DTFH6815B00017.pdf

PDF 11 MB Posted

Attached to
CA FLAP CRS 4018(1), Whitney Portal Road
Solicitation number
DTFH6815B00017
Issued by

About this file

Invitation for Bid

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

SOLICITATION NUMBER: DTFH6815B00017

PROJECT NUMBER: CA FLAP CRS 4018(1)

PROJECT NAME: WHITNEY PORTAL ROAD

BID OPENING DATE:

See Page A-1, Item 13A

This solicitation cites Standard Specifications for Construction of Roads and Bridges on

Federal Highway Projects, FP-03 US Customary Units

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 360

LAKEWOOD, CO 80228

Web site: http://www.fbo.gov E-mail: CFLContracts@dot.gov mailto:CFLContracts@dot.gov

PROJECT CA FLAP CRS 4018(1)

WHITNEY PORTAL ROAD

LOCATION INYO NATIONAL FOREST

COUNTY INYO

STATE CALIFORNIA

LENGTH SCHEDULE A: 11.20 MILES

TYPE OF CONSTRUCTION 3R (RESTORATION, RESURFACING, AND

REHABILITATION) PULVERIZATION,

HOT ASPHALT CONCRETE PAVING,

WIDENING, GRADING AND DRAINAGE

TABLE OF CONTENTS

Notice to Bidders ............................................................................................................. A-i

Solicitation, Offer, and Award ........................................................................................ A-1

Basis for Award and Bid Schedule ................................................................................. A-4

Bid Schedule ................................................................................................................... A-6

Buy American and Hazardous Materials ...................................................................... A-14

Solicitation Provisions .....................................................................................................B-7

Contract Clauses ..............................................................................................................C-1

Davis Bacon Wage Determination.................................................................................. D-1

Division 100 ..................................................................................................................... E-1 Division 150 ................................................................................................................... E-29 Division 200 ................................................................................................................... E-56 Division 300 ................................................................................................................... E-64 Division 400 ................................................................................................................... E-67 Division 500 ................................................................................................................... E-96 Division 600 ................................................................................................................. E-106 Division 700 ................................................................................................................. E-118

APPENDICES

Appendix A ......................................................................................... Encroachment Permit

Appendix B ............................................................................................................. Fire Plan

Appendix C .................................................................. Small Business Subcontracting Plan

Appendix D ................................................................. 404 Permit & Nationwide Permit 14

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects

NOTICE TO BIDDERS

A-i

ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8). Please submit the following with your bid:

Submit the following documents with your Bid Package–

• SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2

• Indication of interest in formal Partnering, Page A-5

• Bid Schedule including Buy American Act & Hazardous Materials, Pages A-6 through A-15

• Bid Guarantee (see FAR Clause 52.228-1), Pages B-1 and B-2. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.

• Completed VETS 100, Page A-ii; Bidders’ Information, Pages B-3 through B-6; Annual Representations and Certifications (52.204-8), Page B-7 thru B-12 and Certification Regarding Responsibility Matters (FAR 52.209-5), Pages B-12 thru B-15.

• HUBZone small business concerns electing to waive the evaluation preference, complete 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns, Section C.

Bidders should retain all other pages for their information. Bids should be submitted in a sealed enveloped and include the Contractor’s Name, Solicitation Number and the Project Number/Name.

I. PRE-BID INFORMATION

It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at http://www.fbo.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.

This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 US Customary Units (FP-03).

The FP-03 was utilized for the design of this project. Hard copies of the FP-03 will not be provided to bidders. The FP-03 is available electronically at http://flh.fhwa.dot.gov/resources/pse/specs/fp- 03.htm or may be purchased by contacting Bob Rosenblatt at ARC Western, telephone number 303- 785-2520 or email bob.rosenblatt@e-arc.com. Limited numbers of hard copies of the FP-03 will be provided to the awarded Prime Contractor.

Applicable FAR provisions and clauses in this IFB are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/far/.

http://www.fbo.gov/ http://flh.fhwa.dot.gov/resources/pse/specs/fp-03.htm http://flh.fhwa.dot.gov/resources/pse/specs/fp-03.htm mailto:bob.rosenblatt@e-arc.com https://www.acquisition.gov/far/

A-ii

Notice of SAM Registration – you must register in the System for Award Management (SAM – replaced CCR) prior to award of a contract resulting from this solicitation. Failure to register prior to contract award may require award to the next successful registered offeror. See FAR Subpart 4.1103©. Register online at www.sam.gov.

Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $36.5 million. If your average annual gross receipts for the past 3 years are above $36.5 million, you are a large business for this solicitation. If they are below $36.5 million you are a small business. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and Certifications on Page B-7. Your small business information is pulled into the Online Representations and Certifications Application (ORCA) website from the System for Award Management (SAM). Please include NAICS 237310 in your SAM. Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov.

Vets100 Reporting: - The Contractor must complete the report if required. See reporting requirements at: www.dol.gov/vets/programs/fcp/main.htm.

• My firm had a qualifying Federal Contract in 2015 and has complied with the reporting requirements.

• My firm did not have a qualifying Federal Contract in 2015 and is therefore exempt from the reporting requirements

This Solicitation Contains a Price Evaluation Factor - The Government will apply a factor of 10% to an apparent low bid submitted by a large business when we also receive a bid from a certified HUBZone small business concern. The 10% factor does not apply to apparent low bids submitted by small businesses. See FAR Clause 52.219-4 Notice of price evaluation preference for HUBZone small business concerns.

In the event this full and open competition results in a contract award to a qualified HUBZone SBC after a price evaluation preference, FAR Clause 52.236-1, Performance of Work by the Contractor does not apply.

§126.700 of the Code of Federal Regulations (Title 13, Part 126, Subpart G), stated below, will replace the performance of work requirements stated in the above mentioned FAR clause.

A qualified HUBZone SBC receiving a contract under this solicitation for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.

http://www.sam.gov/ http://www.dol.gov/vets/programs/fcp/main.htm

A-iii

Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart

102.03 of the FP-03. Bid bonds must be originals and have original signatures and corporate seals.

Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.

ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:

http://osdbuweb.dot.gov.

The Contractor is fully responsible to verify that all data is correct when an offer is submitted.

Failure to properly update your data may cause the offer to be rejected.

Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3).

TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE

ACCEPTED AFTER 4 P.M. ON NOVEMBER 9, 2015

Questions for this solicitation can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at http://www.fbo.gov

Modifications to Bids - Bids may be modified or withdrawn by facsimile or telegraphic notice, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of telegraphic or facsimile data.

For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.

FAX Number to submit modifications to bids for this project is (720) 963-3360

II. Post Award Information.

Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.

FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business http://osdbuweb.dot.gov/

A-iv concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1 million, is required to submit a subcontracting plan prior to contract award. The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. A sample plan for subcontracting requirements is available in Appendix C.

Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration’s Subcontracting Network (SUB-NET) http://web.sba.gov/subnet/ so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts. If the apparent successful low bidder fails to submit an acceptable subcontracting plan with their bid package, that bidder may be ineligible for award of the contract.

A list of currently known business concerns owned and controlled by socially and economically disadvantaged individuals and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available at http://www.sam.gov

Insurance requirements - See Subsection 107.05 of the FP-03.

http://web.sba.gov/subnet/

A-1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration or Repair)

1. SOLICITATION NO.

DTFH6815B00017

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

10/15/2015 IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

CFL15HFPM252

6. PROJECT NO.

CA FLAP CRS 4018(1)

WHITNEY PORTAL ROAD

7. ISSUED BY:

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS DIVISION

12300 WEST DAKOTA AVENUE

LAKEWOOD, COLORADO 80228

CODE: 69050001 8. ADDRESS OFFER TO:

JOE WILSON, CONTRACT SPECIALIST

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS DIVISION

12300 WEST DAKOTA AVENUE

LAKEWOOD, COLORADO 80228

9. FOR INFORMATION CALL

SEE PAGE A-3

A. NAME:

SEE PAGE A-3

B. TELEPHONE NO. (Include area code)

SEE PAGE A-3

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:

ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:

1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)

2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES

3. SPECIAL CONTRACT REQUIREMENTS

4. PLANS

5. BID SCHEDULE

6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY

PROJECTS

7. SUBCONTRACTING PLAN (IF APPLICABLE)

See Subsection 104.04 of the FP-03 for governing order of precedence

11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 11/17/15 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is is not required.

C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53-236-1(e)

X

A-2

GPO: 1985 0 - 469-796 STANDARD FORM 1442 PAGE 2 (REV. 4-85)

OFFEROR (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

DUNS NO.

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

SEE INDIVIDUAL BID SCHEDULE(S)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED

TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 27

(4 copies unless otherwise specified)

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

□ 15 U.S.C. 637( ) □ 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE:

27. PAYMENT WILL BE MADE BY

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by

(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON

AUTHORIZED TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

A-3

Item 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Item 13A.

Item 9: FOR GENERAL INFORMATION: e-mail us at CFLContracts@dot.gov.

FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov or by fax to 720-963-3360.

FOR PHYSICAL DATA: The following data is available electronically with this solicitation at:

• Final Geotechnical Report (March 2015)

• Pavement & Materials Report (June 2014)

Item 11: COMPLETION DATE: Work shall be completed on or before the date specified in Subsection 108.01 of the SCRs.

Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15

Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-03.

Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee

(Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP-03. All bid guarantees must have original signatures with original corporate seals.

Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO

ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE

DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION

MAY RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to www.fbo.gov.

Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the

FP-03.

ESTIMATED

PRICE: The price range of the project work is between $10 and $15 million.

A-4

Bid Schedule Instructions

BIDDERS, PLEASE NOTE: This Bid Proposal is comprised of two schedules. Before preparing the bid, carefully read the Solicitation Provisions and the following:

• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government

• Multiply the unit price by the quantity for each pay item and show the amount bid.

When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.

• Total all amounts bid for each pay item and show the Construction Cost Total on the space provided on the last page of each schedule or option.

• Also show the Construction Cost Total for each schedule/option as well as the combined Total of each Schedule and the Option in the spaces provided on the Bid Summary page.

NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.

Pay Item 15401-0000, Contractor Testing

Bidders must provide prices on two alternative Contractor Testing pay items in two different places in each schedule’s bid tab.

On Pages A-6 (Schedule A) bidders must provide a price for Contractor Testing using a Contractor-furnished field laboratory. As part of Schedule A the price for this alternative item will be included in the "Schedule A Total" line and, therefore, included in the evaluation for award.

Bidders must also provide a stand-alone price on the bottom of Page A-13 for the alternative item, Contractor Testing using a Government-furnished field laboratory. This price will not be factored into the evaluation for award. The Government retains the discretion to award a contract which includes either of the alternative Contractor Testing items at the respective bid price.

Basis for Award

To be eligible for award of contract, the offeror shall submit prices for each item in Bid Schedule A. Accordingly, contract award will be made to the lowest responsible bidder conforming to the solicitation, provided funds are available.

A-5

Partnering

A Partnership recognizes the Government and the Contractor are both responsible and can affect the successful completion of this project. Partnering is a vehicle to ensure the partnership has structure and quality. It recognizes the strengths of each party and uses those strengths to identify and achieve shared goals. One of the primary objectives of Partnering is to facilitate the resolution of disputes in a timely, professional, and non-adversarial manner with the outcome focused on achieving those shared goals.

CFLHD supports the concepts and tenets of Partnering and as such is encouraging the Contractors and it’s subcontractors to establish a Partnering relationship on this project.

A formal Partnering meeting can help facilitate this relationship by helping do document the parties’ common purpose and goals, and ensuring alignment. The goals are mutually agreed upon and address effective and efficient performance within the scope of the contract.

Participation in a formal Partnering meeting is voluntary. Costs of implementing and maintaining the partnership would be agreed to by both parties as described in Subsection 103.05 Partnering of the FP-03. Costs of partnering would be in addition to the contract award amount.

Please indicate your desire to participate in a formal partnering meeting on this project.

(___) We would like to participate in a formal partnering meeting.

(___) We do not want to participate in a formal partnering meeting.

A - 6

Contract Quantity Pay Items

20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS

55207-0000 REPAIR CONCRETE

55601-1100 BRIDGE RAILING, STEEL, TWO RAIL

55901-0000 MEMBRANE WATERPROOFING

58301-0000 CARBON FIBER REINFORCED POLYMER

58302-0000 CARBON FIBER REINFORCED POLYMER TEST

61707-0000 STRUCTURE TRANSITION RAILING

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0100 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A0110 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

29.5 STA $____________ $____________

A0120 15210-3000 CENTERLINE, VERIFICATION AND STAKING

590.00 STA $____________ $____________

A0130 15215-1000 SURVEY AND STAKING, APPROACH ROAD

31 EACH $____________ $____________

A0140 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

6 EACH $____________ $____________

A0150 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

59.0 STA $____________ $____________

A0160 15301-0000 CONTRACTOR QUALITY CONTROL

ALL LPSM $___LPSM_____ $____________

A0170 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A0180 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

A0190 15705-0100 SOIL EROSION CONTROL, SILT FENCE

6,650 LNFT $____________ $____________

A0200 15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE

1,200 LNFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:CA FLAP CRS4018(1)

Project Name:Whitney Portal Road

A - 7

A0210 15706-0200 SOIL EROSION CONTROL, CHECK DAM

150 EACH $____________ $____________

A0220 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION

30 EACH $____________ $____________

A0230 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE

2 EACH $____________ $____________

A0240 15802-0000 WATERING FOR DUST CONTROL

ALL LPSM $___LPSM_____ $____________

A0250 20101-0000 CLEARING AND GRUBBING

60.0 ACRE $____________ $____________

A0260 20220-1000 REMOVAL, INDIVIDUAL TREE

1 EACH $____________ $____________

A0270 20301-0700 REMOVAL OF DELINEATOR

100 EACH $____________ $____________

A0280 20301-1200 REMOVAL OF HEADWALL

1 EACH $____________ $____________

A0290 20301-1400 REMOVAL OF INLET

1 EACH $____________ $____________

A0300 20301-2400 REMOVAL OF SIGN

30 EACH $____________ $____________

A0310 20302-1200 REMOVAL OF GUARDRAIL

1,090 LNFT $____________ $____________

A0320 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS

ALL LPSM $___LPSM_____ $____________

A0330 20401-0000 ROADWAY EXCAVATION

1,500 CUYD $____________ $____________

A0340 20402-0000 SUBEXCAVATION

300 CUYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 8

A0350 20430-1000 SHOULDER, EXCAVATION

112,000 LNFT $____________ $____________

A0360 20441-0000 WASTE

6,150 CUYD $____________ $____________

A0370 21201-0000 LINEAR GRADING

10.0 STA $____________ $____________

A0380 25101-2000 PLACED RIPRAP, CLASS 2

375.0 CUYD $____________ $____________

A0390 25125-0000 BOULDER

20 EACH $____________ $____________

A0400 25126-0000 REMOVE AND RESET BOULDER

3 EACH $____________ $____________

A0410 25201-0000 SPECIAL ROCK EMBANKMENT

450.0 CUYD $____________ $____________

A0420 30305-2000 PULVERIZING, 4-INCH DEPTH

290.0 STA $____________ $____________

A0430 30305-3000 PULVERIZING, 6-INCH DEPTH

340.0 STA $____________ $____________

A0440 30801-2000 ROADWAY AGGREGATE, METHOD 2

6,250 CUYD $____________ $____________

A0450 30801-2000 ROADWAY AGGREGATE, METHOD 2 (recycled pulverized asphalt)

900 CUYD $____________ $____________

A0460 40101-5600 SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, 0.3 TO <3 MILLION ESAL

33,000 TON $____________ $____________

A0480 40105-3000 ANTISTRIP ADDITIVE, TYPE 3

330.0 TON $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 9

A0500 40920-1000 FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H

80.0 TON $____________ $____________

A0510 41103-0000 PRIME COAT (Method 1)

183,700 SQYD $____________ $____________

A0520 41105-0000 BLOTTER

270 TON $____________ $____________

A0530 41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H

80.0 TON $____________ $____________

A0540 41301-0000 ASPHALT PAVEMENT MILLING

2,100 SQYD $____________ $____________

A0550 55207-0000 REPAIR CONCRETE

ALL LPSM $___LPSM_____ $____________

A0560 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL

82 LNFT $____________ $____________

A0570 55901-0000 MEMBRANE WATERPROOFING

127 SQYD $____________ $____________

A0580 58301-0000 CARBON FIBER REINFORCED POLYMER

256 LNFT $____________ $____________

A0590 58302-0000 CARBON FIBER REINFORCED POLYMER TEST

3 EACH $____________ $____________

A0600 60103-0000 CONCRETE, HEADWALL

2 EACH $____________ $____________

A0610 60201-0500 15-INCH PIPE CULVERT

5 LNFT $____________ $____________

A0620 60201-0600 18-INCH PIPE CULVERT

160 LNFT $____________ $____________

A0630 60201-0800 24-INCH PIPE CULVERT

10 LNFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 10

A0640 60202-0500 30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

110 LNFT $____________ $____________

A0650 60210-0500 END SECTION FOR 15-INCH PIPE CULVERT

1 EACH $____________ $____________

A0660 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT

4 EACH $____________ $____________

A0670 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

1 EACH $____________ $____________

A0680 60211-0900 END SECTION FOR 30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL

PIPE CULVERT

2 EACH $____________ $____________

A0690 60403-0700 INLET, CALTRANS

1 EACH $____________ $____________

A0700 60601-0000 SPILLWAY ASSEMBLY

12 EACH $____________ $____________

A0710 60706-0000 CLEANING DRAINAGE STRUCTURE

26 EACH $____________ $____________

A0720 60801-0500 PAVED WATERWAY, TYPE 5

300 SQYD $____________ $____________

A0730 60901-2100 CURB, ASPHALT, 4-INCH DEPTH

24,000 LNFT $____________ $____________

A0740 60901-2300 CURB, ASPHALT, 6-INCH DEPTH

660 LNFT $____________ $____________

A0750 61701-1350 GUARDRAIL SYSTEM G4, TYPE 2, CLASS B STEEL POSTS

3,025.00 LNFT $____________ $____________

A0760 61702-0600 TERMINAL SECTION, TYPE FLARED

13 EACH $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 11

A0770 61702-0800 TERMINAL SECTION TYPE TANGENT

9 EACH $____________ $____________

A0780 61704-1000 REPLACEMENT POST, STEEL

5 EACH $____________ $____________

A0790 61707-0000 STRUCTURE TRANSITION RAILING

42 LNFT $____________ $____________

A0800 61710-0000 RAISING GUARDRAIL

250 LNFT $____________ $____________

A0810 61711-5000 IMPACT ATTENUATOR, QUADGUARD

2 EACH $____________ $____________

A0820 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

80 HOUR $____________ $____________

A0830 62201-0350 BACKHOE

80 HOUR $____________ $____________

A0840 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY

40 HOUR $____________ $____________

A0850 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

40 HOUR $____________ $____________

A0860 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY

40 HOUR $____________ $____________

A0870 62202-1000 MATERIALS TRANSFER VEHICLE

ALL LPSM $___LPSM_____ $____________

A0880 62301-0000 GENERAL LABOR

100 HOUR $____________ $____________

A0890 62302-0100 SPECIAL LABOR, SLOPE SCALING

40 HOUR $____________ $____________

A0900 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

40 HOUR $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 12

A0910 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

40 HOUR $____________ $____________

A0920 62510-2000 SEEDING, HYDRAULIC METHOD

12.0 ACRE $____________ $____________

A0930 62515-2000 MULCHING, HYDRAULIC METHOD

12.0 ACRE $____________ $____________

A0940 62516-3000 MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX

3,100 SQYD $____________ $____________

A0950 63301-0000 SIGN SYSTEM

92 EACH $____________ $____________

A0960 63308-0000 OBJECT MARKER

114 EACH $____________ $____________

A0970 63309-0200 DELINEATOR, TYPE 2

350 EACH $____________ $____________

A0980 63309-1000 DELINEATOR, TYPE SNOWPOLE

46 EACH $____________ $____________

A0990 63313-0000 RUMBLE STRIP (CENTERLINE)

48,000 LNFT $____________ $____________

A1000 63313-1000 RUMBLE STRIP, SHOULDER

10,300 LNFT $____________ $____________

A1010 63316-1000 REMOVE AND RESET SIGN

5 EACH $____________ $____________

A1020 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID

90.0 MILE $____________ $____________

A1030 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

4.0 MILE $____________ $____________

A1040 63404-0800 PAVEMENT MARKINGS, TYPE H

12.0 GAL $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 13

A1050 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

10 EACH $____________ $____________

A1060 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

60 EACH $____________ $____________

A1070 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

150 EACH $____________ $____________

A1080 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

25 EACH $____________ $____________

A1090 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

2 EACH $____________ $____________

A1100 63503-0200 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 2 (Shoulder Closure)

300 LNFT $____________ $____________

A1110 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER

325 LNFT $____________ $____________

A1120 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

100 LNFT $____________ $____________

A1130 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

235.00 SQFT $____________ $____________

A1140 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

25.0 MILE $____________ $____________

A1150 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

7,800 HOUR $____________ $____________

A1160 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

720 HOUR $____________ $____________

Submitted by:____________________________________ Schedule Total:____________

Bid Schedule Schedule:A Schedule Type:Base

Project No:CA FLAP CRS4018(1)

Project Name:Whitney Portal Road

Joe.Wilson Typewritten Text

A0170 15401-0000 CONTRACTOR TESTING (GOVERNMENT-FURNISHED FIELD LABORATORY)

ALL LPSM $___LPSM_____ $____________

Joe.Wilson Typewritten Text

Joe.Wilson Typewritten Text

A-14

BUY AMERICAN ACT- CONSTRUCTION MATERIALS

UNDER TRADE AGREEMENTS

It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.

NOTE TO CONTRACTOR:

The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-11 Paragraph (c) & (d) and FAR Provision 52.225-12 Paragraph (b).

Material and/or Component

Construction Material Description

Unit of Measure

Quantity

*Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

Material and/or Component

Construction Material Description

Unit of Measure

Quantity

*Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]

A-15

HAZARDOUS MATERIALS

As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.

Hazardous Material

Identification Number

USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS

Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.

Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:

• It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.

• The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.

• Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.

B-1

BID BOND

(See instructions on reverse)

DATE BOND EXECUTED (Must not be later than bid opening date)

OMB NO. 9000-0045

Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, D.C. 20405.

PRINCIPAL (Legal name and business address)

TYPE OF ORGANIZATION (AX@ one)

INDIVIDUAL PARTNERSHIP

JOINT VENTURE CORPORATION

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PENAL SUM OF BOND

BID IDENTIFICATION

PERCENT OF

BID PRICE

AMOUNT NOT TO EXCEED

BID DATE

INVITATION NO.

DTFH6815B00017

20 PERCENT

MILLION(S)

THOUSAND(S)

HUNDRED(S)

CENTS

FOR (Construction, Supplies or Services)

CONSTRUCTION

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum “jointly and severally” as well as “severally” only for the purpose of allowing a joint action or actions against any or all of

us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty

(60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of time for acceptance of the bid that the Principal may grant to the Government. Notice to the surety(ies) of extension(s) are waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

PRINCIPAL

SIGNATURE(S)

1.

(Seal)

2.

3.

Corporate

Seal

NAMES(S) &

TITLE(S)

(Typed)

3.

INDIVIDUAL SURETY(IES)

NAME(S)

CORPORATE SURETY(IES)

NAME &

ADDRESS

STATE OF INC.

LIABILITY LIMIT

SURETY A

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 24 (Rev. 10-98) Previous edition is usable Prescribed by GSA - FAR (48 CFR) 53.228(a)

B-2

CORPORATE SURETY(IES) (Continued)

SURETY B

SURETY C

SURETY D

SURETY E

SURETY F

SURETY G

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated “Principal” on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed 3,000,000.00 dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury=s list of approved sureties and must act within the limitation listed therein. Where more than one corporate surety is involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed “CORPORATE SURETY(IES).” In the space designated “SURETY(IES)” on the face of the form, insert only the letter identification of the sureties.

(b) Where individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28), for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capacity.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word “Corporate Seal”;

and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms “bid” and “bidder” shall include “proposal” and “offeror.”

STANDARD FORM 24 (Rev. 10-98) BACK

B-3

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

BIDDER’S INFORMATION

INSTRUCTIONS: Answer all questions on this form inserting "none" or "not applicable" where appropriate. If more space is required attach additional sheets. Return the signed, dated and completed form with the bid to the address shown in the invitation for bids on or before the time set for bid opening. The prospective bidder shall provide any additional information requested by the Government during evaluation of the bids.

If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or partner.

1. Name and address of business:

Name DUNS Number (See FAR Provision 52.204-6)*

Street Home Office Congressional District (Insert District #) *

City State Zip Code

* Necessary for Government reporting purposes only To obtain a Dun & Street number, call County 800-333-0505.

Telephone Number (Include Area Code)

Fax Number (Include Area Code)

2. a. Type of organization (check appropriate box):

If a Foreign entity:

Individual

Non-profit organization

Corporation

Partnership

Joint Venture

Registered in:

b. Size and type of Business Concern (check appropriate boxes):

Large Business Concern

Small Disadvantaged Business Concern

Emerging Small Business

Small Business Concern

Women-Owned Small Business

SBA 8(a) Certified

HUB Zone Business Concern

Veteran Owned Business Concern

Service-Disabled Veteran-Owned Business Concern

Individual

Non-profit organization

Corporation

Partnership

Joint Venture

Incorporated in:

B-4

3. If a joint venture or general partnership:

a. Provide the name under which the project will be bid, the home office address, and name of the principal who will represent the company with regard to this project if different from "1." above.

Principal

Business Name

Street

City State Zip Code

b. Provide the name and home office addresses of each of the joint venture partners; indicate which partner is the sponsoring partner. Attach a separate sheet for additional partners.

Sponsoring Partner Other Partner

Street Street

City State Zip Code City State Zip Code

4. Date organization established: _______________________

5. Name of succeeded business, if any: _________________________________________________________

6. How many years have you been in business as:

a. General contractor years.

b. Subcontractor years.

7. a. Furnish the following information concerning the owner, partners, officers and directors:

Percent of Business Owned

Years of Business Experience

Name

Title

Contracting

Other

b. Attach resumes of these key personnel as well as the on-site project manager(s) and superintendent(s), and specifically identify the following:

- Present position, responsibility, and length of employment.

- Amount and type of construction experience.

- Amount and type of highway construction experience, including position, responsibility, and a brief project description of each period of employment.

- Formal education and training, professional or technical registrations or licenses.

B-5

8. a. Contracts in force. (Attach additional sheets if necessary)

Project Name and Contract Numbers

Owner's Name, Address, and

Contact Name and Telephone #

Scope of Work Performed

Contract Amount

Estimated

Completion Date

Name of Surety

b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet.

B-6

9. a. List at least five of the largest jobs you have completed in the last five years which are similar in project work scope to this project. (Attach additional sheets if necessary)

Project Name and Contract Numbers

Owner's Name, Address, Contact Name and Telephone #

Scope of Work

Performed

Original and Final Contract Amounts

Original and Final Completion Dates

Names of On-site Project

Manager and Superintendent

Name of Surety

b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet.

B-7

Solicitation Provisions

52.203-98, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements-Representation (DEVIATION FEB 2015)

(a) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Resolution Appropriations Act, 2015 (Pub. L. 113-235), Government agencies are not permitted to use funds appropriated (or otherwise made available) under that or any other Act for contracts with an entity that requires employees or subcontractors of such entity seeking to report fraud, waste, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

(b) The prohibition in paragraph (a) of this provision does not contravene requirements applicable to Standard Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(c) Representation. By submission of its offer, the Offeror represents that it does not require employees or subcontractors of such entity seeking to report fraud, waste, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

(End of provision)

52.204-5 Women-Owned Business (Other Than Small Business). (MAY 1999)

(a) Definition. "Women-owned business concern," as used in this provision, means a concern that is at least 51 percent owned by one or more women; or in the case of any publicly owned business, at least 51 percent of its stock is owned by one or more women; and whose management and daily business operations are controlled by one or more women.

(b) Representation. [Complete only if the offeror is a women-owned business concern and has not represented itself as a small business concern in paragraph (b)(1) of FAR 52.219-1, Small Business Program Representations, of this solicitation.] The offeror represents that it * is a women-owned business concern.

52.204-8 Annual Representations and Certifications. (MAY 2014)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237310.

B-8

(2) The small…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .