SECTIONS 300+00 TO 303+25
Sheet 7
2.00% 2.00%1:6
Des. Grade =4867.76
Subgrade =4866.26
Sta.303+00.00
CL
Offset= 11.00 LT
Elev= 4866.04
Offset= 11.00 RT
Elev= 4865.79
Offset= 0.00 RT
Elev= 4866.26
2.00% 2.00%1:6
Des. Grade =4868.24
Subgrade =4866.74
Sta.303+05.00
CL
Offset= 11.00 LT
Elev= 4866.52
Offset= 11.00 RT
Elev= 4866.31
Offset= 0.00 LT
Elev= 4866.74
2.00% 2.00%1:6
Des. Grade =4868.76
Subgrade =4867.26
Sta.303+10.00
CL
Offset= 11.00 LT
Elev= 4867.04
Offset= 11.00 RT
Elev= 4866.77
Offset= 0.00 LT
Elev= 4867.26
2.00% 2.00%1:6 1:6
Des. Grade =4869.29
Subgrade =4867.79
Sta.303+15.00
CL
Offset= 11.00 LT
Elev= 4867.57
Offset= 11.00 RT
Elev= 4867.51
Offset= 0.00 LT
Elev= 4867.79
2.00% 2.00%1:6
1:
Des. Grade =4869.86
Subgrade =4868.36
Sta.303+20.00
CL
Offset= 11.00 LT
Elev= 4868.14
Offset= 11.52 RT
Elev= 4868.07
Offset= 0.00 RT
Elev= 4868.36
2.00% 2.00%1:6
1:
Des. Grade =4870.42
Subgrade =4868.92
Sta.303+25.00
CL
Offset= 11.00 LT
Elev= 4868.70 Offset= 11.52 RT
Elev= 4868.63
Elev= 4868.92
LAKESHORE DRIVE, PHASE 2
ID CASCADE LS DR(1)
400+20 TO 400+50
PAR DRIVE CROSS SECTIONS
Excavation = 0.00 CY
Fill = 0.00 CY
Excavation = 15.33 CY
Fill = 0.24 CY
Excavation = 12.16 CY
Fill = 0.52 CY
Excavation = 9.50 CY
Fill = 0.55 CY
Excavation = 8.07 CY
Fill = 0.50 CY
Excavation = 7.33 CY
Fill = 0.44 CY
Excavation = 7.25 CY
Fill = 0.34 CY
100100
100100
4860 4860
4870 4870
400+20.00
4860 4860
4870 4870
400+25.00
4860 4860
4870 4870
400+30.00
4860 4860
4870 4870
400+35.00
4860 4860
4870 4870
400+40.00
4860 4860
4870 4870
400+45.00
4860 4860
4870 4870
400+50.00
FHWA, Western Federal Lands Highway Division
Lakeshore Drive Phase II
Sheet 1
PAR DRIVE CROSS SECTIONS 400+20 TO 400+50
4.10% 4.50%
Des. Grade =4865.11
Subgrade =4863.61
Sta.400+20.00
CL
Offset= 26.25 LT
Elev= 4864.68
Offset= 27.39 RT
Elev= 4862.37
Offset= 0.00 LT
Elev= 4863.61
3.79% 4.69%
1:16.07
1:7.67
Des. Grade =4865.16
Subgrade =4863.66
Sta.400+25.00
CL
Offset= 19.70 LT
Elev= 4864.41
Offset= 20.32 RT
Elev= 4862.71
Offset= 0.00 LT
Elev= 4863.66
3.05% 4.70% 1:9.60
1:5.13
Des. Grade =4865.22
Subgrade =4863.72
Sta.400+30.00
CL
Offset= 15.70 LT
Elev= 4864.20
Offset= 16.10 RT
Elev= 4862.97
Offset= 0.00 LT
Elev= 4863.72
1.80% 4.44%1:7.52 1:2.14
Des. Grade =4865.28
Subgrade =4863.78
Sta.400+35.00
CL
Offset= 13.14 LT
Elev= 4864.02
Offset= 13.39 RT
Elev= 4863.19
Offset= 0.00 LT
Elev= 4863.78
0.13% 3.74%1:6.5
1:3
Des. Grade =4865.34
Subgrade =4863.84
Sta.400+40.00
CL
Offset= 11.63 LT
Elev= 4863.85
Offset= 11.77 RT
Elev= 4863.40
Offset= 0.00 RT
Elev= 4863.84
1.64% 2.49%1:6.0 7 1:2.49
Des. Grade =4865.37
Subgrade =4863.87
Sta.400+45.00
CL
Offset= 11.02 LT
Elev= 4863.69
Offset= 11.05 RT
Elev= 4863.59
Offset= 0.00 LT
Elev= 4863.87
2.00% 2.00%1:6 1:2
Des. Grade =4865.40
Subgrade =4863.90
Sta.400+50.00
CL
Offset= 11.00 LT
Elev= 4863.68
Offset= 11.00 RT
Elev= 4863.68
Offset= 0.00 LT
Elev= 4863.90
9:39 AM 2 March 2016 ]US_Sur_ft2D [c:\pw_work\chrism\dms34990\id-a2014007YC.dgn
| id-a2014007XA |
| id-a2014007XA |
| id-a2014007XA |
| id-a2014007XA |
| id-a2014007XA |
| id-a2014007XA |
| id-a2014007XA |
| id-a2014007XA |
| id-a2014007XA |
| id-a2014007XA |
| id-a2014007XA |
| id-a2014007XA |
| id-a2014007XA |
| id-a2014007YA |
| id-a2014007YA |
| id-a2014007YB |
| id-a2014007YB |
| id-a2014007YB |
| id-a2014007YB |
| id-a2014007YB |
| id-a2014007YB |
| id-a2014007YB |
| id-a2014007YB |
| id-a2014007YC |
| id-a2014007YC |
File details come from the government source that posted it. Updated .