Physical_Data_Earthwork_Lakeshore.pdf

PDF 289 KB Posted

Attached to
ID CASCADE LS DR(1), Lakeshore Drive Phase II Federal contract opportunity
Solicitation number
DTFH70-16-B-00001
Issued by
Department of Transportation Federal Highway Administration

About this file

Physical Data_Earthwork_Lakeshore

View the file

Other files for this federal contract opportunity

Other files attached to ID CASCADE LS DR(1), Lakeshore Drive Phase II, newest first.
File Type Posted
BidSum.LakeshoreDR.pdf PDF
Q A_4-29.pdf PDF
A003.pdf PDF
A002.pdf PDF
Q A_4-27.pdf PDF
A001_Lakeshore.pdf PDF
Physical_Data_X-sections_Lakeshore.pdf PDF
ID_CASCADE_LS_DR(1)_Plans.pdf PDF
Physical_Data_Right_of_Way_Lakeshore.pdf PDF
Physical_Data_Geotech_Report__02-16_Lakeshore.pdf PDF
IFB_lakeshore.pdf PDF
Physical_Data_SWPPP_Lakeshore.pdf PDF
Plan_Request_Form.docx DOCX document
Preliminary_Letter.pdf PDF
Project_Description.pdf PDF
Preliminary_Plans.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FHWA, Western Federal Lands Highway Division

LAKESHORE DRIVE PHASE II

ID CASCADE LS DR(1)

EARTHWORK REPORT

LAKESHORE DRIVE EARTHWORK REPORT

10+00 TO 31+23

EW_LSD.log Input File: ewkprj.inp Output File: EW_LSD.log 1 1 1 1 2 2 1 3 3 Earthwork 1 4 4 1 5 5 tolerance = 0.030000 1 6 6 1 7 7 vertical search distance = 500.000000 1 8 8 1 9 9 xs dgn = pw:\Projects\2015\BE-384-1506 Lakeshore Drive Phase 2\Project Data\Roadway\CADD_Design\id-a2014007xs01.dgn 1 10 10 1 11 11 Proposed Finish Grade 1 12 12 soil type = RdwyExc 1 13 13 roadway exc mult factor = 1.000000 1 14 14 subsoil exc mult factor = 1.000000 1 15 15 fill mult factor = 1.000000 1 16 16 type = line, line_string 1 17 17 lvname = *cutslope 1 18 18 lvname = *ditchslope 1 19 19 lvname = *fillslope 1 20 20 lvname = *foreslope 1 21 21 lvname = *pave_layer_top 1 22 22 lvname = *conc_wall_below 1 23 23 lvname = *conc_wall_above 1 24 24 lvname = *curb_top 1 25 25 lvname = *curb_bottom 1 26 26 lvname = *parkway_top 1 27 27 lvname = *sidewalk_layer_top 1 28 28 lvname = *sn_wall_face 1 29 29 lvname = *sn_wall_top 1 30 30 lvname = *rw_wall_face 1 31 31 lvname = *rw_wall_top 1 32 32 lvname = *gd_wall_above 1 33 33 lvname = *gd_wall_below 1 34 34 lvname = *conc_median_top 1 35 35 lvname = *conc_median_bottom 1 36 36 lvname = *gfmse_wall_pfg 1 37 37 lvname = *gfmse_wall_embedment_slope 1 38 38 1 39 39 Proposed Undercut 1 40 40 soil type = Pavement 1 41 41 roadway exc mult factor = 0.000001 1 42 42 subsoil exc mult factor = 0.000001 1 43 43 fill mult factor = 0.000001 1 44 44 type = line, line_string 1 45 45 lvname = X_P_Pave_Layer_1 1 46 46 1 47 47 Proposed Undercut 1 48 48 soil type = Aggregate 1 49 49 roadway exc mult factor = 0.000001 1 50 50 subsoil exc mult factor = 0.000001 1 51 51 fill mult factor = 0.000001 1 52 52 type = line, line_string 1 53 53 lvname = X_P_Pave_Layer_2 1 54 54 1 55 55 Proposed Undercut 1 56 56 soil type = CTB 1 57 57 roadway exc mult factor = 0.000001 1 58 58 subsoil exc mult factor = 0.000001 1 59 59 fill mult factor = 0.000001 1 60 60 type = line, line_string

1 61 61 lvname = X_P_Pave_Layer_3 1 62 62 1 63 63 Proposed Undercut 1 64 64 soil type = Curb-Gutter 1 65 65 roadway exc mult factor = 0.000001 1 66 66 subsoil exc mult factor = 0.000001 1 67 67 fill mult factor = 0.000001 1 68 68 type = line, line_string 1 69 69 lvname = X_P_Pave_Layer_4 1 70 70 1 71 71 Proposed Undercut 1 72 72 soil type = Aggregate 1 73 73 roadway exc mult factor = 0.000001 1 74 74 subsoil exc mult factor = 0.000001 1 75 75 fill mult factor = 0.000001 1 76 76 type = line, line_string 1 77 77 lvname = X_P_Pave_Layer_5 1 78 78 1 79 79 Proposed Undercut 1 80 80 soil type = Layer5 1 81 81 roadway exc mult factor = 0.000001 1 82 82 subsoil exc mult factor = 0.000001 1 83 83 fill mult factor = 0.000001 1 84 84 type = line, line_string 1 85 85 lvname = x_p_pave_layer_5 1 86 86 1 87 87 Proposed Undercut 1 88 88 soil type = SidewalkLayer1 1 89 89 roadway exc mult factor = 0.000001 1 90 90 subsoil exc mult factor = 0.000001 1 91 91 fill mult factor = 0.000001 1 92 92 type = line, line_string 1 93 93 lvname = x_p_sidewalk_layer_1 1 94 94 1 95 95 Proposed Undercut 1 96 96 soil type = SidewalkLayer2 1 97 97 roadway exc mult factor = 0.000001 1 98 98 subsoil exc mult factor = 0.000001 1 99 99 fill mult factor = 0.000001 1 100 100 type = line, line_string 1 101 101 lvname = x_p_sidewalk_layer_2 1 102 102 1 103 103 Proposed Undercut 1 104 104 soil type = SidewalkLayer3 1 105 105 roadway exc mult factor = 0.000001 1 106 106 subsoil exc mult factor = 0.000001 1 107 107 fill mult factor = 0.000001 1 108 108 type = line, line_string 1 109 109 lvname = x_p_sidewalk_layer_3 1 110 110 1 111 111 Proposed Undercut 1 112 112 soil type = SidewalkLayer4 1 113 113 roadway exc mult factor = 0.000001 1 114 114 subsoil exc mult factor = 0.000001 1 115 115 fill mult factor = 0.000001 1 116 116 type = line, line_string 1 117 117 lvname = x_p_sidewalk_layer_4 1 118 118 1 119 119 Proposed Undercut 1 120 120 soil type = SubExBackfill 1 121 121 roadway exc mult factor = 0.000001 1 122 122 subsoil exc mult factor = 0.000001 1 123 123 fill mult factor = 0.000001

1 124 124 type = line, line_string 1 125 125 lvname = x_p_subex_backfill1 1 126 126 1 127 127 Proposed Undercut 1 128 128 soil type = RdwyExc 1 129 129 roadway exc mult factor = 0.000001 1 130 130 subsoil exc mult factor = 0.000001 1 131 131 fill mult factor = 0.000001 1 132 132 type = line, line_string 1 133 133 lvname = x_p_subex_backfill2 1 134 134 1 135 135 Proposed Undercut 1 136 136 soil type = SelectWallBackfill 1 137 137 roadway exc mult factor = 0.000001 1 138 138 subsoil exc mult factor = 0.000001 1 139 139 fill mult factor = 0.000001 1 140 140 type = line, line_string 1 141 141 lvname = x_p_mse_wall_backfill1 1 142 142 1 143 143 Proposed Undercut 1 144 144 soil type = SelectWallBackfill 1 145 145 roadway exc mult factor = 0.000001 1 146 146 subsoil exc mult factor = 0.000001 1 147 147 fill mult factor = 0.000001 1 148 148 type = line, line_string 1 149 149 lvname = x_p_mse_wall_backfill2 1 150 150 1 151 151 Proposed Undercut 1 152 152 soil type = GranularBackfill 1 153 153 roadway exc mult factor = 0.000001 1 154 154 subsoil exc mult factor = 0.000001 1 155 155 fill mult factor = 0.000001 1 156 156 type = line, line_string 1 157 157 lvname = x_p_mse_wall_backfill3 1 158 158 1 159 159 Proposed Undercut 1 160 160 soil type = Pervious 1 161 161 roadway exc mult factor = 0.000001 1 162 162 subsoil exc mult factor = 0.000001 1 163 163 fill mult factor = 0.000001 1 164 164 type = line, line_string 1 165 165 lvname = x_p_conc_wall_backfill 1 166 166 1 167 167 Proposed Undercut 1 168 168 soil type = SelectWallBackfill 1 169 169 roadway exc mult factor = 0.000001 1 170 170 subsoil exc mult factor = 0.000001 1 171 171 fill mult factor = 0.000001 1 172 172 type = line, line_string 1 173 173 lvname = x_p_conc_wall_backfill2 1 174 174 1 175 175 Proposed Undercut 1 176 176 soil type = ColdRecycle 1 177 177 roadway exc mult factor = 0.000001 1 178 178 subsoil exc mult factor = 0.000001 1 179 179 fill mult factor = 0.000001 1 180 180 type = line, line_string 1 181 181 lvname = x_p_milling_backfill 1 182 182 1 183 183 Proposed Undercut 1 184 184 soil type = PavedShoulder 1 185 185 roadway exc mult factor = 0.000001 1 186 186 subsoil exc mult factor = 0.000001

1 187 187 fill mult factor = 0.000001 1 188 188 type = line, line_string 1 189 189 lvname = x_p_pave_shd_backfill 1 190 190 1 191 191 Proposed Undercut 1 192 192 soil type = PreLevel 1 193 193 roadway exc mult factor = 0.000001 1 194 194 subsoil exc mult factor = 0.000001 1 195 195 fill mult factor = 0.000001 1 196 196 type = line, line_string 1 197 197 lvname = x_p_rehab_prelevel 1 198 198 1 199 199 Proposed Undercut 1 200 200 soil type = ShoulderBackfill 1 201 201 roadway exc mult factor = 0.000001 1 202 202 subsoil exc mult factor = 0.000001 1 203 203 fill mult factor = 0.000001 1 204 204 type = line, line_string 1 205 205 lvname = x_p_shoulder_backfill 1 206 206 1 207 207 Proposed Undercut 1 208 208 soil type = PavedDitchBackfill 1 209 209 roadway exc mult factor = 0.000001 1 210 210 subsoil exc mult factor = 0.000001 1 211 211 fill mult factor = 0.000001 1 212 212 type = line, line_string 1 213 213 lvname = x_p_pave_ditch_layer_1 1 214 214 1 215 215 Proposed Undercut 1 216 216 soil type = SnWallBackfill 1 217 217 roadway exc mult factor = 0.000001 1 218 218 subsoil exc mult factor = 0.000001 1 219 219 fill mult factor = 0.000001 1 220 220 type = line, line_string 1 221 221 lvname = x_p_sn_wall_top 1 222 222 lvname = x_p_sn_wall_backfill 1 223 223 Do not include in mass ordinate 1 224 224 1 225 225 Proposed Undercut 1 226 226 soil type = Concrete 1 227 227 roadway exc mult factor = 0.000001 1 228 228 subsoil exc mult factor = 0.000001 1 229 229 fill mult factor = 0.000001 1 230 230 type = line, line_string 1 231 231 lvname = x_p_sn_wall_back 1 232 232 1 233 233 Proposed Undercut 1 234 234 soil type = WallCurbBackfill 1 235 235 roadway exc mult factor = 0.000001 1 236 236 subsoil exc mult factor = 0.000001 1 237 237 fill mult factor = 0.000001 1 238 238 type = line, line_string 1 239 239 lvname = x_p_sn_wall_curb_backfill 1 240 240 1 241 241 Proposed Undercut 1 242 242 soil type = FoundationFill 1 243 243 roadway exc mult factor = 0.000001 1 244 244 subsoil exc mult factor = 0.000001 1 245 245 fill mult factor = 0.000001 1 246 246 type = line, line_string 1 247 247 lvname = x_p_sn_foundation_backfill 1 248 248 1 249 249 Proposed Undercut

1 250 250 soil type = WallBackfill 1 251 251 roadway exc mult factor = 0.000001 1 252 252 subsoil exc mult factor = 0.000001 1 253 253 fill mult factor = 0.000001 1 254 254 type = line, line_string 1 255 255 lvname = x_p_rk_wall_top 1 256 256 lvname = x_p_rk_wall_backfill 1 257 257 1 258 258 Proposed Undercut 1 259 259 soil type = Rock 1 260 260 roadway exc mult factor = 0.000001 1 261 261 subsoil exc mult factor = 0.000001 1 262 262 fill mult factor = 0.000001 1 263 263 type = line, line_string 1 264 264 lvname = x_p_rk_wall_back 1 265 265 1 266 266 Proposed Undercut 1 267 267 soil type = GranularFill 1 268 268 roadway exc mult factor = 0.000001 1 269 269 subsoil exc mult factor = 0.000001 1 270 270 fill mult factor = 0.000001 1 271 271 type = line, line_string 1 272 272 lvname = x_p_rk_foundation_backfill 1 273 273 1 274 274 Proposed Undercut 1 275 275 soil type = StructurlWallBkfill 1 276 276 roadway exc mult factor = 0.000001 1 277 277 subsoil exc mult factor = 0.000001 1 278 278 fill mult factor = 0.000001 1 279 279 type = line, line_string 1 280 280 lvname = x_p_gd_wall_backfill1 1 281 281 1 282 282 Proposed Undercut 1 283 283 soil type = SelectWallBackfill 1 284 284 roadway exc mult factor = 0.000001 1 285 285 subsoil exc mult factor = 0.000001 1 286 286 fill mult factor = 0.000001 1 287 287 type = line, line_string 1 288 288 lvname = x_p_gd_wall_backfill2 1 289 289 1 290 290 Proposed Undercut 1 291 291 soil type = GabionRock 1 292 292 roadway exc mult factor = 0.000001 1 293 293 subsoil exc mult factor = 0.000001 1 294 294 fill mult factor = 0.000001 1 295 295 type = line, line_string 1 296 296 lvname = x_p_gfmse_wall_gabion 1 297 297 Do not include in mass ordinate 1 298 298 1 299 299 Proposed Undercut 1 300 300 soil type = SelectWallBackfill 1 301 301 roadway exc mult factor = 0.000001 1 302 302 subsoil exc mult factor = 0.000001 1 303 303 fill mult factor = 0.000001 1 304 304 type = line, line_string 1 305 305 lvname = x_p_gfmse_wall_backfill1 1 306 306 1 307 307 Proposed Undercut 1 308 308 soil type = GranularBackfill 1 309 309 roadway exc mult factor = 0.000001 1 310 310 subsoil exc mult factor = 0.000001 1 311 311 fill mult factor = 0.000001 1 312 312 type = line, line_string

1 313 313 lvname = x_p_gfmse_wall_backfill2 1 314 314 lvname = x_p_gfmse_wall_backfill3 1 315 315 lvname = x_p_gfmse_wall_embedment_slope 1 316 316 co = 16,36,100 1 317 317 1 318 318 Proposed Undercut 1 319 319 soil type = GabionRock 1 320 320 roadway exc mult factor = 0.000001 1 321 321 subsoil exc mult factor = 0.000001 1 322 322 fill mult factor = 0.000001 1 323 323 type = line, line_string 1 324 324 lvname = x_p_gfmse_wall_pfg 1 325 325 1 326 326 Existing Ground Line 1 327 327 soil type = RdwyExc 1 328 328 roadway exc mult factor = 1.000000 1 329 329 subsoil exc mult factor = 1.000000 1 330 330 fill mult factor = 1.000000 1 331 331 type = line, line_string 1 332 332 lvname = x_e_ground_xs 1 333 333 1 334 334 Existing Suitable Material 1 335 335 soil type = RdwyExc 1 336 336 roadway exc mult factor = 1.000000 1 337 337 subsoil exc mult factor = 1.000000 1 338 338 fill mult factor = 1.000000 1 339 339 type = line, line_string 1 340 340 lvname = x_p_subex_exc1 1 341 341 1 342 342 Existing Suitable Material 1 343 343 soil type = SidewalkExc 1 344 344 roadway exc mult factor = 1.000000 1 345 345 subsoil exc mult factor = 1.000000 1 346 346 fill mult factor = 1.000000 1 347 347 type = line, line_string 1 348 348 lvname = x_p_sidewalk_exc 1 349 349 1 350 350 Existing Suitable Material 1 351 351 soil type = MseWallExc 1 352 352 roadway exc mult factor = 1.000000 1 353 353 subsoil exc mult factor = 1.000000 1 354 354 fill mult factor = 1.000000 1 355 355 type = line, line_string 1 356 356 lvname = x_p_mse_wall_exc 1 357 357 1 358 358 Existing Suitable Material 1 359 359 soil type = GfmseWallExc 1 360 360 roadway exc mult factor = 1.000000 1 361 361 subsoil exc mult factor = 1.000000 1 362 362 fill mult factor = 1.000000 1 363 363 type = line, line_string 1 364 364 lvname = x_p_gfmse_wall_excav 1 365 365 1 366 366 Existing Unsuitable Material 1 367 367 soil type = Subexcavation 1 368 368 roadway exc mult factor = 1.000000 1 369 369 subsoil exc mult factor = 1.000000 1 370 370 fill mult factor = 1.000000 1 371 371 type = line, line_string 1 372 372 lvname = x_p_subex_exc2 1 373 373 1 374 374 Existing Unsuitable Material 1 375 375 soil type = CutWall1StrucExc

1 376 376 roadway exc mult factor = 1.000000 1 377 377 subsoil exc mult factor = 1.000000 1 378 378 fill mult factor = 1.000000 1 379 379 type = line, line_string 1 380 380 lvname = x_p_conc_wall_str_exc 1 381 381 1 382 382 Existing Unsuitable Material 1 383 383 soil type = ColdRecycle 1 384 384 roadway exc mult factor = 1.000000 1 385 385 subsoil exc mult factor = 1.000000 1 386 386 fill mult factor = 1.000000 1 387 387 type = line, line_string 1 388 388 lvname = x_p_milling_exc 1 389 389 1 390 390 Existing Unsuitable Material 1 391 391 soil type = ExistPavement 1 392 392 roadway exc mult factor = 1.000000 1 393 393 subsoil exc mult factor = 1.000000 1 394 394 fill mult factor = 1.000000 1 395 395 type = line, line_string 1 396 396 lvname = x_e_pave_surface 1 397 397 1 398 398 Existing Unsuitable Material 1 399 399 soil type = ExistPavementLayer2 1 400 400 roadway exc mult factor = 1.000000 1 401 401 subsoil exc mult factor = 1.000000 1 402 402 fill mult factor = 1.000000 1 403 403 type = line, line_string 1 404 404 lvname = x_e_pave_surface2 1 405 405 1 406 406 Existing Unsuitable Material 1 407 407 soil type = Topsoil 1 408 408 roadway exc mult factor = 1.000000 1 409 409 subsoil exc mult factor = 1.000000 1 410 410 fill mult factor = 1.000000 1 411 411 type = line, line_string 1 412 412 lvname = x_e_topsoil_layer 1 413 413 1 414 414 Existing Unsuitable Material 1 415 415 soil type = SnWallStrExc 1 416 416 roadway exc mult factor = 1.000000 1 417 417 subsoil exc mult factor = 1.000000 1 418 418 fill mult factor = 1.000000 1 419 419 type = line, line_string 1 420 420 lvname = x_p_sn_wall_str_exc 1 421 421 1 422 422 Existing Unsuitable Material 1 423 423 soil type = RockeryWallStrExc 1 424 424 roadway exc mult factor = 1.000000 1 425 425 subsoil exc mult factor = 1.000000 1 426 426 fill mult factor = 1.000000 1 427 427 type = line, line_string 1 428 428 lvname = x_p_rk_wall_str_exc 1 429 429 1 430 430 Existing Unsuitable Material 1 431 431 soil type = GuardwallStrucExc 1 432 432 roadway exc mult factor = 1.000000 1 433 433 subsoil exc mult factor = 1.000000 1 434 434 fill mult factor = 1.000000 1 435 435 type = line, line_string 1 436 436 lvname = x_p_gd_wall_str_exc 1 437 437 1 438 438 Excavation Limit

1 439 439 type = line 1 440 440 lvname = X_P_Exc_Limit 1 441 441 1 442 442 Write Earthwork Shapes 1 443 443 plot param 1 444 444 lv = 6351 1 445 445 lvname = X_EW_Shapes 1 446 446 co = 0 1 447 447 wt = 0 1 448 448 lc = 0 1 449 449 Stratify Shape Color 1 450 450 1 451 451 combine common exc + subgrade exc 1 452 452 1 453 453 Add Accumulated Unadjusted Volume Column 1 454 454 1 455 455 End Area Decimal Places = 2 1 456 456 1 457 457 write column base ascii file = earthwork_LSD.txt 1 458 458 1 459 459 column 2 formula = abs( ["RdwyExc", Common Exc, Unadjusted Volumes] + 1 460 460 ["RdwyExc", Subgrade Exc, Unadjusted Volumes] ) 1 461 461 column 2 number of decimal place = 2 1 462 462 column 2 total length = 10 1 463 463 1 464 464 column 3 formula = abs( ["RdwyExc", Fill, Unadjusted Volumes] ) 1 465 465 column 3 number of decimal place = 2 1 466 466 column 3 total length = 10 1 467 467 1 468 468 column 4 formula = abs( ["Subexcavation", Common Exc, Unadjusted Volumes] + 1 469 469 ["Subexcavation", Subgrade Exc, Unadjusted Volumes] + 1 470 470 ["Subexcavation", Subsoil Exc, Unadjusted Volumes] ) 1 471 471 column 4 number of decimal place = 2 1 472 472 column 4 total length = 10 1 473 473 1 474 474 column 5 formula = abs( ["SubExBackfill", Fill, Unadjusted Volumes] ) 1 475 475 column 5 number of decimal place = 2 1 476 476 column 5 total length = 10 1 477 477 1 478 478 column 6 formula = abs( ["Topsoil", Common Exc, Unadjusted Volumes] + 1 479 479 ["Topsoil", Subgrade Exc, Unadjusted Volumes] + 1 480 480 ["Topsoil", Subsoil Exc, Unadjusted Volumes] ) 1 481 481 column 6 number of decimal place = 2 1 482 482 column 6 total length = 10 1 483 483 1 484 484 1 485 485 Process Earthwork for Baseline = LSD 1 486 486 job number = 201 1 487 487 1 488 488 beg sta = 10+00.00 R 1 1 489 489 end sta = 31+23.00 R 1

0 0 490 END_OF_FILE

COMPUTING EARTHWORKS FOR BASELINE = LSD

COMPUTING EARTHWORKS FOR JOB = 201

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj

Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu.

yd.)

10+00.00 RDWYEXC

Excavation 38.98 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.09 0 0 1.00 0

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 5.98 0 0 0.00 0

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.83 0 0 0.00 0

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.50 0 0 0.00 0

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.47 0 0 0.00 0

10+25.00 RDWYEXC

Excavation 58.30 45 45 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 34.38 23 23 1.00 22

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.83 6 0 0.00 22

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 15.03 12 0 0.00 22

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.84 22 0 0.00 22

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.47 1 0 0.00 22

LAYER5

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.03 0 0 0.00 22

10+50.00 RDWYEXC

Excavation 97.25 72 72 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.23 35 35 1.00 59

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.62 8 0 0.00 59

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 16.33 15 0 0.00 59

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 29.42 26 0 0.00 59

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 1.47 1 0 0.00 59

LAYER5

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 59

10+76.00 RDWYEXC

Excavation 96.68 93 93 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 20.10 30 30 1.00 122

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 122

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 122

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.23 28 0 0.00 122

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 2 0 0.00 122

11+00.00 RDWYEXC

Excavation 87.96 82 82 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 8.10 13 13 1.00 191

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.52 8 0 0.00 191

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.31 15 0 0.00 191

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Fill 28.28 25 0 0.00 191

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 191

11+25.00 RDWYEXC

Excavation 100.64 88 88 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.78 4 4 1.00 275

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 275

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 275

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 275

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 275

11+50.00 RDWYEXC

Excavation 98.05 92 92 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.87 1 1 1.00 366

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 366

AGGREGATE

Excavation 0.00 0 0 0.00

Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 366

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 366

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 366

11+75.00 RDWYEXC

Excavation 106.63 95 95 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.58 1 1 1.00 460

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 460

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 460

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 460

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 460

12+00.00 RDWYEXC

Excavation 106.49 99 99 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.17 1 1 1.00 558

PAVEMENT

Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 558

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 558

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 558

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 558

12+19.45 RDWYEXC

Excavation 106.82 77 77 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 34.69 13 13 1.00 622

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 6 0 0.00 622

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 12 0 0.00 622

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 20 0 0.00 622

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 2 0 0.00 622

12+25.00 RDWYEXC

Excavation 105.05 21 21 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.39 8 8 1.00 635

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 2 0 0.00 635

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 4 0 0.00 635

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 6 0 0.00 635

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 1 0 0.00 635

12+50.00 RDWYEXC

Excavation 101.62 96 96 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 49.92 42 42 1.00 689

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 689

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 689

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Fill 28.22 26 0 0.00 689

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 689

12+75.00 RDWYEXC

Excavation 98.40 92 92 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 57.77 50 50 1.00 731

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 731

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 731

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 731

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 731

13+00.00 RDWYEXC

Excavation 102.40 93 93 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 40.59 46 46 1.00 778

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 778

AGGREGATE

Excavation 0.00 0 0 0.00

Fill 17.28 16 0 0.00 778

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 778

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 778

13+25.00 RDWYEXC

Excavation 105.80 97 97 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 21.16 29 29 1.00 846

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 846

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 846

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 846

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 846

13+50.00 RDWYEXC

Excavation 105.09 98 98 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 5.11 12 12 1.00 932

Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 932

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 932

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 932

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 932

13+75.00 RDWYEXC

Excavation 107.80 99 99 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.08 3 3 1.00 1028

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 1028

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 1028

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 1028

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1028

13+76.28 RDWYEXC

Excavation 107.80 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 1.17 0 0 1.00 1033

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 0 0 0.00 1033

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 1 0 0.00 1033

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 1 0 0.00 1033

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 0 0 0.00 1033

14+00.00 RDWYEXC

Excavation 107.09 94 94 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.06 1 1 1.00 1126

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 7 0 0.00 1126

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 15 0 0.00 1126

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Fill 28.22 25 0 0.00 1126

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1126

14+25.00 RDWYEXC

Excavation 112.30 102 102 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.17 2 2 1.00 1226

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 1226

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 1226

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 1226

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1226

14+50.00 RDWYEXC

Excavation 132.19 113 113 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.10 2 2 1.00 1337

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 1337

AGGREGATE

Excavation 0.00 0 0 0.00

Fill 17.28 16 0 0.00 1337

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 1337

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1337

14+75.00 RDWYEXC

Excavation 144.02 128 128 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.62 2 2 1.00 1463

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 1463

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 1463

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 1463

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1463

15+00.00 RDWYEXC

Excavation 150.23 137 137 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.58 3 3 1.00 1597

Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 1597

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 1597

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 1597

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1597

15+25.00 RDWYEXC

Excavation 157.92 143 143 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.63 3 3 1.00 1737

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 1737

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 1737

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 1737

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1737

15+50.00 RDWYEXC

Excavation 152.41 144 144 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.36 2 2 1.00 1879

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 1879

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 1879

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 1879

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1879

15+75.00 RDWYEXC

Excavation 138.88 135 135 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 5.85 4 4 1.00 2010

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 2010

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 2010

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Fill 28.22 26 0 0.00 2010

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 2010

16+00.00 RDWYEXC

Excavation 92.61 107 107 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 44.51 23 23 1.00 2094

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 2094

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 2094

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 2094

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 2094

16+25.00 RDWYEXC

Excavation 56.02 68 68 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 31.83 35 35 1.00 2127

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.36 8 0 0.00 2127

AGGREGATE

Excavation 0.00 0 0 0.00

Fill 17.28 16 0 0.00 2127

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 2127

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 2127

16+31.00 RDWYEXC

Excavation 53.31 12 12 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 61.13 10 10 1.00 2129

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 2 0 0.00 2129

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 4 0 0.00 2129

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 6 0 0.00 2129

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 1 0 0.00 2129

16+50.00 RDWYEXC

Excavation 49.92 36 36 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 145.66 73 73 1.00 2092

Subsoil Exc 0.00 0 0 0.00 Fill 8.60 6 0 0.00 2092

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.18 12 0 0.00 2092

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 20 0 0.00 2092

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 2 0 0.00 2092

16+75.00 RDWYEXC

Excavation 47.41 46 46 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 228.12 173 173 1.00 1965

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 1965

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 1965

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 1965

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1965

17+00.00 RDWYEXC

Excavation 62.17 50 50 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 294.67 242 242 1.00 1773

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.50 9 0 0.00 1773

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.64 18 0 0.00 1773

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 34.86 29 0 0.00 1773

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1773

17+25.00 RDWYEXC

Excavation 57.67 56 56 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 324.33 287 287 1.00 1542

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.46 10 0 0.00 1542

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.68 19 0 0.00 1542

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Fill 34.86 32 0 0.00 1542

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1542

17+50.00 RDWYEXC

Excavation 56.60 53 53 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 336.83 306 306 1.00 1289

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.50 10 0 0.00 1289

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.64 19 0 0.00 1289

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 34.86 32 0 0.00 1289

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1289

LAYER5

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.10 0 0 0.00 1289

17+75.00 RDWYEXC

Excavation 55.46 52 52 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 328.93 308 308 1.00 1033

PAVEMENT

Excavation 0.00 0 0 0.00

Fill 10.50 10 0 0.00 1033

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.64 19 0 0.00 1033

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 34.86 32 0 0.00 1033

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1033

LAYER5

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 1033

18+00.00 RDWYEXC

Excavation 55.92 51 51 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 315.70 298 298 1.00 786

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.50 10 0 0.00 786

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.64 19 0 0.00 786

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 34.86 32 0 0.00 786

CURB-GUTTER

Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 786

LAYER5

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.13 0 0 0.00 786

18+25.00 RDWYEXC

Excavation 57.25 52 52 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 297.08 284 284 1.00 554

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.50 10 0 0.00 554

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.57 19 0 0.00 554

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 34.93 32 0 0.00 554

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 554

LAYER5

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.05 0 0 0.00 554

18+50.00 RDWYEXC

Excavation 51.30 50 50 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 244.56 251 251 1.00 353

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 9.46 9 0 0.00 353

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.90 18 0 0.00 353

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 31.42 31 0 0.00 353

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 353

LAYER5

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 0.00 0 0 0.00 353

18+75.00 RDWYEXC

Excavation 47.83 46 46 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 155.15 185 185 1.00 214

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 214

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 17 0 0.00 214

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 28 0 0.00 214

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 214

19+00.00 RDWYEXC

Excavation 53.61 47 47 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 67.59 103 103 1.00 158

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 158

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 158

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 158

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 158

19+25.00 RDWYEXC

Excavation 65.17 55 55 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 7.95 35 35 1.00 178

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 178

AGGREGATE

Excavation 0.00 0 0 0.00

Fill 17.28 16 0 0.00 178

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 178

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 178

19+50.00 RDWYEXC

Excavation 91.54 72 72 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 4 4 1.00 246

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 246

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 246

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 246

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 246

19+75.00 RDWYEXC

Excavation 109.00 93 93 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 339

PAVEMENT

Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 339

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 339

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 339

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 339

20+00.00 RDWYEXC

Excavation 124.11 108 108 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 447

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 447

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 447

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 447

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 447

20+25.00 RDWYEXC

Excavation 145.67 125 125 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 572

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 572

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 572

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 572

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 572

20+50.00 RDWYEXC

Excavation 153.00 139 139 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 711

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 711

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 711

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 711

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 711

20+75.00 RDWYEXC

Excavation 153.74 142 142 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.58 1 1 1.00 852

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 852

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 852

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 852

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 852

21+00.00 RDWYEXC

Excavation 142.95 138 138 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 24.86 13 13 1.00 977

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 977

AGGREGATE

Excavation 0.00 0 0 0.00

Fill 17.28 16 0 0.00 977

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 977

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 977

21+25.00 RDWYEXC

Excavation 144.41 133 133 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.08 12 12 1.00 1098

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 1098

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 1098

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 1098

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1098

21+50.00 RDWYEXC

Excavation 128.66 127 127 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.51 0 0 1.00 1225

PAVEMENT

Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 1225

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 1225

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 1225

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1225

21+75.00 RDWYEXC

Excavation 108.47 110 110 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.82 2 2 1.00 1333

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 1333

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 1333

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 1333

CURB-GUTTER

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 2.94 3 0 0.00 1333

22+00.00 RDWYEXC

Excavation 78.68 86 86 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 55.71 28 28 1.00 1391

PAVEMENT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.50 8 0 0.00 1391

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 17.28 16 0 0.00 1391

CTB

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.22 26 0 0.00 1391

CURB-GUTTER

Exc