aaron.sanford Typewritten Text
E-21
CA FLAP CR S4018(1)
WHITNEY PORTAL ROAD
Section 108. - PROSECUTION AND PROGRESS
108.01 Commencement, Prosecution, and Completion of Work: Add the following:
Limit operations as follows:
All work shall be completed by November 7, 2016.
General Limitations
A Notice to Proceed must be issued before commencement of any work.
o No on-site work may occur before March 1, 2016.
o It is the government’s intent to issue a Notice to Proceed prior to March 2016 to allow the contractor to work on required submittals.
Restrict all work activities within the right-of-way areas shown in plans.
Asphalt concrete pavement mix design must be approved before pulverizing activities commence.
Night work is not allowed.
Environmental Limitations
Clearing of vegetation on BLM property between stations 350+00 and 456+00; 575+00 and 596+00; and 620+00 and 676+00 should occur before March 15. If vegetation clearing occurs on or after March 15, furnish a qualified biologist as defined in 623.04A to perform surveys of the area for nesting migratory birds. Pre-construction surveys shall be conducted two weeks prior to construction activities. The biologist will conduct a wandering pedestrian survey within 100 feet of the existing area of road disturbance for nesting migratory birds including raptors. If an active nest is identified, a no-disturbance buffer shall be established around the nest. For non-raptors a buffer of up to 50 feet may be established and for raptors a buffer of up to 250 feet may be established. The extent of the buffer shall be determined by a wildlife biologist in consultation with FHWA- CFLHD environment staff or a BLM biologist. No work shall occur within these buffer areas and they shall be maintained and kept in working order until the nest is no longer active as determined by a qualified biologist. A qualified biologist shall be present during construction to monitor the nest(s) and may stop construction if it is determined that the construction activities are resulting in disturbance to the nest.
Do not perform construction activities prior to May 1 or after November 1 between stations 230+00 and 445+00 when large concentrations (greater than 25 individuals) of mule deer are within one-quarter mile of the project area. Minor activities, excluding paving, earthwork, and use of loud equipment, may be permitted upon prior approval of the CO while a large concentration of deer is present.
No construction activities on the LA Aquaduct bridge shall occur prior to August 15th.
Construction activities may commence between August 1st and August 14th if an FHWA approved biologist has determined no active nests are present.
Protect environmentally sensitive or significant features as described below:
Amendment A002 November 5, 2015
E-57
CA FLAP CR S4018(1)
WHITNEY PORTAL ROAD
203.01 Add the following:
This work also includes sawcutting concrete for removal.
203.04 Removing Material. Add the following:
Removal of Structures and Obstructions, pay item 20304-1000 per lpsm is not limited to, but includes the following known items:
(2) Concrete Deadman Blocks, located in the existing parking lot at approximate station 100+00.
Approximately (11) existing corrugated metal flume downdrains. See the Drainage Summary for locations of proposed spillways to replace the existing downdrains, and one additional flume removal at 362+70, Lt.
Netting under the LA Aqueduct Bridge at stations 685+95 – 686+35. Netting is installed by others to prevent nesting during the project construction season. Remove the netting after bridge work has been completed.
For the removal of the curbs, railings, and fencing at the LA Aqueduct Bridge, submit a removal and debris containment plan to the CO for approval at least 30 days before beginning work.
Include the following:
(1) Methods and equipment to be used;
(2) Measures to be used for protecting the environment, public, adjacent property, and workers; and
(3) Methods to keep debris out of both the aqueduct channel and the fenced limits of the aqueduct.
203.05 Disposing of Material.
(b) Burn. Delete the text.
(c) Bury. Delete the text.
Section 204. - EXCAVATION AND EMBANKMENT
Materials
204.03. Add the following:
Crushed aggregate 703.06 Geotextile 714.01(a) Minor hot asphalt concrete 404
Construction Requirements
Leo.Depaula Text Box
Leo.Depaula Text Box Amendment A002 November 5, 2015
Leo.Depaula Text Box Amendment A002 November 5, 2015
Leo.Depaula Text Box
Untitled
| Text1: |
| Text2: |
| 0: 1 |
| 1: 5 |
| Text3: |
| 0: A002 |
| 1: 11/5/2015 |
| 2: |
| 0: |
| 1: CA FLAP CRS 4018(1) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: Joe Wilson 1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH6815B00017 |
| 1: October 15, 2015 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0 * |
| Text11: |
| 0: |
| 1: |
| Text12: See Below * |
| Text13: Invitation for Bid |
Remove Page E-21 and replace with attached page E-21 dated November 5, 2015.
Remove Page E-57 and replace with attached page E-57 dated November 5, 2015.
Plans Remove plan sheet S1 and replace with attached plan sheet S1 dated November 5, 2015.
Remove plan sheet S3 and replace with attached plan sheet S3 dated November 5, 2015.
NOTE: When printing revised sheets, turn on 'Document and Markups' in the Print Properties menu to illustrate changes on hard copy print.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN ITEM 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO SF-1442, PAGE A-2, OF THE SOLICITATION)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |