WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material P
M
M a y
U
S C c m y fi le s p w p r o d u c ti o n d a k t-fo r t1 a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 IRR FORT 1002(1) AK
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
Sucker
Laura Lak e
Island
Homebrew
SCALE IN MILES
0 1
N
VICINITY MAP
PROJECT LOCATION
BRIDGE REPLACEMENT
IVARS ROAD
Project location (66°35'N, 145°06'W)1.
NOTE:
AIRPORT
MUNICIPAL
FORT YUKON
FORT YUKON
Yllota
Slough
A.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D m y fi le s p w p r o d u c ti o n d a k t-fo r t1 a c .d g n
AK IRR FORT 1002(1)
S e p te m b e r
T
P h a n
J
D o u c e y
C h e c k e d b y
D e s ig n e d b
Sheet and Description
Section C Section D Section E Section F Section G Section H
Typical Section
Plan & Profile
Erosion Control
Riprap Details
Bridge Plans
Temporary Traffic Control
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 700 50 750
A0140 15705-1800 SOIL EROSION CONTROL,
TEMPORARY DIVERSION BERM LNFT 120 30 150
A0160 20101-0000 CLEARING AND GRUBBING ACRE 0.9 0.1 1.0
A0180 20301-1900 REMOVAL OF PIPE CULVERT EACH 24 24
A0200 20401-0000 ROADWAY EXCAVATION CUYD 159 41 200
A0220 20403-0000 UNCLASSIFIED BORROW CUYD 3,499 101 3,600
A0240 20701-0100 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE A SQYD 2,359 91 2,450
A0260 20702-0100 GEOTEXTILE FILTER, CLASS 1,
TYPE A SQYD 544 56 600
A0280 25101-0500 PLACED RIPRAP, METHOD A,
CLASS 5 CUYD 648 52 700
A0300 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 601 49 650
A0320 55210-0400 PRECAST STRUCTURAL CONCRETE,
CLASS A(AE), ABUTMENT CUYD 47 47
A0340 55235-0000 EXPANSION JOINTS LNFT 34 34
A0360 55504-0000 PRE-FABRICATED STEEL BRIDGE LPSM ALL
A0380 57401-0000 GRS-IBS, GEOSYNTHETIC
REINFORCEMENT SQYD 3,500 3,500
A0400 57402-0000 GRS-IBS, OPEN-GRADED BACKFILL TON 1,100 1,100
A0420 57403-0000 GRS-IBS, CONCRETE MASONRY UNIT SQYD 250 250
A0440 61702-1200 TERMINAL SECTION, TYPE LST EACH 4 4
A0460 61707-1000 STRUCTURE TRANSITION RAILING,
G4 SYSTEM LNFT 52 52
A0480 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 20 20
A0500 62201-0850 WHEEL LOADER, 1 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 20 20
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-F eb -2
:1
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
Iv ar s
B ri dg e_
En gE st .x ls x]
Sh ee t
STATE PROJECT
B.1IRR FORT 1002(1)AK
NUMBER
Sheet and Description
Section C Section D Section E Section F Section G Section H
Typical Section
Plan & Profile
Erosion Control
Riprap Details
Bridge Plans
Temporary Traffic Control
ALLOWANCE Bid Schedule
A0520 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER
MOUNTED, 1.0 CUBIC YARD
MINIMUM CAPACITY WITH THUMB
ATTACHMENT HOUR 20 20
A0540 62301-0000 GENERAL LABOR HOUR 40 40
A0560 62501-0000 TURF ESTABLISHMENT ACRE 0.4 0.1 0.5
A0580 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 4 4
A0600 63502-1500 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE A EACH 8 8
A0620 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 38 7 45
A0640 63507-0700 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR DAY 60 60
A0660 63703-0000 RESIDENTIAL HOUSING EACH 1 1
A0680 63704-0000 VEHICLE EACH 1 1
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
3- D ec -2
:1
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
Iv ar s
B ri dg e_
En gE st .x ls x]
Sh ee t (2
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2IRR FORT 1002(1)AK
NUMBER
TYPICAL SECTION
TYPICAL SECTION
NO SCALE
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k t-fo r t1 c a .d g n
AK IRR FORT 1002(1)
N o v e m b e r
P h
D o u c
C h e c k e d b y
D e s ig n e d b y
232425
LC
1:4
S lo p e s ta k e l im it s
C le a r in g l im it s
S lo p e s ta k e l im it s
C le a r in g l im it s
107+45 to 109+28
103+50 to 105+92
1:4 (typ.)
1:3 (typ.)
2 Construct slope as shown in the Staking Report.
on the plan and profile curve data.
Superelevate roadway on curves at the rate "e" as indicated
FOOTNOTE:
1:3 (ty p.)
-2.00%-2.00%
Unclassified borrow geotextile, class 1, type A
Separation-stabilization fruT tnemhsilbatse fru tnemhsilbatse
3'
3' method 2
10" Roadway aggregate, Existing ground
Profile grade point
18'
QUANTITIES
TABULATION OF PLAN
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k t-fo r t1 fa .d g n
AK IRR FORT 1002(1)
N o v e m b e r
P h
D o u c
C h e c k e d b y
D e s ig n e d b
PT
.9
PC
.1
P T
.6
P T
.5
P C
.4
-0.8850%
,0
.2
50' VC
K = 12
+3.2031
,0
.0
45' VC
K = 11
-0.7751%
K = 7
30' VC
,0
.2
-4.9948%
K = 10
56' VC
+0.5325%
.3
,0
.5
.4
N
Curve= PRO_MAIN_3
D
R= 110.00'
T= 49.80'
Curve= PRO_MAIN_6
D
R= 90.00'
T= 22.52'
Existing ground
BEGIN PROJECT
END PROJECT
El=1000.54
E=20339.505
N=10083.952
El=996.46
E=20875.242
N=9985.017 e= 0.025
L= 93.53' e= 0.025
L= 44.14'
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
CUYD
EXC.
CUYD
EMB.
110+00108+00107+00105+00104+00103+00
970 970
106+00 109+00
1025 1025
CP
13105
CP
13106
CP
13104
CP
13103
CP
13102 upon completion of bridge
Culverts to be removed
Line to be constructed
END BRIDGE
107+45.14
BEGIN BRIDGE
105+92.81
Slope stake limits
Slope stake limits
Profile grade
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k t-fo r t1 fb .d g n
AK IRR FORT 1002(1)
N o v e m b e r
P h
D o u c
C h e c k e d b y
D e s ig n e d b y
3,499
103+50.93
AK IRR FORT 1002(1)
109+28.00
AK IRR FORT 1002(1)
Install object marker
105+92
Install object marker
107+45
105+92.81
BEGIN BRIDGE
107+45.14
END BRIDGE
Install transition railing
105+81 to 105+94, LT & RT
Install terminal section
105+56 to 105+81, LT & RT
Install transition railing
107+43 to 107+56, LT & RT
Install terminal section
107+56 to 107+81, LT & RT
105+56.26 to 105+81.44 type LST, LT & RT
Terminal section, railing, G4 system, LT & RT
Structure transition
105+81.44 to 105+94.52 railing, G4 system, LT & RT
Structure transition
107+43.43 to 107+56.56 type LST, LT & RT
Terminal section, 107+56.56 to 107+81.69
13107
13106
13105
13104
13103
13102
13101
9973.248
9991.389
9975.122
9975.814
10118.846
10068.296
10000.000
21147.357
20952.564
20844.973
20739.831
20475.072
20273.922
20000.000
997.962
996.340
995.810
994.632
996.335
1000.083
1000.000*
* Not shown. Outside sheet boundary
Clearing limits
Clearing limits
LST Section
NOTE:
NO SCALE
1.
DETAILS
APPROACH RAILING
PLAN @ ABUTMENT
LC Post
W-Beam Guardrail
ELEVATION VIEW
PostLC
Timber deck
See Sheet D.4, Standard 617-11, for other details.
6'-0" long post (typ.)
with 6" x 8" timber blocks (typ.)
Transition posts will be steel
2-W-Beam type 4 (Weathering) - class B (10 gauge)
Timber deck
" = 12'-6"2 14 spac. @ 3'-1
Pay limits, Transition guardrail section
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k t-fo r t1 fc .d g n
AK IRR FORT 1002(1)
A
N o v e m b e r
P h
D o u c
C h e c k e d b y
D e s ig n e d b
STANDARD APPROVED FOR USE 1/1994
DRAFT: 10/2013
REVISED: 4/1994 6/2005
617-11
STEEL POSTS
G4 W-BEAM GUARDRAIL
" dia. hole4
6'-0"
" deep16 11" dia. x
"4
25"
18"
10"
2"
4" minimum
4" minimum
4" minimum
" minimum8
" minimum4
" GUARDRAIL BOLT8
5 " RECESS NUT8
" x 18"8
" high (typ.)2
" plain round washer4
" recess nut.8
"2 1than
"4 ty p
3"
2"
" dia. (typ.)4
" dia.4
W 6 x 9
See Note 2
2'-0" (typ.)
Post spacing 6'-3" ty p
(t yp
6" (typ.)
8" ty p
" splice bolt slot.8 1" x 132
" post bolt slot at 6'-3"2 1" x 24
" guardrail splice4 1" x 18
" x 10" guardrail8 t o e d g e
" 6"
"4
S e e N o te ty p
6"
"4
8"
"4
"16 11"4
"16
"8
" x 10" guardrail post bolt8
See Special Contract Requirements when 7'-0" or longer posts
Standards 617-13 or 617-24.
"16
"32
"4 14 "4
142"
"16
"16
" R16
" R16
"4
"16 1"16
"32
"16
STATE PROJECT
NUMBER
SHEET
D.4
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
o v e m b e r
U m y fi le s p w p r o d u c ti o n d a k t-fo r t1 fd .d g n
IRR FORT 1002(1) AK
NO SCALE
1:10 or flatter slope
NOTE:
When encountering impenetrable material, see
6.
5.
4.
3.
2.
1.
including its appearance, and accepted manufacturing practices.
those consistent with the proper functioning of the part, Dimensional tolerances not shown or implied are intended to be
Use consistent material throughout the length of guardrail run.
Modified block may be wood, plastic, or composite material.
post. Alternate reflector tab shapes are acceptable.
Install reflector tab between post bolt and rail, every fourth arrangement is specified.
See Special Contract Requirements when the alternative hole are specified.
BLOCK
W BEAM RAIL
GUARDRAIL BOLT AND RECESS NUT
POST AND BLOCK DETAIL
STANDARD HOLE ARRANGEMENT
TYPICAL GUARDRAIL CROSS SECTIONSTANDARD POST SECTION
POST SPACING
DETAIL
POST AND BLOCK
ARRANGEMENT
ALTERNATE HOLE
STRUCTURAL SHAPE POST
TOP
FRONTSIDE
TOP
SIDE FRONT
SECTION A-A
RAIL ELEVATION
(STANDARD HOLE ARRANGEMENT)
Post length stamp
Reflector tab
L Thread Length
W beam rail recess both sides guardrail bolt
(See Note 5)
Modified Block spacing, center to center about
Symmetrical fill slope
Variable bolts and nuts (8 per splice) shown on typical section sheet
Aggregate base or as
Lap in direction of traffic
Traffic symmetry ofCL
A
A slots
Splice bolt
Neutral axis o r g r o u n d l in e o f p a v e m e n t future overlays guardrail to accommodate
Upper 2 holes for raising on terminal sections
All posts except those nut by more extend beyond
Thread not to groundline at face of rail
Edge of pavement or rail as applicable ground line at face of
Edge of pavement or bolt and recess nut
Hinge line of foreslope steeper than fill slope
Variable slope but not placed front and rear
Reflective sheeting
Splice bolt slots
L
(See Note 4)
REFLECTOR TAB
terminal sections approach and departure
Widening required for
Subgrade shoulder.
S e e N o te
L e n g th
Thickness
Sheet
8 required, each end of rail
CL
TYPE LST, WOOD POSTS
LOW SPEED TERMINAL
G4 W-BEAM GUARDRAIL
shop-formed to a 16' radius
One 12'-6" beam rail section
6' -3 m in lim it
25' Pa y
O ff s e t
Length of Need
TSL epyt noitces lanimreT
Normal line of guardrail
1V:4H slope or flatter steeper slope
Transition to
In-line Anchorage Assembly
Direction of traffic
PLAN
in 25' or more normal shoulder
Transition back to rail end section
Rounded W beam
Slope break
End post gnicaps tsop lacipyT
Transition guardrail section
Pay limits, guardrail, system G4
NOTE:
ty p
4 " max.
" nom.2
1" dia. hole8
4"
RIGHT SIDEFRONT
POST #3 ASSEMBLY
DETAIL A
Steel tube anchor nut with 2 washers each
" x 10" hex bolt and 8
Ground line and steel washer
1" H.S. hex nut plate to prevent rotation galvanized nails bent over
Two 16d common
Post sleeve
Cable assembly
Steel tube anchor
Bearing plate
"2 17"2
18"4
24" (approx.)
R"4
3" (min.)
"16 31" x 1
30°
ROUNDED END SECTION
PLAN
ELEVATION
slots
"4
"4
6'-3"
16"12" ty p
IN-LINE ANCHORAGE ASSEMBLY
ELEVATION
tube connection plate and steel option for soil
Welded connection tube connection plate and steel option for soil
Welded connection
4 3 washer under the nut at Posts #3 & 4 under the bolt head and a steel nut with a rectangular plate washer
" x 18" guardrail bolt and recess 8
Terminal post
Bearing plate
See Detail A and steel washer
1" H.S. hex nut
Steel tube anchor Soil plate nut with 2 washers each
" x 8" hex bolt and8 52 -
Soil plate
Ground line
Terminal post
Anchor plate cable assembly
Galvanized
2-W - Beam type 4 (Weathering) - class B (10 gauge)
Do not use LST terminal where speeds are in excess of 45 MPH.
See Standard 617-15 for other details.
for details.
Posts 1 and 2 are standard guardrail posts. See Standard 617-10 otherwise shown on plan.
Use offset from face of rail to slope break as shown unless anchorage assembly and posts 1-4.
Pay limits for terminal section type LST include the in-line
6.
5.
4.
3.
2.
1.
D.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k t-fo r t1 fc .d g n
AK IRR FORT 1002(1)
N o v e m b e r
P h
D o u c
C h e c k e d b y
D e s ig n e d b
"2 1than
" plain round washer.4
S e e N o te ty p
(t yp
6"
(t yp
6" (typ.)
8"
(typ.)
8" ty p
STANDARD APPROVED FOR USE 1/1994
DRAFT: 10/2013
REVISED: 4/1994 6/2005
617-10
WOOD POSTS
G4 W-BEAM GUARDRAIL
See Special Contract Requirements when 7'-0" or longer posts
Standards 617-13 or 617-24.
" splice bolt slot.8 1" x 132
" post bolt slot at 6'-3"2 1" x 24
"4
"16 1"16
" x 18"8
" RECESS NUT8
5" GUARDRAIL BOLT8
"4
25"
18"
10"
2"
" minimum8
" minimum4
4" minimum
4" minimum
4" minimum
6'-0"
6'-0"
Post spacing 6'-3"
" x 18" guardrail post bolt8
" guardrail splice 4 1" x 18 ty p
" dia. hole4
" recess nut8
" deep16 11" dia. x
8"8"
"32
"16
"16
"16
"4 14 "4
142"
See Note 2
2'-0" (typ.)
"8
"16
"32
2"
3"
"4
" deep4 1" high and 2
" dia. holes (typ.)4 t o e d g e
"4
"16
"16
" R16
" R16
STATE PROJECT
NUMBER
SHEET
D.6
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
o v e m b e r
U m y fi le s p w p r o d u c ti o n d a k t-fo r t1 ff .d g n
IRR FORK 1002(1) AK
NOTE:
NO SCALE
on terminal sections
All posts except those nut by more extend beyond
Thread not to
5.
4.
3.
2.
1.
recess both sides o r g r o u n d l in e o f p a v e m e n t
W BEAM RAIL
SECTION A-A
RAIL ELEVATION
spacing, center to center about
Symmetrical
A
A
Splice bolt slots
Thickness
Sheet
8 required, each end of rail
CL
slots
Splice bolt
Neutral axis
When encountering impenetrable material, see including its appearance, and accepted manufacturing practices.
those consistent with the proper functioning of the part, Dimensional tolerances not shown or implied are intended to be
Alternate reflector tab shapes are acceptable.
Install reflector tab between post bolt and rail, every fourth post.
arrangement is specified.
See Special Contract Requirements when the alternative hole are specified.
Post and block bolts and nuts (8 per splice)
Lap in direction of traffic
Post length stamp future overlays to accommodate raising guardrail
Upper 2 holes for
L
L Thread Length
POST BOLT ASSEMBLY
POST AND BLOCK DETAIL
STANDARD HOLE ARRANGEMENT
GUARDRAIL BOLT AND RECESS NUT
POST AND BLOCK DETAIL
ALTERNATE HOLE ARRANGEMENT
TYPICAL GUARDRAIL CROSS SECTIONSTANDARD POST SECTION
POST SPACING
(See Note 4)
REFLECTOR TAB
1:10 or flatter slope groundline at face of rail
Edge of pavement or rail as applicable ground line at face of
Edge of pavement or guardrail bolt
W beam rail placed front and rear
Reflective sheeting nail on each side of block
Toenail with one 16d galvanized
Traffic Hinge line of foreslope steeper than fill slope
Variable slope but not terminal sections approach and departure
Widening required for
Subgrade shoulder.
shown on typical section sheet
Aggregate base or as fill slope
Variable
STANDARD APPROVED FOR USE 1/1994
DRAFT: 5/2014
REVISED: 4/1994 6/2005
617-15
ASSEMBLY DETAILS
MELT, LST & CRT ANCHORAGE
G4 W-BEAM GUARDRAIL
8"
4"
" dia. hole8
9"6"9"
24"
" dia. holes4
" thick plate4
" thick plate8
8" 6"
" dia. hole4
1" H.S. hex nut
2"
" hex head bolt8 5" x 18
" end plate4 3" x 3" x 28
" dia. hole8 1with 1
"4
"8
3"
"2
"16
" x 1" slotted hole4
" dia. hole4
3"
" dia. hole4
"16 3TS 8" x 6" x
" dia. holes (typ.)4 threaded entire length
" Stud32 31" dia. x 7
(min.)
2"
"8
"8
"8
") galvanized cable to be4 3" x 4
1" dia. (4
" bent plate16 3" x 8
516" x 12
R "8
3"
3"
"2
"4
"2
"4
" dia. hole2
"4 3" x 24
" dia. hole8
2"4"4"4"2"
16"
"8
1" R
"8
"8
STATE PROJECT
NUMBER
SHEET
D.7
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
o v e m b e r
U m y fi le s p w p r o d u c ti o n d a k t-fo r t1 fg .d g n
IRR FORK 1002(1) AK
NOTE:
NO SCALE
BEARING PLATE
STEEL TUBE ANCHOR
POST SLEEVE
GUARDRAIL ANCHOR PLATE
TERMINAL POST
(Standard swaged fitting and stud)
CABLE ASSEMBLY
ANCHOR PLATE DETAILS FOR LST ANCHORAGE ASSEMBLY
FRONT SIDE
FRONT SIDE
the post of anchorage assembly)
(Use to attach the section to
RECTANGULAR PLATE WASHER
(2 REQUIRED)
SOIL PLATE
slotted hole on end post only
S4S
1.
manufacturing practices.
part, including its appearance, and accepted to be those consistent with the proper functioning of the
Dimensional tolerances not shown or implied are intended and steel washer
Stud
Anchor plate
Standard swaged fitting
Neutral axis
W Beam rail element swage connected (AASHTO M-30, type II)
35°
2.5°
ASTM A500 grade B axis of rail, 8 required on front face of neutral and nut with steel washer
EROSION CONTROL
TABULATION OF
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k t-fo r t1 d a .d g n
AK IRR FORT 1002(1)
N o v e m b e r
P h
D o u c
C h e c k e d b y
D e s ig n e d b
PLAN
EROSION CONTROL
SCALE IN FEET
0 50 10050
Install silt fence
103+50 to 105+92
Install silt fence
107+45 to 109+28
Slope stake limits
Slope stake limits
E.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k t-fo r t1 d b .d g n
AK IRR FORT 1002(1)
N o v e m b e r
P h
D o u c
C h e c k e d b y
D e s ig n e d b y
Install temporary diversion berm
107+30 to 107+90
105+90 to 106+50
FOOTNOTE:
Final location to be determined by the CO.
NO SCALE
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
Flow
T o e o f s lo p e
Flow
Flow
PLAN
ELEVATION
Varies
Varies
Limits of clearing
Support mesh
Backfilled and compacted soil
Steel or wood post
(undisturbed)
Existing ground
Geotextile
4.
3.
2.
1.
fo r s p a c in g
S e e N o te
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
REVISED:
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
SILT FENCE
W157-1
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
IRR FORT 1002(1) AK
N o v e m b e r
U m y fi le s p w p r o d u c ti o n d a k t-fo r t1 d c .d g n
NOTE:
Staple or tie
Section B
Geotextile fabric fabric, Section A
Geotextile
Top of posts tied together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric see End Posts Detail
End posts, see End Posts Detail
End posts, See Note 3
See Note 3 around the ends.
Curve ends of selt fence upgrade to prevent water from running as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric m in m in m in
6-foot (max.) spacing without fence support.
10-foot (max.) spacing with fence support.
NO SCALE
Existing ground construction level at time of
Diverted water
Water surface elevation
OHW
Limit of work zone
OPTION B
OPTION A
OPTION C
OPTION D
OHW
OHW
OHW
Existing ground
Existing ground
Sandbag (typ.)
Sandbag (typ.)
Sandbag (typ.)
Sandbag (typ.)
Concrete barrier
Concrete barrier approved by the CO)
(anchoring method to be
Waterproof membrane
Concrete barrier
Limit of work zone
Limit of work zone
Existing ground construction level at time of
Diverted water
Water surface elevation membrane
Waterproof elevation (min.)
Top of berm elevation (min.)
Top of berm elevation (min.)
Top of berm construction level at time of
Diverted water
Water surface elevation membrane
Waterproof
Water surface elevation construction level at time of
Diverted water
Existing abutment or pier
REVISED:
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DIVERSION BERM METHODS
TEMPORARY IN-STREAM
W157-17 m in m in
4'-6" m in m in with 6" (min.) freeboard. Submit plans for temporary
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
IRR FORT 1002(1) AK
N o v e m b e r
U m y fi le s p w p r o d u c ti o n d a k t-fo r t1 d d .d g n
NOTE:
5.
4.
3.
2.
1.
height of the sandbag barrier.
by the CO. Remove sediment when deposits reach half the berm daily. Repair as needed afdter rainfall events or as directed
While in use, inspect and maintain the temporary diversion
Place a maximum of one diversion in the stream at any given time.
of sandbags should overlap the joints in lower rows.
rows on the bottom as there are vertical course. Upper rows
Place sandbags to form a pyramid by laying equal numbers of
Construct temporary diversion according to Subsection 157.10.
stream diversion to the CO for approval prior to installation.
a minimum height equivalent to the water surface elevation etc.). As a minimum, provide a temporary diversion berm with any approved prefabricated or portable diversion berms, dams, choose an alternate means of diverting the stream (including the stream during construction operations. The Contractor may
The options shown are suggested configurations for diverting membrane
Waterproof
BRIDGE RIPRAP
TABULATION OF
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k t-fo r t1 q a .d g n
AK IRR FORT 1002(1)
O c to b e r
P h
D o u c
C h e c k e d b y
D e s ig n e d b
Q Vel.
500Q
100Q
50Q
2Q
SLOPE PROTECTION
WS ELEV.
SLOPE: 2(h):1(v)
TYPE: Riprap
REMARKS:
BOTTOM EL.: 981.0 ft.
X
X
X
X
X
X
X
X
X
X
X
X CLASS: 5 (FP-14)
TOTAL SCOUR EL: 981.0 ft
105+50 106+00 106+50 107+00 107+50 108+00
TOP EL.: 1000.0 ft DEPTH: 4 ft. Min
RIPRAP DETAIL
IVARS BRIDGE
F.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k t-fo r t1 fa .d g n
AK IRR FORT 1002(1)
N o v e m b e r
P h
S o u r k
C h e c k e d b y
D e s ig n e d b y
150'-0" Bridge length at road centerline
Existing grade at road centerline
Finish grade
Geotextile filter, class 1, type A
Elev. 981.0
Placed riprap, class 5
134'-0" Waterway opening
94'-0" Streambed width to be removed
Existing culverts (24) centerline
El. = 985.0 @ road
Proposed channel bottom Spill through abutment
Min. low chord
El. = 998.0
Design flood WS
El. = 995.0
38'-0" (typ.)
ty p
PLAN
N
SECTION A-A
AA
Refer to Section 203
Remove existing structure.
Girder length: 150'-0"
Bridge length: 152'-4" m in
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
S 63° 01' 10" E
PLAN
ELEVATION
-0.7751%
Elev. 1004.59
Sta. 105+92.81 Elev. 1003.41
Sucker River
PLAN AND ELEVATION
Proposed ground line elev. 998.15
Low chord
Concrete backwall
Sta. 107+45.14
CL
CL
Structure Roadway line at profile
Existing ground
Begin bridge
End bridge
Elev. 978.50 Elev. 978.50
Bridge
30' VC
K=7
,0
.2
-4.9948%
,0
.0
K=11
45' VC
3.2031 % -0.7751%
Not to scale
PROFILE GRADE
150'-0"
Girder length
1 RG3005-AAF AF 1" = 10'
G.1
8'-0" 8'-0"
A C
T U
A L F I L E G
F
O R
T
P
E
D G
N culvert structure
Edges of existing
D e fa u lt m y fi le s p w p r o d u c ti o n d G
F
O R
T
P
E .D
G N
N o v e m b e r
*Navigational opening: 7'-0" min
@ Structure
Elev. 1003.41
End bridge
@ Structure
Elev. 1004.59
Begin bridge railing details (typ.)
sheet for transition and approach
See "APPROACH RAILING DETAILS"
GRS-IBS (typ.)
BAO
CL CL
CL
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
STATE PROJECT
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DRAWING NO.
