Drawings & Map.pdf

PDF 715 KB Posted

Attached to
Camp Dawson-OPS Replacement & Installation of Concrete
Solicitation number
CRFQ 0603 ADJ2700000013 1
Issued by
Kanawha County, West Virginia

About this file

This is a technical drawings and specifications document for the Camp Dawson Operations (OPS) Replacement & Installation of Concrete project in West Virginia. The document outlines detailed concrete pavement construction requirements, including joint specifications for contraction and construction joints with precise measurements for depth, width, and sealant application. The specifications require a broom finish applied immediately after float finishing to roughen the trafficked surface using a fiber bristle broom perpendicular to the main traffic route. Additionally, the contractor must install new gate reset loops at both the entrance and exit gates of the vehicular concrete pavement area, with the entrance gate requiring one reset loop and the exit gate requiring both a vehicle detection loop and a gate reset loop, all installed according to manufacturer recommendations.

The document does not contain information regarding pricing terms, set-asides, incumbent contractors, funding sources, response deadlines, or contract award dates. No details are provided regarding the project timeline, site visit requirements, bidder meetings, or contract renewal options. The technical specifications focus exclusively on construction methodology and materials standards for the concrete pavement work and associated gate detection systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o Contraction joints will be initial saw cut; 1/8 inch thick and 2-inch depth. Finished joint will be 1 1/8 depth, ¼ inch wide with sealant and ¼ inch gap with backer.

o Construction joint will be 1 1/8-inch depth, ¼ inch wide with sealant and ¼ inch gap with backer.

o Install 1/2" expansion joints with sealant when paving is adjacent to vertical faces, curbs, steps or any fixed object, or other rigid paving material o Fuel resistant sealant will be used as specified.

Broom Finish:

o Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber bristle broom perpendicular to main traffic route.

Figure 1

Figure 2

Figure 3

13550 Transportation Control Instrumentation

Gate Reset loop o Contractor will install new gate reset loops located at the entrance and exit gates of the vehicular concrete pavement.

o Entrance gate will have one rest loop installed o Exit gate will have one vehicle detection loop and one gate reset loop installed.

Installation will be per manufactures’ recommendations.