This document includes a federal contract opportunity to renovate a dental clinic. The contractor shall provide all equipment, tools, labor and supplies necessary to renovate the Second Floor Dental Clinic at the main campus of the John D. Dingell VA Medical Center in Detroit, Michigan. The completed project shall include all necessary features and items specified in the contract drawings and specifications to deliver a fully functional dental clinic to the government. All work must be performed during normal business hours from Monday through Friday between 8:00AM to 4:30PM, and shall be completed within 365 days of the Notice to Proceed. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

U N I T

E D

STAT ES OF

A M

E R

IC

A

S

RI

A F F A

SN

AR

ETEVFO

TN

E

M T R A P

E

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

ALLIANCE | 7GAE JV PROJECT NO.: 218134

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e o e q u a rt e r in c h o th re e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs42

100% BID DOCUMENTS

GI001

553-18-203

4646 JOHN R. STREET, DETROIT, MI 48201

MARCH 19, 2021

JRB SLS

COVER SHEET VA DETROIT DENTAL

CLINIC RENOVATION

DETROIT, MICHIGAN

NORTH

LOCATION MAP

PROJECT TEAM DRAWING SHEET INDEX

BUILDING OCCUPANCY:

CONSTRUCTION TYPE:

BUILDING HEIGHT:

PROJECT AREA SQUARE FOOTAGE:

DESCRIPTIONSHEET ISSUE DATE

1A, AUTOMATIC SPRINKLER SYSTEM

46'-6"

SECOND FLOOR: I-2

SECOND FLOOR DENTAL SUITE

EXISTING:

7,760 S.F.

PROJECT INFORMATION

MEP ENGINEERING:

ARCHITECTURE/LOW VOLTAGE/FIRE PROTECTION:

OWNER:

PH: 269.927.0144

ALLIANCE | 7GAE JV

KALAMAZOO, MI 49007

600 E. MICHIGAN AVE - SUITE B

PH: 616.361.2664

616.361.1493FX:

PROGRESSIVE AE

GRAND RAPIDS, MI 49525

1811 4 MILE RD. N.E.

JOHN D. DINGELL DETROIT VAMC

DETROIT, MI 48201

4646 JOHN R. STREET

PH: 202.617.8485

ALEXANDRIA, VA 22314

2850 EISENHOWER AVE - SUITE 310

PROJECT NO. 553-18-203 VA DETROIT DENTAL CLINIC RENOVATION

JOHN D. DINGELL VA MEDICAL CENTER -

DETROIT, MICHIGAN

100% BID DOCUMENTS

P001 GENERAL PLUMBING INFORMATION MARCH 19, 2021

PD102.1 1ST FLR INT & 2ND FLR PLUMBING DEMO - PHASE 1 MARCH 19, 2021

PD102.2 1ST FLR INT & 2ND FLR PLUMBING DEMO - PHASE 2 MARCH 19, 2021

PD102.3 1ST FLR INT & 2ND FLR PLUMBING DEMO - PHASE 3 MARCH 19, 2021

PD102.4 1ST FLR INT & 2ND FLR PLUMBING DEMO - PHASE 4 MARCH 19, 2021

PL102.0 COMPOSITE 1ST FLR INT PLUMBING PLAN MARCH 19, 2021

PL102.1 1ST FLR INT & 2ND FLR PLUMBING PLANS - PHASE 1 MARCH 19, 2021

PL102.2 1ST FLR INT & 2ND FLR PLUMBING - PHASE 2 MARCH 19, 2021

PL102.2i 1ST FLR INT SPACE - PHASE 3 MARCH 19, 2021

PL102.3 2ND FLR PLUMBING - PHASE 3 MARCH 19, 2021

PL102.4 1ST FLR INT & 2ND FLR PLUMBING - PHASE 4 MARCH 19, 2021

M001 GENERAL MECHANICAL INFORMATION MARCH 19, 2021

MD102 SECOND FLOOR HVAC DEMO PLAN MARCH 19, 2021

MH102 SECOND FLOOR HVAC PLAN MARCH 19, 2021

E001 ELECTRICAL NOTES AND ABBREVIATIONS MARCH 19, 2021

ED102 SECOND FLOOR DEMOLITION PLAN MARCH 19, 2021

EP102 SECOND FLOOR POWER PLAN MARCH 19, 2021

EL102 SECOND FLOOR LIGHTING PLAN MARCH 19, 2021

00 DENTAL EZ - COVER SHEET MARCH 19, 2021

01 DENTAL EZ - SHEET 01 MARCH 19, 2021

02 DENTAL EZ - SHEET 02 MARCH 19, 2021

03 DENTAL EZ - SHEET 03 MARCH 19, 2021

04 DENTAL EZ - SHEET 04 MARCH 19, 2021

05 DENTAL EZ - SHEET 05 MARCH 19, 2021

06 DENTAL EZ - SHEET 06 MARCH 19, 2021

07 DENTAL EZ - SHEET 07 MARCH 19, 2021

08 DENTAL EZ - SHEET 08 MARCH 19, 2021

GI001 COVER SHEET MARCH 19, 2021

GI002 GENERAL INFORMATION & SYMBOL LEGEND MARCH 19, 2021

GC201 COMPOSITE SECOND FLOOR PHASING PLAN MARCH 19, 2021

GC202 SECOND FLOOR PHASING PLAN - PHASE 1 MARCH 19, 2021

GC203 SECOND FLOOR PHASING PLAN - PHASE 2 MARCH 19, 2021

GC204 SECOND FLOOR PHASING PLAN - PHASE 3 MARCH 19, 2021

GC205 SECOND FLOOR PHASING PLAN - PHASE 4 MARCH 19, 2021

AD102 COMPOSITE SECOND FLOOR DEMOLITION PLAN MARCH 19, 2021

AD102.1 SECOND FLOOR DEMOLITION PLAN - PHASE 1 MARCH 19, 2021

AD102.2 SECOND FLOOR DEMOLITION PLAN - PHASE 2 MARCH 19, 2021

AD102.3 SECOND FLOOR DEMOLITION PLAN - PHASE 3 MARCH 19, 2021

AD102.4 SECOND FLOOR DEMOLITION PLAN - PHASE 4 MARCH 19, 2021

AI102 COMPOSITE SECOND FLOOR PLAN MARCH 19, 2021

AI102.1 SECOND FLOOR PLAN - PHASE 1 MARCH 19, 2021

AI102.2 SECOND FLOOR PLAN - PHASE 2 MARCH 19, 2021

AI102.3 SECOND FLOOR PLAN - PHASE 3 MARCH 19, 2021

AI102.4 SECOND FLOOR PLAN - PHASE 4 MARCH 19, 2021

AC122 SECOND FLOOR REFLECTED CEILING PLAN MARCH 19, 2021

AI420 INTERIOR ELEVATIONS MARCH 19, 2021

AI421 INTERIOR ELEVATIONS MARCH 19, 2021

AI422 INTERIOR ELEVATIONS MARCH 19, 2021

AI423 INTERIOR ELEVATIONS MARCH 19, 2021

ID001 INTERIOR FINISH KEY & SCHEDULE MARCH 19, 2021

ID102 SECOND FLOOR FINISH PLAN MARCH 19, 2021

RENOVATION:

10,407 S.F.

DESCRIPTIONSHEET ISSUE DATE

ALTERNATE #1: ELIMINATE ALL NEW CEILING

REPLACEMENT WORK IN

PROJECT SCOPE (CC238, CC222, CC224,

CC225, C2461) . EXISTING CEILINGS &

FIXTURES TO REMAIN IN PLACE.

ALTERNATE #2: ELIMINATE NEW DOOR ON SOILED UTILITY

C2467.

ALTERNATE #3: REMOVE ALL NEW INTERIOR FINISHES IN

STORAGE C2463.

ALTERNATE #4: ELIMINATE CEILING-MOUNTED PATIENT LIFT

& ASSOCIATED STRUCTURAL WORK FROM

DENTAL OPERATORY C2447.

ALTERNATE #5: ELIMINATE NEW INTERIOR FINISHES FROM

CC223 CORRIDOR, C2428 ORAL SURGERY

RECOVERY, & C2431 APPT. ALCOVE

DEDUCTIVE ALTERNATES

DIRECTOR

ASSOCIATE DIRECTOR

PROJECT #553-18-203 SIGNATURE DATE

CHIEF OF STAFF

CHIEF, FMS

CHIEF, ENGINEERING SECTION

CHIEF, ENVIRONMENTAL MANAGEMENT SECTION

INFECTION CONTROL OFFICER

PATIENT SAFETY MANAGER

GEMS COORDINATOR

CHIEF, POLICE SERVICE

CHIEF, FIRE SERVICE

UNION SAFETY REPRESENTATIVE

CONTRACTING OFFICER

COR

SAFETY SPECIALIST

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

95% CONSTRUCTION DOCUMENTS 12/04/2020

100% BID DOCUMENTS 03/19/2021

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

95% CONSTRUCTION DOCUMENTS 12/04/2020

100% BID DOCUMENTS 03/19/2021

A300

A320

A420

A500

ARCHITECTURAL SYMBOLS & PLAN INDICATORS

ABBREVIATIONSBARRIER-FREE DESIGN INFORMATION

ROOMNAME

XXX

A

A

A

A

8'-0"

TOP OF STEEL

ELEV. 10'-0"

A200

TITLE

SCALE X" = 1'-0"

OBSTRUCTED APPROACH

UNOBSTRUCTED APPROACH

TYP. CODE REGULATED MOUNTING HEIGHTS

SCALE: NONE

TYP. EQUIPMENT MOUNTING HEIGHTS

SCALE: NONE

ELEVATION INDICATION

SHEET NO.

ELEVATION NUMBER

SECTION INDICATOR

ENLARGED PLAN OR

ELEVATION

PROPOSED SPOT

EXISTING SPOT

ELEVATION

100.57'

100.57'

STRUCTURAL SPAN

ROOF TRUSSES

FLOOR JOIST OR

RAMP

@ 16" O.C.

2 x 12

1" per 12"

SLOPE UP

REVISION TAG W/

REVISION NUMBER

KEYNOTE TAG

WINDOW TAG W/

WINDOW TYPE

INDICATOR

WALL SECTION CUT

COLUMN LINE

WALL TYPES

ELEVATION

BUILDING SECTION CUT

SHEET LOCATION

DETAIL NUMBER

TYPICAL

DIMENSIONING

SET-BACK LINE

PROPERTY LINE

EXISTING

CONTOUR

TOPOGRAPHY

CONTOUR

100'

100'

TOPOGRAPHY

PROPOSED

SECTIONS & DETAILS

TYPICAL TITLE FOR

DOOR NUMBER

DOOR TAG W/

ROOM NUMBER

ROOM NAME/

NORTH ARROW

60" DIAMETER CLEAR

WHEELCHAIR TURNING

SPACE - REFER TO PLAN

- REFER TO PLAN

AND GROUND SPACE

30" x 48" CLEAR FLOOR

CEILING HEIGHT TAG

GENERAL NOTES:

ACCESSIBLE CONTROLS, OPERATING

MECHANISMS & HARDWARE SHALL COMPLY

WITH SECTIONS 1109.13 OF THE IBC AND

SECTION 309 OF ICC/ANSI A117.1.

ACCESSIBLE SIGNAGE FURNISHED BY OWNER,

SHALL COMPLY WITH SECTIONS 1110 OF THE

IBC AND SECTION 703 OF ICC/ANSI A117.1.

PORTABLE FIRE EXTINGUISHERS TO BE

PROVIDED IN ACCORDANCE WITH THE 2000

ICC INTERNATIONAL FIRE CODE. IBC (906.1).

REFER TO FLOOR PLAN SHEETS FOR

LOCATIONS OF FIRE EXTINGUISHER CABINETS

(FEC)

RECEPTACLE

LIGHT

SWITCH

HVAC

CONTROLS

FIRE

ALARM

FEC

LESS THEN 40#

FEC

GREATER THEN 40#

TEL

PP

RH/CH

GBX

SH1

CL

OT

SPH

CRK SND

PT

SD

HS

XR COM4 MR

CRBG

WP

TP SNR

4'-4"

NOTE: ITEMS SHOWN ON THIS SHEET ARE NOT

NECESSARILY INCLUDED IN THIS

PROJECT.

TV

MOUNTING HEIGHT GENERAL NOTES:

1. REFER TO SHEETS AI102.1 - AI102.4 FOR

EQUIPMENT ABBREVIATIONS AND LOCATIONS.

2. REFER TO INTERIOR ELEVATIONS FOR

ADDITIONAL INFORMATION.

3. ITEMS ON THIS SHEET ARE NOT NECESSARILY

INCLUDED IN THIS PROJECT.

4. CONTRACTOR TO VERIFY ALL EQUIPMENT

MOUNTING HEIGHTS WITH OWNER.

5. REFER TO MECHANICAL/ELECTRICAL

DRAWINGS FOR DEVICE MOUNTING

HEIGHTS.

XXXNORTH

M A

X

IF

B

A R

R

IE

R F

R E E

M

IN

" 5

M A

X

M A

X

M A

X

SIDE FRONT

M

A X

M

A X

20" - 25"

M

A X

FRONT

M

A X

20" MAX

SIDE

SIDE FRONT

M

IN

M

A X

M

IN

M

A X

@ AT

A/C AIR CONDITIONIN/AIR CONDITIONER

ACOUS ACOUSTICAL

AD AREA DRAIN, AUTOMATIC DAMPER

ADJ ADJUST, ADJUSTABLE

ALUM ALUMINUM

AP ACCESS PANEL

ACT ACOUSTICAL CEILING

B BASE

BAR BARRIER

BD BOARD

BF BARRIER FREE

BKT BRACKET

BLDG BUILDING

BLKG BLOCKING

BOTT BOTTOM

C TO C CENTER TO CENTER

CAB CABINET

CE COLUMN ENCLOSURE

CIR CIRCLE

CIR CIRCUIT

CL CENTER LINE, CLEARANCES

CLG CEILING

CJ CONTROL JOINT

CLKG CAULKING

CLO CLOSET

CMT CERAMIC MOSAIC TILE

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

CORR CORRIDOR

CPT CARPET

CSS CLINICAL SERVICE SINK

CT CERAMIC TILE

CTR CENTER

CUH CABINET UNIT HEATER

DEMO DEMOLITION, DEMOLISH

DEPT DEPARTMENT

DF DRINKING FOUNTAIN

DIA, D DIAMETER

DIM DIMENSION

DN DOWN

DR DRAIN

DS DOWNSPOUT

ELECT ELECTRICAL

ELEV ELEVATION

ENTR ENTRANCE

EQ EQUAL

EP ELECTRICAL PANEL

EXH EXHAUST

EXP EXPOSED

EXIST EXISTING, EXSIST'G

EXT EXTERIOR

EW EACH WAY

FA FIRE ALARM

FD FIRE DAMPER OR FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FIN FINISH

FL, FLR FLOOR FINISH

FLG, FLRG FLOORING, FLOOR'G

FURN FURNITURE, FURNACE

FWC FABRIC WALL COVERING

FT FEET, FOOT

GALV GALVANIZE(D)

GL GLASS

GSB GYPSUM SHEATHING BOARD

GWB GYPSUM WALLBOARD

GYP. BD GYPSUM BOARD

ID INSIDE DIAMETER

INSUL INSULATION

IN INCH(ES)

JAN JANITOR'S CLOSET

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

HW HEADWALL

LAM LAMINATED

LF LINEAL FEET

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MANUF MANUFACTURED, MANUFACTURER

MIN MINIMUM

MLD'G MOLDING

MTL METAL

N NORTH

NAT NATURAL

NIC NOT IN CONTRACT

NORM NORMAL

NTS NOT TO SCALE

O.C. ON CENTER

OPN'G OPENING

O, O2 OXYGEN

PLAST PLASTIC

PNT PAINT

PREFAB PREFABRICATED

PLYWD PLYWOOD, PLYW'D

R RADIUS

RA RETURN AIR

REQ'D REQUIRED

RM ROOM

S SINK, SOUTH, SHINGLE

SA SUPPLY AIR

SAN SANITARY

SMKD SMOKE DAMPER

SECT SECTION

SHWR SHOWER

SIM SIMILAR

SPEC SPECIFICATION

SQ SQUARE

SS SERVICE SINK, STAINLESS STEEL

STD STANDARD

STOR STORAGE

SUSP SUSPEND(ED)

SYM SYMBOL, SYMMETRICAL

TOIL TOILET

TYP TYPICAL

UNFIN UNFINISHED

UTIL UTILITY

VAC VACUUM

VAV VARIABLE AIR VOLUME

VCT VINYL COMPOSITION TILE

VD VOLUME DAMPER

VERT VERTICAL

V.I.F. VERIFY IN FIELD

VT VINYL TILE

VWC VINYL WALL COVERING

W/ WITH

WC WATER CLOSET

WD WOOD

WNDW WINDOW

W. HTR WATER HEATER

W/O WITHOUT

WP WALL PROTECTION

FLOOR LINE

UNDERSIDE OF

EXISTING DECK

TEMPORARY PARTITION.

5/8" GYP. BOARD ON 3 5/8"

METAL STUDS.

NOTE:

PLASTER TAPE ALL GYP. BD.

JOINTS; SECURE ALL TAPE

WITH RAM-TACK HIGH TACK

SPRAY OR EQUAL;

CONTRACTOR TO PROVIDE

FINISH WALL ON OCCUPIED

SIDE TO GIVE FINISHED

APPEARANCE; REFER TO

PHASING PLANS FOR

ADDITIONAL INFORMATION

OCCUPIED SIDERENOVATION SIDE

MECHANICALLY

FASTEN BOTTOM

TRACK TO FLOOR

CEILING LEVEL

2-1/2" DEEP SLOTTED

METAL DEFLECTION

TRACK FASTENED TO

DECK@ 2'-0" O.C.

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

ALLIANCE | 7GAE JV PROJECT NO.: 218134

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs42

100% BID DOCUMENTS

GI002

553-18-203

4646 JOHN R. STREET, DETROIT, MI 48201

MARCH 19, 2021

JRB SLS

GENERAL INFORMATION &

SYMBOL LEGEND

VA DETROIT DENTAL

CLINIC RENOVATION

SCALE: N.T.S.GI002

W1 - TEMPORARY WALL TYPE01

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

95% CONSTRUCTION DOCUMENTS 12/04/2020

100% BID DOCUMENTS 03/19/2021

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

22.2

23242526

D.9

E

F

G

H

C2402

VISUAL FIELDS

RM

C2404

EYEWARE

DISPENSING /

MODIF.

C2406

CLEAN UTILITY

C2408

SOILED UTILITY

C2410

EXAM / TREAT

CONSULT

C2412

EXAM / TREAT

CONSULT

C2414

EXAM / TREAT

CONSULT

C2416

ARGON LASER

TREATMENT RM

CC221

CORRIDOR

CC230

CORRIDOR

C2425

WAITING

CC233

CORRIDOR

C2500 C2502

CC231

C2485

ASSIST. CHIEF

OFFICE C2487

CHIEF OFFICE

C2488

ELEC. RM.

C2487A

CLOSET

C2489

CLASSROOM

STUDY

C2491

STORAGE

C2493A

MEN'S TOILET

C2493

MEN'S LOCKERS

C2495

WOMEN'S

LOCKERS

C2495A

WOMEN'S

TOILET

C2503

C2501

C2544

C2545

C2481

SECRETARY

OFFICE / FILES

CC239

CORRIDOR

CC225

CORRIDOR

C2426

ORAL SURGERY

C2428

ORAL SURG.

RECOVERY

CC223

CORRIDOR

C2431

APPT. ALCOVE

C2432

PATIENT INTERVIEW

RM

C2430

DIRECTOR OFFICE

C2429

ORAL SURGERY

C2427

ORAL SURGERY

C2437

DENTAL OPERATORY

C2439

DENTAL OPERATORY

C2441

DENTAL OPERATORY

C2440

ORAL DIAGN. EXAM

C2438

CLEAN UTILITY

C2436

H.A.C.

CC222

CORRIDOR

C2442

STERILIZATION

C2443

DENTAL OPERATORY

C2445

DENTAL OPERATORY

C2447

DENTAL OPERATORY

C2444

DENTAL OPERATORY

C2478

OVERFLOW

OPERATORY

C2433

OVERFLOW

OPERATORY

C2472

DENTAL X-RAY

C2470

ORAL DIAGN.

C2446

DENTAL OPERATORY

C2473

DENTAL HYGIENE

PREVENTIVE

C2475

DENTAL HYGIENE

PREVENTIVE

C2477

DENTAL HYGIENE

PREVENTIVE

CC224

CORRIDOR

C2484

OFFICE COORD.

DENTAL AUX.

C2480

DENTAL HYGIENE

PREVENTIVE

C C

C O

R R

ID

O

R

C2449

DENTAL OPERATORY

C2451

DENTAL OPERATORY

C2453

DENTAL OPERATORY

C2455

DENTAL OPERATORY

C2454

DENTAL OPERATORY

C2452

DENTAL OPERATORY

C2448

TOILET

C2461

DENTAL LAB

C2462

CLEAN WORK RM

C2463

STORAGE

C2492

PROG. ASSIST.

OFFICE

C2467

SOILED UTILITY

C2471

ORAL DIAGN. X-RAY

C2466

ORAL DIAGN.

EXAM/OR

CC227

CORRIDOR

CC238

CORRIDOR

C2464

TECH WORK RM

D.8

D

24.424.6 23.8 23.5 22.9 22.7

SC208

STAIR NO. 8

C2464

MECHANICAL

ROOM

C2465

ELECTRICAL

ROOM

5' - 0"

PHASING LEGEND

PHASE 1 PHASE 1 (AFTER HOURS)

PHASE 2

PHASE 4

PHASE 3

AREA NOT IN SCOPE

PHASE 2 (AFTER HOURS)

PHASE 3 (AFTER HOURS)

GENERAL CONSTRUCTION NOTES

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS

GC201-GC205. NO PHASING OVERLAP SHALL BE ALLOWED. NO

WORK OUT OF SEQUENCE SHALL BE ALLOWED.

2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE

ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY

ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL

GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL

PROJECT.

3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD

DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD

LOCKSETS.

4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED

AT ALL TIMES.

5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY

WALK-OFF MATS INSIDE AND OUTSIDE OF WORKSPACE.

6. CONTRACTOR TO REFER TO DEMOLITION SHEETS FOR ADDITIONAL

INFORMATION ON DEMOLITION INTENT & EXTENT.

7. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,

MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY. EXCESSIVE

NOISE-LEVEL WORK SHALL TAKE PLACE BETWEEN 6:00 PM & 10:00

PM.

8. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD

OPERATING HOURS.

9. ANY WORK TO BE COMPLETED AT ABOVE NOISE LEVELS INDICATED

IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND

COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE

GOVERNMENT.

10. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS

AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION, CONTRACTOR

SHALL CONTACT OWNER FOR ABATEMENT.

11. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE

ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR EACH

PHASE PRIOR TO OCCUPANCY BEING GRANTED.

12. AREAS OF CONSTRUCTION SHALL BE NEGATIVE PRESSURE.

CONSTRUCTION BARRIERS SHALL HAVE A DEVICE (MANOMETER OR

EQUAL) TO MONITOR NEGATIVE PRESSURIZATION FOR THE

DURATION OF THE CONSTRUCTION PHASE.

ENERGY

CENTER

NORTH

PARKING

DECK

SOUTH

PARKING

DECK

4 3

8 7

2 1

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

ALLIANCE | 7GAE JV PROJECT NO.: 218134

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs42

100% BID DOCUMENTS

GC201

553-18-203

4646 JOHN R. STREET, DETROIT, MI 48201

MARCH 19, 2021

JRB SLS

COMPOSITE SECOND FLOOR

PHASING PLAN

VA DETROIT DENTAL

CLINIC RENOVATION

NORTH

SCALE: 1/8" = 1'-0"

COMPOSITE SECOND FLOOR PHASING PLAN

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

95% CONSTRUCTION DOCUMENTS 12/04/2020

100% BID DOCUMENTS 03/19/2021

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

242526

F

G

H

CC225

CORRIDOR

C2428

ORAL SURG.

RECOVERY

CC223

CORRIDOR

C2431

APPT. ALCOVE

C2432

PATIENT INTERVIEW

RM

C2430

DIRECTOR OFFICE

C2429

ORAL SURGERY

C2437

DENTAL OPERATORY

C2439

DENTAL OPERATORY

C2441

DENTAL OPERATORY

C2440

ORAL DIAGN. EXAM

C2438

CLEAN UTILITY

C2436

H.A.C.

CC222

CORRIDOR

C2442

STERILIZATION

C2443

DENTAL OPERATORY

C2445

DENTAL OPERATORY

C2447

DENTAL OPERATORY

C2444

DENTAL OPERATORY

C2478

OVERFLOW

OPERATORY

C2433

OVERFLOW

OPERATORY

C2472

DENTAL X-RAY

C2470

ORAL DIAGN.

C2446

DENTAL OPERATORY

C2473

DENTAL HYGIENE

PREVENTIVE

C2475

DENTAL HYGIENE

PREVENTIVE

C2477

DENTAL HYGIENE

PREVENTIVE

CC224

CORRIDOR

C2449

DENTAL OPERATORY

C2451

DENTAL OPERATORY

C2471

ORAL DIAGN. X-RAY

CC227

CORRIDOR

CORRIDOR WORK SHALL BE

COMPLETED AFTER HOURS

W1

W1

TEMPORARY CONSTRUCTION

PARTITION, SEE NOTES

TEMPORARY CONSTRUCTION

PARTITION, SEE NOTES

PROVIDE MANOMETER TO

MONITOR NEGATIVE

PRESSURIZATION OF

CONSTRUCTION ZONE

PROVIDE MANOMETER TO

MONITOR NEGATIVE

PRESSURIZATION OF

CONSTRUCTION ZONE

11' - 11"

GENERAL CONSTRUCTION NOTES

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS

GC201-GC205. NO PHASING OVERLAP SHALL BE ALLOWED. NO

WORK OUT OF SEQUENCE SHALL BE ALLOWED.

2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE

ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY

ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL

GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL

PROJECT.

3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD

DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD

LOCKSETS.

4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED

AT ALL TIMES.

5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY

WALK-OFF MATS INSIDE AND OUTSIDE OF WORKSPACE.

6. CONTRACTOR TO REFER TO DEMOLITION SHEETS FOR ADDITIONAL

INFORMATION ON DEMOLITION INTENT & EXTENT.

7. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,

MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY. EXCESSIVE

NOISE-LEVEL WORK SHALL TAKE PLACE BETWEEN 6:00 PM & 10:00

PM.

8. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD

OPERATING HOURS.

9. ANY WORK TO BE COMPLETED AT ABOVE NOISE LEVELS INDICATED

IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND

COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE

GOVERNMENT.

10. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS

AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION, CONTRACTOR

SHALL CONTACT OWNER FOR ABATEMENT.

11. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE

ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR EACH

PHASE PRIOR TO OCCUPANCY BEING GRANTED.

12. AREAS OF CONSTRUCTION SHALL BE NEGATIVE PRESSURE.

CONSTRUCTION BARRIERS SHALL HAVE A DEVICE (MANOMETER OR

EQUAL) TO MONITOR NEGATIVE PRESSURIZATION FOR THE

DURATION OF THE CONSTRUCTION PHASE.

PHASING LEGEND

PHASE 1 PHASE 1 (AFTER HOURS)

PHASE 2

PHASE 4

PHASE 3

AREA NOT IN SCOPE

PHASE 2 (AFTER HOURS)

PHASE 3 (AFTER HOURS)

PHASE 1 DESCRIPTION

• DENTAL OPERATORIES C2437, C2439, C2440, C2441, C2443 WILL BE

CLOSED FROM CLINIC USE & WILL BE RENOVATED WITH NEW

FLOORING, WALL BASE, PAINT, & CASEWORK. MEP WORK REQ'D

FOR THE NEW DENTAL DELIVERY SYSTEM SHALL BE INCLUDED FOR

THE OPERATORIES IN THIS PHASE. THE ASSOCIATED PORTION OF

CORRIDORS CC222 & CC225 WILL RECEIVE NEW FLOORING, WALL

BASE, CRASH RAIL, PAINT, & NEW CEILING GRID AND TILE.

NOTE:

• ALL TEMPORARY CONSTRUCTION WALLS SHALL BE SMOKE & DUST

TIGHT; WALLS ARE TO BE 3-5/8" METAL STUDS W. 5/8" GYP. BD. ON

BOTH SIDES; PROVIDE 3'-0" x 7'-0" ACCESS DOOR; PROVIDE STICKY

WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA; PROVIDE

CONSTRUCTION SIGNAGE "DANGER - CONSTRUCTION AREA,

AUTHORIZED PERSONNEL ONLY"

• FOR AFTER-HOURS WORK, CONTRACTOR SHALL PROVIDE DUST

SEPARATION FOR THE CONSTRUCTION AREA AT THE BEGINNING OF

EACH SHIFT; AT THE END OF EACH SHIFT, CONTRACTOR IS TO

REMOVE DUST SEPARATION AND CLEAN AREA AS REQUIRED;

PROVIDE STICKY WALK-OFF MATS AT ENTRANCE TO

CONSTRUCTION AREA; PROVIDE CONSTRUCTION SIGNAGE

"DANGER - CONSTRUCTION AREA, AUTHORIZED PERSONNEL ONLY".

IF FLOORING WORK IS NOT COMPLETED AT END OF SHIFT; ENSURE

THE SURFACE IS ACCEPTABLE FOR PATIENT/STAFF FOOT & WHEELED

TRAFFIC. FLOORING SURFACE SHALL BE SLIP-RESISTANT & SHALL

COMPLY W. ALL ADA REQUIREMENTS INCLUDING CHANGES IN

FLOOR LEVEL AT TRANSITIONS TO EXISTING FLOORING MATERIAL.

RENOVATIONS IN CORRIDOR CC222 LOCATED IN FRONT OF

STERILIZATION ROOM C2442 SHALL BE COMPLETED AFTER HOURS.

ENERGY

CENTER

NORTH

PARKING

DECK

SOUTH

PARKING

DECK

4 3

8 7

2 1

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

ALLIANCE | 7GAE JV PROJECT NO.: 218134

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs42

100% BID DOCUMENTS

GC202

553-18-203

4646 JOHN R. STREET, DETROIT, MI 48201

MARCH 19, 2021

JRB SLS

SECOND FLOOR PHASING

PLAN - PHASE 1

VA DETROIT DENTAL

CLINIC RENOVATION

NORTH

SCALE: 1/4" = 1'-0"

SECOND FLOOR PHASING PLAN - PHASE 1

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

95% CONSTRUCTION DOCUMENTS 12/04/2020

100% BID DOCUMENTS 03/19/2021

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

23242526

G

CC225

CORRIDOR

C2441

DENTAL OPERATORY

CC222

CORRIDOR

C2442

STERILIZATION

C2443

DENTAL OPERATORY

C2445

DENTAL OPERATORY

C2447

DENTAL OPERATORY

C2444

DENTAL OPERATORY

C2478

OVERFLOW

OPERATORY

C2433

OVERFLOW

OPERATORY

C2472

DENTAL X-RAY

C2470

ORAL DIAGN.

C2446

DENTAL OPERATORY

C2473

DENTAL HYGIENE

PREVENTIVE

C2475

DENTAL HYGIENE

PREVENTIVE

C2477

DENTAL HYGIENE

PREVENTIVE

CC224

CORRIDOR

C2484

OFFICE COORD.

DENTAL AUX.

C2480

DENTAL HYGIENE

PREVENTIVE

C C

C O

R R

ID

O

R

C2449

DENTAL OPERATORY

C2451

DENTAL OPERATORY

C2471

ORAL DIAGN. X-RAY

C2466

ORAL DIAGN.

EXAM/OR

CC227

CORRIDOR

W1

W1TEMPORARY CONSTRUCTION

PARTITION, SEE NOTES

TEMPORARY CONSTRUCTION

PARTITION, SEE NOTES

CORRIDOR WORK SHALL BE

COMPLETED AFTER HOURS

PROVIDE MANOMETER TO MONITOR

NEGATIVE PRESSURIZATION OF

CONSTRUCTION ZONE

PROVIDE MANOMETER TO MONITOR

NEGATIVE PRESSURIZATION OF

CONSTRUCTION ZONE

11' - 11"

GENERAL CONSTRUCTION NOTES

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS

GC201-GC205. NO PHASING OVERLAP SHALL BE ALLOWED. NO

WORK OUT OF SEQUENCE SHALL BE ALLOWED.

2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE

ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY

ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL

GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL

PROJECT.

3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD

DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD

LOCKSETS.

4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED

AT ALL TIMES.

5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY

WALK-OFF MATS INSIDE AND OUTSIDE OF WORKSPACE.

6. CONTRACTOR TO REFER TO DEMOLITION SHEETS FOR ADDITIONAL

INFORMATION ON DEMOLITION INTENT & EXTENT.

7. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,

MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY. EXCESSIVE

NOISE-LEVEL WORK SHALL TAKE PLACE BETWEEN 6:00 PM & 10:00

PM.

8. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD

OPERATING HOURS.

9. ANY WORK TO BE COMPLETED AT ABOVE NOISE LEVELS INDICATED

IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND

COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE

GOVERNMENT.

10. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS

AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION, CONTRACTOR

SHALL CONTACT OWNER FOR ABATEMENT.

11. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE

ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR EACH

PHASE PRIOR TO OCCUPANCY BEING GRANTED.

12. AREAS OF CONSTRUCTION SHALL BE NEGATIVE PRESSURE.

CONSTRUCTION BARRIERS SHALL HAVE A DEVICE (MANOMETER OR

EQUAL) TO MONITOR NEGATIVE PRESSURIZATION FOR THE

DURATION OF THE CONSTRUCTION PHASE.

PHASING LEGEND

PHASE 1 PHASE 1 (AFTER HOURS)

PHASE 2

PHASE 4

PHASE 3

AREA NOT IN SCOPE

PHASE 2 (AFTER HOURS)

PHASE 3 (AFTER HOURS)

PHASE 2 DESCRIPTION

• DENTAL OPERATORIES C2475 AND C2477 WILL BE CLOSED FROM

CLINIC USE & WILL BE RENOVATED WITH NEW FLOORING, WALL

BASE, PAINT, & CASEWORK. FORMER X-RAY C2433 AND C2478 WILL

BE CONVERTED INTO SMALLER SWING OPERATORIES AND WILL

ALSO RECEIVE NEW FLOORING & CASEWORK. DENTAL X-RAY

C2470 WILL RECEIVE NEW FLOORING & WALL BASE. ONCE THE

OPERATORIES ARE COMPLETE, CORRIDOR CC224 WILL RECEIVE

NEW FLOORING, WALL BASE, CRASH RAIL, PAINT, & NEW CEILING

GRID AND TILE.

• THIS PHASE WILL CONSIST OF AFTER-CLINIC HOURS TO COMPLETE

THE RENOVATIONS TO CORRIDOR CC225. DURING CLINIC HOURS,

CORRIDOR CC225 NEEDS TO BE OPEN TO PATIENTS & STAFF TO

ACCESS ALL OTHER AREAS NOT INCLUDED IN PHASE 2. WORK

INCLUDES NEW FLOORING, WALL BASE, PAINT, CRASH RAILS, AND

CEILING GRID & TILE.

NOTE:

• ALL TEMPORARY CONSTRUCTION WALLS SHALL BE SMOKE & DUST

TIGHT; WALLS ARE TO BE 3-5/8" METAL STUDS W. 5/8" GYP. BD. ON

BOTH SIDES; PROVIDE 3'-0" x 7'-0" ACCESS DOOR; PROVIDE STICKY

WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA; PROVIDE

CONSTRUCTION SIGNAGE "DANGER - CONSTRUCTION AREA,

AUTHORIZED PERSONNEL ONLY"

• FOR AFTER-HOURS WORK, CONTRACTOR SHALL PROVIDE DUST

SEPARATION FOR THE CONSTRUCTION AREA AT THE BEGINNING OF

EACH SHIFT; AT THE END OF EACH SHIFT, CONTRACTOR IS TO

REMOVE DUST SEPARATION AND CLEAN AREA AS REQUIRED;

PROVIDE STICKY WALK-OFF MATS AT ENTRANCE TO

CONSTRUCTION AREA; PROVIDE CONSTRUCTION SIGNAGE

"DANGER - CONSTRUCTION AREA, AUTHORIZED PERSONNEL ONLY".

IF FLOORING WORK IS NOT COMPLETED AT END OF SHIFT; ENSURE

THE SURFACE IS ACCEPTABLE FOR PATIENT/STAFF FOOT & WHEELED

TRAFFIC. FLOORING SURFACE SHALL BE SLIP-RESISTANT & SHALL

COMPLY W. ALL ADA REQUIREMENTS INCLUDING CHANGES IN

FLOOR LEVEL AT TRANSITIONS TO EXISTING FLOORING MATERIAL.

ENERGY

CENTER

NORTH

PARKING

DECK

SOUTH

PARKING

DECK

4 3

8 7

2 1

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

ALLIANCE | 7GAE JV PROJECT NO.: 218134

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs42

100% BID DOCUMENTS

GC203

553-18-203

4646 JOHN R. STREET, DETROIT, MI 48201

MARCH 19, 2021

JRB SLS

SECOND FLOOR PHASING

PLAN - PHASE 2

VA DETROIT DENTAL

CLINIC RENOVATION

NORTH

SCALE: 1/4" = 1'-0"

SECOND FLOOR PHASING PLAN - PHASE 2

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

95% CONSTRUCTION DOCUMENTS 12/04/2020

100% BID DOCUMENTS 03/19/2021

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

D.9

E

F

CC239

CORRIDOR

CC222

CORRIDOR

C2442

STERILIZATION

C2443

DENTAL OPERATORY

C2445

DENTAL OPERATORY

C2447

DENTAL OPERATORY

C2444

DENTAL OPERATORY

C2478

OVERFLOW

OPERATORY

C2433

OVERFLOW

OPERATORY

C2472

DENTAL X-RAY

C2470

ORAL DIAGN.

C2446

DENTAL OPERATORY

C2473

DENTAL HYGIENE

PREVENTIVE

C2475

DENTAL HYGIENE

PREVENTIVE

C2477

DENTAL HYGIENE

PREVENTIVE

CC224

CORRIDOR

C2484

OFFICE COORD.

DENTAL AUX.

C2480

DENTAL HYGIENE

PREVENTIVE

C C

C O

R R

ID

O

R

C2449

DENTAL OPERATORY

C2451

DENTAL OPERATORY

C2453

DENTAL OPERATORY

C2455

DENTAL OPERATORY

C2454

DENTAL OPERATORY

C2452

DENTAL OPERATORY

C2448

TOILET

C2461

DENTAL LAB

C2462

CLEAN WORK RM

C2463

STORAGE

C2492

PROG. ASSIST.

OFFICE

C2467

SOILED UTILITY

C2471

ORAL DIAGN. X-RAY

C2466

ORAL DIAGN.

EXAM/OR

CC227

CORRIDOR

CC238

CORRIDOR

C2464

TECH WORK RM

D.8

24.424.6 23.8 23.5 22.9

SC208

STAIR NO. 8

5' - 5"

TEMPORARY

CONSTRUCTION

PARTITION, SEE NOTES

ON PHASING PLANS

W1

TEMPORARY CONSTRUCTION

PARTITION, SEE NOTES ON PHASING

PLANS

W1

PROVIDE MANOMETER TO

MONITOR NEGATIVE

PRESSURIZATION OF

CONSTRUCTION ZONE

PROVIDE MANOMETER TO

MONITOR NEGATIVE

PRESSURIZATION OF

CONSTRUCTION ZONE

GENERAL CONSTRUCTION NOTES

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS

GC201-GC205. NO PHASING OVERLAP SHALL BE ALLOWED. NO

WORK OUT OF SEQUENCE SHALL BE ALLOWED.

2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE

ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY

ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL

GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL

PROJECT.

3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD

DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD

LOCKSETS.

4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED

AT ALL TIMES.

5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY

WALK-OFF MATS INSIDE AND OUTSIDE OF WORKSPACE.

6. CONTRACTOR TO REFER TO DEMOLITION SHEETS FOR ADDITIONAL

INFORMATION ON DEMOLITION INTENT & EXTENT.

7. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,

MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY. EXCESSIVE

NOISE-LEVEL WORK SHALL TAKE PLACE BETWEEN 6:00 PM & 10:00

PM.

8. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD

OPERATING HOURS.

9. ANY WORK TO BE COMPLETED AT ABOVE NOISE LEVELS INDICATED

IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND

COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE

GOVERNMENT.

10. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS

AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION, CONTRACTOR

SHALL CONTACT OWNER FOR ABATEMENT.

11. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE

ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR EACH

PHASE PRIOR TO OCCUPANCY BEING GRANTED.

12. AREAS OF CONSTRUCTION SHALL BE NEGATIVE PRESSURE.

CONSTRUCTION BARRIERS SHALL HAVE A DEVICE (MANOMETER OR

EQUAL) TO MONITOR NEGATIVE PRESSURIZATION FOR THE

DURATION OF THE CONSTRUCTION PHASE.

PHASING LEGEND

PHASE 1 PHASE 1 (AFTER HOURS)

PHASE 2

PHASE 4

PHASE 3

AREA NOT IN SCOPE

PHASE 2 (AFTER HOURS)

PHASE 3 (AFTER HOURS)

PHASE 3 DESCRIPTION

• THE DENTAL LAB WILL BE CLOSED TO STAFF USE AT THIS PHASE TO

REPLACE THE CEILING TILES, REMOVE ALL EXISTING CASEWORK,

EQUIPMENT, & FINISHES. NEW FLOORING, WALL BASE, AND PAINT

SHALL BE INSTALLED FOLLOWED BY THE NEW LAB CASEWORK &

EQUIPMENT. MEP WORK WILL BE RED'Q TO COMPLETE ALL NEW

EQUIPMENT & CASEWORK CONNECTIONS. ORAL EXAM ROOM

C2466 RENOVATIONS WILL ALSO BE INCLUDED IN PHASE 6. AS AN

ALTERNATE OPTION, STORAGE C2463 SHALL RECEIVE NEW

FLOORING & WALL BASE.

• DENTAL OPERATORIES C2444, C2445, C2446, C2447, C2449, C2451,

C2452, C2453, C2454, & C2455 WILL BE CLOSED FROM CLINIC USE

& WILL BE RENOVATED WITH NEW FLOORING, WALL BASE, PAINT,

AND CASEWORK. MEP WORK REQ'D FOR THE NEW DENTAL

DELIVERY SYSTEM SHALL BE INCLUDED FOR THE OPERATORIES IN

THIS PHASE. THIS PHASE WILL ALSO INCLUDE THE ASSOCIATED

SECTION OF CORRIDOR CC222 WHICH WILL RECEIVE NEW

FLOORING, WALL BASE, CRASH RAIL, PAINT, AND NEW CEILING

GRID & TILE. THE CORRIDOR WORK SHALL MAINTAIN ACCESS TO

C2442 STERILIZATION AT ALL TIMES DURING CLINIC HOURS.

• THIS PHASE WILL CONSIST OF AFTER-CLINIC HOURS TO COMPLETE

THE RENOVATIONS TO CORRIDOR CC227 & CC238. DURING

CLINIC HOURS, CORRIDOR CC227 & CC238 NEED TO BE OPEN TO

STAFF TO ACCESS ALL OTHER AREAS NOT INCLUDED IN PHASE 3.

WORK INCLUDES NEW FLOORING, WALL BASE, PAINT, CRASH RAILS,

AND CEILING GRID & TILE.

NOTE:

• ALL TEMPORARY CONSTRUCTION WALLS SHALL BE SMOKE & DUST

TIGHT; WALLS ARE TO BE 3-5/8" METAL STUDS W. 5/8" GYP. BD. ON

BOTH SIDES; PROVIDE 3'-0" x 7'-0" ACCESS DOOR; PROVIDE STICKY

WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA; PROVIDE

CONSTRUCTION SIGNAGE "DANGER - CONSTRUCTION AREA,

AUTHORIZED PERSONNEL ONLY"

• FOR AFTER-HOURS WORK, CONTRACTOR IS TO PROVIDE DUST

SEPARATION FOR THE CONSTRUCTION AREA AT THE BEGINNING OF

EACH SHIFT; AT THE END OF EACH SHIFT, CONTRACTOR IS TO

REMOVE DUST SEPARATION AND CLEAN AREA AS REQUIRED;

PROVIDE STICKY WALK-OFF MATS AT ENTRANCE TO

CONSTRUCTION AREA; PROVIDE CONSTRUCTION SIGNAGE

"DANGER - CONSTRUCTION AREA, AUTHORIZED PERSONNEL ONLY".

IF FLOORING WORK IS NOT COMPLETED AT END OF SHIFT; ENSURE

THE SURFACE IS ACCEPTABLE FOR PATIENT/STAFF FOOT & WHEELED

TRAFFIC. FLOORING SURFACE SHALL BE SLIP-RESISTANT & SHALL

COMPLY W. ALL ADA REQUIREMENTS INCLUDING CHANGES IN

FLOOR LEVEL AT TRANSITIONS TO EXISTING FLOORING MATERIAL.

ENERGY

CENTER

NORTH

PARKING

DECK

SOUTH

PARKING

DECK

4 3

8 7

2 1

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

ALLIANCE | 7GAE JV PROJECT NO.: 218134

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs42

100% BID DOCUMENTS

GC204

553-18-203

4646 JOHN R. STREET, DETROIT, MI 48201

MARCH 19, 2021

JRB SLS

SECOND FLOOR PHASING

PLAN - PHASE 3

VA DETROIT DENTAL

CLINIC RENOVATION

NORTH

SCALE: 1/4" = 1'-0"

SECOND FLOOR PHASING PLAN - PHASE 3

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

95% CONSTRUCTION DOCUMENTS 12/04/2020

100% BID DOCUMENTS 03/19/2021

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

PHASING LEGEND

PHASE 1 PHASE 1 (AFTER HOURS)

PHASE 2

PHASE 4

PHASE 3

AREA NOT IN SCOPE

PHASE 2 (AFTER HOURS)

PHASE 3 (AFTER HOURS)

GENERAL CONSTRUCTION NOTES

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS

GC201-GC205. NO PHASING OVERLAP SHALL BE ALLOWED. NO

WORK OUT OF SEQUENCE SHALL BE ALLOWED.

2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE

ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY

ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL

GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL

PROJECT.

3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD

DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD

LOCKSETS.

4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED

AT ALL TIMES.

5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY

WALK-OFF MATS INSIDE AND OUTSIDE OF WORKSPACE.

6. CONTRACTOR TO REFER TO DEMOLITION SHEETS FOR ADDITIONAL

INFORMATION ON DEMOLITION INTENT & EXTENT.

7. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,

MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY. EXCESSIVE

NOISE-LEVEL WORK SHALL TAKE PLACE BETWEEN 6:00 PM & 10:00

PM.

8. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD

OPERATING HOURS.

9. ANY WORK TO BE COMPLETED AT ABOVE NOISE LEVELS INDICATED

IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND

COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE

GOVERNMENT.

10. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS

AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION, CONTRACTOR

SHALL CONTACT OWNER FOR ABATEMENT.

11. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE

ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR EACH

PHASE PRIOR TO OCCUPANCY BEING GRANTED.

12. AREAS OF CONSTRUCTION SHALL BE NEGATIVE PRESSURE.

CONSTRUCTION BARRIERS SHALL HAVE A DEVICE (MANOMETER OR

EQUAL) TO MONITOR NEGATIVE PRESSURIZATION FOR THE

DURATION OF THE CONSTRUCTION PHASE.

H

CC230

CORRIDOR

CC225

CORRIDOR

C2426

ORAL SURGERYC2428

ORAL SURG.

RECOVERY

CC223

CORRIDOR

C2431

APPT. ALCOVE

C2432

PATIENT INTERVIEW

RM

C2430

DIRECTOR OFFICE

C2429

ORAL SURGERY

C2427

ORAL SURGERY

PROVIDE VISQUEEN BARRIER

BETWEEN EXISTING SUITE DOOR

& PUBLIC CORRIDOR.

CONTRACTOR TO FOLLOW VA

STANDARD ICRA GUIDELINES

PROVIDE MANOMETER TO MONITOR

NEGATIVE PRESSURIZATION OF

CONSTRUCTION ZONE

PROVIDE MANOMETER TO

MONITOR NEGATIVE

PRESSURIZATION OF

CONSTRUCTION ZONE

PHASE 4 DESCRIPTION

• ORAL SURGERY PROCEDURE ROOMS C2426, C2427, AND C2429

WILL BE RENOVATED WITH NEW FLOORING, WALL BASE, PAINT, AND

CASEWORK. MEP WORK REQ'D FOR THE NEW ORAL SURGERY

CHAIRS SHALL BE INCLUDED IN THIS PHASE. AS AN ALTERNATE

OPTION, CORRIDOR CC223, ORAL SURGERY RECOVERY C2428,

AND APPT. ALCOVE C2431 MAY RECEIVE NEW FLOORING AND

WALLS BASE AS PART OF THIS PHASE.

NOTE:

• PROVIDE STICKY WALK-OFF MATS AT ENTRANCE TO

CONSTRUCTION AREA; PROVIDE CONSTRUCTION SIGNAGE

"DANGER - CONSTRUCTION AREA, AUTHORIZED PERSONNEL ONLY"

ENERGY

CENTER

NORTH

PARKING

DECK

SOUTH

PARKING

DECK

4 3

8 7

2 1

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

ALLIANCE | 7GAE JV PROJECT NO.: 218134

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs42

100% BID DOCUMENTS

GC205

553-18-203

4646 JOHN R. STREET, DETROIT, MI 48201

MARCH 19, 2021

JRB SLS

SECOND FLOOR PHASING

PLAN - PHASE 4

VA DETROIT DENTAL

CLINIC RENOVATION

NORTH

SCALE: 1/4" = 1'-0"

SECOND FLOOR PHASING PLAN - PHASE 4

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

95% CONSTRUCTION DOCUMENTS 12/04/2020

100% BID DOCUMENTS 03/19/2021

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

2222.223242526

E

F

G

H

CC225

CORRIDOR

C2426

ORAL SURGERY

C2428

ORAL SURG.

RECOVERY

CC223

CORRIDOR

C2431

APPT. ALCOVE

C2432

PATIENT INTERVIEW

RM

C2430

DIRECTOR OFFICE

C2429

ORAL SURGERY

C2427

ORAL SURGERY

C2437

DENTAL OPERATORY

C2439

DENTAL OPERATORY

C2441

DENTAL OPERATORY

C2440

ORAL DIAGN. EXAM

C2438

CLEAN UTILITY

C2436

H.A.C.

CC222

CORRIDOR

C2442

STERILIZATION

C2443

DENTAL OPERATORY

C2445

DENTAL OPERATORY

C2447

DENTAL OPERATORY

C2444

DENTAL OPERATORY

C2478

OVERFLOW

OPERATORY

C2433

OVERFLOW

OPERATORY

C2472

DENTAL X-RAY

C2470

ORAL DIAGN.

C2446

DENTAL OPERATORY

C2473

DENTAL HYGIENE

PREVENTIVE

C2475

DENTAL HYGIENE

PREVENTIVE

C2477

DENTAL HYGIENE

PREVENTIVE

CC224

CORRIDOR

C2484

OFFICE COORD.

DENTAL AUX.

C2480

DENTAL HYGIENE

PREVENTIVE

C C

C O

R R

ID

O

R

C2449

DENTAL OPERATORY

C2451

DENTAL OPERATORY

C2453

DENTAL OPERATORY

C2455

DENTAL OPERATORY

C2454

DENTAL OPERATORY

C2452

DENTAL OPERATORY

C2448

TOILET

C2461

DENTAL LAB

C2462

CLEAN WORK RM

C2463

STORAGE

C2492

PROG. ASSIST.

OFFICE

C2467

SOILED UTILITY

C2471

ORAL DIAGN. X-RAY

C2466

ORAL DIAGN.

EXAM/ORCC227

CORRIDOR

CC238

CORRIDOR

C2464

TECH WORK RM

C2402

VISUAL FIELDS

RM

C2404

EYEWARE

DISPENSING /

MODIF.

C2406

CLEAN UTILITY

C2408

SOILED UTILITY

C2410

EXAM / TREAT

CONSULT

C2412

EXAM / TREAT

CONSULT

C2414

EXAM / TREAT

CONSULT

C2416

ARGON LASER

TREATMENT RM

CC221

CORRIDOR

CC230

CORRIDOR

C2425

WAITING

CC233

CORRIDOR

C2500 C2502

CC231

CC232

C2485

ASSIST. CHIEF

OFFICE C2487

CHIEF OFFICE

C2488

ELEC. RM.

C2487A

CLOSET

C2489

CLASSROOM

STUDY

C2491

STORAGE

C2493A

MEN'S TOILET

C2493

MEN'S LOCKERS

C2495

WOMEN'S

LOCKERS

C2495A

WOMEN'S

TOILET

C2503

C2501

C2543

C2544

C2545

C2481

SECRETARY

OFFICE / FILES

CC239

CORRIDOR

D.8

24.424.6 23.8 23.5 22.9 22.7

SC208

STAIR NO. 8

1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMTED

TO WHAT IS SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO

REMOVE ALL MATERIALS AND ITEMS AS REQUIRED TO FACILITATE

NEW CONSTRUCTION.

2. CONTRACTOR SHALL VERIFY EXISTING FIELD CONDITIONS PRIOR

TO ANY WORK. IF CONDITIONS DO NOT REFLECT WHAT IS NOTED

IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS TO NOTIFY

THE ARCHITECT.

3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET

OF CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS

WITHOUT VERIFYING AND COORDINATING WITH ALL GENERAL

TRADES AS TO HOW THEY RELATE TO THE OVERALL PROJECT.

4. CONTRACTOR IS RESPONSIBLE TO PROVIDE DUMPSTERS.

LOCATION OF DUMPSTERS TO BE DETERMINED BY OWNER WITH

CONTRACTOR'S INPUT.

5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED

MATERIALS. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED

BY DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOBSITE.

REMOVE DAILY AND DISPOSE OF IN A LEGAL MANNER. ONSITE

SALE OR BURNING OF REMOVED ITEMS IS NOT PERMITTED.

6. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO

ENSURE THE SAFETY OF THE PUBLIC AND/OR WORKMEN ON THE

SITE TO PREVENT ACCIDENTS OR INJURY TO ANY PERSON ON,

ABOUT, OR ADJACENT TO THE PREMISES. THE CONTRACTOR

SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND

REGULATIONS PERTAINING TO SAFETY AND THE PREVENTION OF

ACCIDENTS.

7. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT,

INSULATION, WATER PROOFING, EMERGENCY LIGHTING,

SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH ARE

TO REMAIN.

8. THE OWNER RESERVES THE RIGHTS TO ANY REMOVE MATERIALS

OR ITEMS. CONTRACTOR TO COORDINATE WITH OWNER.

9. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY

DEMOLITION OR REWORK TO PREPARE FOR NEW CONSTRUCTION

AS REQUIRED.

10. WHERE CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL

WITHIN THE CEIILNGS ARE TO BE REMOVED OR REROUTED. REFER

TO MECHANICAL. ELECTRICAL, AND PLUMBING PLANS FOR

ADDITIONAL DEMOLITION NOT SHOWN ON THIS SHEET.

11. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM

OCCUPIED AREAS WITH A SMOKE TIGHT WALL ASSEMBLY WITH

SUITABLE DUST BARRIER. TAKE CARE SO THAT CONSTRUCTION

DUST IS NOT TRANSMITTED TO OCCUPIED AREAS BY MECHANICAL

SYSTEM.

12. OWNER TO COORDINATE ACCESS TO WORK AREAS WHICH ARE

OCCUPIED; OWNER TO RELOCATE EQUPMENT FROM WORK

AREA AS NECESSARY.

13. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND

SURFACES CUT OR DAMAGED DURING DEMOLITION, BY

METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING

WARRANTIES.

14. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE

PERFORMED.

15. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED

IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND

COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE

GOVERNMENT

GENERAL DEMO NOTES

ENERGY

CENTER

NORTH

PARKING

DECK

SOUTH

PARKING

DECK

4 3

8 7

2 1

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

ALLIANCE | 7GAE JV PROJECT NO.: 218134

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs42

100% BID DOCUMENTS

AD102

553-18-203

4646 JOHN R. STREET, DETROIT, MI 48201

MARCH 19, 2021

JRB SLS

COMPOSITE SECOND FLOOR

DEMOLITION PLAN

VA DETROIT DENTAL

CLINIC RENOVATION

NORTH

SCALE: 1/8" = 1'-0"

COMPOSITE SECOND FLOOR DEMOLITION PLAN

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

95% CONSTRUCTION DOCUMENTS 12/04/2020

100% BID DOCUMENTS 03/19/2021

REVISIONS DATE

35% SCHEMATIC DESIGN 08/29/2019

65% DESIGN DEVELOPMENT 03/24/2020

G

H

C2402

VISUAL FIELDS

RM

C2404

EYEWARE

DISPENSING /

MODIF.

C2406

CLEAN UTILITY

C2408

SOILED UTILITY

C2410

EXAM / TREAT

CONSULT

C2412

EXAM / TREAT

CONSULT

CC221

CORRIDOR

CC225

CORRIDOR

C2431

APPT. ALCOVE

C2432

PATIENT INTERVIEW

RM

C2430

DIRECTOR OFFICE

C2437

DENTAL OPERATORY

C2439

DENTAL OPERATORY

C2441

DENTAL OPERATORY

C2440

ORAL DIAGN. EXAM

C2438

CLEAN UTILITY

C2436

H.A.C.

CC222

CORRIDOR

C2442

STERILIZATION

C2443

DENTAL OPERATORY

C2478

OVERFLOW

OPERATORY

CC222

CORRIDOR

TEMPORARY

CONSTRUCTION

PARTITION, SEE NOTES

ON PHASING PLANS

TEMPORARY

CONSTRUCTION

PARTITION, SEE NOTES

ON PHASING PLANS

CC225

CORRIDOR

2 3

77 9

9 7

77 9

9 7

77 9

9 7

77 9

9 7

77 9

W1

W1 2 3

2 3

2 3

76.00

76.00

AD102.1

C2433

OVERFLOW

OPERATORY

C2445

DENTAL OPERATORY

S

S

1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMTED

TO WHAT IS SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO

REMOVE ALL MATERIALS AND ITEMS AS REQUIRED TO FACILITATE

NEW CONSTRUCTION.

2. CONTRACTOR SHALL VERIFY EXISTING FIELD CONDITIONS PRIOR

TO ANY WORK. IF CONDITIONS DO NOT REFLECT WHAT IS NOTED

IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS TO NOTIFY

THE ARCHITECT.

3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET

OF CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS

WITHOUT VERIFYING AND COORDINATING WITH ALL GENERAL

TRADES AS TO HOW THEY RELATE TO THE OVERALL PROJECT.

4. CONTRACTOR IS RESPONSIBLE TO PROVIDE DUMPSTERS.

LOCATION OF DUMPSTERS TO BE DETERMINED BY OWNER WITH

CONTRACTOR'S INPUT.

5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED

MATERIALS. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED

BY DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOBSITE.

REMOVE DAILY AND DISPOSE OF IN A LEGAL MANNER. ONSITE

SALE OR BURNING OF REMOVED ITEMS IS NOT PERMITTED.

6. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO

ENSURE THE SAFETY OF THE PUBLIC AND/OR WORKMEN ON THE

SITE TO PREVENT ACCIDENTS OR INJURY TO ANY PERSON ON,

ABOUT, OR ADJACENT TO THE PREMISES. THE CONTRACTOR

SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND

REGULATIONS PERTAINING TO SAFETY AND THE PREVENTION OF

ACCIDENTS.

7. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT,

INSULATION, WATER PROOFING, EMERGENCY LIGHTING,

SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH ARE

TO REMAIN.

8. THE OWNER RESERVES THE RIGHTS TO ANY REMOVE MATERIALS

OR ITEMS. CONTRACTOR TO COORDINATE WITH OWNER.

9. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY

DEMOLITION OR REWORK TO PREPARE FOR NEW CONSTRUCTION

AS REQUIRED.

10. WHERE CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL

WITHIN THE CEIILNGS ARE TO BE REMOVED OR REROUTED. REFER

TO MECHANICAL. ELECTRICAL, AND PLUMBING PLANS FOR

ADDITIONAL DEMOLITION NOT SHOWN ON THIS SHEET.

11. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM

OCCUPIED AREAS WITH A SMOKE TIGHT WALL ASSEMBLY WITH

SUITABLE DUST BARRIER. TAKE CARE SO THAT CONSTRUCTION

DUST IS NOT TRANSMITTED TO OCCUPIED AREAS BY MECHANICAL

SYSTEM.

12. OWNER TO COORDINATE ACCESS TO WORK AREAS WHICH ARE

OCCUPIED; OWNER TO RELOCATE EQUPMENT FROM WORK

AREA AS NECESSARY.

13. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND

SURFACES CUT OR DAMAGED DURING DEMOLITION, BY

METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING

WARRANTIES.

14. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE

PERFORMED.

15. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED

IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND

COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE

GOVERNMENT

GENERAL DEMO NOTES

REMOVE EXISTING DOOR. EXISTING FRAME TO REMAIN.

EXISTING DOOR HARDWARE TO BE REMOVED AND SALVAGED

FOR REINSTALLATION.

REMOVE EXISTING WALL-MOUNTED BUMPER GUARDS.

REMOVE EXISTING HANDRAIL COVERS, HANDRAIL RETAINER

TO REMAIN IN PLACE. PROTECT DURING DEMOLITION FOR

INSTALLATION OF NEW HANDRAIL COVERS.

REMOVE EXISTING FLOORING & FLOOR FINISHES INCLUDING

INTERGAL WALL BASE, ALL ADHESIVES, SETTING MATERIALS,

ETC. DOWN TO EXISTING SUBSTRATE. GRIND CONCRETE

FLOORS AS REQUIRED TO PROVIDE A SMOOTH AND UNIFORM

SURFACE FOR NEW FINISHES. PATCH EXISTING WALLS WHERE

INTERGAL WALL BASE IS REMOVED AS REQUIRED TO RECEIVE

NEW FINISHES.

REMOVE & SALVAGE EXISTING CEILING TILE & GRID SYSTEM.

CONTRACTOR TO SALVAGE TILE FOR RECYCLING.

REMOVE EXISTING CEILING TILE. EXISTING GRID SYSTEM TO

REMAIN. CONTRACTOR TO SALVAGE TILE FOR RECYCLING.

REMOVE EXISTING CASEWORK, SINKS & WALL MOUNTED

EQUIPMENT. SALVAGE WALL-MOUNTED EQUIPMENT & TURN

OVER TO OWNER UNLESS DIRECTED OTHERWISE. PATCH &

REPAIR EXPOSED SURFACES TO REMAIN AS REQUIRED TO

RECEIVE NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE & SALVAGE EXISTING DENTAL CHAIR & DELIVERY

SYSTEM. TURN OVER TO OWNER UNLESS DIRECTED OTHERWISE.

REMOVE EXISTING MECHANICAL, PLUMBING, & ELECTRICAL

ITEMS - REFER TO MECHANICAL, PLUMBING, & ELECTRICAL

DEMOLITION PLANS FOR FURTHER INFORMATION. PATCH &

REPAIR EXPOSED SURFACES TO REMAIN AS REQUIRED TO

RECEIVE NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE & SALVAGE ALL EXISTING WALL EQUIPMENT. PATCH

& REPAIR WALLS AS REQUIRED TO RECEIVE NEW PAINT FINISH.

REINSTALL EXISTING WALL EQUIPMENT IN SAME LOCATION.

PATCH & REPAIR WALL SURFACE WHERE EXISTING X-RAY EQUIP

IS REMOVED & REPLACED. OWNER TO COORDINATE ACTUAL

REPLACEMENT OF EQUIPMENT.

DEMOLITION KEY NOTES

G

CC222

CORRIDOR

C2442

STERILIZATION

TEMPORARY

CONSTRUCTION

PARTITION, SEE NOTES

ON PHASING PLANS

CC225

CORRIDOR

W1

RENOVATION

CONSTRUCTION TO BE

COMPLETED AFTER HOURS

DEMOLITION LEGEND

EXISTING NON-FIRE RATED WALL

NEW TEMPORARY CONSTRUCTION PARTITION

EXISTING DOOR

DEMOLISHED DOOR

1-HOUR FIRE RATED PARTITION - UL DES U419

2-HOUR FIRE RATED BARRIER - UL DES U419

1-HOUR SMOKE BARRIER - NFPA 101 - 8.3

AREA NOT IN PROJECT SCOPE

CURRENT PHASE RENOVATION AREA

TEMPORARY CONSTRUCTION DOOR

PROVIDE TEMPORARY UPRIGHT SPINKLER

PENDANTS DURING CONSTRUCTION PHASE

WHERE CEILING REPLACEMENT TAKES

PLACE. RETURN SPRINKLER PENDANTS TO

ORIGINAL LOCATION ONCE NEW CEILING

WORK IS COMPLETED.

S

ENERGY

CENTER

NORTH

PARKING

DECK

SOUTH

PARKING

DECK

4 3

8 7

2 1

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

ALLIANCE | 7GAE JV PROJECT NO.: 218134

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs42

100% BID DOCUMENTS

AD102.1

553-18-203

4646 JOHN R. STREET, DETROIT, MI 48201

MARCH 19, 2021

JRB JS

SECOND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .