The file's text, extracted by GovTribe without its formatting.
EEBACS - Contractors shall use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes).
The Contractor shall be required to attend a training session on the use of EEBACS. The training session will require up to 4 hours. No more than 3 Contractor staff may attend the training unless approved by the CO. The Contractor shall be responsible for training additional staff.
Complete and electronically submit “EEBACS User Account Form” (Form EEBACS-001) for each individual requiring EEBACS access. Submit forms to the CO at the preconstruction conference or at least 10 days prior to the start of any contract work or EEBACS training. As needed, request additional system access using Form EEBACS-001 and allow 7 days for system access.
The Contractor is responsible for maintaining active EEBACS accounts for all contractor staff who use EEBACS and for ensuring that CO is notified within 24 hours after an account holder is reassigned or no longer employed by the Contractor. Within 24 hours after an account holder is reassigned or no longer employed by the Contractor, submit an EEBACS-001 form requesting that the account be disabled.
A user guide, “EEBACS for Construction Contractors”, is available. An electronic version can be found at http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm
MEASUREMENT AND PAYMENT (Schedule A) – Payment for Schedule A will be Lump Sum for each task (Tasks 1 – 5). At completion of each task, payment will be paid for the total task price for each task submitted under Schedule A.
Submit invoices to the designated billing office by the 7th day after the closing date. Invoices received by the designated billing office after the 16th day following the closing date will not be accepted for payment processing that month. Include late, unprocessed invoice submittals in the following months invoice.
The Government’s receiving report will be developed using the measurements and quantities from Pay Notes received by the CO in EEBACS and determined acceptable.
http://flh.fhwa.dot.gov/resources/pse/estimate/guide.htm�
| Amended B-sheets.pdf |
| B4 |
| TAB_X-RDS-001.pdf |
| V12-amend.pdf |
| sp_c633-A-001.pdf |
| V12-amend.pdf |
| sp_c633-A-001.pdf |
| A003-Bsheets.pdf |
| SUM_X-001.pdf |
| Rev-B2.pdf |
| SUM_Y-001.pdf |
| Rev-B4.pdf |
| TAB_X-RDS-001.pdf |
| Rev-B5.pdf |
| TAB_X-PKS-001.pdf |
| Rev-B9.pdf |
| TAB_Y-RDS-001.pdf |
| Rev-B10.pdf |
| TAB_Y-PKS-001.pdf |
| Rev-B4.pdf |
| TAB_X-RDS-001.pdf |
| Rev-B5.pdf |
| TAB_X-PKS-001.pdf |
| Text3: |
| 0: A001 |
| 1: 03/14/2013 |
| 2: |
| 0: |
| 1: MN ERFO 1 |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: JASON LONGSHORE
1:
| Text6: |
| 0: DTFH68-13-R-00009 |
| 1: 03/06/2013 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text12: See Below* |
| Text13: The purpose of this amendment is to incorporate the terms and conditions relating to EEBACS and MEASURE AND PAYMENT (SCHEDULE A) as stated on page two (2) of this amendment. |
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |