This is a Designated Special Provision 7 (DSP7) document issued by the Pennsylvania Department of Transportation (PennDOT) establishing Disadvantaged Business Enterprise (DBE) requirements for federally-funded construction projects. The provision implements U.S. Department of Transportation policy ensuring nondiscrimination in contract awards and creating equitable competition opportunities for firms owned and controlled by socially and economically disadvantaged individuals. The document applies to all federally-funded contracts entered into by PennDOT during the Pennsylvania Unified Certification Program (UCP) reevaluation period and establishes comprehensive requirements for DBE participation, including definitions, contractor obligations, prompt payment requirements, and record-keeping procedures. All contractors are required to include DBE provisions in subcontracts at every tier and must make good faith efforts to identify and utilize certified DBEs. Contractors must submit completed Form EO-21 containing bidders list information within five days of bid opening, including firm name, address, DBE status, NAICS codes, firm age, and annual gross receipts for all subcontractors.
The provision specifies that there is currently no specific DBE contract goal during the UCP's reevaluation process, but contractors must still recruit and utilize certified Small Business Enterprises (SBEs) and make efforts to identify DBEs as they become certified. Contractors are required to maintain detailed records documenting DBE and SBE participation, subcontractor payments, and compliance with prompt payment requirements, with payment to subcontractors required within seven days of the prime contractor's receipt of payment from PennDOT. Failure to comply with DBE requirements constitutes material breach of contract and may result in contract termination, suspension, debarment from future bidding for up to three years, withholding of funds, liquidated damages, or other remedies. PennDOT will monitor compliance through the Engineering and Construction Management System (ECMS), conducting reviews and investigations as necessary, and contractors must retain all records for three years following final payment acceptance.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix C – Designated Special Provision 7 (DSP7) 408/2026
C7 - 1 Initial Edition
APPENDIX C
DESIGNATED SPECIAL PROVISION (DSP7)
DISADVANTAGED BUSINESS ENTERPRISE (DBE) REQUIREMENTS
for Federally-Funded Construction Projects
Statement of Purpose
The purpose of this Special Provision is to carry out the U.S. Department of Transportation (DOT) policy of ensuring nondiscrimination in the award and administration of DOT-assisted Contracts and creating a level playing field on which firms owned and controlled by individuals who are determined to be socially and economically disadvantaged can compete fairly for DOT-assisted Contracts. The Disadvantaged Business Enterprise (DBE) requirements of 49 C.F.R., Part 26, as amended (Part 26) apply to this contract. This exhibit shall be physically included in every subcontract.
The United States Department of Transportation issued an Interim Notice of Final Rulemaking (IFR) on October 3, 2025. Pursuant to 49 CFR § 26.111 under this IFR, PennDOT, as a member of the UCP, is reevaluating DBEs. This exhibit applies to all federally-funded contracts entered into by PennDOT, during the UCP’s reevaluation period.
There are no DBE contract goals during the UCP’s reevaluation process and until PennDOT has an approved DBE Program Plan, after the UCP’s evaluation process.
Section I. Definitions
The following definitions apply for terms used in this Special Provision:
A. Contract. Any contract between PennDOT and a Contractor that is paid in whole or part with DOT financial assistance.
B. Contractor. One who participates, through a contract or subcontract (at any tier), in a Contract for highway, transit, or airport programs.
C. Days. Calendar days. In computing any period of time described in this Special Provision, the day from which the period begins to run is not counted, and when the last day of the period is a Saturday, Sunday, or state holiday, the period extends to the next day that is not a Saturday, Sunday, or state holiday. Similarly, in circumstances where PennDOT’s offices are closed for all or part of the last day, the period extends to the next day on which the PennDOT offices are open.
D. DBE Neutral. A program that is, or can be, used to assist all small businesses.
E. Director. The Director of the Bureau of Equal Opportunity.
F. Disadvantaged Business Enterprise (DBE). A for-profit small business concern:
1. that is an entity certified by the Pennsylvania Unified Certification Program as listed on www.paucp.com;
2. that is at least 51 percent owned by one or more individuals who are both socially and economically disadvantaged; and
3. whose management and daily business operations are controlled by one or more of the socially and economically disadvantaged individuals who own it.
G. DOT. The United States Department of Transportation, including, but not limited to, the Office of the Secretary, the Departmental Office of Civil Rights, the FHWA, the Federal Transit Administration (FTA) and the Federal Aviation Administration (FAA).
H. ECMS. PennDOT’s Engineering and Construction Management System website (https://www.ecms.penndot.gov/ECMS/).
I. FHWA. The United States Department of Transportation, Federal Highway Administration.
J. Good Faith Effort. Efforts to achieve DBE participation which, by their scope, intensity, and appropriateness of this objective can reasonably be expected to fulfill the program requirement.
K. NAICS. North American Industry Classification System.
L. Part 26. 49 C.F.R. Part 26.
M. PennDOT. The Commonwealth of Pennsylvania, Department of Transportation.
C7 - 2 Initial Edition
N. Publication 408. PennDOT Publication 408 Specifications (current edition), together with its amendments and supplements.
O. Small Business Enterprise (SBE). A for-profit small business concern certified by PennDOT as listed on www.dotsbe.pa.gov that meets the ownership and control requirements of the SBE certification program and the personal net worth requirements of the SBE certification program.
P. UCP. Pennsylvania Unified Certification Program.
Section II. Required DBE Provisions
The Contractor, subcontractor, or subrecipient shall include the following provisions in every subcontract it enters into under this Contract (and require that its subcontractors also require inclusion of this provision in their subcontracts):
A. Policy for Federally Funded Projects. It is the policy of the DOT and PennDOT that DBEs, as defined in Part 26, and this Special Provision, be given the opportunity to participate in the performance of contracts financed in whole or in part with federal funds under this contract.
Consequently, the DBE requirements of Part 26, as amended, apply to this contract.
