PROJECT_DESCRIPTION.pdf

PDF 18 KB Posted

Attached to
AK IRR FORT 1002(1), Ivars Road Bridge Replacement
Solicitation number
DTFH70-15-B-00026
Issued by

About this file

Project Description

View the file

Other files

File Type Posted
BidSum_IvarsRoad.pdf PDF
BidSum_IvarsRoad.pdf PDF
Q A_03-29.pdf PDF
A001.pdf PDF
A002_AK_IRR_FORT_1002(1).pdf PDF
Q A_3-20.pdf PDF
Q A.pdf PDF
GM29-15_Ivars_Bridge_Prelim_Foundation_Recommendations.pdf PDF
IvarsBridge_ew.pdf PDF
IFB__IVARS_RD.pdf PDF
Plans_IVARS.pdf PDF
Ft_Yukon_Airport_Improvements_and_Material_Site_Study2.pdf PDF
Plan_Request_form_IVARS.pdf PDF
IvarsBridge_xs.pdf PDF
GR13-15_Ivars_Bridge_Final_Foundation_Report.pdf PDF
Full-Set_IVARS_05-August_2015.pdf PDF
PreAdd_Letter.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AK IRR FORT 1002(1) Ivars Road Bridge Replacement, Yukon Flats National Wildlife Refuge, Native Village of Fort Yukon, Alaska

Description of Work: The work consists of clearing, grading, aggregate surfacing, GRS bridge abutment construction and modular bridge placement, and other small items of work.

The project includes construction of a 155 foot long modular girder bridge with timber deck. Abutments are founded on Geosynthetic Reinforced Soil (GRS) foundation. The work includes demolition of the existing culvert and concrete deck bridge upon completion of the new structure.

Project length: 0.10 Miles

Tentative Fixed Completion Date: Fall 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $2 million to $3 million

Location: This project is located approximately 140 Miles North of Fairbanks, Alaska.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

Base Schedule

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance (yes/no)

Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices)

750 LNFT

DIVISION 200 – Earthwork 201 Clearing & Grubbing 1 ACRE 203 Removal of Structures & Obstructions (structures, demolition) 1 EACH 204 Excavation & Embankment 125 CUYD 207 Earthwork Geosynthetics(class1, type C) 440 SQYD

DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Riprap 400 CUYD

DIVISION 300 – Aggregate and Base Courses

302 Roadway Aggregate 575 TON

DIVISION 550 – Bridge Construction

552 Structural Concrete (concrete – major structures)

47 CUYD

552 Expansion Joints 34 LNFT 554 Reinforcing Steel 2100 LB 555 Prefabricated Steel Bridge 1 LPSM 557 Structural Timber and Lumber, Treated 21 MFBM 574 GRS-IBS Geosyntheric Reinforcement 1800 SQYD 574 GRS-IBS Open-Graded Backfill 2100 TON 574 GRS-IBS Concrete Masonry Unit 2650 SQYD

DIVISION 600 – Incidental Construction

621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 625 Turf Establishment (indicate seeding or mulching separately) 0.5 ACRE 635 Temporary Traffic Control – Barricade 4 EACH 635 Temporary Traffic Control – Warning Light 8 EACH 635 Temporary Traffic Control – Construction Sign 20 SQFT