Amendment 2.pdf
PDF 152 KB Posted
- Solicitation number
- DTFASA-17-R-00164
About this file
Amendment 2 (pdf)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PPQ.pdf | ||
| RFO.pdf | ||
| Specifications.PDF | ||
| Amendment 1.pdf | ||
| Davis Bacon.pdf | ||
| Drawings.pdf | ||
| Business Declaration.doc | DOC document | |
| SF-1413.pdf | ||
| PPQ.pdf | ||
| Drawings.pdf | ||
| Amendment 1.pdf | ||
| Business Declaration.doc | DOC document | |
| Davis Bacon.pdf | ||
| SF-1413.pdf | ||
| RFO.pdf | ||
| Specifications.PDF | ||
| Davis Bacon.pdf | ||
| PPQ.pdf | ||
| RFO.pdf | ||
| Drawings.pdf | ||
| SF-1413.pdf | ||
| Specifications.PDF | ||
| Business Declaration.doc | DOC document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 4
000002 01/18/2017
FEDERAL AVIATION ADMINISTRATION
WESTERN SERVICE AREA
1601 LIND AVE SW
AAQ-530-ANM ACQUISITION GROUP
AAQ530ANM-AFN
RENTON WA 98057
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x
DTFASA-17-R-00164
1 copies to the issuing office.
01/18/2017
(x)
The following changes are hereby incorporated into this RFO.
See attached answers to received questions, and clarifications.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Darren T. Odegard
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Q There is a conflict between Specification Bid Item A.(i) and the Drawings, sheet LGB-D-ILS-G002. Is work inside the RSA to be done at night?
A Allow 1 week (5 working days of the night work)
Q Will you please restate the "delivery location" of the GFM? Is it on-site? Is it in Long Beach? May we to receive it from an FAA shipper at the site in lieu of FAA shipping it in to Long Beach?
A All GFM will be located at Long Beach ATCT. It is possible to arrange them to the site but please figure in the cost of moving them from Long Beach ATCT to the job sites.
Q Are the reference drawings available for the solicitation or just for the contract, 1.03 Supplementary
Drawings, Paragraph A.?
A All reference drawings are in the possession of the contracting officer. Let me know if you need a copy then I will send a copy to the CO for the distribution.
Q Is fibercrete required in the localizer construction, array foundation and shelter grade beams?
A No but the concrete mix design is a required submittal for approval.
Q Is the localizer heliax to be 7/8 inch (LGB-D-LOC30-EOO1) or 1/2 inch (LGB-D-LOC30-COO1, LGB-D-
ILS-E004)?
A They will be ½” Heliax.
Q LGB-D-ILS-E004, Note 5. Reference is made to a disconnect. What amperage rating and what amperage rating for its fuses? Typically the LOC site has a 240 Vac service and a 250V disconnect is installed. Is the service to this site also 240 Vac?
A It will be a 600V max rated and fused at 100 A.
Q Which ground rod locations require LGB-D-ILS-E006, Detail 9, Ground Rod Locator Box?
A No ground boxes are designated for this project except for the service entrance.
Q Where is Service Entrance and Ground Access Well per LGB-D-ILS-E006, Detail 8?
A You have an option to pick a location but work with an onsite FAA engineer.
Q Do shelters have their Ground Plates per the details on LGB-D-ILS-E006, in other words are they GFM in the new LOC shelter or existing in the OM shelter? If not which shelter(s) require(s) CFM ground plates and which style or styles?
A This is an option for the contractor to choose; however, the ground rods should work at Long
Beach Airport.
Q Drawing LGB-D-LOC30-C002, Note 1C states that grounds are to come into the LOC shelter thru the floor. Where do ground conductors enter per the "GROUND PLATE ENTRANCE DETAILS" on LGB-D-
ILS-E006, each detail - condulet LB / fiberglass j-box?
A Drawing E006 shows many options for the contractor; however, all the grounding conductors for the shelter has the designated holes.
Q Where is there required an air terminal per the detail on LGB-D-ILS-E006? What is the post size in that detail?
A The lightning protection kit for the shelter is GFM but the contractor installed. The kit comes with bases, air terminals, adhesive and the down conductor from the roof but not the transition to the ground.
Q In what sections of duct will it be considered to be "under pavement" per LGB-D-ILS-S003, Note 4?
A Any and all sections that have asphalt or concrete pavement that the contractor must cut to install a ductbank; however, I don’t recall any pavements.
Q LGB-D-ILS-S010, Detail E. Is the height of the light base to be 27 inch including the extension, so a 24 inch base plus a 3 inch extension or is the light base to be 27 inch plus the extension. If this is the case what size extension is required?
A 24” plus a 3” extension can be used.
3.2.2.3-20 ELECTRONIC OFFERS (JUL 2004) Emailed Responses: responses must be emailed to Darren.odegard@faa.gov NOT michelle.gunia@faa.gov
Business Declaration: A Business Declaration is not required to be filled out.
mailto:Darren.odegard@faa.gov mailto:michelle.gunia@faa.gov
| DTFASA-17-R-00164 |
| Q There is a conflict between Specification Bid Item A |
File details come from the government source that posted it. Updated .