B. Contractor Assurance. The Contractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this or any DOT-assisted contract. The Contractor shall take all necessary and reasonable steps under Part 26 to ensure that DBEs have the maximum opportunity to compete for and perform subcontracts. PennDOT’s DBE program, as required by Part 26 and as approved by DOT, is incorporated by reference in this contract. Implementation of Part 26 is a legal obligation and failure by the Contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or imposition of other available sanctions. Upon notification to the Contractor of its failure to carry out its approved program, the DOT may impose sanctions as provided for under Part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 et seq.).
C. Required DBE Assurance. The Contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The Contractor shall carry out applicable requirements of Part 26 in the award and administration of DOT-assisted contracts. Failure by the Contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as PennDOT deems appropriate, which may include, but is not limited to:
(1) Withholding monthly progress payments;
(2) Assessing sanctions;
(3) Liquidated damages; and/or
(4) Disqualifying the Contractor from future bidding as non-responsible.
D. Prompt Payment and Retainage. This Section applies to both DBE and non-DBE subcontractors and all lower-tiered subcontractors.
1. Prompt Payment. Prime contractors are required to make prompt payment under 49
C.F.R. § 26.29. A certification of prompt payment will be required to certify that all subcontractors were paid from the previous month's payments. The prime contractor shall pay each subcontractor under the prime contract within seven Days of the prime contractor's receipt of payment from PennDOT for undisputed services provided by the subcontractor.
For purposes of this section, a subcontractor's work is satisfactorily completed when all the tasks called for in the subcontract have been accomplished and documented as required by PennDOT. When PennDOT has made an incremental acceptance of a portion of a prime contract, the work of a subcontractor covered by that acceptance is deemed to be satisfactorily completed.
Any delay or postponement of payment from a prime Contractor to a subcontractor may take place only for good cause, and with PennDOT’s prior written approval.
2. Retainage. A prime Contractor shall not withhold retainage from a subcontractor.
C7 - 3 Initial Edition
3. Compliance with Prompt Payments and Retainage. The Contractor shall and shall cause its subcontractors to submit any records and reports to PennDOT to comply with this Section or PennDOT’s monitoring and oversight responsibilities to ensure compliance with prompt payment.
4. Failure to Comply. If the Contractor fails to comply with this Section, PennDOT may assess sanctions for non-compliance, which include, but are not limited to, withholding funds, suspending the contract until compliance is obtained, terminating this agreement for Contractor default, damages, entering the Contractor in the Contractor Responsibility Program (CRP), and/or suspension and debarment proceedings in relation to the Contractor’s prequalification status under 67 Pa. Code § 457.13, or more generally under 62 Pa.C.S.
§ 513.
E. Failure to Comply with DBE Requirements. Failure to carry out the requirements of Part 26 constitutes a breach of contract and may result in termination of the contract, being barred from bidding on PennDOT contracts for up to three years, withholding progress payments, assessing sanctions, assessing liquidated damages, or any other remedy that PennDOT deems appropriate.
Section III. Small Business Enterprise (SBE) Participation.
There is no SBE goal. However, the Contractor shall recruit and utilize certified SBEs in addition to all other equal opportunity requirements of the Contract.
Section IV. DBE Obligation.
There is no DBE goal during the reevaluation process described in 49 CFR § 26.111 and until PennDOT’s DBE program plan is approved after the UCP’s reevaluation process.
A. Contractor Use of DBEs. As DBE firms are certified under the reevaluation process, the Contractor shall make an effort to identify and use DBEs. PennDOT will monitor payments to DBE and SBE subcontractors through the Contractor’s submissions of payments as reflected in ECMS.
B. Bidder’s List. PennDOT is required to obtain all bidders list information as required by 49 CFR §
26.11(c)(2) within five Days of bid, which includes but is not limited to, the following:
(i) Firm name;
(ii) Firm address including ZIP code;
(iii) Firm's status as a DBE or non-DBE;
(iv) NAICS code applicable to each scope of work the firm sought to perform in its bid;
(v) Age of the firm; and
(vi) The annual gross receipts of the firm (this information may be obtained by asking each firm to indicate into what gross receipts bracket they fit (e.g., less than $1 million; $1-3 million; $3-6 million;
$6-10 million; etc.)).
All bidders, as a requirement for their bid to be responsive, shall complete EO-21 for all items in subsections (i)-(vi) above for all subcontractors (DBE and non-DBE) that the Contractor intends to utilize on the project, and send the completed form EO-21 to PennDOT at ra-pdbidderslist@pa.gov within five Days of bid opening; Contractors shall reference the PennDOT contract number in the subject line or body of the email.
Section V. ACTIONS TO BE TAKEN BY PENNDOT DURING PERFORMANCE OF THIS AGREEMENT
A. Review of Performance. To ensure that all contract obligations under this Exhibit are met, PennDOT will review the Contractors use of small businesses, DBEs, and will review the prime contractor’s and subcontractor’s compliance with subcontractor (at all tiers) prompt payment and retainage requirements in accordance with this Exhibit.
B. Investigations. PennDOT may conduct reviews or investigations of participants as necessary. All participants, including, but not limited to, DBEs, non-DBEs, and complainants using DBE Subcontractors, are required to cooperate fully and promptly with compliance reviews, investigations, and other requests for information.
C7 - 4 Initial Edition
C. Sanctions. Upon completion of the work and during the performance of the work, PennDOT will review DBE participation for data collection purposes, only and will review Contractor compliance with applicable requirements of 49 CFR Part 26, which includes, but is not limited to, prompt payment, nondiscrimination, and required record-keeping and reporting obligations. Sanctions may be imposed for noncompliance; sanctions may include, but are not limited to, assessing sanctions, liquidated damages, default, suspension, debarment, termination of the Contract, or the Contractor being declared ineligible for future PennDOT contracts.
Section VI. RECORDS AND CONTINUING OBLIGATIONS OF THE CONTRACTOR
A. Reports and Records.
1. The Contractor shall make available upon request a copy of all subcontracts, regardless of whether the contract is with a DBE subcontractor. The Contractor shall ensure that all subcontracts require that the subcontractor and all lower tier subcontracts be performed in accordance with Part 26 and this Exhibit. All Contactors agree to provide PennDOT with the information it needs to fulfill PennDOT’s requirement to know about all aspects of Part 26 on the Contract at all times.
2. The Contractor shall keep all project records as necessary to determine compliance with Part
26 and this Exhibit. At a minimum, the records shall reflect the following:
i. the number of disadvantaged and non-disadvantaged subcontractors, small businesses, Regular Dealers, Manufacturers, DBE Distributors, consultants, and service providers, and the type of work or services performed on or materials incorporated in this project, as applicable;
ii. documentation of the Contractor's general outreach and solicitation efforts to potential subcontractors, including DBEs and SBEs, for this project;
iii. records certifying that the amounts were actually paid to the DBE and SBE for work performed on the project; and
iv. cancelled checks shall be kept on file in the home office to reflect payment for the specific project and for inspection and audit by PennDOT.
3. ECMS will have information about the number of contracts awarded to DBEs and SBEs, noting the type of work and amount of each contract executed. The Contractor shall enter payment information into ECMS “Subcontractor Payments” within five business days after the end of the month, which include the following:
i. the amount paid to each subcontractor (DBE and non-DBE) during the payment period and the payment date. Only subcontractors that received payments during the payment period will have to acknowledge the payment details in the ECMS system;
ii. payment verification ID (Check number, etc.) for any payments great than $0 for payment period; and
iii. if the actual amount paid to the DBE is less than the award amount, the Contractor shall provide a complete explanation of the difference.
B. Maintenance of Records. The Contractor shall maintain all records required under Part 26 and this Exhibit for a period of three years following acceptance of final payment from PennDOT, unless extended by statute or applicable record retention requirements in the Contract, or required to be retained as a result of litigation, claims, audits, or investigations. The Contractor shall make the records available for inspection by PennDOT and the FHWA at any time during the term of this Contract and for the three years following final payment from PennDOT, unless required to be kept longer as a result of a statute or Contract provision, or as a result of litigation, claims, audits, or investigations.
OS-299 (10-22)
www.penndot.pa.gov
TRANSMITTAL LETTER
PUBLICATION:
Publication 408, 2026 Edition
DATE:
6/05/2026
SUBJECT:
PennDOT Publication 408/2026 Change No. 1 Specifications
INFORMATION AND SPECIAL INSTRUCTIONS:
Applicability: This Transmittal Letter and its attachment constitute Change No. 1 of PennDOT Specifications, Publication 408/2026. Change No. 1 of Pub 408/2026 is hereby referred to as Pub 408/2026-1. It is new and complete in its entirety and is effective on projects let after October 9, 2026.
Change Format: All subsequent changes to Pub 408/2026 will be made using a "new page" format. To relate conditions that are in effect, each bid proposal will contain a SSP named either: "APPLICABLE DESIGNATED SPECIAL PROVISIONS (FEDERAL)” or "APPLICABLE DESIGNATED SPECIAL PROVISIONS (STATE)” and, if applicable, “APPLICABLE DESIGNATED SPECIAL PROVISIONS (STATE) - DSP 13. BUY AMERICA”. These SSPs exist in ECMS format. They will specify the Designated Special Provisions that apply to the particular project.
CANCEL AND DESTROY THE FOLLOWING: ADDITIONAL COPIES ARE AVAILABLE FROM:
☒ PennDOT website - www.penndot.pa.gov Click on Forms, Publications & Maps
APPROVED FOR ISSUANCE BY:
Michael B. Carroll, Secretary Department of Transportation by:
Kelly M. Barber, P.E., Chief Engineer of Highway Administration Department of Transportation http://www.penndot.pa.gov/ http://www.penndot.pa.gov/
Index of Changes to Publication 408/2026 408/2026
Change No. 1
INDEX OF CHANGES
TO
PUBLICATION 408/2026
General: The Index of Changes has been created to assist Publication 408/2026 users in determining specifics of semiannual changes made since the release of the Initial Edition. This Index contains specifics of all Changes, which includes where and why revisions have been made.
The Change Process: Changes to Publication 408/2026 are issued biannually. Numbered Changes consist of a Transmittal Letter with instructions for posting of revisions, an updated version of this Index, and “new pages” containing the revisions. All Numbered Changes are filed electronically in sequential order on the PennDOT Website. Numbered Changes will be incorporated into Publication 408/2026 and filed under the Change Letters and Indices portion of the Publication.
Researching Revisions. It is critical for many users of Publication 408 to be able to determine the point in time revisions were made and what the specific changes were. This is important from a contractual perspective when researching specifications applicable to projects previously awarded. To assist in this process, refer to this Change Index. If revisions have been made, users can then refer to specifics found in the Initial Edition or subsequent Numbered Change.
CHANGE INDEX OF REVISIONS
THROUGH CHANGE NO. 1
Section and Portion Changed Revised w/ Effective Dates Explanation Section Part or Paragraph Change No. From Nature and Rationale for Change
Preface
TOC
501, 530, 698, 641, 676, DSP1, DSP2,
DSP3, DSP10,
DSP11, DSP14,
DSP18, DSP20
1 October 9, 2026 To revise number of pages for Sections 501, 530, 698; to revise title of Sections 641 and 676; to remove DSP1, DSP2, DSP3, DSP10, DSP11, DSP14, DSP18;
to add DSP20.
106 106.03(b)3, 106.11(a)2, 106.11(a)2.f, 106.11(a)3.d
1 October 9, 2026 To clarify Final Assembly for manufactured products; to revise De Minimis values; to make minor language changes; to include language for electronic submission of material certifications through
ECMS.
107 107.28 1 October 9, 2026 To require completion of Form CS- 102 and to update information reflecting DEP ‘NOT’ Form.
110 110.04, 110.06(a), 110.10(b), 110.10(c)2, 110.10(e), 1 October 9, 2026 To remove requirement that stored material payments cannot exceed 25% of current contract amount; to enhance quality of concrete pavement.
220 220.2(i) 1 October 9, 2026 To correct a typographical error.
404 404.1(a), 404.1(b), 404.3(a), 404.3(b)1, 404.3(b)2, 404.3(c)1, 404.3(d), 404.3(f), 404.4
1 October 9, 2026 To modify payment structure for Ride Quality Incentive Pavement Schedules.
419 414.3(i)2.b.1.a, 419.3(k)1.b.1.a, 419.3(p), 419.4(a)
1 October 9, 2026 To revise the order of operations for Independent Assurance on non-comparison follow-up procedures.
466 466.2(a), 466.2(b), 466.2(c), 466.3(f)1, 466.3(f)2, 466.3(f)3, 466.3(g)1, 466.3(g)3
466.3(i)
1 October 9, 2026 To change AASHTO reference from “M 288” to “M 355M/M 355”;
to change the word ‘percent’ to the symbol ‘%’; to add unit of measure;
to change measurement from decimal to fraction
501 501.2(g), 501.3(f), 501.3(g)4, 501.3(i), 501.3(k)4.b, 501.3(l), 501.3(n), 501.3(p)
1 October 9, 2026 To enhance quality of concrete pavement.
506 506.3, 506.4(a)1, 506.4(a)3, 506.4(c) pavement. Section 506.3 modifies Sections 501.3 (s), 501.3(t)1, and 501.3(u)1.
507 507.1(a), 507.1(b), 507.3(a), 507.3(b)1, 507.3(b)2, 507.3(f), 507.4
1 October 9, 2026 To modify payment structure for Ride Quality Incentive Pavement Schedules; to make minor grammar changes
530 530.2, 530.3, 530.4(a)3, 530.4(a)4, 530.4(c) pavement. Section 530.2 modifies Section 501.2. Section 530.3 modifies Sections 501.3(a), 501.3(k)4, 501.3(t)1, 501.3(u)1, and 501.3(v).
608 608.4(b)3, 608.4(c) 1 October 9, 2026 To require completion of Form CS- 102 and to update information reflecting DEP ‘NOT’ Form; to change the word ‘percent’ to the symbol ‘%’.
633 633.4(a), 633.4(c) 1 October 9, 2026 To update content for curbs, gutters, and joints primarily associated with roundabouts; to delete 633.4(c).
641 Section title, 641.1, 641.3, 641.4
1 October 9, 2026 To revise Section title; to update content for curbs, gutters, and joints primarily associated with roundabouts.
676 Section title, 676.1, 676.3(l), 676.4(a), 676.4(f)
1 October 9, 2026 To revise Section title; to update content for curbs, gutters, and joints primarily associated with roundabouts; to add subbase as incidental; to add subsections 676.3(l) and 676.4(f).
703 703.2(c)3 1 October 9, 2026 To enhance quality of concrete
704 704.1(b), 704.1(c)3, 704.1(c)4, 704.1(d)3, 704.1(d)4.a, 704.1(d)4.b, 704.1(d)5, 704.1(d)7, 704.2(a)
1 October 9, 2026 To eliminate certain testing requirements and to enhance quality of concrete pavement; to enhance quality of concrete
App C Appendix C Whole Document 1 October 9, 2026 To remove DSP18 and add
DSP20.
DSP18 Whole Document 1 October 9, 2026 To remove.
DSP20 Whole Document 1 October 9, 2026 To comply with Federal regulations regarding unmanned aircraft systems (UAS).
SPECIFICATIONS
2026 Edition
Change No. 1, Effective October 9, 2026 www.pa.gov/penndot
PUB 408 (5-26)
Change Packets
Preface 408/2026 i Initial Edition
Commonwealth of Pennsylvania
DEPARTMENT OF TRANSPORTATION
Publication 408/2026
SPECIFICATIONS
PREFACE
Contents:
Publication 408/2026 contains current Construction Specifications for PennDOT projects. Publication 408/2026 is located on the PennDOT website at www.penndot.pa.gov, select “Forms and Publications”.
Updated semiannually, each new Change will contain all previous Edition/Change(s) in their entirety, with changed pages integrated. The changed pages for each new Change are also located on the PennDOT website.
Standard Special Provisions (SSPs) and Master Construction Items that apply to Publication 408/2026:
SSPs and Master Items are maintained in PennDOT’s Engineering and Construction Management System (ECMS) and accessible on the PennDOT website to both PennDOT Business Partners and Public Users.
This is the only access provided to these documents and lists to all users. Public Users should go to the ECMS website, login as a Guest, and then navigate to “Construction Projects” > “Resources”. “Resources” provides access to both Master Items and SSPs. Business Partners can login before selecting “Construction Projects” > “Resources” if they want access to other more complete ECMS data and information applying to PennDOT projects and schedules.
Use of Dimension Values:
Publication 408/2026 is a single set of Construction Specifications that contains measurements in English values. Metric values may be shown for informational purposes and/or generally accepted industry use.
Dual values will not be indicated on design drawings, renderings, or in details and instructions that are project specific. Similarly, there will not be a mixing of values in formulating calculations or in presentation.
Changes and their Effective Dates:
Publication 408/2026 will be available only as an online document. Hardcopy versions will not be made available. Each semiannual change will be updated with new pages incorporated into the document and a separate Change Packet and Transmittal Letter will indicate the most recent changes and will contain a list of the current changes and an Index of Changes listing all changes to date. The full specifics of each Change can be found within the Section to this Publication entitled: Change Letters and Indices to Publication 408/2026. Effective date(s) are:
• Pub 408/2026, Initial Edition (Pub 408/2026-IE) – projects let after April 10, 2026.
• Pub 408/2026, Change No. 1 (Pub 408/2026-1) – projects let after October 9, 2026.
• Pub 408/2026, Change No. 2 (Pub 408/2026-2) – projects let after April 9, 2027.
• Pub 408/2026, Change No. 3 (Pub 408/2026-3) – projects let after October 8, 2027.
• Pub 408/2026, Change No. 4 (Pub 408/2026-4) – projects let after April 14, 2028.
• Pub 408/2026, Change No. 5 (Pub 408/2026-5) – projects let after October 13, 2028.
• Pub 408/2026, Change No. 6 (Pub 408/2026-6) – projects let after April 13, 2029.
• Pub 408/2026, Change No. 7 (Pub 408/2026-7) – projects let after October 12, 2029.
• Pub 408/2026, Change No. 8 (Pub 408/2026-8) – projects let after April 12, 2030.
106.01 106.01
106 – 1
SECTION 106—CONTROL OF MATERIAL
106.01 GENERAL—Use material complying with the requirements of these specifications. At the pre-construction conference, submit a list of material to be sampled and tested by the Contractor and a list of material to be sampled and tested by the Department.
Comply with the provisions of the Pennsylvania Trade Practices Act, 71 P.S. Section 773.101, et seq., concerning the purchase of aluminum and steel products produced in a foreign country. On Federal-Aid projects, also comply with the provisions specified in Section 106.10.
Comply with the provisions of the Steel Products Procurement Act, 73 P.S. Section 1881, et seq. in the performance of the contract or any subcontract.
Following contract execution, furnish to the Department a complete statement of the project construction material’s origin, composition, and manufacture.
For Fabricated Structural Steel materials, as identified in Section 1105.01(a) and inspected in accordance with Section 1105.01(e), and any other fabricated aluminum, precast or prestressed concrete products inspected during manufacturing, stamped, and approved for shipment by the Department’s Representative, furnish Form CS-4171 to the Inspector-in-Charge. Certified mill test reports for any steel included will be reviewed by the Department’s Inspector and retained by the fabricator.
For all other steel products or products containing steel that will be permanently incorporated in the project, provide the Inspector-in-Charge the following when the product is delivered to the project site:
• For any “identifiable” steel products, certification that Section 4 of the Steel Products Procurement Act, 73 P.S. Section 1884, has been complied with. Identifiable steel products are steel products which contain permanent markings which indicate the material was both melted and manufactured in the United States.
• For all other “unidentifiable” steel products, documentation such as invoices, bills of lading, and mill certification that positively identify that the steel was melted and manufactured in the United States.
The provisions of the Steel Products Procurement Act will not be waived unless the Secretary has determined, under authority granted in Section 4(b) of the act, that a certain steel product or products is not produced in the United States in sufficient quantities to meet contract requirements. Such a determination will be set forth in a proposal for the Department’s review and response. Include with the proposal a comprehensive list of sources, including names and contact information, for verification. The Secretary does not have the authority to waive the provisions specified in Section 106.10.
Steel products are defined as products rolled, formed, shaped, drawn, extruded, forged, cast, fabricated, otherwise similarly processed, or processed by a combination of two or more of these operations from steel made in the United States by the open hearth, basic oxygen, electric furnace, Bessemer, or any other steel-producing process. Included are cast iron products and machinery and equipment as listed in United States Department of Commerce Standard Industrial Classification 25, 35, and 37 and made of, fabricated from, or containing steel components. If a product, as delivered to the project, contains both foreign and United States steel, such product is considered to be a United States steel product only if at least 75% of the cost of the articles, materials, and supplies have been mined, produced, or manufactured, as the case may be, in the United States. On Federal-Aid projects, comply with the provisions specified in Section 106.10.
No payment will be made on the contract if unidentified steel products are supplied, until the hereinbefore requirements are met.
Any payments made that should not have been made may be recoverable from a manufacturer or supplier as well as from a contractor or subcontractor.
Any person who willfully violates the Steel Products Procurement Act will be prohibited from submitting bids for any contract for a period of 5 years from the date of determination that a violation has occurred. If a subcontractor, manufacturer, or supplier, violates the Steel Products Procurement Act, such person will be prohibited from performing any work or supplying any materials to the Department for a period of 5 years from the date of determination that a violation has occurred.
If steel products are used as a construction tool or appurtenance and will not serve a permanent functional use in the project, compliance with the Steel Products Procurement Act is not required.
When standard manufactured items are specified and these items are identified by unit mass (unit weight), section dimensions, or similar characteristics, their identification will be considered to be nominal masses (weights) or dimensions. Unless more stringently controlled by specified tolerances, industry established
106.01 106.02(a)
106 – 2 manufacturing tolerances will be accepted.
106.02 MATERIAL—
(a) Preliminary Acceptance and Approval. Have each material and material source of supply listed on Form CS-200 (Source of Supply – Materials) or Form CS-201 (Source of Supply – Traffic Control Devices) and approved before delivery to project. Department Bulletin listed material and material sources are available for use by the Contractor. If non-Bulletin material or material sources are proposed for use, the requirements specified in 106.02(a)2 must be met before these materials are delivered to the project.
The Department reserves the right to obtain samples of any material provided by the Contractor for laboratory testing to verify compliance with specifications.
1. Bulletin Material, Material Application, and Material Source. Defined as any of the following:
• Any material and material source listed in Bulletin 14 and used in the material application as specified in the Bulletin, Publication 408, or a Special Provision.
• Any material and material source listed in Bulletin 15 and used in the material application as specified in the Bulletin, Publication 408, or a Special Provision.
• Any asphalt material and material application specified in Publication 408 and produced at a source listed in Bulletin 41.
• Any cement concrete material and material application specified in Publication 408 and produced at a source listed in Bulletin 42.
Submit a CS-200 or CS-201 to the Representative with the following information: contract item number, item description, material description/type/class, product name, manufacturer/producer plant location, applicable Bulletin supplier code, Bulletin number, and Publication 408 or Bulletin Section.
If a previously submitted Bulletin material source no longer provides the specified material, submit a change in material to the Representative as outlined on Form CS-200 or CS-201. Once written acceptance is received, furnish material from another Bulletin material source listed in Bulletin 14, 15, 41, or 42.
2. Non-Bulletin Material, Material Application, or Material Source. Defined as any of the following:
• Any material, product, or material source not listed in Bulletin 14 or Bulletin 15
• Any material, product, or material source listed in Bulletin 14 or Bulletin 15 being used in an application not intended or specified in the Bulletin, Publication 408, or a Special Provision
• Any asphalt material or product not produced at a source listed in Bulletin 41
• Any asphalt material or product not specified in Publication 408 or a Special Provision
• Any ready-mixed, cement concrete material or product not produced at a source listed in Bulletin 42
• Any ready-mixed, cement concrete material or product not specified in Publication 408 or a Special
Provision
2.a. Construction-Aid Material. A necessary, temporary, or ancillary material that is not specified for use as part of a contract item or extra work item but used by the Contractor only to aid in the completion of the work. The material is typically not a permanent part of the specified work (example: wood and nails for temporary formwork). The material need not be listed on Form CS-200 and does not require any Department approval for delivery to or use on the project. The Representative reserves the right to determine whether a material is a construction-aid material. Note temporary traffic control items are not construction-aid materials and do need listed on Form CS-201 since these items must be from Bulletin 15 listed sources and are specified for use as part of contract items or extra work items.
2.b. Project-Specific, LTS Approved Material. Non-Bulletin material proposed for use on a particular project as part of a contract item or extra work item, which requires approval by the LTS. Use of material is not meant to circumvent the use of available material sources listed in Bulletin 14, 15, 41, or 42.
Have each material and material source listed on Form CS-200 or Form CS-201. The material is defined as any material, product, or material source that meets one or more of the following criteria:
106.02(a) 106.03(a)
106 – 3
• Meets specified requirements in Publication 408 or Special Provision, for the material and material application.
• Meets specified requirements in AASHTO or ASTM Standard for the material and material application.
• Meets specified requirements in project Special Provision for the material and material application.
Submit material to the LTS for evaluation and testing a minimum of 90 days before planned delivery to the project. Submit the following information to the LTS, with a copy to the Representative: source, description, specified use, QC Plan, independent lab test data showing material meets all specified requirements as determined on a single lot of material, and material samples of the kind and quality specified. Do not deliver material to the project until written acceptance is received from the Representative.
2.c. Project-Specific, Locally Approved Material. Non-Bulletin material proposed for use on a particular project as part of a contract item or extra work item, which does not require LTS approval because of the low risk to constructed Project performance but does require local approval by the Representative (i.e., at the District or project level). This category of material is not meant to circumvent the use of available material sources listed in the Bulletins, or the requirements of Project-Specific, LTS Approved Materials.
These materials must meet specification requirements and will be clearly identified in the specification as only needing local approval by the Representative. Have each material and material source listed on Form CS-200 or Form CS-201. Submit for local approval by the Representative all required information for the material, as indicated in the specification.
Examples of locally approved materials are project specific items, such as Section 860 (inlet filter bags), Section 867 (compost filter socks), and Section 868 (compost blanket and compost filter berms) where the specification indicates that these materials are to be locally approved. Bulletin 15 will reference specific Publication 408 Sections that apply to Locally Approved Materials. Bulletin 15 will not list actual materials or material sources for this category of materials as they will be accepted for use on a project-specific basis by local approval.
(b) Inspection. Inspect material delivered to the project and stockpile the material passing inspection for use. Do not incorporate questionable material, until material is tested by LTS and accepted in writing by the Representative. The Department reserves the right to reject questionable material delivered to the project when the LTS test results are not according to the specifications. Furnish assistance to the Inspector, as required to obtain samples.
Allow designated Department representatives to inspect material being used, or intended to be used, at any time before, during, or after material preparation, while being used during the progress of the work, or after the work has been completed. Furnish or arrange with producers or manufacturers to provide necessary material, labor, tools, and equipment for such inspection.
Inspections and tests, if made at any point other than the point of incorporation in the work, will not guarantee acceptance of the material. Inspection and testing performed by the Department will not relieve the Contractor’s responsibility for QC.
106.03 TESTS AND ACCEPTANCE OF MATERIAL—
(a) Restricted Performance Specifications.
1. Responsibility. The Department will be responsible for determining the acceptability of the material and construction. Material will be reviewed for acceptance through the Department’s specified acceptance procedures. Sample locations for acceptance testing will be determined by the Department.
Perform sampling and testing for acceptance in the presence of the Inspector, unless otherwise specified. Lot size will be specified. If operational conditions cause work to be interrupted before the specified lot size has been achieved, the lot may be redefined by the Inspector. It is the intent of these specifications that
106.03(a) 106.03(a)
106 – 4 each lot be evaluated based on the same number of samples. Transport acceptance samples from sampling point to testing site or other designated location in the presence of the Inspector.
The Contractor is responsible for the control and quality of the material and construction.
Prepare a QC Plan as specified in Section 106.03(a)2.a and submit it to the Inspector-In-Charge for review at the start of the project. Include QC sampling and testing frequencies and action points to initiate corrective measures. Notify the Inspector before performing QC sampling and testing. Perform QC sampling and testing and report results to the Inspector.
Obtain and test samples according to the Department’s PTMs. If the required test method is not specified, use methods described in the AASHTO Standard Specifications for Transportation Materials and Methods of Sampling and Testing, and Supplements, Standards and/or Tentatives of ASTM, or other testing procedures adopted by the Department.
Verification sampling and testing will be performed by the District, unless otherwise specified.
QA sampling and testing will be performed or witnessed by the BOCM.
Independent Assurance sampling and testing will be administered by the CQAD.
2. QC.
2.a Maintain a QC system that provides reasonable assurance that materials, products, and completed construction, submitted for acceptance, conform to contract requirements whether self-manufactured, processed, or procured from subcontractors or vendors. When specified, submit for review, a plan of the QC system to be used. Have performed or perform the inspections and tests required to substantiate product conformance to contract requirements. Make the inspection and test results available for review throughout the contract life.
Procedures will be subject to the review of the Department before the work is started. Charts and records documenting QC inspections and tests are the property of the Department. Submit a QC Plan for use in compliance with the following guidelines, as a minimum:
2.a.1 Raw Materials. List the source of material along with methods of documentation and testing performed to assure the material quality.
2.a.2 Production Control. List lot size and samples required; include sample selection, labeling and test procedure; also include manufacturing phase.
2.a.3 Product Testing. List type and frequency of tests to be performed, along with method of documenting and reporting test results. List test equipment and calibration procedure (frequency) required.
List procedure for retesting or rejecting items failing the tests. List the disposal methods and location for test samples and rejected lots.
2.a.4 Personnel. List the personnel in charge of QC and define their areas of responsibility.
2.a.5 Packaging and Shipping. List method of identifying, storing, loading, transporting, and unloading to assure safe delivery of acceptable material and products.
2.a.6 Documentation. List the procedures used for documentation and certification.
The QC Plan and process are subject to periodic review and inspection by the Department.
2.b Promptly record conforming and non-conforming inspection and test results on acceptable forms or charts. Keep these records complete and keep them available for inspection at all times during the performance of the work.
2.c Promptly correct any errors, equipment malfunctions, process changes, or other assignable causes which have resulted or could result in the submission of material, products, and completed construction not conforming to specification requirements.
2.d When required, provide or have provided and maintain measuring and testing devices necessary to ensure that material and products conform to contract requirements. To ensure continued accuracy, calibrate these devices at established intervals against Department standards.
106 – 5
2.e When required, make the measuring and testing equipment available to the Representative for use in determining conformance of material, products, or completed construction with contract requirements.
In addition, make personnel available for the operation of such devices and for verification of the accuracy and condition of the devices. Have calibration results available at all times. The Department reserves the right to conduct periodic inspections of the measuring and testing devices to confirm both calibration and condition of operation.
2.f Failure to comply with the QC Plan may result in suspension of approval to provide material for Department use and/or removal from the approved list of material suppliers in the applicable bulletins.
3. Acceptance Plans.
3.a Percent Within Limits. The percentage of each lot within the specified limits will be determined by the following procedures:
3.a.1 The “n” sampling positions on the lot will be located by use of the table of random numbers found in PTM No. 1.
3.a.2 A measurement will be made at each location, or a test portion taken and the measurement made on the test portion.
3.a.3 The lot ( X ) measurements are averaged to find X .
n
1i
XX
3.a.4 The Standard Deviation, “s,” of the lot measurements will be determined as follows:
1i
1n )XX(s
3.a.5 The Quality Index (QU) is found by subtracting the average (X) of the measurements from the upper specification limit (U) and dividing the result by “s.”
s
)Xu(Qu
3.a.6 The Quality Index (QL) is found by subtracting the lower specification limit (L) from the average and dividing the result by “s.”
s
)LX(QL
3.a.7 The percentage of material that will fall within the upper limit (U) is estimated by entering Table A or Table B with QU, using the column appropriate to the total number of measurements (n). Use Table A if QU has a negative value, or use Table B if QU has a positive value.
3.a.8 The percentage of material that will fall within the lower limit (L) is estimated by entering Table A or Table B with QL, using the column appropriate to the total number of measurements (n). Use Table A if QL has a negative value, or use Table B if QL has a positive value.
3.a.9 In cases where both upper (U) and lower (L) limits are concerned, the percentage of material that will fall within limits is found by adding the percent (PU) within the upper limit (U) to the percent (PL) within the lower limit (L) and subtracting 100 from the sum.
106 – 6
Total percent within limits = (PU + PL ) - 100
3.a.10 When determining the percentage within limits when the calculated Quality Index (Q.I.)
value is between two tabular values in Table A or Table B, the following procedure is used:
• The difference between the tabular Q.I. values on either side of the calculated value Q.I.
value will be determined.
• The difference will be divided by 2 and the quotient added to the lower tabular Q.I. value, resulting in the interpolated Q.I. value.
• If the calculated Q.I. is equal to or greater than the interpolated value, the higher listed percent within limits will be used.
• If the calculated Q.I. is less than interpolated value, the lower listed percent within the limits will be used.
106 – 7
TABLE A
Estimating Percent of Lot Within Limits
(Standard Deviation Method) Negative Values of QU or QL
Percent Within Limits n=3 n=4 n=5 n=6 n=7
50 0.0000 0.0000 0.0000 0.0000 0.0000 49 0.0361 0.0300 0.0281 0.0272 0.0267 48 0.0722 0.0600 0.0562 0.0545 0.0535 47 0.1083 0.0900 0.0843 0.0818 0.0802 46 0.1444 0.1200 0.1124 0.1091 0.1070
45 0.1806 0.1500 0.1406 0.1364 0.1338 44 0.2158 0.1800 0.1689 0.1639 0.1608 43 0.2510 0.2100 0.1972 0.1914 0.1878 42 0.2863 0.2400 0.2256 0.2189 0.2148 41 0.3215 0.2700 0.2539 0.2464 0.2418
40 0.3568 0.3000 0.2823 0.2740 0.2689 39 0.3912 0.3300 0.3106 0.3018 0.2966 38 0.4252 0.3600 0.3392 0.3295 0.3238 37 0.4587 0.3900 0.3678 0.3577 0.3515 36 0.4917 0.4200 0.3968 0.3859 0.3791
35 0.5242 0.4500 0.4254 0.4140 0.4073 34 0.5564 0.4800 0.4544 0.4426 0.4354 33 0.5878 0.5101 0.4837 0.4712 0.4639 32 0.6187 0.5401 0.5131 0.5002 0.4925 31 0.6490 0.5701 0.5424 0.5292 0.5211
30 0.6788 0.6001 0.5717 0.5586 0.5506 29 0.7076 0.6301 0.6018 0.5880 0.5846 28 0.7360 0.6601 0.6315 0.6178 0.6095
27 0.7635 0.6901 0.6619 0.6480 0.6395 26 0.7905 0.7201 0.6919 0.6782 0.6703
25 0.8164 0.7501 0.7227 0.7093 0.7011 24 0.8416 0.7801 0.7535 0.7403 0.7320 23 0.8661 0.8101 0.7846 0.7717 0.7642 22 0.8896 0.8401 0.8161 0.8040 0.7964 21 0.9122 0.8701 0.8479 0.8363 0.8290
20 0.9342 0.9001 0.8798 0.8693 0.8626 19 0.9555 0.9301 0.9123 0.9028 0.8966 18 0.9748 0.9601 0.9453 0.9367 0.9315 17 0.9940 0.9901 0.9782 0.9718 0.9673 16 1.0118 1.0201 1.0125 1.0073 1.0032
106 – 8
TABLE A (continued)
Negative Values of QU or QL
15 1.0286 1.0501 1.0469 1.0437 1.0413 14 1.0446 1.0801 1.0819 1.0813 1.0798 13 1.0597 1.1101 1.1174 1.1196 1.1202 12 1.0732 1.1401 1.1538 1.1592 1.1615 11 1.0864 1.1701 1.1911 1.2001 1.2045
10 1.0977 1.2001 1.2293 1.2421 1.2494 9 1.1087 1.2301 1.2683 1.2866 1.2966 8 1.1170 1.2601 1.3091 1.3328 1.3465 7 1.1263 1.2901 1.3510 1.3813 1.3990 6 1.1330 1.3201 1.3946 1.4332 1.4562
5 1.1367 1.3501 1.4408 1.4892 1.5184 4 1.1402 1.3801 1.4898 1.5500 1.5868 3 1.1439 1.4101 1.5428 1.6190 1.6662 2 1.1476 1.4401 1.6018 1.6990 1.7615 1 1.1510 1.4701 1.6719 1.8016 1.8893
106 – 9
TABLE B
Positive Values of QU or QL
99 1.1510 1.4701 1.6719 1.8016 1.8893 98 1.1476 1.4401 1.6018 1.6990 1.7615 97 1.1439 1.4101 1.5428 1.6190 1.6662 96 1.1402 1.3801 1.4898 1.5500 1.5868 95 1.1367 1.3501 1.4408 1.4892 1.5184
94 1.1330 1.3201 1.3946 1.4332 1.4562 93 1.1263 1.2901 1.3510 1.3813 1.3990 92 1.1170 1.2601 1.3091 1.3328 1.3465 91 1.1087 1.2301 1.2683 1.2866 1.2966 90 1.0977 1.2001 1.2293 1.2421 1.2494
89 1.0864 1.1701 1.1911 1.2001 1.2045 88 1.0732 1.1401 1.1538 1.1592 1.1615 87 1.0596 1.1101 1.1174 1.1196 1.1202 86 1.0446 1.0801 1.0819 1.0813 1.0798 85 1.0286 1.0501 1.0469 1.0437 1.0413
84 1.0118 1.0201 1.0125 1.0073 1.0032 83 0.9940 0.9901 0.9782 0.9718 0.9673 82 0.9748 0.9601 0.9453 0.9367 0.9315 81 0.9550 0.9301 0.9123 0.9028 0.8966 80 0.9342 0.9001 0.8798 0.8693 0.8626
79 0.9122 0.8701 0.8479 0.8363 0.8290 78 0.8896 0.8401 0.8161 0.8040 0.7964 77 0.8661 0.8101 0.7846 0.7717 0.7642 76 0.8416 0.7801 0.7535 0.7403 0.7320 75 0.8164 0.7501 0.7227 0.7093 0.7011
74 0.7905 0.7201 0.6919 0.6782 0.6703 73 0.7635 0.6901 0.6619 0.6480 0.6395 72 0.7360 0.6601 0.6315 0.6178 0.6095 71 0.7076 0.6301 0.6018 0.5880 0.5846 70 0.6788 0.6001 0.5717 0.5586 0.5506
69 0.6490 0.5701 0.5424 0.5292 0.5211 68 0.6187 0.5401 0.5131 0.5002 0.4925 67 0.5878 0.5101 0.4837 0.4712 0.4639 66 0.5564 0.4800 0.4544 0.4426 0.4354 65 0.5242 0.4500 0.4254 0.4140 0.4073
106.03(a) 106.03(b)
106 – 10
TABLE B (continued)
Positive Values of QU or QL
64 0.4917 0.4200 0.3968 0.3859 0.3791 63 0.4587 0.3900 0.3678 0.3577 0.3515 62 0.4252 0.3600 0.3392 0.3295 0.3238 61 0.3912 0.3300 0.3106 0.3018 0.2966 60 0.3568 0.3000 0.2823 0.2740 0.2689
59 0.3215 0.2700 0.2539 0.2464 0.2418 58 0.2863 0.2400 0.2256 0.2189 0.2148 57 0.2510 0.2100 0.1972 0.1914 0.1878 56 0.2158 0.1800 0.1689 0.1639 0.1608 55 0.1806 0.1500 0.1406 0.1364 0.1338
54 0.1444 0.1200 0.1124 0.1091 0.1070 53 0.1083 0.0900 0.0843 0.0818 0.0802 52 0.0722 0.0600 0.0562 0.0545 0.0535 51 0.0361 0.0300 0.0281 0.0272 0.0267 50 0.0000 0.0000 0.0000 0.0000 0.0000
3.b Resampling of Lot. It is the intent of these specifications that lots will meet specification requirements at the time of submission. If permitted, nonconforming lots that can be corrected may be reworked and sampled.
3.c General Basis of Adjusted Payment. The related adjusted percentage of contract price will be determined by the method designated in the appropriate specification section.
(b) Specifications, Other than Restricted Performance.
1. Responsibility. The Department will be responsible for determining the acceptability of the material and construction. Material will be reviewed for acceptance through the Department’s specified acceptance procedures. Sample locations for acceptance testing will be determined by the Department.
Perform sampling and testing for acceptance in the presence of the Inspector, unless otherwise specified.
Transport acceptance samples from sampling point to testing site or other designated location in the presence of the Inspector.
The Contractor is responsible for the control and quality of the material and construction.
Prepare a QC Plan as specified in Section 106.03(a)2.a and submit it to the Inspector-In-Charge for review at the start of the project.