AK IRR FORT 1002(1)
B. Oltmann November 201512
YUKON-KOYUKUK CENSUS AREA
NATIVE VILLAGE OF FORT YUKON
IVARS BRIDGE
OHW=991.0*
for riprap and geotextile details
Refer to "RIPRAP DETAILS" section
Existing pipe culvert (typ.)
GENERAL NOTES
SPECIFICATIONS:
Construction:
Design:
Live loads:
Dead loads:
DESIGN LOADS:
Miscellaneous Structural Steel:
MATERIALS:
" unless noted otherwise on the plans.4 3Chamfer exposed edges of all concrete
Welding:
Bearings:
GEOTECHNICAL REPORT:
Structural steel:
Provide 2" cover for reinforcing steel unless otherwise noted.
Furnish reinforcing steel conforming to AASHTO M31, Grade 60 deformed.
LRFD Bridge Construction Specifications with 60 durometer hardness, Grade 5. Follow AASHTO LRFD design Method A.
Provide elastomeric bearing pads conforming to the requirements of Section 18.2 of the AASHTO
Seismic Parameters:
AASHTO Guide Specifications for LRFD Seismic Bridge Design, 2011.
AASHTO LRFD Bridge Design Specifications 2014, 7th edition.
Lateral Earth Pressure: equivalent fluid weight of soil, 120 pcf
Concrete: 150 pcf
HL-93
f'c = 4,500 psi at 28 days.
Furnish Class A(AE) for abutments.
otherwise noted on the plans.
type 1, (ASTM A325 TYPE 1) with ASTM A563 Grade C nuts and ASTM F463 washer unless
Furnish slip critical, friction type, Class A, field connections conforming to AASHTO M164, to the ASTM A847 Supplemental Requirements, 583 (for Zone 2), and 593.
Furnish main load carrying member components subjected to tensile stress conforming
Furnish structural steel for bearings and sole plates conforming to ASTM A709, Grade 36.
Furnish high-strength low alloy structural steel conforming to ASTM A709 Grade 50W, unpainted.
DRAWING TITLE
G.2
Precast Concrete:
angle and connection assemblies after fabrication.
connection assemblies conforming to ASTM A36. Galvanize guard
Furnish structural metal for guard angles and precast abutment
Furnish diaphragm anchor bolts conforming to ASTM A307.
GENERAL NOTES
AF AF No Scale 2 RG3005-B
GRS-IBS Details (4 of 4)
GRS-IBS Details (3 of 4)
GRS-IBS Details (2 of 4)
GRS-IBS Details (1 of 4)
GRS-IBS Plan & Elevation
Miscellaneous Details
Typical Section
Abutment Reinforcement
Abutment Layout
Foundation Plan
General Notes
Plan and Elevation
For boring logs and other geotechnical information, see Geotechnical Memorandum No. 13-15, dated 10-2015.
A C
T U
A L F I L E G
F
O R
T
G
N
D G
N
- MT. - 10% min.
Fillet welds - Visual - 100%
Perform non-destructive testing of welds as follows:
using low hydrogen electrodes classified E7028.
Perform welding process manual shielded metal arc welding (SMAW)
D1.5 Bridge Welding Code.
Perform all welding in accordance with the current AASHTO/AWS
Timber:
Reinforcing Steel:
for Use Category 4B (UC4B).
Treat timber according to American Wood Protection Association standards
AASHTO 7% chance of exceedence in 75 years
Liquefaction Potential = Low
= DSite Class
= 0.085S1
= 0.226Ss
= 0.098PGA
D e fa m y fi le s p w p r o d u c ti o n d G
F
O R
T
G N .D
G N
N o v e m b e r
DRAWING INDEX
DRAWING NO.
RG3005-L
RG3005-K
RG3005-J
RG3005-I
RG3005-H
RG3005-G
RG3005-F
RG3005-E
RG3005-D
RG3005-C
RG3005-B
RG3005-A
BAO
Federal Highway Projects, FP-14.
Standard Specifications for Construction of Roads and Bridges on
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
B. Oltmann November 201512
YUKON-KOYUKUK CENSUS AREA
NATIVE VILLAGE OF FORT YUKON
IVARS BRIDGE
FOUNDATION PLAN
Begin bridge
End bridge
(See Note 1) (Typ.)
Concrete footing
Notes:
FOUNDATION PLAN
RG3005-CAF AF
G.3
A C
T U
A L F I L E G
F
O R
T
F
O U
N D
A T I O
N
D G
N
D e fa m y fi le s p w p r o d u c ti o n d G
F
O R
T
F
O U
N D
A T I O
N .D
G N
1" = 10'
(See Note 2) (Typ.)
GRS-IBS
for GRS-IBS details.
See "GRS-IBS PLAN & ELEVATION" sheet 2.
for concrete footing details.
See "ABUTMENT LAYOUT" sheet1.
N o v e m b e r
BAO
N
15'-0"
9'-2"
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
B. Oltmann November 201512
YUKON-KOYUKUK CENSUS AREA
ABUTMENT LAYOUT
Begin/End Bridge
A
AB
B
(Abutment 1 shown, Abutment 2 similar)
SECTION A-A SECTION B-B
BearingCL
C
C
F F
E E
(Abutment 1 shown, Abutment 2 similar)
ABUTMENT PLAN
PRECAST CONNECTION PLAN SECTION C-C SECTION D-D
VIEW E-E VIEW F-F
Notes:
21'-2"
1'-0" 9'-7" 9'-7" 1'-0"
See Note 1
CLBearing
CLAbutment
5'-0"
1'-0"
8'-2"
4'-1" 4'-1"
11"
1'-0" 7'-2"
8'-2"
D
D
Begin/End Bridge
Elev. A
Elev. B
Elev. C
ELEVATIONS
ELEV. ABUT. 1 ABUT. 2
A
B*
C*
1004.59 1003.41
998.82 997.64
996.42 995.24
" x 6" 7'-5"8 3P L
"16
Typ.
welded studs
" Ø x 5"2 18 -embed. angles with x 7'-7"8 3L 4x4x welded studs
" Ø x 5"2 13 -embed. angles with x 2'-0"8 3L 4x4x welded studs
" Ø x 5"2 16 -embed. angles with x 5'-1"8 3L 4x4x
L
Typ.
L
" x 6" x 4'-11"8 3P
"16 abutment Precast
CL
CL
(See Note 2)
" welded studs @ 1'4 1"x4 guard angle with4 1L 2x2x
Begin/End Bridge
CL
S e e N o te
S e e N o te
Structure
Symm. about
Structure
Symm. about
Structure
Symm. about
RG3005-D
G.4
AF AF As Shown
" = 1'-0"2 1Scale:
" = 1'-0"8 3Scale:
" = 1'-0"8 3Scale: " = 1'-0"8
3Scale:
" = 1'-0"8 3Scale: " = 1'-0"8
3Scale:
" = 1'-0"2 1Scale: " = 1'-0"2
1Scale:
approved shop drawings.
elevations with bridge manufacturer's
*Estimated elevations. Verify final
Precast abutment
Precast abutment abutment Precast
" x 6" x 1'-10"8 3P
A C
T U
A L F I L E G
F
O R
T
A
B U
T L
A Y
O U
T .D
G N
D e fa m y fi le s p w p r o d u c ti o n d G
F
O R
T
A B
U T L
A Y
O U
T .D
G N
F e b r u a r y
BAO
(Typ.)
Constr. jt.
(Typ.)
Constr. jt.
-2%
Cast top of bearing seat with a 2% slope for drainage.
specification TT-P-641 or Military specification MIL-P-21035.
two coasts of zinc dust-zinc oxide paint meeting Federal damaged by field welding by cleaning and recoating with
Perform field welding according to AWS D1.5. Repair areas to AASHTO M 111. Fabricate assemblies prior to galvanizing.
AWS D1.5. Galvanize all steel components for connections to AASHTO M 169. Perform welding for studs according to
AASHTO M 270, Grade 36. Provide welded studs conforming
Provide structural plates and shapes conforming to approved shop drawings.
backwall and cheekwall height with bridge manufacturer's assembly height, girder depth, and deck thickness. Verify
Match backwall and cheekwall height to sum of bearing approved shop drawings.
Verify guard angle length with bridge manufacturer's
Match guard angle length to width of timber bridge deck.
footing, or holes may be drilled in the field.
manufacturer. Anchor inserts may be cast into precast
Anchor bolt size and locations determined by bridge
6.
5.
4.
3.
2.
1.
7'-2"
February 2016
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
B. Oltmann 12
YUKON-KOYUKUK CENSUS AREA
"2 13 10 Spa. @ 1'-0" = 10'-0"
S p a
#5A6 (Typ.)
#5A3 (Typ.)
#5A2 (Typ.)
A
T y p
BridgeCL
BridgeCL
(Abutment 1 shown, Abutment 2 similar)
B
B A
A
(Abutment 1 shown, Abutment 2 similar)
PLAN SECTION A-A
SECTION B-B
S p a
A
T y p
#5A2 (Typ.)
(Typ.)
#7A1
10 Spa. @ 1'-0" = 10'-0
2 - #7A4 (Typ.)
#7A4
7 Spa @ 1'-0" = 7'-0" 8"
#7A4
(Typ.)
#7A1
3"
S p a
#5A2 (Typ.)
A c lr
"2 126 Spa. @ 1'-0" = 6'-0"
#5A2 #5A2
AF AF
REINFORCING BAR DETAILS
1/2" = 1'-0"
"2
#5A2 (38 Required) #7A4 (48 Required)
7'-10"
#5A3 (24 Required)
"2 17'-9
A e .f
A
ELEVATION
Note:
One abutment only
Concrete steel
Reinforcing
23.4 Cu. Yds
3100 lbs
(Quantities for one abutment)
5 RG3005-E
G.5
ABUTMENT REINFORCEMENT
ESTIMATED QUANTITIES*
*Information only
9"
(Typ.)
#7A1 m in
M in la p
"2
A C
T U
A L F I L E G
F
O R
T
A
B U
T R
E B
A R .D
G N
10'-3"
6"
#5A5 (28 Required)
6 Spa. @ 1'-0" = 6'-0"
#5A5
(Typ.)
#5A5
#7A4
(Typ.)
#7A4
Maintain concrete cover over reinforcement.
cheekwall at spacing no greater than 1'-0" c-c.
horizontal reinforcement as needed in backwall and
See "ABUTMENT LAYOUT" sheet. Provide additional bridge manufacturer's approved shop drawings.
Verify height of backwall and cheekwall with
D e fa m y fi le s p w p r o d u c ti o n d G
F
O R
T
A B
U T R
E B
A R .D
G N
F e b r u a r y
#7A1, top & bottom
AF BAO
#5A6 (24 Required)
#7A1 (40 Required)
February 2016
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
B. Oltmann 12
YUKON-KOYUKUK CENSUS AREA
AF AF
CL
CL
NEAR ABUTMENT NEAR MIDSPAN
TYPICAL SECTION
As shown
Scale: 4"=1'-0"
FLANGE CLIP
4.
3.
2.
1.
TYPICAL SECTION
CL
Dimension "A" is equal to thickness of top flange.
flange clip is located on every girder at 12" spaces.
on opposite sides of girder flanges so that a side of each girder. Stagger clip spacing 12"
Place flange clips at 2'-0" spacing along each galvanized nails.
and edges of girder flanges. Use 20 penny
Place flange clips snugly against bottoms
Grade 40 or 50, Coating G90.
galvanized sheet or strip steel, ASTM A653, Provide flange clips made from 12 gage
G.6
RG3005-F6
3.
2.
1.
Flange clip notes:
A C
T U
A L F I L E G
F
O R
T
T
Y P X
S .D
G N
D e fa m y fi le s p w p r o d u c ti o n d G
F
O R
T
T Y P X
S .D
G N
N o v e m b e r
Typical section notes:
for additional information.
purposes only. See "APPROACH RAILING DETAILS" sheet of AASHTO TL-1. Configuration shown is for illustrative capable of meeting vehicle design load requirements
Provide weathering steel w-beam guardrail system to Section 104.
for superstructure to the CO for approval according
Submit design calculations and detailed shop drawings purposes only.
Prefabricated girder bridge is shown for illustrative
RUNNING BOARD DETAIL
" = 1'-0" 2 1Scale:
" = 1'-0"2 1Scale:
BAO
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
B. Oltmann November 201512
YUKON-KOYUKUK CENSUS AREA
NATIVE VILLAGE OF FORT YUKON
IVARS BRIDGE
One 12'-0" lane with two 2'-0" shoulders
3"x12" Running boards
3'-0" 1'-6" 1'-6" 3'-0"
16'-0" Minimum travel way
Structure
Roadway
(Typ.)
Flange clip
0.00%
A
7(See Note 3) (Typ.)
Weathering steel rail post
(Typ.)
steel W-beam railing Double nested weathering
1"
1"
" Ø holes for nails32
3'-0" ends 3'-0" min Stagger adjacent plank centers along the planks. Countersink lag screw heads.
intermediate lag screw connections on two feet
Use two lag screws at ends of planks. Stagger
S e e N o te
Timber laminated deck
(See Notes 1 and 2) Weathering steel girders m in
Running board note:
MISCELLANEOUS DETAILS
AF AF No Scale
Ambient temperature at time of expansion joint installation.
"8
TEMPERATURE SETTING TABLE (°F)
* Temperature (°F) (Abutments)
"A" (in) beads and silcone band Field-applied silicone corner silicone Precompressed foam Impregnated backwall Concrete
"4 1L 2"x2"x anchor @ 1'-0"
" Ø stud4 1"x4
Top flange bridge width @ 2'-0" spaces for full
" x 12" Lag bolts2
Taper running planks @ ends
A both sides Epoxy adhesive
CL Bearing
CL Bearing
CL Bearing
Laminated bearing pad
Steel plate
BEARING DETAIL
EXPANSION BOTTOM PLATE
FIXED TOP & BOTTOM &
EXPANSION TOP PLATE
EXPANSION JOINT IMPACT ANGLE
(See detail)
" Impact angle4 13'x5"x
3"
CL
holes @ 2'-0"
" Ø 16
Furnish and install bearings.
Furnish galvanized steel for all exposed surfaces of steel for bearing.
prior to installation.
Submit detail and design of bearing to the CO for approval, The sketch of the bearing is for illustration only.
4.
3.
2.
1.
G.7
RG3005-G7
Bearing notes:
laminated deck Timber full clear deck width.
Use one continuous angle to fit
Impact angle note:
A C
T U
A L F I L E G
F
O R
T
M
I S
C .D
G N contraction from 2" nominal setting width.
Furnish seal capable of 50% expansion and 2.
system, as shown.
Provide a watertight, continuous seal 1.
Expansion joint note:
" 8
"8
"16
"8
"16
D e fa m y fi le s p w p r o d u c ti o n d G
F
O R
T
M I S
C .D
G N
N o v e m b e r
BAO
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
B. Oltmann November 201512
YUKON-KOYUKUK CENSUS AREA
3.
4.
reinforcement
Geosynthetic
15'-0" reinforcement top three rows with epoxy-coated #4 rebar
Concrete filled CMU blocks
Minor concrete
Epoxy-coated #4 rebar
Solid core CMU
15'-0"
S e e S h e e t
G .1
See Sheet G.12
2'-5" 2'-5"10'-7"
S h e e t
G .1
S e e D e ta il o
B a m s e a t z o n e coping not shown wet-cast mortar
GRS-IBS Backfill
Foundation (RSF)
Reinforced Soil
G.8 IRR FORT 1002(1)AK
A C
T U
A L F I L E X
X X
X
D
8 NO SCALE
GRS-IBS PLAN & ELEVATION
RG3005-H
PROJECT TEAM LEADER BRIDGE DRAWING
C.TUTTLE
NO.
U.S. DEPARTMENT OF TRANSPORTATION
IVARS ROAD BRIDGE REPLACEMENT
B. OLTMANN 12 October, 2015
A
A
ELEVATION VIEW
Facing Block Schedule
GRS-IBS ABUTMENT
Beam seat zone
PLAN VIEW
NOTE:
FOOTNOTE:
W in g w a ll
W in g w a ll
Wingwall (folded out) Wingwall (folded out)
B
B
C C
GRS-IBS WEST ABUTMENT
Colored solid core concrete masonry unit (CMU) abutment wall
Face of GRS
CMU area (varies)
Colored solid core
1.
2.
Minor concrete
Concrete filled hollow core concrete masonry unit (CMU) block face
GRS wall CMU area (varies)
Solid core CMU
Centerline of road block H2
Top row reinforcement
Geosynthetic
B e a r in g b e d z o
R
S solid core CMU
Colored 2
Solid core CMU
Solid core concrete masonry unit (CMU)
ISOMETRIC VIEW
10'-7"
See Sheet G.9
Wet-cast mortar coping not shown.
rebar and concrete.
of upper 2 courses of CMU blocks to accept
Cut "X" into bottom geosynthetic reinforcement
995.0'. (Riprap armor not shown)
Use colored solid core CMU below elevation
Wingwalls folded out for elevation view.
mortar coping
Wet-cast mortar coping
Wet-cast
GRS-IBS Backfill
Insert epoxy-coated #4 rebars into the top 3 rows of hollow core CMU's and fill with concrete.
Stagger CMU block vertical joints at 12 block width, including corners.
On the top row of hollow core CMU's create a wet-cast mortar coping 1-inch to 3 -inch sloped to face to drain.
No colorant allowed in the concrete masonry units above elevation 995.0'. Riprap armor not shown.
hollow core CMU block
Concrete filled
BEARING BED ZONE
BEAM SEAT AND
LEGEND:
limits
Excavation
Colored solid core concrete masonry unit (CMU)
Top longitudinal reinforcement tail unit (CMU)
Concrete filled hollow core concrete masonry
8'-2"
2'-6"
Colored solid core CMU
Existing ground
VIEW A-A
RSF Bottom El. 978.5'
15'-0"
Existing ground line
FOOTNOTE:
NOTE:
2.
1.
3.
See Sheet G.10 for Detail A
5'-0"
Solid core concrete masonry unit (CMU)
Solid core CMU
Select Borrow (GRS-IBS)
Select Borrow (GRS-IBS)
Roadway Aggregate, Method 2
Abutment slab
GRS-IBS, Geosynthetic reinforcement mortar coping
Wet-cast
Minor concrete method 2
10" Roadway aggregate, courses
Backfill all
GRS-IBS,
evenly spaced
8 courses
Abut. 2 El. 1003.41 Abut. 1 El. 1004.59
GRS-IBS, Backfill
SHEET 1 OF 4
GRS-IBS, Backfill
Foundation (RSF)
Reinforced Soil above elevation 995.0'. (Riprap armor not shown).
No colorant allowed in the concrete masonry units
-inch sloped toward face to drain.4 3coping 1-inch to
On the top row of CMU's create a wet-cast mortar
CMU's and corner CMU's and fill with concrete.
Insert epoxy-coated #4 rebars into the top 3 rows of
NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
B. OLTMANN NO SCALE C. TUTTLE
NO. DATE BY REVISIONS
BRIDGE DRAWING
9 of 12 October, 2015
DATE
GRS-IBS DETAILS
DRAWING NO.
RG3005-I
WESTERN FEDERAL LANDS HIGHWAY DIVISION
U.S. DEPARTMENT OF TRANSPORTATION
G.9
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d a k t-fo r t1 q d .d g n
AK IRR FORT 1002(1)
o v e m b e r
CMU with epoxy-coated #4 rebar
Concrete filled hollow core
Solid core CMU
10'-0" past the last reinforcement.
Extend top layer wrapped tail longitudinally 5-feet and concrete.
of upper 2 courses of CMU blocks to accept rebar
Cut "X" into bottom geosynthetic reinforcement construction.
Backfill and compact simultaneous to GRS-IBS excavation). Shoring may be required.
Regulations (29CFR, Part 1926, Subpart P, Short term back slope ratio per OSHA Safety
(Riprap not shown.)
Colored solid core CMU below elevation 995.0'.
Vertical wall face batter = 0°.
FOOTNOTE:
NOTE:
3.
1.
2.
DETAIL AColored solid core concrete masonry unit (CMU)
Minor concrete
Epoxy-coated #4 rebar
Minor concrete unit (CMU)
Concrete filled hollow core concrete masonry
Solid core CMU reinforcement tail
Top longitudinal
B e a r in g b e d z o n e
(Bearing bed zone, beam seat, and integrated approach detail)
Solid core concrete masonry unit (CMU)
Select Borrow (GRS-IBS)
I n te g r a te d a p p r o a c h z o n e
Beam seat zone
10" Roadway aggregate, method 2 primary reinforcement geosynthetic
Bearing bed GRS-IBS
2 courses of CMU blocks to accept rebar and concrete.
Cut "X" into bottom geosynthetic reinforcement of upper
Vertical wall face batter = 0°.
tail (min.)
reinforcement
Wrap 4' GRS-IBS, Roadway aggregate, method 2 reinforcement geosynthetic secondary
Bearing bed GRS-IBS, mortar coping, sloped to drain
" Wet-cast 4 31" to reinforcement layers geosynthetic
Primary GRS-IBS, all courses
GRS-IBS, Backfill, GRS-IBS, Backfill geosythetic reinforcement tail, (typ.)
Wrap 15' GRS-IBS, AK IRR FORT 1002(1) G.10
A C
T U
A L F I L E X
X X
X
D
10 NO SCALE
SHEET 2 OF 4
GRS-IBS DETAILS
PROJECT TEAM LEADER BRIDGE DRAWING
RG3005-J
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
B. OLTMANN 12 October, 2015
Concrete filled hollow core CMU with rebar (typ.)
secondary reinforcement, 5 layers, 10' length
Bearing bed GRS-IBS geosynthetic
Strike CMU concrete fill flush with top of CMU's.
-inch sloped toward face to drain.4 31-inch to
On the top row of CMU's create a wet-cast mortar coping and fill with concrete.
Insert epoxy-coated #4 rebars into the top 3 rows of CMU's pavement structure
See Sheet C.1 for method 2
10" Roadway aggregate, LEGEND:
FOOTNOTE:
NOTE:
2.
1.
WINGWALL ELEVATION
VIEW B-B
Colored solid core concrete masonry unit (CMU)
Colored solid core CMU
3.
4.
Concrete filled hollow core concrete masonry unit (CMU)
Existing ground
2'-6"
15'-0"
Solid core CMU block
Solid core concrete masonry unit (CMU)
Select Borrow (GRS-IBS)
Select Borrow (GRS-IBS)
Select Borrow (GRS-IBS)
Excavation limits
Roadway aggregate, method 2
GRS-IBS, Geosynthetic reinforcement
See Sheet F.2 for Riprap Detail
Wet-cast mortar coping
Select Borrow (GRS-IBS)
2 courses of CMU blocks to accept rebar and concrete.
Cut "X" into bottom geosynthetic reinforcement of upper
Backfill and compact simultaneous to GRS-IBS construction.
required.
(29CFR, Part 1926, Subpart P, excavation). Shoring may be
Short term back slope ratio per OSHA Safety Regulations
Colored solid core to elevation 995.0'. (Riprap armor not shown)
Vertical wall face batter = 0°.
GRS-IBS Backfill
GRS-IBS Backfill
Foundation (RSF)
Reinforced Soil RSF bottom El. 978.5'
Wet-cast mortar coping reinforcement top three rows with epoxy-coated #4 rebar
Concrete filled CMU blocks
GRS wall CMU block face elevation 995.0'. (Riprap armor not shown)
No colorant allowed in the concrete masonry units above block width, including corners.2 1Stagger CMU blocks at
-inch sloped toward face to drain.4 31-inch to
On the top row of CMU's create a wet-cast mortar coping and fill with concrete.
Insert epoxy-coated #4 rebars into the top 3 rows of CMU's
AK IRR FORT 1002(1) G.11
A C
T U
A L F I L E X
X X
X
D
11 NO SCALE
SHEET 3 OF 4
GRS-IBS DETAILS
PROJECT TEAM LEADER BRIDGE DRAWING
RG3005-K
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
B. OLTMANN 12 October, 2015
#4 rebar reinforcement top three rows
CMU blocks with epoxy-coated
Concrete filled hollow core
CMU block face
GRS wall
Select borrow
Colored solid core concrete masonry unit (CMU) solid core CMU
Colored
Minor concrete
G R
S w in g w a ll p a y l im it s v a r ie s
Concrete filled hollow core concrete masonry unit (CMU)
2'-6"
Wall foundation toe elevation
Existing ground
VIEW C-C
FOOTNOTE:
NOTE:
2.
1.
3.
G R
S
Solid core concrete masonry unit (CMU)
Vertical wall face batter = 0°.
Roadway Aggregate, Method 2
R S
F
13'-0"
AK IRR FORT 1002(1) G.12
A C
T U
A L F I L E X
X X
X
D
12 NO SCALE
SHEET 4 OF 4
GRS-IBS DETAILS
PROJECT TEAM LEADER BRIDGE DRAWING
RG3005-L
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
B. OLTMANN 12
LC
GRS-IBS Geosynthetic reinforcement
Geosynthetic reinforcement
GRS-IBS
Wet cast mortar coping b e d z o n e
B e a r in g
10'-7" aggregate, method 2
10" Roadway
Beam seat zone c o u r s e s e v e n ly
I n te g r a te d a p p r o a c h s p a c e d
GRS-IBS, backfill, all courses
GRS-IBS, Backfill
RSF bottom El. 978.5
October, 2015
#4 rebar reinforcement top three rows
CMU blocks with epoxy-coated
Concrete filled hollow core elevation 995.0'. (Riprap armor not shown)
No colorant allowed in the concrete masonry units above
-inch sloped toward face to drain.4 31-inch to
On the top row of CMU's create a wet-cast mortar coping and fill with concrete.
Insert epoxy-coated #4 rebars into the top 3 rows of CMU's
TEMPORARY TRAFFIC CONTROL
TABULATION OF
Location to be determined by the CO.
FOOTNOTE:
H.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k t-fo r t1 n a .d g n
AK IRR FORT 1002(1)
N o v e m b e r
P h
D o u c
C h e c k e d b y
D e s ig n e d b
N
SCALE IN FEET
0 50 10050
PLAN
ROAD CLOSURE
TRAFFIC CONTROL
TEMPORARY
type A warning lights, 2 each
Type 3 barricade with type A warning lights, 2 each
Type 3 barricade with
H.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k t-fo r t1 n b .d g n
AK IRR FORT 1002(1)
N o v e m b e r
P h
D o u c
C h e c k e d b y
D e s ig n e d b