This document includes a federal contract opportunity to renovate a dental clinic. The contractor shall provide all equipment, tools, labor and supplies necessary to renovate the Second Floor Dental Clinic at the main campus of the John D. Dingell VA Medical Center in Detroit, Michigan. The completed project shall include all necessary features and items specified in the contract drawings and specifications to deliver a fully functional dental clinic to the government. All work must be performed during normal business hours from Monday through Friday between 8:00AM to 4:30PM, and shall be completed within 365 days of the Notice to Proceed. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
U N I T
E D
STAT ES OF
A M
E R
IC
A
S
RI
A F F A
SN
AR
ETEVFO
TN
E
M T R A P
E
1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com
616 361 2664 OFFICE 616 361 1493 FAX
600 E. Michigan Ave, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
ALLIANCE | 7GAE JV PROJECT NO.: 218134
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o n e o e q u a rt e r in c h o th re e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs42
100% BID DOCUMENTS
GI001
553-18-203
4646 JOHN R. STREET, DETROIT, MI 48201
MARCH 19, 2021
JRB SLS
COVER SHEET VA DETROIT DENTAL
CLINIC RENOVATION
DETROIT, MICHIGAN
NORTH
LOCATION MAP
PROJECT TEAM DRAWING SHEET INDEX
BUILDING OCCUPANCY:
CONSTRUCTION TYPE:
BUILDING HEIGHT:
PROJECT AREA SQUARE FOOTAGE:
DESCRIPTIONSHEET ISSUE DATE
1A, AUTOMATIC SPRINKLER SYSTEM
46'-6"
SECOND FLOOR: I-2
SECOND FLOOR DENTAL SUITE
EXISTING:
7,760 S.F.
PROJECT INFORMATION
MEP ENGINEERING:
ARCHITECTURE/LOW VOLTAGE/FIRE PROTECTION:
OWNER:
PH: 269.927.0144
ALLIANCE | 7GAE JV
KALAMAZOO, MI 49007
600 E. MICHIGAN AVE - SUITE B
PH: 616.361.2664
616.361.1493FX:
PROGRESSIVE AE
GRAND RAPIDS, MI 49525
1811 4 MILE RD. N.E.
JOHN D. DINGELL DETROIT VAMC
DETROIT, MI 48201
4646 JOHN R. STREET
PH: 202.617.8485
ALEXANDRIA, VA 22314
2850 EISENHOWER AVE - SUITE 310
PROJECT NO. 553-18-203 VA DETROIT DENTAL CLINIC RENOVATION
JOHN D. DINGELL VA MEDICAL CENTER -
DETROIT, MICHIGAN
100% BID DOCUMENTS
P001 GENERAL PLUMBING INFORMATION MARCH 19, 2021
PD102.1 1ST FLR INT & 2ND FLR PLUMBING DEMO - PHASE 1 MARCH 19, 2021
PD102.2 1ST FLR INT & 2ND FLR PLUMBING DEMO - PHASE 2 MARCH 19, 2021
PD102.3 1ST FLR INT & 2ND FLR PLUMBING DEMO - PHASE 3 MARCH 19, 2021
PD102.4 1ST FLR INT & 2ND FLR PLUMBING DEMO - PHASE 4 MARCH 19, 2021
PL102.0 COMPOSITE 1ST FLR INT PLUMBING PLAN MARCH 19, 2021
PL102.1 1ST FLR INT & 2ND FLR PLUMBING PLANS - PHASE 1 MARCH 19, 2021
PL102.2 1ST FLR INT & 2ND FLR PLUMBING - PHASE 2 MARCH 19, 2021
PL102.2i 1ST FLR INT SPACE - PHASE 3 MARCH 19, 2021
PL102.3 2ND FLR PLUMBING - PHASE 3 MARCH 19, 2021
PL102.4 1ST FLR INT & 2ND FLR PLUMBING - PHASE 4 MARCH 19, 2021
M001 GENERAL MECHANICAL INFORMATION MARCH 19, 2021
MD102 SECOND FLOOR HVAC DEMO PLAN MARCH 19, 2021
MH102 SECOND FLOOR HVAC PLAN MARCH 19, 2021
E001 ELECTRICAL NOTES AND ABBREVIATIONS MARCH 19, 2021
ED102 SECOND FLOOR DEMOLITION PLAN MARCH 19, 2021
EP102 SECOND FLOOR POWER PLAN MARCH 19, 2021
EL102 SECOND FLOOR LIGHTING PLAN MARCH 19, 2021
00 DENTAL EZ - COVER SHEET MARCH 19, 2021
01 DENTAL EZ - SHEET 01 MARCH 19, 2021
02 DENTAL EZ - SHEET 02 MARCH 19, 2021
03 DENTAL EZ - SHEET 03 MARCH 19, 2021
04 DENTAL EZ - SHEET 04 MARCH 19, 2021
05 DENTAL EZ - SHEET 05 MARCH 19, 2021
06 DENTAL EZ - SHEET 06 MARCH 19, 2021
07 DENTAL EZ - SHEET 07 MARCH 19, 2021
08 DENTAL EZ - SHEET 08 MARCH 19, 2021
GI001 COVER SHEET MARCH 19, 2021
GI002 GENERAL INFORMATION & SYMBOL LEGEND MARCH 19, 2021
GC201 COMPOSITE SECOND FLOOR PHASING PLAN MARCH 19, 2021
GC202 SECOND FLOOR PHASING PLAN - PHASE 1 MARCH 19, 2021
GC203 SECOND FLOOR PHASING PLAN - PHASE 2 MARCH 19, 2021
GC204 SECOND FLOOR PHASING PLAN - PHASE 3 MARCH 19, 2021
GC205 SECOND FLOOR PHASING PLAN - PHASE 4 MARCH 19, 2021
AD102 COMPOSITE SECOND FLOOR DEMOLITION PLAN MARCH 19, 2021
AD102.1 SECOND FLOOR DEMOLITION PLAN - PHASE 1 MARCH 19, 2021
AD102.2 SECOND FLOOR DEMOLITION PLAN - PHASE 2 MARCH 19, 2021
AD102.3 SECOND FLOOR DEMOLITION PLAN - PHASE 3 MARCH 19, 2021
AD102.4 SECOND FLOOR DEMOLITION PLAN - PHASE 4 MARCH 19, 2021
AI102 COMPOSITE SECOND FLOOR PLAN MARCH 19, 2021
AI102.1 SECOND FLOOR PLAN - PHASE 1 MARCH 19, 2021
AI102.2 SECOND FLOOR PLAN - PHASE 2 MARCH 19, 2021
AI102.3 SECOND FLOOR PLAN - PHASE 3 MARCH 19, 2021
AI102.4 SECOND FLOOR PLAN - PHASE 4 MARCH 19, 2021
AC122 SECOND FLOOR REFLECTED CEILING PLAN MARCH 19, 2021
AI420 INTERIOR ELEVATIONS MARCH 19, 2021
AI421 INTERIOR ELEVATIONS MARCH 19, 2021
AI422 INTERIOR ELEVATIONS MARCH 19, 2021
AI423 INTERIOR ELEVATIONS MARCH 19, 2021
ID001 INTERIOR FINISH KEY & SCHEDULE MARCH 19, 2021
ID102 SECOND FLOOR FINISH PLAN MARCH 19, 2021
RENOVATION:
10,407 S.F.
DESCRIPTIONSHEET ISSUE DATE
ALTERNATE #1: ELIMINATE ALL NEW CEILING
REPLACEMENT WORK IN
PROJECT SCOPE (CC238, CC222, CC224,
CC225, C2461) . EXISTING CEILINGS &
FIXTURES TO REMAIN IN PLACE.
ALTERNATE #2: ELIMINATE NEW DOOR ON SOILED UTILITY
C2467.
ALTERNATE #3: REMOVE ALL NEW INTERIOR FINISHES IN
STORAGE C2463.
ALTERNATE #4: ELIMINATE CEILING-MOUNTED PATIENT LIFT
& ASSOCIATED STRUCTURAL WORK FROM
DENTAL OPERATORY C2447.
ALTERNATE #5: ELIMINATE NEW INTERIOR FINISHES FROM
CC223 CORRIDOR, C2428 ORAL SURGERY
RECOVERY, & C2431 APPT. ALCOVE
DEDUCTIVE ALTERNATES
DIRECTOR
ASSOCIATE DIRECTOR
PROJECT #553-18-203 SIGNATURE DATE
CHIEF OF STAFF
CHIEF, FMS
CHIEF, ENGINEERING SECTION
CHIEF, ENVIRONMENTAL MANAGEMENT SECTION
INFECTION CONTROL OFFICER
PATIENT SAFETY MANAGER
GEMS COORDINATOR
CHIEF, POLICE SERVICE
CHIEF, FIRE SERVICE
UNION SAFETY REPRESENTATIVE
CONTRACTING OFFICER
COR
SAFETY SPECIALIST
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
95% CONSTRUCTION DOCUMENTS 12/04/2020
100% BID DOCUMENTS 03/19/2021
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
95% CONSTRUCTION DOCUMENTS 12/04/2020
100% BID DOCUMENTS 03/19/2021
A300
A320
A420
A500
ARCHITECTURAL SYMBOLS & PLAN INDICATORS
ABBREVIATIONSBARRIER-FREE DESIGN INFORMATION
ROOMNAME
XXX
A
A
A
A
8'-0"
TOP OF STEEL
ELEV. 10'-0"
A200
TITLE
SCALE X" = 1'-0"
OBSTRUCTED APPROACH
UNOBSTRUCTED APPROACH
TYP. CODE REGULATED MOUNTING HEIGHTS
SCALE: NONE
TYP. EQUIPMENT MOUNTING HEIGHTS
SCALE: NONE
ELEVATION INDICATION
SHEET NO.
ELEVATION NUMBER
SECTION INDICATOR
ENLARGED PLAN OR
ELEVATION
PROPOSED SPOT
EXISTING SPOT
ELEVATION
100.57'
100.57'
STRUCTURAL SPAN
ROOF TRUSSES
FLOOR JOIST OR
RAMP
@ 16" O.C.
2 x 12
1" per 12"
SLOPE UP
REVISION TAG W/
REVISION NUMBER
KEYNOTE TAG
WINDOW TAG W/
WINDOW TYPE
INDICATOR
WALL SECTION CUT
COLUMN LINE
WALL TYPES
ELEVATION
BUILDING SECTION CUT
SHEET LOCATION
DETAIL NUMBER
TYPICAL
DIMENSIONING
SET-BACK LINE
PROPERTY LINE
EXISTING
CONTOUR
TOPOGRAPHY
CONTOUR
100'
100'
TOPOGRAPHY
PROPOSED
SECTIONS & DETAILS
TYPICAL TITLE FOR
DOOR NUMBER
DOOR TAG W/
ROOM NUMBER
ROOM NAME/
NORTH ARROW
60" DIAMETER CLEAR
WHEELCHAIR TURNING
SPACE - REFER TO PLAN
- REFER TO PLAN
AND GROUND SPACE
30" x 48" CLEAR FLOOR
CEILING HEIGHT TAG
GENERAL NOTES:
ACCESSIBLE CONTROLS, OPERATING
MECHANISMS & HARDWARE SHALL COMPLY
WITH SECTIONS 1109.13 OF THE IBC AND
SECTION 309 OF ICC/ANSI A117.1.
ACCESSIBLE SIGNAGE FURNISHED BY OWNER,
SHALL COMPLY WITH SECTIONS 1110 OF THE
IBC AND SECTION 703 OF ICC/ANSI A117.1.
PORTABLE FIRE EXTINGUISHERS TO BE
PROVIDED IN ACCORDANCE WITH THE 2000
ICC INTERNATIONAL FIRE CODE. IBC (906.1).
REFER TO FLOOR PLAN SHEETS FOR
LOCATIONS OF FIRE EXTINGUISHER CABINETS
(FEC)
RECEPTACLE
LIGHT
SWITCH
HVAC
CONTROLS
FIRE
ALARM
FEC
LESS THEN 40#
FEC
GREATER THEN 40#
TEL
PP
RH/CH
GBX
SH1
CL
OT
SPH
CRK SND
PT
SD
HS
XR COM4 MR
CRBG
WP
TP SNR
4'-4"
NOTE: ITEMS SHOWN ON THIS SHEET ARE NOT
NECESSARILY INCLUDED IN THIS
PROJECT.
TV
MOUNTING HEIGHT GENERAL NOTES:
1. REFER TO SHEETS AI102.1 - AI102.4 FOR
EQUIPMENT ABBREVIATIONS AND LOCATIONS.
2. REFER TO INTERIOR ELEVATIONS FOR
ADDITIONAL INFORMATION.
3. ITEMS ON THIS SHEET ARE NOT NECESSARILY
INCLUDED IN THIS PROJECT.
4. CONTRACTOR TO VERIFY ALL EQUIPMENT
MOUNTING HEIGHTS WITH OWNER.
5. REFER TO MECHANICAL/ELECTRICAL
DRAWINGS FOR DEVICE MOUNTING
HEIGHTS.
XXXNORTH
M A
X
IF
B
A R
R
IE
R F
R E E
M
IN
" 5
M A
X
M A
X
M A
X
SIDE FRONT
M
A X
M
A X
20" - 25"
M
A X
FRONT
M
A X
20" MAX
SIDE
SIDE FRONT
M
IN
M
A X
M
IN
M
A X
@ AT
A/C AIR CONDITIONIN/AIR CONDITIONER
ACOUS ACOUSTICAL
AD AREA DRAIN, AUTOMATIC DAMPER
ADJ ADJUST, ADJUSTABLE
ALUM ALUMINUM
AP ACCESS PANEL
ACT ACOUSTICAL CEILING
B BASE
BAR BARRIER
BD BOARD
BF BARRIER FREE
BKT BRACKET
BLDG BUILDING
BLKG BLOCKING
BOTT BOTTOM
C TO C CENTER TO CENTER
CAB CABINET
CE COLUMN ENCLOSURE
CIR CIRCLE
CIR CIRCUIT
CL CENTER LINE, CLEARANCES
CLG CEILING
CJ CONTROL JOINT
CLKG CAULKING
CLO CLOSET
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CSS CLINICAL SERVICE SINK
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
DEMO DEMOLITION, DEMOLISH
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA, D DIAMETER
DIM DIMENSION
DN DOWN
DR DRAIN
DS DOWNSPOUT
ELECT ELECTRICAL
ELEV ELEVATION
ENTR ENTRANCE
EQ EQUAL
EP ELECTRICAL PANEL
EXH EXHAUST
EXP EXPOSED
EXIST EXISTING, EXSIST'G
EXT EXTERIOR
EW EACH WAY
FA FIRE ALARM
FD FIRE DAMPER OR FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FL, FLR FLOOR FINISH
FLG, FLRG FLOORING, FLOOR'G
FURN FURNITURE, FURNACE
FWC FABRIC WALL COVERING
FT FEET, FOOT
GALV GALVANIZE(D)
GL GLASS
GSB GYPSUM SHEATHING BOARD
GWB GYPSUM WALLBOARD
GYP. BD GYPSUM BOARD
ID INSIDE DIAMETER
INSUL INSULATION
IN INCH(ES)
JAN JANITOR'S CLOSET
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
HW HEADWALL
LAM LAMINATED
LF LINEAL FEET
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MANUF MANUFACTURED, MANUFACTURER
MIN MINIMUM
MLD'G MOLDING
MTL METAL
N NORTH
NAT NATURAL
NIC NOT IN CONTRACT
NORM NORMAL
NTS NOT TO SCALE
O.C. ON CENTER
OPN'G OPENING
O, O2 OXYGEN
PLAST PLASTIC
PNT PAINT
PREFAB PREFABRICATED
PLYWD PLYWOOD, PLYW'D
R RADIUS
RA RETURN AIR
REQ'D REQUIRED
RM ROOM
S SINK, SOUTH, SHINGLE
SA SUPPLY AIR
SAN SANITARY
SMKD SMOKE DAMPER
SECT SECTION
SHWR SHOWER
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS SERVICE SINK, STAINLESS STEEL
STD STANDARD
STOR STORAGE
SUSP SUSPEND(ED)
SYM SYMBOL, SYMMETRICAL
TOIL TOILET
TYP TYPICAL
UNFIN UNFINISHED
UTIL UTILITY
VAC VACUUM
VAV VARIABLE AIR VOLUME
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
V.I.F. VERIFY IN FIELD
VT VINYL TILE
VWC VINYL WALL COVERING
W/ WITH
WC WATER CLOSET
WD WOOD
WNDW WINDOW
W. HTR WATER HEATER
W/O WITHOUT
WP WALL PROTECTION
FLOOR LINE
UNDERSIDE OF
EXISTING DECK
TEMPORARY PARTITION.
5/8" GYP. BOARD ON 3 5/8"
METAL STUDS.
NOTE:
PLASTER TAPE ALL GYP. BD.
JOINTS; SECURE ALL TAPE
WITH RAM-TACK HIGH TACK
SPRAY OR EQUAL;
CONTRACTOR TO PROVIDE
FINISH WALL ON OCCUPIED
SIDE TO GIVE FINISHED
APPEARANCE; REFER TO
PHASING PLANS FOR
ADDITIONAL INFORMATION
OCCUPIED SIDERENOVATION SIDE
MECHANICALLY
FASTEN BOTTOM
TRACK TO FLOOR
CEILING LEVEL
2-1/2" DEEP SLOTTED
METAL DEFLECTION
TRACK FASTENED TO
DECK@ 2'-0" O.C.
1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com
616 361 2664 OFFICE 616 361 1493 FAX
600 E. Michigan Ave, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
ALLIANCE | 7GAE JV PROJECT NO.: 218134
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs42
100% BID DOCUMENTS
GI002
553-18-203
4646 JOHN R. STREET, DETROIT, MI 48201
MARCH 19, 2021
JRB SLS
GENERAL INFORMATION &
SYMBOL LEGEND
VA DETROIT DENTAL
CLINIC RENOVATION
SCALE: N.T.S.GI002
W1 - TEMPORARY WALL TYPE01
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
95% CONSTRUCTION DOCUMENTS 12/04/2020
100% BID DOCUMENTS 03/19/2021
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
22.2
23242526
D.9
E
F
G
H
C2402
VISUAL FIELDS
RM
C2404
EYEWARE
DISPENSING /
MODIF.
C2406
CLEAN UTILITY
C2408
SOILED UTILITY
C2410
EXAM / TREAT
CONSULT
C2412
EXAM / TREAT
CONSULT
C2414
EXAM / TREAT
CONSULT
C2416
ARGON LASER
TREATMENT RM
CC221
CORRIDOR
CC230
CORRIDOR
C2425
WAITING
CC233
CORRIDOR
C2500 C2502
CC231
C2485
ASSIST. CHIEF
OFFICE C2487
CHIEF OFFICE
C2488
ELEC. RM.
C2487A
CLOSET
C2489
CLASSROOM
STUDY
C2491
STORAGE
C2493A
MEN'S TOILET
C2493
MEN'S LOCKERS
C2495
WOMEN'S
LOCKERS
C2495A
WOMEN'S
TOILET
C2503
C2501
C2544
C2545
C2481
SECRETARY
OFFICE / FILES
CC239
CORRIDOR
CC225
CORRIDOR
C2426
ORAL SURGERY
C2428
ORAL SURG.
RECOVERY
CC223
CORRIDOR
C2431
APPT. ALCOVE
C2432
PATIENT INTERVIEW
RM
C2430
DIRECTOR OFFICE
C2429
ORAL SURGERY
C2427
ORAL SURGERY
C2437
DENTAL OPERATORY
C2439
DENTAL OPERATORY
C2441
DENTAL OPERATORY
C2440
ORAL DIAGN. EXAM
C2438
CLEAN UTILITY
C2436
H.A.C.
CC222
CORRIDOR
C2442
STERILIZATION
C2443
DENTAL OPERATORY
C2445
DENTAL OPERATORY
C2447
DENTAL OPERATORY
C2444
DENTAL OPERATORY
C2478
OVERFLOW
OPERATORY
C2433
OVERFLOW
OPERATORY
C2472
DENTAL X-RAY
C2470
ORAL DIAGN.
C2446
DENTAL OPERATORY
C2473
DENTAL HYGIENE
PREVENTIVE
C2475
DENTAL HYGIENE
PREVENTIVE
C2477
DENTAL HYGIENE
PREVENTIVE
CC224
CORRIDOR
C2484
OFFICE COORD.
DENTAL AUX.
C2480
DENTAL HYGIENE
PREVENTIVE
C C
C O
R R
ID
O
R
C2449
DENTAL OPERATORY
C2451
DENTAL OPERATORY
C2453
DENTAL OPERATORY
C2455
DENTAL OPERATORY
C2454
DENTAL OPERATORY
C2452
DENTAL OPERATORY
C2448
TOILET
C2461
DENTAL LAB
C2462
CLEAN WORK RM
C2463
STORAGE
C2492
PROG. ASSIST.
OFFICE
C2467
SOILED UTILITY
C2471
ORAL DIAGN. X-RAY
C2466
ORAL DIAGN.
EXAM/OR
CC227
CORRIDOR
CC238
CORRIDOR
C2464
TECH WORK RM
D.8
D
24.424.6 23.8 23.5 22.9 22.7
SC208
STAIR NO. 8
C2464
MECHANICAL
ROOM
C2465
ELECTRICAL
ROOM
5' - 0"
PHASING LEGEND
PHASE 1 PHASE 1 (AFTER HOURS)
PHASE 2
PHASE 4
PHASE 3
AREA NOT IN SCOPE
PHASE 2 (AFTER HOURS)
PHASE 3 (AFTER HOURS)
GENERAL CONSTRUCTION NOTES
1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS
GC201-GC205. NO PHASING OVERLAP SHALL BE ALLOWED. NO
WORK OUT OF SEQUENCE SHALL BE ALLOWED.
2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE
ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY
ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL
GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL
PROJECT.
3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD
DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD
LOCKSETS.
4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED
AT ALL TIMES.
5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY
WALK-OFF MATS INSIDE AND OUTSIDE OF WORKSPACE.
6. CONTRACTOR TO REFER TO DEMOLITION SHEETS FOR ADDITIONAL
INFORMATION ON DEMOLITION INTENT & EXTENT.
7. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,
MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY. EXCESSIVE
NOISE-LEVEL WORK SHALL TAKE PLACE BETWEEN 6:00 PM & 10:00
PM.
8. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD
OPERATING HOURS.
9. ANY WORK TO BE COMPLETED AT ABOVE NOISE LEVELS INDICATED
IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND
COORDINATED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE
GOVERNMENT.
10. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS
AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION, CONTRACTOR
SHALL CONTACT OWNER FOR ABATEMENT.
11. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE
ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR EACH
PHASE PRIOR TO OCCUPANCY BEING GRANTED.
12. AREAS OF CONSTRUCTION SHALL BE NEGATIVE PRESSURE.
CONSTRUCTION BARRIERS SHALL HAVE A DEVICE (MANOMETER OR
EQUAL) TO MONITOR NEGATIVE PRESSURIZATION FOR THE
DURATION OF THE CONSTRUCTION PHASE.
ENERGY
CENTER
NORTH
PARKING
DECK
SOUTH
PARKING
DECK
4 3
8 7
2 1
1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com
616 361 2664 OFFICE 616 361 1493 FAX
600 E. Michigan Ave, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
ALLIANCE | 7GAE JV PROJECT NO.: 218134
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs42
100% BID DOCUMENTS
GC201
553-18-203
4646 JOHN R. STREET, DETROIT, MI 48201
MARCH 19, 2021
JRB SLS
COMPOSITE SECOND FLOOR
PHASING PLAN
VA DETROIT DENTAL
CLINIC RENOVATION
NORTH
SCALE: 1/8" = 1'-0"
COMPOSITE SECOND FLOOR PHASING PLAN
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
95% CONSTRUCTION DOCUMENTS 12/04/2020
100% BID DOCUMENTS 03/19/2021
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
242526
F
G
H
CC225
CORRIDOR
C2428
ORAL SURG.
RECOVERY
CC223
CORRIDOR
C2431
APPT. ALCOVE
C2432
PATIENT INTERVIEW
RM
C2430
DIRECTOR OFFICE
C2429
ORAL SURGERY
C2437
DENTAL OPERATORY
C2439
DENTAL OPERATORY
C2441
DENTAL OPERATORY
C2440
ORAL DIAGN. EXAM
C2438
CLEAN UTILITY
C2436
H.A.C.
CC222
CORRIDOR
C2442
STERILIZATION
C2443
DENTAL OPERATORY
C2445
DENTAL OPERATORY
C2447
DENTAL OPERATORY
C2444
DENTAL OPERATORY
C2478
OVERFLOW
OPERATORY
C2433
OVERFLOW
OPERATORY
C2472
DENTAL X-RAY
C2470
ORAL DIAGN.
C2446
DENTAL OPERATORY
C2473
DENTAL HYGIENE
PREVENTIVE
C2475
DENTAL HYGIENE
PREVENTIVE
C2477
DENTAL HYGIENE
PREVENTIVE
CC224
CORRIDOR
C2449
DENTAL OPERATORY
C2451
DENTAL OPERATORY
C2471
ORAL DIAGN. X-RAY
CC227
CORRIDOR
CORRIDOR WORK SHALL BE
COMPLETED AFTER HOURS
W1
W1
TEMPORARY CONSTRUCTION
PARTITION, SEE NOTES
TEMPORARY CONSTRUCTION
PARTITION, SEE NOTES
PROVIDE MANOMETER TO
MONITOR NEGATIVE
PRESSURIZATION OF
CONSTRUCTION ZONE
PROVIDE MANOMETER TO
MONITOR NEGATIVE
PRESSURIZATION OF
CONSTRUCTION ZONE
11' - 11"
GENERAL CONSTRUCTION NOTES
1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS
GC201-GC205. NO PHASING OVERLAP SHALL BE ALLOWED. NO
WORK OUT OF SEQUENCE SHALL BE ALLOWED.
2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE
ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY
ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL
GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL
PROJECT.
3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD
DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD
LOCKSETS.
4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED
AT ALL TIMES.
5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY
WALK-OFF MATS INSIDE AND OUTSIDE OF WORKSPACE.
6. CONTRACTOR TO REFER TO DEMOLITION SHEETS FOR ADDITIONAL
INFORMATION ON DEMOLITION INTENT & EXTENT.
7. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,
MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY. EXCESSIVE
NOISE-LEVEL WORK SHALL TAKE PLACE BETWEEN 6:00 PM & 10:00
PM.
8. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD
OPERATING HOURS.
9. ANY WORK TO BE COMPLETED AT ABOVE NOISE LEVELS INDICATED
IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND
COORDINATED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE
GOVERNMENT.
10. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS
AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION, CONTRACTOR
SHALL CONTACT OWNER FOR ABATEMENT.
11. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE
ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR EACH
PHASE PRIOR TO OCCUPANCY BEING GRANTED.
12. AREAS OF CONSTRUCTION SHALL BE NEGATIVE PRESSURE.
CONSTRUCTION BARRIERS SHALL HAVE A DEVICE (MANOMETER OR
EQUAL) TO MONITOR NEGATIVE PRESSURIZATION FOR THE
DURATION OF THE CONSTRUCTION PHASE.
PHASING LEGEND
PHASE 1 PHASE 1 (AFTER HOURS)
PHASE 2
PHASE 4
PHASE 3
AREA NOT IN SCOPE
PHASE 2 (AFTER HOURS)
PHASE 3 (AFTER HOURS)
PHASE 1 DESCRIPTION
• DENTAL OPERATORIES C2437, C2439, C2440, C2441, C2443 WILL BE
CLOSED FROM CLINIC USE & WILL BE RENOVATED WITH NEW
FLOORING, WALL BASE, PAINT, & CASEWORK. MEP WORK REQ'D
FOR THE NEW DENTAL DELIVERY SYSTEM SHALL BE INCLUDED FOR
THE OPERATORIES IN THIS PHASE. THE ASSOCIATED PORTION OF
CORRIDORS CC222 & CC225 WILL RECEIVE NEW FLOORING, WALL
BASE, CRASH RAIL, PAINT, & NEW CEILING GRID AND TILE.
NOTE:
• ALL TEMPORARY CONSTRUCTION WALLS SHALL BE SMOKE & DUST
TIGHT; WALLS ARE TO BE 3-5/8" METAL STUDS W. 5/8" GYP. BD. ON
BOTH SIDES; PROVIDE 3'-0" x 7'-0" ACCESS DOOR; PROVIDE STICKY
WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA; PROVIDE
CONSTRUCTION SIGNAGE "DANGER - CONSTRUCTION AREA,
AUTHORIZED PERSONNEL ONLY"
• FOR AFTER-HOURS WORK, CONTRACTOR SHALL PROVIDE DUST
SEPARATION FOR THE CONSTRUCTION AREA AT THE BEGINNING OF
EACH SHIFT; AT THE END OF EACH SHIFT, CONTRACTOR IS TO
REMOVE DUST SEPARATION AND CLEAN AREA AS REQUIRED;
PROVIDE STICKY WALK-OFF MATS AT ENTRANCE TO
CONSTRUCTION AREA; PROVIDE CONSTRUCTION SIGNAGE
"DANGER - CONSTRUCTION AREA, AUTHORIZED PERSONNEL ONLY".
IF FLOORING WORK IS NOT COMPLETED AT END OF SHIFT; ENSURE
THE SURFACE IS ACCEPTABLE FOR PATIENT/STAFF FOOT & WHEELED
TRAFFIC. FLOORING SURFACE SHALL BE SLIP-RESISTANT & SHALL
COMPLY W. ALL ADA REQUIREMENTS INCLUDING CHANGES IN
FLOOR LEVEL AT TRANSITIONS TO EXISTING FLOORING MATERIAL.
RENOVATIONS IN CORRIDOR CC222 LOCATED IN FRONT OF
STERILIZATION ROOM C2442 SHALL BE COMPLETED AFTER HOURS.
ENERGY
CENTER
NORTH
PARKING
DECK
SOUTH
PARKING
DECK
4 3
8 7
2 1
1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com
616 361 2664 OFFICE 616 361 1493 FAX
600 E. Michigan Ave, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
ALLIANCE | 7GAE JV PROJECT NO.: 218134
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs42
100% BID DOCUMENTS
GC202
553-18-203
4646 JOHN R. STREET, DETROIT, MI 48201
MARCH 19, 2021
JRB SLS
SECOND FLOOR PHASING
PLAN - PHASE 1
VA DETROIT DENTAL
CLINIC RENOVATION
NORTH
SCALE: 1/4" = 1'-0"
SECOND FLOOR PHASING PLAN - PHASE 1
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
95% CONSTRUCTION DOCUMENTS 12/04/2020
100% BID DOCUMENTS 03/19/2021
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
23242526
G
CC225
CORRIDOR
C2441
DENTAL OPERATORY
CC222
CORRIDOR
C2442
STERILIZATION
C2443
DENTAL OPERATORY
C2445
DENTAL OPERATORY
C2447
DENTAL OPERATORY
C2444
DENTAL OPERATORY
C2478
OVERFLOW
OPERATORY
C2433
OVERFLOW
OPERATORY
C2472
DENTAL X-RAY
C2470
ORAL DIAGN.
C2446
DENTAL OPERATORY
C2473
DENTAL HYGIENE
PREVENTIVE
C2475
DENTAL HYGIENE
PREVENTIVE
C2477
DENTAL HYGIENE
PREVENTIVE
CC224
CORRIDOR
C2484
OFFICE COORD.
DENTAL AUX.
C2480
DENTAL HYGIENE
PREVENTIVE
C C
C O
R R
ID
O
R
C2449
DENTAL OPERATORY
C2451
DENTAL OPERATORY
C2471
ORAL DIAGN. X-RAY
C2466
ORAL DIAGN.
EXAM/OR
CC227
CORRIDOR
W1
W1TEMPORARY CONSTRUCTION
PARTITION, SEE NOTES
TEMPORARY CONSTRUCTION
PARTITION, SEE NOTES
CORRIDOR WORK SHALL BE
COMPLETED AFTER HOURS
PROVIDE MANOMETER TO MONITOR
NEGATIVE PRESSURIZATION OF
CONSTRUCTION ZONE
PROVIDE MANOMETER TO MONITOR
NEGATIVE PRESSURIZATION OF
CONSTRUCTION ZONE
11' - 11"
GENERAL CONSTRUCTION NOTES
1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS
GC201-GC205. NO PHASING OVERLAP SHALL BE ALLOWED. NO
WORK OUT OF SEQUENCE SHALL BE ALLOWED.
2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE
ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY
ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL
GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL
PROJECT.
3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD
DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD
LOCKSETS.
4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED
AT ALL TIMES.
5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY
WALK-OFF MATS INSIDE AND OUTSIDE OF WORKSPACE.
6. CONTRACTOR TO REFER TO DEMOLITION SHEETS FOR ADDITIONAL
INFORMATION ON DEMOLITION INTENT & EXTENT.
7. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,
MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY. EXCESSIVE
NOISE-LEVEL WORK SHALL TAKE PLACE BETWEEN 6:00 PM & 10:00
PM.
8. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD
OPERATING HOURS.
9. ANY WORK TO BE COMPLETED AT ABOVE NOISE LEVELS INDICATED
IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND
COORDINATED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE
GOVERNMENT.
10. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS
AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION, CONTRACTOR
SHALL CONTACT OWNER FOR ABATEMENT.
11. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE
ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR EACH
PHASE PRIOR TO OCCUPANCY BEING GRANTED.
12. AREAS OF CONSTRUCTION SHALL BE NEGATIVE PRESSURE.
CONSTRUCTION BARRIERS SHALL HAVE A DEVICE (MANOMETER OR
EQUAL) TO MONITOR NEGATIVE PRESSURIZATION FOR THE
DURATION OF THE CONSTRUCTION PHASE.
PHASING LEGEND
PHASE 1 PHASE 1 (AFTER HOURS)
PHASE 2
PHASE 4
PHASE 3
AREA NOT IN SCOPE
PHASE 2 (AFTER HOURS)
PHASE 3 (AFTER HOURS)
PHASE 2 DESCRIPTION
• DENTAL OPERATORIES C2475 AND C2477 WILL BE CLOSED FROM
CLINIC USE & WILL BE RENOVATED WITH NEW FLOORING, WALL
BASE, PAINT, & CASEWORK. FORMER X-RAY C2433 AND C2478 WILL
BE CONVERTED INTO SMALLER SWING OPERATORIES AND WILL
ALSO RECEIVE NEW FLOORING & CASEWORK. DENTAL X-RAY
C2470 WILL RECEIVE NEW FLOORING & WALL BASE. ONCE THE
OPERATORIES ARE COMPLETE, CORRIDOR CC224 WILL RECEIVE
NEW FLOORING, WALL BASE, CRASH RAIL, PAINT, & NEW CEILING
GRID AND TILE.
• THIS PHASE WILL CONSIST OF AFTER-CLINIC HOURS TO COMPLETE
THE RENOVATIONS TO CORRIDOR CC225. DURING CLINIC HOURS,
CORRIDOR CC225 NEEDS TO BE OPEN TO PATIENTS & STAFF TO
ACCESS ALL OTHER AREAS NOT INCLUDED IN PHASE 2. WORK
INCLUDES NEW FLOORING, WALL BASE, PAINT, CRASH RAILS, AND
CEILING GRID & TILE.
NOTE:
• ALL TEMPORARY CONSTRUCTION WALLS SHALL BE SMOKE & DUST
TIGHT; WALLS ARE TO BE 3-5/8" METAL STUDS W. 5/8" GYP. BD. ON
BOTH SIDES; PROVIDE 3'-0" x 7'-0" ACCESS DOOR; PROVIDE STICKY
WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA; PROVIDE
CONSTRUCTION SIGNAGE "DANGER - CONSTRUCTION AREA,
AUTHORIZED PERSONNEL ONLY"
• FOR AFTER-HOURS WORK, CONTRACTOR SHALL PROVIDE DUST
SEPARATION FOR THE CONSTRUCTION AREA AT THE BEGINNING OF
EACH SHIFT; AT THE END OF EACH SHIFT, CONTRACTOR IS TO
REMOVE DUST SEPARATION AND CLEAN AREA AS REQUIRED;
PROVIDE STICKY WALK-OFF MATS AT ENTRANCE TO
CONSTRUCTION AREA; PROVIDE CONSTRUCTION SIGNAGE
"DANGER - CONSTRUCTION AREA, AUTHORIZED PERSONNEL ONLY".
IF FLOORING WORK IS NOT COMPLETED AT END OF SHIFT; ENSURE
THE SURFACE IS ACCEPTABLE FOR PATIENT/STAFF FOOT & WHEELED
TRAFFIC. FLOORING SURFACE SHALL BE SLIP-RESISTANT & SHALL
COMPLY W. ALL ADA REQUIREMENTS INCLUDING CHANGES IN
FLOOR LEVEL AT TRANSITIONS TO EXISTING FLOORING MATERIAL.
ENERGY
CENTER
NORTH
PARKING
DECK
SOUTH
PARKING
DECK
4 3
8 7
2 1
1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com
616 361 2664 OFFICE 616 361 1493 FAX
600 E. Michigan Ave, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
ALLIANCE | 7GAE JV PROJECT NO.: 218134
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs42
100% BID DOCUMENTS
GC203
553-18-203
4646 JOHN R. STREET, DETROIT, MI 48201
MARCH 19, 2021
JRB SLS
SECOND FLOOR PHASING
PLAN - PHASE 2
VA DETROIT DENTAL
CLINIC RENOVATION
NORTH
SCALE: 1/4" = 1'-0"
SECOND FLOOR PHASING PLAN - PHASE 2
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
95% CONSTRUCTION DOCUMENTS 12/04/2020
100% BID DOCUMENTS 03/19/2021
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
D.9
E
F
CC239
CORRIDOR
CC222
CORRIDOR
C2442
STERILIZATION
C2443
DENTAL OPERATORY
C2445
DENTAL OPERATORY
C2447
DENTAL OPERATORY
C2444
DENTAL OPERATORY
C2478
OVERFLOW
OPERATORY
C2433
OVERFLOW
OPERATORY
C2472
DENTAL X-RAY
C2470
ORAL DIAGN.
C2446
DENTAL OPERATORY
C2473
DENTAL HYGIENE
PREVENTIVE
C2475
DENTAL HYGIENE
PREVENTIVE
C2477
DENTAL HYGIENE
PREVENTIVE
CC224
CORRIDOR
C2484
OFFICE COORD.
DENTAL AUX.
C2480
DENTAL HYGIENE
PREVENTIVE
C C
C O
R R
ID
O
R
C2449
DENTAL OPERATORY
C2451
DENTAL OPERATORY
C2453
DENTAL OPERATORY
C2455
DENTAL OPERATORY
C2454
DENTAL OPERATORY
C2452
DENTAL OPERATORY
C2448
TOILET
C2461
DENTAL LAB
C2462
CLEAN WORK RM
C2463
STORAGE
C2492
PROG. ASSIST.
OFFICE
C2467
SOILED UTILITY
C2471
ORAL DIAGN. X-RAY
C2466
ORAL DIAGN.
EXAM/OR
CC227
CORRIDOR
CC238
CORRIDOR
C2464
TECH WORK RM
D.8
24.424.6 23.8 23.5 22.9
SC208
STAIR NO. 8
5' - 5"
TEMPORARY
CONSTRUCTION
PARTITION, SEE NOTES
ON PHASING PLANS
W1
TEMPORARY CONSTRUCTION
PARTITION, SEE NOTES ON PHASING
PLANS
W1
PROVIDE MANOMETER TO
MONITOR NEGATIVE
PRESSURIZATION OF
CONSTRUCTION ZONE
PROVIDE MANOMETER TO
MONITOR NEGATIVE
PRESSURIZATION OF
CONSTRUCTION ZONE
GENERAL CONSTRUCTION NOTES
1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS
GC201-GC205. NO PHASING OVERLAP SHALL BE ALLOWED. NO
WORK OUT OF SEQUENCE SHALL BE ALLOWED.
2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE
ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY
ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL
GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL
PROJECT.
3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD
DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD
LOCKSETS.
4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED
AT ALL TIMES.
5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY
WALK-OFF MATS INSIDE AND OUTSIDE OF WORKSPACE.
6. CONTRACTOR TO REFER TO DEMOLITION SHEETS FOR ADDITIONAL
INFORMATION ON DEMOLITION INTENT & EXTENT.
7. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,
MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY. EXCESSIVE
NOISE-LEVEL WORK SHALL TAKE PLACE BETWEEN 6:00 PM & 10:00
PM.
8. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD
OPERATING HOURS.
9. ANY WORK TO BE COMPLETED AT ABOVE NOISE LEVELS INDICATED
IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND
COORDINATED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE
GOVERNMENT.
10. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS
AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION, CONTRACTOR
SHALL CONTACT OWNER FOR ABATEMENT.
11. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE
ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR EACH
PHASE PRIOR TO OCCUPANCY BEING GRANTED.
12. AREAS OF CONSTRUCTION SHALL BE NEGATIVE PRESSURE.
CONSTRUCTION BARRIERS SHALL HAVE A DEVICE (MANOMETER OR
EQUAL) TO MONITOR NEGATIVE PRESSURIZATION FOR THE
DURATION OF THE CONSTRUCTION PHASE.
PHASING LEGEND
PHASE 1 PHASE 1 (AFTER HOURS)
PHASE 2
PHASE 4
PHASE 3
AREA NOT IN SCOPE
PHASE 2 (AFTER HOURS)
PHASE 3 (AFTER HOURS)
PHASE 3 DESCRIPTION
• THE DENTAL LAB WILL BE CLOSED TO STAFF USE AT THIS PHASE TO
REPLACE THE CEILING TILES, REMOVE ALL EXISTING CASEWORK,
EQUIPMENT, & FINISHES. NEW FLOORING, WALL BASE, AND PAINT
SHALL BE INSTALLED FOLLOWED BY THE NEW LAB CASEWORK &
EQUIPMENT. MEP WORK WILL BE RED'Q TO COMPLETE ALL NEW
EQUIPMENT & CASEWORK CONNECTIONS. ORAL EXAM ROOM
C2466 RENOVATIONS WILL ALSO BE INCLUDED IN PHASE 6. AS AN
ALTERNATE OPTION, STORAGE C2463 SHALL RECEIVE NEW
FLOORING & WALL BASE.
• DENTAL OPERATORIES C2444, C2445, C2446, C2447, C2449, C2451,
C2452, C2453, C2454, & C2455 WILL BE CLOSED FROM CLINIC USE
& WILL BE RENOVATED WITH NEW FLOORING, WALL BASE, PAINT,
AND CASEWORK. MEP WORK REQ'D FOR THE NEW DENTAL
DELIVERY SYSTEM SHALL BE INCLUDED FOR THE OPERATORIES IN
THIS PHASE. THIS PHASE WILL ALSO INCLUDE THE ASSOCIATED
SECTION OF CORRIDOR CC222 WHICH WILL RECEIVE NEW
FLOORING, WALL BASE, CRASH RAIL, PAINT, AND NEW CEILING
GRID & TILE. THE CORRIDOR WORK SHALL MAINTAIN ACCESS TO
C2442 STERILIZATION AT ALL TIMES DURING CLINIC HOURS.
• THIS PHASE WILL CONSIST OF AFTER-CLINIC HOURS TO COMPLETE
THE RENOVATIONS TO CORRIDOR CC227 & CC238. DURING
CLINIC HOURS, CORRIDOR CC227 & CC238 NEED TO BE OPEN TO
STAFF TO ACCESS ALL OTHER AREAS NOT INCLUDED IN PHASE 3.
WORK INCLUDES NEW FLOORING, WALL BASE, PAINT, CRASH RAILS,
AND CEILING GRID & TILE.
NOTE:
• ALL TEMPORARY CONSTRUCTION WALLS SHALL BE SMOKE & DUST
TIGHT; WALLS ARE TO BE 3-5/8" METAL STUDS W. 5/8" GYP. BD. ON
BOTH SIDES; PROVIDE 3'-0" x 7'-0" ACCESS DOOR; PROVIDE STICKY
WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA; PROVIDE
CONSTRUCTION SIGNAGE "DANGER - CONSTRUCTION AREA,
AUTHORIZED PERSONNEL ONLY"
• FOR AFTER-HOURS WORK, CONTRACTOR IS TO PROVIDE DUST
SEPARATION FOR THE CONSTRUCTION AREA AT THE BEGINNING OF
EACH SHIFT; AT THE END OF EACH SHIFT, CONTRACTOR IS TO
REMOVE DUST SEPARATION AND CLEAN AREA AS REQUIRED;
PROVIDE STICKY WALK-OFF MATS AT ENTRANCE TO
CONSTRUCTION AREA; PROVIDE CONSTRUCTION SIGNAGE
"DANGER - CONSTRUCTION AREA, AUTHORIZED PERSONNEL ONLY".
IF FLOORING WORK IS NOT COMPLETED AT END OF SHIFT; ENSURE
THE SURFACE IS ACCEPTABLE FOR PATIENT/STAFF FOOT & WHEELED
TRAFFIC. FLOORING SURFACE SHALL BE SLIP-RESISTANT & SHALL
COMPLY W. ALL ADA REQUIREMENTS INCLUDING CHANGES IN
FLOOR LEVEL AT TRANSITIONS TO EXISTING FLOORING MATERIAL.
ENERGY
CENTER
NORTH
PARKING
DECK
SOUTH
PARKING
DECK
4 3
8 7
2 1
1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com
616 361 2664 OFFICE 616 361 1493 FAX
600 E. Michigan Ave, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
ALLIANCE | 7GAE JV PROJECT NO.: 218134
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs42
100% BID DOCUMENTS
GC204
553-18-203
4646 JOHN R. STREET, DETROIT, MI 48201
MARCH 19, 2021
JRB SLS
SECOND FLOOR PHASING
PLAN - PHASE 3
VA DETROIT DENTAL
CLINIC RENOVATION
NORTH
SCALE: 1/4" = 1'-0"
SECOND FLOOR PHASING PLAN - PHASE 3
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
95% CONSTRUCTION DOCUMENTS 12/04/2020
100% BID DOCUMENTS 03/19/2021
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
PHASING LEGEND
PHASE 1 PHASE 1 (AFTER HOURS)
PHASE 2
PHASE 4
PHASE 3
AREA NOT IN SCOPE
PHASE 2 (AFTER HOURS)
PHASE 3 (AFTER HOURS)
GENERAL CONSTRUCTION NOTES
1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS
GC201-GC205. NO PHASING OVERLAP SHALL BE ALLOWED. NO
WORK OUT OF SEQUENCE SHALL BE ALLOWED.
2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE
ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY
ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL
GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL
PROJECT.
3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD
DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD
LOCKSETS.
4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED
AT ALL TIMES.
5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY
WALK-OFF MATS INSIDE AND OUTSIDE OF WORKSPACE.
6. CONTRACTOR TO REFER TO DEMOLITION SHEETS FOR ADDITIONAL
INFORMATION ON DEMOLITION INTENT & EXTENT.
7. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,
MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY. EXCESSIVE
NOISE-LEVEL WORK SHALL TAKE PLACE BETWEEN 6:00 PM & 10:00
PM.
8. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD
OPERATING HOURS.
9. ANY WORK TO BE COMPLETED AT ABOVE NOISE LEVELS INDICATED
IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND
COORDINATED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE
GOVERNMENT.
10. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS
AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION, CONTRACTOR
SHALL CONTACT OWNER FOR ABATEMENT.
11. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE
ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR EACH
PHASE PRIOR TO OCCUPANCY BEING GRANTED.
12. AREAS OF CONSTRUCTION SHALL BE NEGATIVE PRESSURE.
CONSTRUCTION BARRIERS SHALL HAVE A DEVICE (MANOMETER OR
EQUAL) TO MONITOR NEGATIVE PRESSURIZATION FOR THE
DURATION OF THE CONSTRUCTION PHASE.
H
CC230
CORRIDOR
CC225
CORRIDOR
C2426
ORAL SURGERYC2428
ORAL SURG.
RECOVERY
CC223
CORRIDOR
C2431
APPT. ALCOVE
C2432
PATIENT INTERVIEW
RM
C2430
DIRECTOR OFFICE
C2429
ORAL SURGERY
C2427
ORAL SURGERY
PROVIDE VISQUEEN BARRIER
BETWEEN EXISTING SUITE DOOR
& PUBLIC CORRIDOR.
CONTRACTOR TO FOLLOW VA
STANDARD ICRA GUIDELINES
PROVIDE MANOMETER TO MONITOR
NEGATIVE PRESSURIZATION OF
CONSTRUCTION ZONE
PROVIDE MANOMETER TO
MONITOR NEGATIVE
PRESSURIZATION OF
CONSTRUCTION ZONE
PHASE 4 DESCRIPTION
• ORAL SURGERY PROCEDURE ROOMS C2426, C2427, AND C2429
WILL BE RENOVATED WITH NEW FLOORING, WALL BASE, PAINT, AND
CASEWORK. MEP WORK REQ'D FOR THE NEW ORAL SURGERY
CHAIRS SHALL BE INCLUDED IN THIS PHASE. AS AN ALTERNATE
OPTION, CORRIDOR CC223, ORAL SURGERY RECOVERY C2428,
AND APPT. ALCOVE C2431 MAY RECEIVE NEW FLOORING AND
WALLS BASE AS PART OF THIS PHASE.
NOTE:
• PROVIDE STICKY WALK-OFF MATS AT ENTRANCE TO
CONSTRUCTION AREA; PROVIDE CONSTRUCTION SIGNAGE
"DANGER - CONSTRUCTION AREA, AUTHORIZED PERSONNEL ONLY"
ENERGY
CENTER
NORTH
PARKING
DECK
SOUTH
PARKING
DECK
4 3
8 7
2 1
1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com
616 361 2664 OFFICE 616 361 1493 FAX
600 E. Michigan Ave, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
ALLIANCE | 7GAE JV PROJECT NO.: 218134
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs42
100% BID DOCUMENTS
GC205
553-18-203
4646 JOHN R. STREET, DETROIT, MI 48201
MARCH 19, 2021
JRB SLS
SECOND FLOOR PHASING
PLAN - PHASE 4
VA DETROIT DENTAL
CLINIC RENOVATION
NORTH
SCALE: 1/4" = 1'-0"
SECOND FLOOR PHASING PLAN - PHASE 4
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
95% CONSTRUCTION DOCUMENTS 12/04/2020
100% BID DOCUMENTS 03/19/2021
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
2222.223242526
E
F
G
H
CC225
CORRIDOR
C2426
ORAL SURGERY
C2428
ORAL SURG.
RECOVERY
CC223
CORRIDOR
C2431
APPT. ALCOVE
C2432
PATIENT INTERVIEW
RM
C2430
DIRECTOR OFFICE
C2429
ORAL SURGERY
C2427
ORAL SURGERY
C2437
DENTAL OPERATORY
C2439
DENTAL OPERATORY
C2441
DENTAL OPERATORY
C2440
ORAL DIAGN. EXAM
C2438
CLEAN UTILITY
C2436
H.A.C.
CC222
CORRIDOR
C2442
STERILIZATION
C2443
DENTAL OPERATORY
C2445
DENTAL OPERATORY
C2447
DENTAL OPERATORY
C2444
DENTAL OPERATORY
C2478
OVERFLOW
OPERATORY
C2433
OVERFLOW
OPERATORY
C2472
DENTAL X-RAY
C2470
ORAL DIAGN.
C2446
DENTAL OPERATORY
C2473
DENTAL HYGIENE
PREVENTIVE
C2475
DENTAL HYGIENE
PREVENTIVE
C2477
DENTAL HYGIENE
PREVENTIVE
CC224
CORRIDOR
C2484
OFFICE COORD.
DENTAL AUX.
C2480
DENTAL HYGIENE
PREVENTIVE
C C
C O
R R
ID
O
R
C2449
DENTAL OPERATORY
C2451
DENTAL OPERATORY
C2453
DENTAL OPERATORY
C2455
DENTAL OPERATORY
C2454
DENTAL OPERATORY
C2452
DENTAL OPERATORY
C2448
TOILET
C2461
DENTAL LAB
C2462
CLEAN WORK RM
C2463
STORAGE
C2492
PROG. ASSIST.
OFFICE
C2467
SOILED UTILITY
C2471
ORAL DIAGN. X-RAY
C2466
ORAL DIAGN.
EXAM/ORCC227
CORRIDOR
CC238
CORRIDOR
C2464
TECH WORK RM
C2402
VISUAL FIELDS
RM
C2404
EYEWARE
DISPENSING /
MODIF.
C2406
CLEAN UTILITY
C2408
SOILED UTILITY
C2410
EXAM / TREAT
CONSULT
C2412
EXAM / TREAT
CONSULT
C2414
EXAM / TREAT
CONSULT
C2416
ARGON LASER
TREATMENT RM
CC221
CORRIDOR
CC230
CORRIDOR
C2425
WAITING
CC233
CORRIDOR
C2500 C2502
CC231
CC232
C2485
ASSIST. CHIEF
OFFICE C2487
CHIEF OFFICE
C2488
ELEC. RM.
C2487A
CLOSET
C2489
CLASSROOM
STUDY
C2491
STORAGE
C2493A
MEN'S TOILET
C2493
MEN'S LOCKERS
C2495
WOMEN'S
LOCKERS
C2495A
WOMEN'S
TOILET
C2503
C2501
C2543
C2544
C2545
C2481
SECRETARY
OFFICE / FILES
CC239
CORRIDOR
D.8
24.424.6 23.8 23.5 22.9 22.7
SC208
STAIR NO. 8
1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMTED
TO WHAT IS SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO
REMOVE ALL MATERIALS AND ITEMS AS REQUIRED TO FACILITATE
NEW CONSTRUCTION.
2. CONTRACTOR SHALL VERIFY EXISTING FIELD CONDITIONS PRIOR
TO ANY WORK. IF CONDITIONS DO NOT REFLECT WHAT IS NOTED
IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS TO NOTIFY
THE ARCHITECT.
3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET
OF CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS
WITHOUT VERIFYING AND COORDINATING WITH ALL GENERAL
TRADES AS TO HOW THEY RELATE TO THE OVERALL PROJECT.
4. CONTRACTOR IS RESPONSIBLE TO PROVIDE DUMPSTERS.
LOCATION OF DUMPSTERS TO BE DETERMINED BY OWNER WITH
CONTRACTOR'S INPUT.
5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED
MATERIALS. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED
BY DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOBSITE.
REMOVE DAILY AND DISPOSE OF IN A LEGAL MANNER. ONSITE
SALE OR BURNING OF REMOVED ITEMS IS NOT PERMITTED.
6. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO
ENSURE THE SAFETY OF THE PUBLIC AND/OR WORKMEN ON THE
SITE TO PREVENT ACCIDENTS OR INJURY TO ANY PERSON ON,
ABOUT, OR ADJACENT TO THE PREMISES. THE CONTRACTOR
SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND
REGULATIONS PERTAINING TO SAFETY AND THE PREVENTION OF
ACCIDENTS.
7. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT,
INSULATION, WATER PROOFING, EMERGENCY LIGHTING,
SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH ARE
TO REMAIN.
8. THE OWNER RESERVES THE RIGHTS TO ANY REMOVE MATERIALS
OR ITEMS. CONTRACTOR TO COORDINATE WITH OWNER.
9. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY
DEMOLITION OR REWORK TO PREPARE FOR NEW CONSTRUCTION
AS REQUIRED.
10. WHERE CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL
WITHIN THE CEIILNGS ARE TO BE REMOVED OR REROUTED. REFER
TO MECHANICAL. ELECTRICAL, AND PLUMBING PLANS FOR
ADDITIONAL DEMOLITION NOT SHOWN ON THIS SHEET.
11. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM
OCCUPIED AREAS WITH A SMOKE TIGHT WALL ASSEMBLY WITH
SUITABLE DUST BARRIER. TAKE CARE SO THAT CONSTRUCTION
DUST IS NOT TRANSMITTED TO OCCUPIED AREAS BY MECHANICAL
SYSTEM.
12. OWNER TO COORDINATE ACCESS TO WORK AREAS WHICH ARE
OCCUPIED; OWNER TO RELOCATE EQUPMENT FROM WORK
AREA AS NECESSARY.
13. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND
SURFACES CUT OR DAMAGED DURING DEMOLITION, BY
METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING
WARRANTIES.
14. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE
PERFORMED.
15. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED
IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND
COORDINATED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE
GOVERNMENT
GENERAL DEMO NOTES
ENERGY
CENTER
NORTH
PARKING
DECK
SOUTH
PARKING
DECK
4 3
8 7
2 1
1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com
616 361 2664 OFFICE 616 361 1493 FAX
600 E. Michigan Ave, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
ALLIANCE | 7GAE JV PROJECT NO.: 218134
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs42
100% BID DOCUMENTS
AD102
553-18-203
4646 JOHN R. STREET, DETROIT, MI 48201
MARCH 19, 2021
JRB SLS
COMPOSITE SECOND FLOOR
DEMOLITION PLAN
VA DETROIT DENTAL
CLINIC RENOVATION
NORTH
SCALE: 1/8" = 1'-0"
COMPOSITE SECOND FLOOR DEMOLITION PLAN
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
95% CONSTRUCTION DOCUMENTS 12/04/2020
100% BID DOCUMENTS 03/19/2021
REVISIONS DATE
35% SCHEMATIC DESIGN 08/29/2019
65% DESIGN DEVELOPMENT 03/24/2020
G
H
C2402
VISUAL FIELDS
RM
C2404
EYEWARE
DISPENSING /
MODIF.
C2406
CLEAN UTILITY
C2408
SOILED UTILITY
C2410
EXAM / TREAT
CONSULT
C2412
EXAM / TREAT
CONSULT
CC221
CORRIDOR
CC225
CORRIDOR
C2431
APPT. ALCOVE
C2432
PATIENT INTERVIEW
RM
C2430
DIRECTOR OFFICE
C2437
DENTAL OPERATORY
C2439
DENTAL OPERATORY
C2441
DENTAL OPERATORY
C2440
ORAL DIAGN. EXAM
C2438
CLEAN UTILITY
C2436
H.A.C.
CC222
CORRIDOR
C2442
STERILIZATION
C2443
DENTAL OPERATORY
C2478
OVERFLOW
OPERATORY
CC222
CORRIDOR
TEMPORARY
CONSTRUCTION
PARTITION, SEE NOTES
ON PHASING PLANS
TEMPORARY
CONSTRUCTION
PARTITION, SEE NOTES
ON PHASING PLANS
CC225
CORRIDOR
2 3
77 9
9 7
77 9
9 7
77 9
9 7
77 9
9 7
77 9
W1
W1 2 3
2 3
2 3
76.00
76.00
AD102.1
C2433
OVERFLOW
OPERATORY
C2445
DENTAL OPERATORY
S
S
1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMTED
TO WHAT IS SHOWN ON THE DEMOLITION PLANS. THE INTENT IS TO
REMOVE ALL MATERIALS AND ITEMS AS REQUIRED TO FACILITATE
NEW CONSTRUCTION.
2. CONTRACTOR SHALL VERIFY EXISTING FIELD CONDITIONS PRIOR
TO ANY WORK. IF CONDITIONS DO NOT REFLECT WHAT IS NOTED
IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS TO NOTIFY
THE ARCHITECT.
3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET
OF CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS
WITHOUT VERIFYING AND COORDINATING WITH ALL GENERAL
TRADES AS TO HOW THEY RELATE TO THE OVERALL PROJECT.
4. CONTRACTOR IS RESPONSIBLE TO PROVIDE DUMPSTERS.
LOCATION OF DUMPSTERS TO BE DETERMINED BY OWNER WITH
CONTRACTOR'S INPUT.
5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED
MATERIALS. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED
BY DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOBSITE.
REMOVE DAILY AND DISPOSE OF IN A LEGAL MANNER. ONSITE
SALE OR BURNING OF REMOVED ITEMS IS NOT PERMITTED.
6. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO
ENSURE THE SAFETY OF THE PUBLIC AND/OR WORKMEN ON THE
SITE TO PREVENT ACCIDENTS OR INJURY TO ANY PERSON ON,
ABOUT, OR ADJACENT TO THE PREMISES. THE CONTRACTOR
SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND
REGULATIONS PERTAINING TO SAFETY AND THE PREVENTION OF
ACCIDENTS.
7. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT,
INSULATION, WATER PROOFING, EMERGENCY LIGHTING,
SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH ARE
TO REMAIN.
8. THE OWNER RESERVES THE RIGHTS TO ANY REMOVE MATERIALS
OR ITEMS. CONTRACTOR TO COORDINATE WITH OWNER.
9. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY
DEMOLITION OR REWORK TO PREPARE FOR NEW CONSTRUCTION
AS REQUIRED.
10. WHERE CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL
WITHIN THE CEIILNGS ARE TO BE REMOVED OR REROUTED. REFER
TO MECHANICAL. ELECTRICAL, AND PLUMBING PLANS FOR
ADDITIONAL DEMOLITION NOT SHOWN ON THIS SHEET.
11. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM
OCCUPIED AREAS WITH A SMOKE TIGHT WALL ASSEMBLY WITH
SUITABLE DUST BARRIER. TAKE CARE SO THAT CONSTRUCTION
DUST IS NOT TRANSMITTED TO OCCUPIED AREAS BY MECHANICAL
SYSTEM.
12. OWNER TO COORDINATE ACCESS TO WORK AREAS WHICH ARE
OCCUPIED; OWNER TO RELOCATE EQUPMENT FROM WORK
AREA AS NECESSARY.
13. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND
SURFACES CUT OR DAMAGED DURING DEMOLITION, BY
METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING
WARRANTIES.
14. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE
PERFORMED.
15. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED
IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND
COORDINATED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE
GOVERNMENT
GENERAL DEMO NOTES
REMOVE EXISTING DOOR. EXISTING FRAME TO REMAIN.
EXISTING DOOR HARDWARE TO BE REMOVED AND SALVAGED
FOR REINSTALLATION.
REMOVE EXISTING WALL-MOUNTED BUMPER GUARDS.
REMOVE EXISTING HANDRAIL COVERS, HANDRAIL RETAINER
TO REMAIN IN PLACE. PROTECT DURING DEMOLITION FOR
INSTALLATION OF NEW HANDRAIL COVERS.
REMOVE EXISTING FLOORING & FLOOR FINISHES INCLUDING
INTERGAL WALL BASE, ALL ADHESIVES, SETTING MATERIALS,
ETC. DOWN TO EXISTING SUBSTRATE. GRIND CONCRETE
FLOORS AS REQUIRED TO PROVIDE A SMOOTH AND UNIFORM
SURFACE FOR NEW FINISHES. PATCH EXISTING WALLS WHERE
INTERGAL WALL BASE IS REMOVED AS REQUIRED TO RECEIVE
NEW FINISHES.
REMOVE & SALVAGE EXISTING CEILING TILE & GRID SYSTEM.
CONTRACTOR TO SALVAGE TILE FOR RECYCLING.
REMOVE EXISTING CEILING TILE. EXISTING GRID SYSTEM TO
REMAIN. CONTRACTOR TO SALVAGE TILE FOR RECYCLING.
REMOVE EXISTING CASEWORK, SINKS & WALL MOUNTED
EQUIPMENT. SALVAGE WALL-MOUNTED EQUIPMENT & TURN
OVER TO OWNER UNLESS DIRECTED OTHERWISE. PATCH &
REPAIR EXPOSED SURFACES TO REMAIN AS REQUIRED TO
RECEIVE NEW CONSTRUCTION AND/OR NEW FINISHES.
REMOVE & SALVAGE EXISTING DENTAL CHAIR & DELIVERY
SYSTEM. TURN OVER TO OWNER UNLESS DIRECTED OTHERWISE.
REMOVE EXISTING MECHANICAL, PLUMBING, & ELECTRICAL
ITEMS - REFER TO MECHANICAL, PLUMBING, & ELECTRICAL
DEMOLITION PLANS FOR FURTHER INFORMATION. PATCH &
REPAIR EXPOSED SURFACES TO REMAIN AS REQUIRED TO
RECEIVE NEW CONSTRUCTION AND/OR NEW FINISHES.
REMOVE & SALVAGE ALL EXISTING WALL EQUIPMENT. PATCH
& REPAIR WALLS AS REQUIRED TO RECEIVE NEW PAINT FINISH.
REINSTALL EXISTING WALL EQUIPMENT IN SAME LOCATION.
PATCH & REPAIR WALL SURFACE WHERE EXISTING X-RAY EQUIP
IS REMOVED & REPLACED. OWNER TO COORDINATE ACTUAL
REPLACEMENT OF EQUIPMENT.
DEMOLITION KEY NOTES
G
CC222
CORRIDOR
C2442
STERILIZATION
TEMPORARY
CONSTRUCTION
PARTITION, SEE NOTES
ON PHASING PLANS
CC225
CORRIDOR
W1
RENOVATION
CONSTRUCTION TO BE
COMPLETED AFTER HOURS
DEMOLITION LEGEND
EXISTING NON-FIRE RATED WALL
NEW TEMPORARY CONSTRUCTION PARTITION
EXISTING DOOR
DEMOLISHED DOOR
1-HOUR FIRE RATED PARTITION - UL DES U419
2-HOUR FIRE RATED BARRIER - UL DES U419
1-HOUR SMOKE BARRIER - NFPA 101 - 8.3
AREA NOT IN PROJECT SCOPE
CURRENT PHASE RENOVATION AREA
TEMPORARY CONSTRUCTION DOOR
PROVIDE TEMPORARY UPRIGHT SPINKLER
PENDANTS DURING CONSTRUCTION PHASE
WHERE CEILING REPLACEMENT TAKES
PLACE. RETURN SPRINKLER PENDANTS TO
ORIGINAL LOCATION ONCE NEW CEILING
WORK IS COMPLETED.
S
ENERGY
CENTER
NORTH
PARKING
DECK
SOUTH
PARKING
DECK
4 3
8 7
2 1
1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com
616 361 2664 OFFICE 616 361 1493 FAX
600 E. Michigan Ave, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
2 3 4 5 6 7 8 9
2 3 4 5 6 7 8 91
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANTS ARCHITECT/ENGINEERS
DRAWING TITLE:
APPROVED: PROJECT DIRECTOR LOCATION:
PROJECT TITLE:
DATE: CHECKED: DRAWN:
PROJECT NUMBER:
BUILDING NUMBER:
DRAWING NUMBER:
DWG. ___ OF ___
ALLIANCE | 7GAE JV PROJECT NO.: 218134
Office of
Construction and Facilities
Management
VA FORM 08-6231
o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o
6 "
Department of Veterans Affairs42
100% BID DOCUMENTS
AD102.1
553-18-203
4646 JOHN R. STREET, DETROIT, MI 48201
MARCH 19, 2021
JRB JS
SECOND…