J-08 Task Order Work-Plan Template Amend 0003.xlsx

XLSX spreadsheet 117 KB Posted

Attached to
Security System Design and Integration II (SSDI II) Federal contract opportunity
Solicitation number
DTFAWA-17-R-00049
Issued by
Department of Transportation Federal Aviation Administration Headquarters

About this file

This request for information from the Federal Aviation Administration solicits industry feedback on draft documents for a follow-on security systems design and integration contract. The current incumbent is Versar Security Systems, LLC. The solicitation seeks comments on requirements for a technical refresh of security systems at staffed FAA facilities, which may include replacement of integrated physical access control, surveillance, and perimeter intrusion detection systems. Access control systems must meet HSPD-12 and NIST FIPS requirements. All facilities must be accessible for remote monitoring through the FAA's Physical Security Enterprise Management System. Interested parties must register in SAM under NAICS code 561621, Security System Services, and sign a document security notice to receive sensitive documents. Comments are due by August 3, 2017 via email. This request is for information purposes only and does not constitute a request for proposal or acceptance of proposals.

J-08 Task Order Work-Plan Template Amend 0003 (xlsx)

View the file

Other files for this federal contract opportunity

Other files attached to Security System Design and Integration II (SSDI II), newest first.
File Type Posted
J-19 SSDI II Sample Task for KSN FSL - 2.docx DOCX document
Amendment 0005 SF30.pdf PDF
J-04 Labor Category Definitions.doc DOC document
SSDI II DID's.zip ZIP file
J-16 Equipment ListA0009 PRICE.xls XLS spreadsheet
Amendment 0004 with change pages.pdf PDF
J-03 List of Applicable Documents A0008.pdf PDF
Amendment 0006.pdf PDF
J-14 drawings.zip ZIP file
J-17 Past Performance Questionnaire.docx DOCX document
J-01 SSDI-II List of Facilities_FOUO.pdf PDF
J-19 Sample Task Drawings 2 180110 A0001.pdf PDF
VENDOR DOCUMENT SECURITY NOTICE.doc DOC document
J-07 Work-Plan Request.xls XLS spreadsheet
J-19 Sample Task Drawings 1 A0001.pdf PDF
J-02 Acronym List.pdf PDF
J-23 FAA Order 1600.16E FOUO.pdf PDF
J-19 SSDI II Sample Task for KSN.doc DOC document
J-24 Past Experience and Performance History Form.doc DOC document
J-12 Sample Site Survey Report.doc DOC document
J-19 SSDI II PSEMS Tasking.docx DOCX document
J-22 FAA Order 1370.121.pdf PDF
J-16 Equipment List.xls XLS spreadsheet
J-19 Sample Task Drawings 3 A0001.pdf PDF
J-01 SSDI-II List of Facilities_FOUO.pdf PDF
J-12 Sample Site Survey Report.doc DOC document
J-13 Resume Format.doc DOC document
J-10 Non-Standard Equipment Request Template.xls XLS spreadsheet
J-19 FSL-2 Drawings Amend 0001.pdf PDF
J-13 Resume Format.doc DOC document
J-14 drawings.zip ZIP file
J-19 SSDI II Sample Task for KSN FSL - 2.docx DOCX document
J-15 Excerpt from 1600.69C FOUO.pdf PDF
J-19 SSDI II Sample Task for KSN FSL - 1.docx DOCX document
J-19 Sample Task Drawings 1 A0001.pdf PDF
J-19 SSDI II PSEMS Tasking.docx DOCX document
Amendment 0001 - SF30.pdf PDF
J-10 Non-Standard Equipment Request Template.xls XLS spreadsheet
J-11 Contractor Acceptance Inspection (CAI) Form.CAI —
J-03 List of Applicable Documents.pdf PDF
J-07 Work-Plan Request.xls XLS spreadsheet
J-18 Physical Security Enterprise Management System (PSEMS) FOUO.PSEMS —
J-11 Contractor Acceptance Inspection (CAI) Form.CAI —
J-21 Close Out Task Order Sample Form.xls XLS spreadsheet
J-21 Close Out Task Order Sample Form.xls XLS spreadsheet
Amendment 0001 - SF30.pdf PDF
VENDOR DOCUMENT SECURITY NOTICE.doc DOC document
DTFAWA-17-R-00049 PWREQ.pdf PDF
J-02 Acronym List.pdf PDF
J-20 SSDI II Cost Model.xlsx XLSX spreadsheet
Show all 50

Security System Design and Integration II (SSDI II) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TO Approval

TASK ORDER NumberMod. #Order Type
(T&M, FFP, CPFF,etc.)

(Order Title)

Job Order Number (JON):
Total Order Ceiling Amount (including travel):$0.00
Travel Costs (CLIN 5000-5003):$0.00
Fixed Fee (CPFF Orders only):
Task Order Ceiling Amount (not including Travel):$0.00
Original Order Amount:
Previous Modification Amounts:
Funds (added to or subtracted with) this Order:$0.00

Task Order Summary (If Order Modification, indicate reason) :

Site location included in Order:
Facility LOC IDFACILITY / SITE TYPE (ATCT, FSDO, ARTCC, etc.)Address, CITY, STATEOrder Completion Date
-
Order Approvals:
FAA / ContractorNameRouting Symbol / PositionTelephone NumberSignatureDate
FAA SSDI Contracting Officers Representative (COR)

FAA Contracting Officer (CO)

Breakdown of funding:
Site SurveyDesign / ConsultationPhase IIProgram ManagementTotal Funding Required By This Modification
Site PreparationIntegration / InstallationTraining
Labor Costs:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Sub-Contract Costs:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Travel Costs:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Approved Security Equipment:$ - 0$ - 0
Non-Contract Security Equipment (pre-approval required before use):$ - 0$ - 0
Other Direct Costs:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Documentation / Bonds / Permits:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Order Totals:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Yes/NoVerified By
Workplan Approved:
Funding Identified:
Funding Added to or on Contract:

Notes: Site visits will be coordinated through the FAA designated Field COR or designated FAA individual.

&"Arial,Bold"&14TASK ORDER Security Systems Installation FAA Contract No. DTFAWA-08-D-00010

&F &P &6 Form: SSDI-001 (REV -) Attachment J.

Work Plan Approvals & Summary

$0.0000
Work Plan Number (yyyy-rr-nnn)Mod. #Order Type
(T&M, FFP, CPFF,etc.)
$0.00
(Order Title)

Job Order Number (JON):

Task Order Summary (and if Order Modification, indicate reason) :
$0.00
Site location included in Order:
Facility LOC IDFACILITY / SITE TYPE (ATCT, FSDO, ARTCC, etc.)Address, CITY, STATEOrder Completion Date
00012/31/99-12/31/99
Work Plan Approvals:
FAA / ContractorNameRouting Symbol / PositionTelephone NumberSignatureDate
Contractor

Headquarters or Service Area Point of Contact (POC)

FAA Field COR Field COR or Service Area Point of Contact (POC)

FAA Service Area POC Headquarters

FAA SSDI Contracting Officers Representative (COR)

Notes:

&"Arial,Bold"&14WORK PLAN

SECURITY SYSTEMS DESIGN AND INTEGRATION CONTRACT

Contract Number DTFAWA-08-D-00010

Page &P of &N &6 Form: SSDI-001 (REV -)

Detail of Work

ERROR:#VALUE!00
Work Plan Number (yyyy-rr-nnn)Revision

Detail of work to be performed:

Contract Number DTFAWA-08-D-00010

Page &P of &N &6 Form: FSRM-001I (REV 6A) Attachment J.7.7.

Labor Hours - ALL LABOR CA

00
Work Plan Number (yyyy-rr-nnn)Revision
Labor categories supporting Order:
IndividualsHoursHourlyTotalLabor Costs
ItemLabor CategoryNameProgram ManagementSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTrainingTotal Labor HoursRateLabor CostsProgram ManagementSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTraining
Program Manager00$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Service Area Point of Contact (POC)0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Project Site Manager0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Project Site Supervisor0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
System Administrator0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Program Management Specialist0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Administration Support0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Configuration Control Specialist00$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Program Control Specialist00$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Systems Engineer - Senior0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Security Systems Specialist - Senior0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Security Systems Specialist - Junior0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Electronic Security Technician - SR0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Electronic Security Technician - JR0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Quality Control Specialist0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Training Specialist0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Draftsman - CAD Operator0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Principle Specialist I0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Principle Specialist II0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Network Engineer0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Information Assurance Specialist0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Logistics Specialist0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
0000000$0.00$ - 0$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Hours0000000000000
Total Labor Costs:

Contract Number DTFAWA-08-D-00010

Page &P of &N &6 Form: SSDI-001I (REV 9)

Subcontractor Work

$0.0000
Work Plan Number (yy-rr-nnn)Revision
Detail of Sub-Contractor Duties
Sub-ContractorDetail of Sub-Contractor Work
Sub-Contractor Labor:
Order Phase (Enter "x" in applicable column)Sub-Contractor CostsRelated Activity

(DO NOT ENTER DATA IN THESE FIELDS)

Sub-ContractorSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTrainingSummary of Sub-Contractor WorkHours / QuantityUnit CostSub-Contract CostSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTrainingSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTraining
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0: Sub-Contract Labor Costs
Sub-Contractor Material:
Task Order Phase (Enter "x" in applicable column)Sub-Contractor CostsRelated Activity

(DO NOT ENTER DATA IN THESE FIELDS)

Sub-ContractorSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTrainingDescription of Sub-Contractor Material ItemsQuantityUnit CostSub-Contract CostSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTrainingSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTraining
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 000000
Sub-Contract Material Costs:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Total Sub-Contract Costs: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Contract Number DTFAWA-08-D-00010

Page &P of &N

&6Form: SSDI-001I (REV 6A)

Travel

$0.0000
Work Plan Number (yyyy-rr-nnn)Revision
Travel Costs:
Purpose of travel
(Enter "x" in applicable column enter only 1 "x" per row)Travel CostsRelated Activity

(DO NOT ENTER DATA IN THESE FIELDS)

Individual TravelingProgram Mgmt. Reviews / MeetingsSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTrainingOriginationDestinationAirfare or Auto (per trip)FTR Rate / Mile. RateDuration of Trip (days) / Mileage, # of tripsNumber of trips / Miles per tripTravel CostProgram ManagementSite SurveyDesign /
ConsultationSite PreparationIntegration / InstallationTrainingProgram ManagementSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTraining
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Travel Costs:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Total Travel Costs: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Contract Number DTFAWA-08-D-00010

Page &P of &N &6 Form: SSDI-001I (REV 6A)

Approved Security Equipment

000x
Work Plan Number (yyyy-rr-nnn)Revisionx
x
Approved Security Equipment:x
SSDI ID NumberPart NumberManufacturerSystem/ComponentQty.xTotal CostUnit CostStandard Mfg. Warranty (Years)

Total Equipment/Material Costs: x $ - 0

Equipment Requiring Approval

Work Plan Number (yyyy-rr-nnn) Revision

New Equipment not on approved equipment list:
Non Standard Equipment ApprovalsPart NumberSystem/ComponentQty.Unit CostTotal Cost
Approval Request NumberApproved Item Number
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Total Equipment/Material Costs:$ - 0

Other Direct Costs

$0.0000
Work Plan Number (yyyy-rr-nnn)Revision
Other Direct Costs:
Order Phase (Enter "x" in applicable column)Other Direct CostsRelated Activity

(DO NOT ENTER DATA IN THESE FIELDS)

Program ManagementSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTrainingDescriptionQty.Unit CostTotal CostProgram ManagementSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTrainingProgram ManagementSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTraining
$0.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
Other Direct Costs:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Total ODC's: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Total ODC's (Materials): $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Documentation / Bonds / Permits / Freight:
Order Phase (Enter "x" in applicable column)Other Direct CostsRelated Activity

(DO NOT ENTER DATA IN THESE FIELDS)

Program ManagementSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTrainingDescriptionQty.Unit CostTotal CostProgram ManagementSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTrainingProgram ManagementSite SurveyDesign / ConsultationSite PreparationIntegration / InstallationTraining
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
$0.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0000000
Documentation / Bond / Permit Costs:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Total Documentation / Bond / Permit Costs: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

&"Arial,Bold"&14WORK PLAN

SECURITY SYSTEMS DESIGN AND INTEGRATION CONTRACT

Contract Number DTFAWA-08-D-00010

Page &P of &N &6 Form: SSDI-001I (REV 6A)

Work Plan-Deliverables-Doc

00
Work Plan Number (yyyy-rr-nnn)Mod. #
Submittals / Deliverables:
Required Submittals / Order DeliverablesCLINCDRL # or SOW SectionDuration (Working Days)Start Date (Date or Days After TO Award)
(mm/dd/yy)Completion Date (Date or Days After Item Start Date)

(mm/dd/yy)

Project Duration - Weeks (assumes 5 day work week) 0.0

Contract Number DTFAWA-08-D-00010

Page &P of &N &6

Basis of Estimate

1
Program Management SupportSite Survey PreparationSite Survey visitDevelop Site Survey ReportSite Survey Coordination meetingADDITIONAL SITE SUREVY TASKS (Identify Task)ADDITIONAL SITE SUREVY TASKS (Identify Task)ADDITIONAL SITE SUREVY TASKS (Identify Task)Prepare DesignADDITIONAL DESIGN TASKS (Identify Task)ADDITIONAL DESIGN TASKS (Identify Task)ADDITIONAL DESIGN TASKS (Identify Task)Issue Non-Standard Equipment RequestPrepare Draft Phase 2 OrderPrepare Implementation ScheduleIncorporate FAA comments in OrderIssue SubcontractsOrder EquipmentIssue installation drawings and SSR for site installationCoordinated project activitiesMonitor Quality AssuranceMaintain CorrespondenceAttend Project MeetingsPrepare meeting minutesSite
Pre-construction meetingObtain PermitsObtain outage permitConfigure, program and bench test head end equipmentInstall security fencingInstall General ConstructionInstall Access ControlInstall security power taps/circuitsInstall CCTVInstall Security LightingInstall LocksInstall Perimeter Intrusion systemInstall Burglar alarm systemInstall IntercomInspection & punch listCommission Access Control systemCommission CCTVCommission IntercomCommission Burglar AlarmCommission Security LightingCommission LocksCommission Perimeter Intrusion DetectionCommission OtherADDITIONAL INTEGRATION / INSTALLATION TASKS
(Identify Task)ADDITIONAL INTEGRATION / INSTALLATION TASKS
(Identify Task)ADDITIONAL INTEGRATION / INSTALLATION TASKS
(Identify Task)Pre CAI/JAI TestingFAA TrainingPerform CAI/JAIComplete As-built drawingsDrawing Re-WorkConstruction close outPrepare O & M ManualsPrepare / Issue Closeout OrderHours by Labor Category (not including "PM % of Labor in Order" column)
Program ManagerProgram Management00
Program Control SpecialistProgram Management0000
Configuration Control SpecialistProgram Management0000
Program Management SpecialistProgram Management00
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation00
Training0
Administrative SupportProgram Management00
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation0000000
Training00
Regional Point of Contact (POC)Program Management00
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation000000000000
Training0
Project Site ManagerProgram Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation00000
Training0
Project Site SupervisorProgram Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation00000
Training0
Security Systems Specialist - SeniorProgram Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation00
Training0
Security Systems Specialist - JuniorProgram Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation00
Training0
Systems Engineer - SeniorProgram Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation0000000
Training0
Electronic Security Technician - SeniorProgram Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation00000
Training0
Electronic Security Technician - JuniorProgram Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation0
Training0
Quality Control SpecialistProgram Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation0000
Training0
Training SpecialistProgram Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation0
Training00
Draftsman / CAD OperatorProgram Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation00000
Training0
System AdministratorProgram Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation0
Training0
Principle Specialist IProgram Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation000000000
Training00
Principle Specialist IIProgram Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation0
Training0
Network EngineerProgram Management0
Site Survey0
Design Consultation00
Site Preparation0
Integration/Installation0
Training0
Information Assurance SpecialistProgram Management0
Site Survey00
Design Consultation0
Site Preparation0
Integration/Installation0
Training0
Logistics SpecialistProgram Management00
Site Survey0
Design Consultation0
Site Preparation00
Integration/Installation0
Training0
0Program Management0
Site Survey0
Design Consultation0
Site Preparation0
Integration/Installation0
Training0

Total Labor Hours by Function (FYI Only) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

&P &"Arial,Bold"&14WORK PLAN

SECURITY SYSTEMS DESIGN AND INTEGRATION CONTRACT

Contract Number DTFAWA-08-C-00XXX DTFAWA-08-D-00010

Page &Pof &N &6

File details come from the government source that posted it. Updated .