J-08 Task Order Work-Plan Template Amend 0003.xlsx
XLSX spreadsheet 117 KB Posted
- Attached to
- Security System Design and Integration II (SSDI II) Federal contract opportunity
- Solicitation number
- DTFAWA-17-R-00049
About this file
This Request for Information from the Federal Aviation Administration solicits industry feedback on draft documents for a follow-on security systems design and integration contract. The incumbent contractor is Versar Security Systems, LLC, and the solicitation number will be DTFAWA-17-R-00049. Services required include a complete technical refresh of security systems at staffed FAA facilities, which can range from replacement of integrated physical access control, surveillance, and perimeter intrusion systems to replacement of intercoms and door hardware. Access control systems must meet HSPD-12 and NIST FIPS requirements and be on the GSA approved products list. All facilities must be accessible for remote monitoring through the FAA's PSEMS. Interested parties must register in SAM under NAICS code 561621 and sign a document security notice to receive the FOUO/SUI documents. Comments are due by August 3, 2017 to the contracting officer. This is an information request only and not a solicitation; costs to respond will not be reimbursed.
J-08 Task Order Work-Plan Template Amend 0003 (xlsx)
View the file
Other files for this federal contract opportunity
Show all 50
Security System Design and Integration II (SSDI II) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TO Approval
| TASK ORDER Number | Mod. # | Order Type |
| (T&M, FFP, CPFF,etc.) |
(Order Title)
| Job Order Number (JON): | ||||
| Total Order Ceiling Amount (including travel): | $0.00 | |||
| Travel Costs (CLIN 5000-5003): | $0.00 | |||
| Fixed Fee (CPFF Orders only): | ||||
| Task Order Ceiling Amount (not including Travel): | $0.00 | |||
| Original Order Amount: | ||||
| Previous Modification Amounts: | ||||
| Funds (added to or subtracted with) this Order: | $0.00 |
Task Order Summary (If Order Modification, indicate reason) :
| Site location included in Order: | ||||
| Facility LOC ID | FACILITY / SITE TYPE (ATCT, FSDO, ARTCC, etc.) | Address, CITY, STATE | Order Completion Date | |
| - |
| Order Approvals: | |||||
| FAA / Contractor | Name | Routing Symbol / Position | Telephone Number | Signature | Date |
| FAA SSDI Contracting Officers Representative (COR) |
FAA Contracting Officer (CO)
| Breakdown of funding: | |||||||
| Site Survey | Design / Consultation | Phase II | Program Management | Total Funding Required By This Modification | |||
| Site Preparation | Integration / Installation | Training | |||||
| Labor Costs: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sub-Contract Costs: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Travel Costs: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Approved Security Equipment: | $ - 0 | $ - 0 | |||||
| Non-Contract Security Equipment (pre-approval required before use): | $ - 0 | $ - 0 | |||||
| Other Direct Costs: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Documentation / Bonds / Permits: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Order Totals: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Yes/No | Verified By | ||||||
| Workplan Approved: | |||||||
| Funding Identified: | |||||||
| Funding Added to or on Contract: |
Notes: Site visits will be coordinated through the FAA designated Field COR or designated FAA individual.
&"Arial,Bold"&14TASK ORDER Security Systems Installation FAA Contract No. DTFAWA-08-D-00010
&F &P &6 Form: SSDI-001 (REV -) Attachment J.
Work Plan Approvals & Summary
| $0.00 | 00 | ||||
| Work Plan Number (yyyy-rr-nnn) | Mod. # | Order Type | |||
| (T&M, FFP, CPFF,etc.) | |||||
| $0.00 | |||||
| (Order Title) |
Job Order Number (JON):
| Task Order Summary (and if Order Modification, indicate reason) : |
| $0.00 |
| Site location included in Order: | |||||
| Facility LOC ID | FACILITY / SITE TYPE (ATCT, FSDO, ARTCC, etc.) | Address, CITY, STATE | Order Completion Date | ||
| 0 | 0 | 0 | 12/31/99 | - | 12/31/99 |
| Work Plan Approvals: | |||||
| FAA / Contractor | Name | Routing Symbol / Position | Telephone Number | Signature | Date |
| Contractor |
Headquarters or Service Area Point of Contact (POC)
FAA Field COR Field COR or Service Area Point of Contact (POC)
FAA Service Area POC Headquarters
FAA SSDI Contracting Officers Representative (COR)
Notes:
&"Arial,Bold"&14WORK PLAN
SECURITY SYSTEMS DESIGN AND INTEGRATION CONTRACT
Contract Number DTFAWA-08-D-00010
Page &P of &N &6 Form: SSDI-001 (REV -)
Detail of Work
| ERROR:#VALUE! | 00 |
| Work Plan Number (yyyy-rr-nnn) | Revision |
Detail of work to be performed:
Contract Number DTFAWA-08-D-00010
Page &P of &N &6 Form: FSRM-001I (REV 6A) Attachment J.7.7.
Labor Hours - ALL LABOR CA
| 00 | |||||||||||||||||
| Work Plan Number (yyyy-rr-nnn) | Revision | ||||||||||||||||
| Labor categories supporting Order: | |||||||||||||||||
| Individuals | Hours | Hourly | Total | Labor Costs | |||||||||||||
| Item | Labor Category | Name | Program Management | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Total Labor Hours | Rate | Labor Costs | Program Management | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training |
| Program Manager | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Service Area Point of Contact (POC) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Project Site Manager | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Project Site Supervisor | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| System Administrator | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Program Management Specialist | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Administration Support | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Configuration Control Specialist | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Program Control Specialist | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Systems Engineer - Senior | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Security Systems Specialist - Senior | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Security Systems Specialist - Junior | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Electronic Security Technician - SR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Electronic Security Technician - JR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Quality Control Specialist | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Training Specialist | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Draftsman - CAD Operator | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Principle Specialist I | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Principle Specialist II | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Network Engineer | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Information Assurance Specialist | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Logistics Specialist | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Total Labor Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
| Total Labor Costs: |
Contract Number DTFAWA-08-D-00010
Page &P of &N &6 Form: SSDI-001I (REV 9)
Subcontractor Work
| $0.00 | 00 | |
| Work Plan Number (yy-rr-nnn) | Revision |
| Detail of Sub-Contractor Duties | |
| Sub-Contractor | Detail of Sub-Contractor Work |
| Sub-Contractor Labor: | |||
| Order Phase (Enter "x" in applicable column) | Sub-Contractor Costs | Related Activity |
(DO NOT ENTER DATA IN THESE FIELDS)
| Sub-Contractor | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Summary of Sub-Contractor Work | Hours / Quantity | Unit Cost | Sub-Contract Cost | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | : Sub-Contract Labor Costs | |||||||||||||
| Sub-Contractor Material: | |||||||||||||||||||
| Task Order Phase (Enter "x" in applicable column) | Sub-Contractor Costs | Related Activity |
(DO NOT ENTER DATA IN THESE FIELDS)
| Sub-Contractor | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Description of Sub-Contractor Material Items | Quantity | Unit Cost | Sub-Contract Cost | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| Sub-Contract Material Costs: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Sub-Contract Costs: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Contract Number DTFAWA-08-D-00010
Page &P of &N
&6Form: SSDI-001I (REV 6A)
Travel
| $0.00 | 00 | |
| Work Plan Number (yyyy-rr-nnn) | Revision |
| Travel Costs: | ||||
| Purpose of travel | ||||
| (Enter "x" in applicable column enter only 1 "x" per row) | Travel Costs | Related Activity |
(DO NOT ENTER DATA IN THESE FIELDS)
| Individual Traveling | Program Mgmt. Reviews / Meetings | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Origination | Destination | Airfare or Auto (per trip) | FTR Rate / Mile. Rate | Duration of Trip (days) / Mileage, # of trips | Number of trips / Miles per trip | Travel Cost | Program Management | Site Survey | Design / | ||||||||||
| Consultation | Site Preparation | Integration / Installation | Training | Program Management | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | |||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Travel Costs: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Travel Costs: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Contract Number DTFAWA-08-D-00010
Page &P of &N &6 Form: SSDI-001I (REV 6A)
Approved Security Equipment
| 0 | 00 | x | ||||||
| Work Plan Number (yyyy-rr-nnn) | Revision | x | ||||||
| x | ||||||||
| Approved Security Equipment: | x | |||||||
| SSDI ID Number | Part Number | Manufacturer | System/Component | Qty. | x | Total Cost | Unit Cost | Standard Mfg. Warranty (Years) |
Total Equipment/Material Costs: x $ - 0
Equipment Requiring Approval
Work Plan Number (yyyy-rr-nnn) Revision
| New Equipment not on approved equipment list: | ||||||
| Non Standard Equipment Approvals | Part Number | System/Component | Qty. | Unit Cost | Total Cost | |
| Approval Request Number | Approved Item Number | |||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| Total Equipment/Material Costs: | $ - 0 |
Other Direct Costs
| $0.00 | 00 |
| Work Plan Number (yyyy-rr-nnn) | Revision |
| Other Direct Costs: | |||
| Order Phase (Enter "x" in applicable column) | Other Direct Costs | Related Activity |
(DO NOT ENTER DATA IN THESE FIELDS)
| Program Management | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Description | Qty. | Unit Cost | Total Cost | Program Management | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Program Management | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | |
| $0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| Other Direct Costs: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total ODC's: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Total ODC's (Materials): $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Documentation / Bonds / Permits / Freight: | |||
| Order Phase (Enter "x" in applicable column) | Other Direct Costs | Related Activity |
(DO NOT ENTER DATA IN THESE FIELDS)
| Program Management | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Description | Qty. | Unit Cost | Total Cost | Program Management | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | Program Management | Site Survey | Design / Consultation | Site Preparation | Integration / Installation | Training | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| $0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||
| Documentation / Bond / Permit Costs: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Documentation / Bond / Permit Costs: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
&"Arial,Bold"&14WORK PLAN
SECURITY SYSTEMS DESIGN AND INTEGRATION CONTRACT
Contract Number DTFAWA-08-D-00010
Page &P of &N &6 Form: SSDI-001I (REV 6A)
Work Plan-Deliverables-Doc
| 00 | |||||
| Work Plan Number (yyyy-rr-nnn) | Mod. # | ||||
| Submittals / Deliverables: | |||||
| Required Submittals / Order Deliverables | CLIN | CDRL # or SOW Section | Duration (Working Days) | Start Date (Date or Days After TO Award) | |
| (mm/dd/yy) | Completion Date (Date or Days After Item Start Date) |
(mm/dd/yy)
Project Duration - Weeks (assumes 5 day work week) 0.0
Contract Number DTFAWA-08-D-00010
Page &P of &N &6
Basis of Estimate
| 1 | |||||||||||||||||||||||||||||||||||||||||
| Program Management Support | Site Survey Preparation | Site Survey visit | Develop Site Survey Report | Site Survey Coordination meeting | ADDITIONAL SITE SUREVY TASKS (Identify Task) | ADDITIONAL SITE SUREVY TASKS (Identify Task) | ADDITIONAL SITE SUREVY TASKS (Identify Task) | Prepare Design | ADDITIONAL DESIGN TASKS (Identify Task) | ADDITIONAL DESIGN TASKS (Identify Task) | ADDITIONAL DESIGN TASKS (Identify Task) | Issue Non-Standard Equipment Request | Prepare Draft Phase 2 Order | Prepare Implementation Schedule | Incorporate FAA comments in Order | Issue Subcontracts | Order Equipment | Issue installation drawings and SSR for site installation | Coordinated project activities | Monitor Quality Assurance | Maintain Correspondence | Attend Project Meetings | Prepare meeting minutes | Site | |||||||||||||||||
| Pre-construction meeting | Obtain Permits | Obtain outage permit | Configure, program and bench test head end equipment | Install security fencing | Install General Construction | Install Access Control | Install security power taps/circuits | Install CCTV | Install Security Lighting | Install Locks | Install Perimeter Intrusion system | Install Burglar alarm system | Install Intercom | Inspection & punch list | Commission Access Control system | Commission CCTV | Commission Intercom | Commission Burglar Alarm | Commission Security Lighting | Commission Locks | Commission Perimeter Intrusion Detection | Commission Other | ADDITIONAL INTEGRATION / INSTALLATION TASKS | ||||||||||||||||||
| (Identify Task) | ADDITIONAL INTEGRATION / INSTALLATION TASKS | ||||||||||||||||||||||||||||||||||||||||
| (Identify Task) | ADDITIONAL INTEGRATION / INSTALLATION TASKS | ||||||||||||||||||||||||||||||||||||||||
| (Identify Task) | Pre CAI/JAI Testing | FAA Training | Perform CAI/JAI | Complete As-built drawings | Drawing Re-Work | Construction close out | Prepare O & M Manuals | Prepare / Issue Closeout Order | Hours by Labor Category (not including "PM % of Labor in Order" column) | ||||||||||||||||||||||||||||||||
| Program Manager | Program Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Program Control Specialist | Program Management | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Configuration Control Specialist | Program Management | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Program Management Specialist | Program Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Administrative Support | Program Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||
| Training | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Regional Point of Contact (POC) | Program Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Project Site Manager | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Project Site Supervisor | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Security Systems Specialist - Senior | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Security Systems Specialist - Junior | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Systems Engineer - Senior | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Electronic Security Technician - Senior | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Electronic Security Technician - Junior | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Quality Control Specialist | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training Specialist | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Draftsman / CAD Operator | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| System Administrator | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Principle Specialist I | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||||
| Training | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Principle Specialist II | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Network Engineer | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Information Assurance Specialist | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| Logistics Specialist | Program Management | 0 | 0 | ||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | 0 | |||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 | ||||||||||||||||||||||||||||||||||||||||
| 0 | Program Management | 0 | |||||||||||||||||||||||||||||||||||||||
| Site Survey | 0 | ||||||||||||||||||||||||||||||||||||||||
| Design Consultation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Site Preparation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Integration/Installation | 0 | ||||||||||||||||||||||||||||||||||||||||
| Training | 0 |
Total Labor Hours by Function (FYI Only) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
&P &"Arial,Bold"&14WORK PLAN
SECURITY SYSTEMS DESIGN AND INTEGRATION CONTRACT
Contract Number DTFAWA-08-C-00XXX DTFAWA-08-D-00010