A003.pdf

PDF 114 KB Posted

Attached to
ID CASCADE LS DR(1), Lakeshore Drive Phase II Federal contract opportunity
Solicitation number
DTFH70-16-B-00001
Issued by
Department of Transportation Federal Highway Administration

About this file

A003

View the file

Other files for this federal contract opportunity

Other files attached to ID CASCADE LS DR(1), Lakeshore Drive Phase II, newest first.
File Type Posted
BidSum.LakeshoreDR.pdf PDF
Q A_4-29.pdf PDF
A002.pdf PDF
Q A_4-27.pdf PDF
A001_Lakeshore.pdf PDF
ID_CASCADE_LS_DR(1)_Plans.pdf PDF
Physical_Data_Earthwork_Lakeshore.pdf PDF
Physical_Data_X-sections_Lakeshore.pdf PDF
Physical_Data_Right_of_Way_Lakeshore.pdf PDF
Physical_Data_Geotech_Report__02-16_Lakeshore.pdf PDF
IFB_lakeshore.pdf PDF
Physical_Data_SWPPP_Lakeshore.pdf PDF
Plan_Request_Form.docx DOCX document
Preliminary_Letter.pdf PDF
Project_Description.pdf PDF
Preliminary_Plans.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A003 05/02/2016 N/A ID CASCADE LS DR(1), Lakeshore Drive Phase II

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X DTFH70-16-B-00001

9B. DATED (SEE ITEM 11)

03/31/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ID CASCADE LS DR(1), Lakeshore Drive Phase II

See page 2 for revisions.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A003, dated 5/2/16 ID CASCADE LS DR(1) Solicitation No. DTFH70-16-B-00001 LAKESHORE DRIVE PHASE II

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Page Section/Table Revision F-12 308.08 Measurement Revises measurement G-3 713.04 Revises seed mix

PLANS

Plan sheet #G.1 Revises ‘Allowable Pipe Material’

Plan sheet #G.2 Revises ‘Allowable Pipe Material’

ENCLOSURES

Pages:

F-12 G-3

Plan Sheets:

G.1 G.2

F-12 DIVISION 300

Special Contract Requirements Project: ID CASCADE LS DR(1), LAKESHORE DRIVE PHASE II

308.06 Maintenance. After pavement removal, maintain exposed material to the correct line, grade, and cross section by blading, watering, rolling, or any combination thereof until placement of the next course. Should irregularities develop in any surface during or after compaction, loosen the surface and correct defects. Recompact the disturbed area.

308.07 Acceptance. Recycled pavement will be evaluated under Subsections 106.02 and 106.04.

Measurement

308.08 Measure the items listed in the bid schedule according to Subsection 109.02.

Measure recycled aggregate base by the cubic yard in its original position.

Payment

308.09 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 308 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Revised by Amendment A003

G-3

Special Contract Requirements Project: ID CASCADE LS DR(1), LAKESHORE DRIVE PHASE II

Section 713. — ROADSIDE IMPROVEMENT MATERIAL

08/01/14–FP14

713.03 Fertilizer. Add the following:

(a) Fertilizer for turf establishment. Furnish fertilizer with the following percentages of available nutrients:

24:3:8 Nitrogen (N): Phosphorus (P): Potassium (K), with a minimum 15% slow-release nitrogen.

713.04 Seed. Add the following:

Furnish a mixture consisting of the following kinds of seed with the corresponding percentages by weight of “live seed”:

GRASSES

Red Fescue (Festuca rubra) 14.8% Tegmar Intermediate Wheatgrass (Thinopyrum intermedium) 14.8% Bluebunch Wheatgrass (Pseudoroegnaria spicata) 18.4% Sandberg Bluegrass (Poa secunda J. Presl) 9.3% Siberian Wheatgrass (Agropyron fragile [Roth]) 14.8%

LEGUME

Ladak Alfalfa (Medicago sativa) 9.3%

NATIVE FORBS

Rocky Mountain Penstemon (Penstemon strictus Benth.) 9.3% Western Yarrow (Achillea millefolium L.) 9.3%

Determine the amount of “live seed” in a container by the following formula:

Net weight of seed in container multiplied by the purity percentage multiplied by the germination percentage. (If seed is 85 percent pure and tests 90 percent germination, then a 100 pound (45.4 kilogram) container would contain 76.5 pounds (34.7 kilograms) of “live seed”).

Revised by Amendment A002

Revised by Amendment A003

C/P

Revised by Amendment A0033

Kevin.Parker Polygon

Kevin.Parker Polygon

Kevin.Parker Polygon

C/P

Revised by Amendment A0033

Kevin.Parker Polygon

Kevin.Parker Polygon

Kevin.Parker Polygon

File details come from the government source that posted it. Updated .