This document is a set of electrical drawings for a fire alarm system replacement project at the Michigan State Police 1st District Post located at 7119 N. Canal Road, Dimondale, Michigan 48821. The project is managed by the State of Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, with Matrix Consulting Engineers, Inc. serving as the electrical engineer. The scope of work includes complete demolition of the existing fire alarm system and installation of a new addressable fire alarm control panel (FACP) with associated fire detection and notification devices throughout the facility. The project requires removal of all obsolete exposed conduit, wire, and unused equipment, with salvage of existing devices to be relinquished to the owner. New installation must comply with NFPA 72 and National Electrical Code Article 760 standards. The fire alarm system is to be certified by a NICET Level 2 Fire Alarm supplier, with the new system interfacing with the building's security panel for door control activation upon smoke detector operation. The project includes installation of smoke detectors, heat detectors, manual pull stations, audible/strobe notification appliances, and a fire alarm interactive graphic display connected to the State of Michigan network. A bid date of October 22, 2025, is indicated on the drawings.

The division 26 contractor is responsible for all conduit installation, wiring, patching, painting, and coordination with mechanical systems for HVAC shutdown integration via relays. All power cable and fire alarm device wire must be installed in minimum 3/4-inch EMT conduit painted red unless otherwise specified. The contractor must submit shop drawings, wiring diagrams, and battery calculations to the engineer for approval before submission to the Authority Having Jurisdiction (AHJ). The facility is 100% sprinkled, and all wall and floor penetrations must be sealed to maintain original fire ratings. The contractor is required to field-verify equipment voltages and loads prior to installation, conduct training of building occupants on the new system, and provide all operation and maintenance manuals and as-built drawings to the owner upon project completion. Site coordination is essential, with the contractor required to visit the project site and determine the exact extent of demolition work before bidding.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICAL DRAWING INDEX

MICHIGAN STATE POLICE 1ST DISTRICT POST

7119 N. CANAL RD

DIMONDALE, MI 48821

FILE NUMBER: 171/22202.HJD

MATRIX PROJECT NUMBER: 22225.05

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

MICHIGAN STATE POLICE POST - FIRE ALARM REPLACEMENT

N SITE MAP

ELECTRICAL ENGINEER

MATRIX CONSULTING ENGINEERS, INC.

JOSEPH F. SOVIS, VICE PRESIDENT

KARSON MIENTKIEWICZ, ELECTRICAL DESIGN ENGINEER III

DTMB

HEATHER DEKORTE, PROJECT DIRECTOR

ARTHUR "BUTCH" KIMBALL, BUILDING AUTOMATION SPECIALTY SERVICES MANAGER

ROBERT "BOB" WELLER, FACILITIES SUPERVISOR FIRE SYSTEMS AND HIGH VOLTAGE

T-000

JFS

TITLE SHEET

KPM

file no.

checked by drawn by consultant issue date contract order no.

171CODTMB7337

consultant job no.

22225.05

M a tr ix

171/22202. HJD

acct. template sheet description

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

Y22312

FOR BID 10/22/2025

KMientkiewicz Stamp

FCPS

V

M C

X

X

X

H

CONTROL MODULE

S

ADDENDUM NOTE

PLAN NOTE

DEMOLITION NOTE

MONITOR MODULE

FIRE CONTROL POWER SUPPLY

VISUAL ONLY UNIT

ELECTRICAL SYMBOLS LEGEND

DH

J

DATA OUTLET

JUNCTION BOX

WALL JUNCTION BOX

PULL (JUNCTION) BOX

UNDERFLOOR JUNCTION BOX

OUTLETS

CIRCUITRY and RACEWAYS

UNDERFLOOR DUCT

BUS DUCT

PLUGMOLD AS SPECIFIED

WIREMOLD AS SPECIFIED

FLEXIBLE PIGTAILS/CONNECTIONS

"CONDUIT RUN CONTINUES" INDICATION

END OF CONDUIT RUN, CAP AND STAKE

END OF CONDUIT RUN

HOME RUN (with circuit numbers)

CONDUIT STUB DOWN

CONDUIT STUB UP

CONDUIT INSTALLED

CONDUIT INSTALLED

SERVICE and EQUIPMENT

TELEPHONE TERMINAL BOARD

GENERATOR, KW SHOWN

PANELBOARD, FLUSH MOUNTED

PANELBOARD, SURFACE MOUNTED

DISCONNECT SWITCH

FIRE ALARM

TAMPER SWITCH (furnished by FP/C) FLOW SWITCH (furnished by FP/C)

FIREFIGHTER COMMUNICATION JACK

MAGNETIC DOOR HOLDER

REMOTE TEST STATION FOR DUCT DETECTORS, CLG. MTD.

REMOTE TEST STATION FOR DUCT DETECTORS, WALL MTD.

END OF LINE DEVICE

ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

PULL STATION

SPEAKER & LIGHT

SPEAKER

HORN

DUCT SMOKE DETECTOR

HEAT DETECTOR

SMOKE DETECTOR

HORN & LIGHT

DESIGNATIONS

(by E.C.)

(by others)

TT

FACP

ANN

EOL

G

F

FC

F

1,3

OR

PM

WM

BD

UFD

J

J

J

DUCT SMOKE DETECTORF/S

CEILING MOUNTED WIFI

POLE

PUMP

PANEL

P

PNL

PVC

PRV-

P-

PB

POLY VINYL CHLORIDE

POWER ROOF VENTILATOR

PULL BOX

GENERAL CONTRACTOR

GROUND

HUMIDIFIERH-

GND

GFI

GC

GROUND FAULT INTERRUPTER

ABBREVIATIONS LEGEND

POWER

SWITCH

RECEPT

SF-

SWBD

TCC

SPEC

SW

RGC

RTU-

PWR

VOLTS

WATTS

UF

V

W

UL

VL

UNO

UH-

TS

TYP

TR

ROOF TOP UNIT

RECEPTACLE

SWITCHBOARD

UNDER FLOOR

SPECIFICATIONS

RIGID GALVANIZED STEEL CONDUIT

UNLESS NOTED OTHERWISE

UNDERWRITERS' LABORATORIES, INC.

TAMPER PROOF RECEPTACLE

TAMPER PROOF SWITCH

TEMPERATURE CONTROL CONTRACTOR

VERIFY LOCATION WITH OWNER

TYPICAL

UNIT HEATER

SUPPLY FAN

WITH

WITHOUT

W/

XFMR

W/O

WP

TRANSFORMER

WEATHER PROOF

HOUR

LIGHT

JUNCTION BOX

LIGHT CONTROL

ISOLATED GROUND

HORSEPOWER

MINIMUM

MOUNT

MAKE-UP AIR UNIT

MOTOR CONTROL CENTER

MAIN LUG ONLY

MOUNTED

MOUNTING

MAXIMUM

LIGHTING

LT FLEX

MTD

MUAU-

MTG

MLO

MIN

MT

MC

MAX

MCC

LTG

IG

LC

LT

IMC

JB

HR

HVAC

HOA

HP

NORMALLY CLOSED

NOT IN CONTRACT

NORMALLY OPEN

NOT TO SCALE

NIGHT LIGHTNL

NTS

NO

NIC

NC

HAND-OFF-AUTO SELECTOR SWITCH

HEATING/VENTILATING/AIR CONDITIONING

INTERMEDIATE METAL CONDUIT

LIQUID TIGHT FLEXIBLE METAL CONDUIT

MECHANICAL CONTRACTOR

HID HIGH INTENSITY DISCHARGE

A

AC

AFF

ACU-

AHJ

AHU-

AS

B-

BC

AIC

ATS

BLDG

CHLR-

CND (C)

CKT BKR

CKT

CUH-

CU-

DISC

DFU-

EF-

EC

DWH-

EBB-

DWG

CT-

EXIST (E)

EWC

FLEX

FLA

FLR

FSES

FLUOR

EMT

ABOVE FINISHED FLOOR

AIR CONDITIONING UNIT

AMPS

ABOVE COUNTER

AIR HANDLING UNIT

AUTOMATIC TRANSFER SWITCH

AMPS INTERRUPTING CAPACITY

AUTHORITY HAVING JURISDICTION

ABOVE SHELF

BOILER

BUILDING

BELOW COUNTER

CHILLER

DOMESTIC WATER HEATER

CABINET UNIT HEATER

CIRCUIT

CIRCUIT BREAKER

CONDUIT

CONDENSING UNIT

COOLING TOWER

DUCT FURNACE

DRAWING

DISCONNECT

FOOD SERVICE EQUIP. SUPPLIER

ELECTRIC WATER COOLER

ELECTRICAL CONTRACTOR

ELECTRIC BASEBOARD

ELECTRICAL METALLIC TUBING

EXISTING

EXHAUST FAN

FLOOR

FLUORESCENT

FLEXIBLE CONDUIT

FULL LOAD AMPS

EM EMERGENCY

F/S FIRE/SMOKE

FU- FURNACE

1. ALL WALL AND FLOOR PENETRATIONS ARE TO BE SEALED TO MAINTAIN ORIGINAL

RATING.

2. ALL CONDUITS TO BE FIELD ROUTED ALONG EXISTING PIPING AND STRUCTURAL

STEEL.

3. THE DIVISION 26 CONTRACTORS SHALL VISIT THE PROJECT AND DETERMINE THE

EXACT EXTENT OF THE DEMOLITION WORK REQUIRED BEFORE BIDDING THE PROJECT.

4. REMOVE ALL EXISTING OBSOLETE EXPOSED CONDUIT, WIRE AND UNUSED EQUIPMENT

WHERE WORK IS BEING DONE EXCEPT ITEMS NOTED OTHERWISE.

5. WHERE BUILDING SURFACES ARE DAMAGED BY THE REMOVAL OF OLD WORK,

SURFACES SHALL BE PATCHED TO MATCH ADJACENT WITH LIKE MATERIALS.

6. EXISTING WORK WHICH IS PRESENTLY CONCEALED AND WHICH WILL REMAIN

CONCEALED AND DOES NOT INTERFERE WITH ANY NEW WORK OF ANY TRADE NEED

NOT BE REMOVED. HOWEVER, ALL CONDUIT SHALL BE CAPPED BELOW FINISH

SURFACE AND THEN PATCHED TO MATCH, OR AS NOTED.

7. EXISTING OPENINGS, WHICH ARE TO BE REUSED, SHALL BE MODIFIED OR ENLARGED

TO SUIT THE NEW SYSTEMS AS REQUIRED. PROVIDE ALL REQUIRED CUTTING AND

PATCHING. CONTRACTOR SHALL REPAIR ALL FIRE SUPPRESSION REQUIRED PRIOR TO

COMPLETION OF WORK.

8. IF ASBESTOS IS PRESENT, IT WILL BE REMOVED OR RENDERED HARMLESS UNDER

SEPARATE CONTRACT BY THE OWNER.

9. THE DIVISION 26 CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING THE EXISTING

WALLS TO MATCH THE ADJACENT SURFACES BEHIND ALL SURFACE MOUNTED

EQUIPMENT.

10. CONTRACTOR SHALL FIELD VERIFY ALL EQUIPMENT VOLTAGES AND LOADS PRIOR TO

INSTALLING SERVICE TO EQUIPMENT.

11. DRAWINGS ARE BASED ON EXISTING RECORD DOCUMENT AND CASUAL FIELD

OBSERVATION. REPORT ANY DISCREPANCIES TO ENGINEER FOR CLARIFICATION.

12. ALL REQUEST AND QUESTIONS SHALL BE IN RFI FORMAT PER THE STATE FORMS.

13. CONTRACTOR IS REQUIRED TO MEET ALL PARTS OF THE DRAWINGS AND

SPECIFICATIONS.

14. FOR AREAS THAT INCLUDE HARD-LID CEILINGS, CONTRACTOR SHALL PROVIDE AND

INSTALL ACCESS PANELS AS NEEDED FOR FUTURE MAINTENANCE AND MODIFICATION.

GENERAL ELECTRICAL NOTES

C CEILING MOUNTED DEVICE

1. SUBMIT SHOP DRAWINGS, WIRING DIAGRAMS, BATTERY CALCULATIONS TO

ENGINEER ON FIRE ALARM SYSTEM.

2. SUBMIT FIRE ALARM SHOP DRAWINGS TO AHJ AFTER ENGINEER APPROVAL.

3. PROVIDE AND INSTALL FIRE ALARM SYSTEM PER APPROVED AHJ SUBMITTAL.

LABEL NEW DEVICES "OUT OF SERVICE" UNTIL NEW SYSTEM HAS BEEN

APPROVED BY AHJ. NEW DEVICES TO BE INSTALLED IN EXISTING LOCATIONS

SHALL BE INSTALLED AT A LOCATION ABOVE CEILING TO BE TESTED PRIOR TO

REMOVAL OF EXISTING SYSTEM AND PERMANENT INSTALLATION AND TESTED

AGAIN AFTER THE PERMANENT INSTALLATION.

4. NEW FIRE ALARM SYSTEM SHALL BE CERTIFIED BY NICET LEVEL 2 FIRE ALARM

SUPPLIER.

5. ENGINEER WILL PROVIDE PUNCH LIST ON FIRE ALARM SYSTEM.

6. OBTAIN AHJ APPROVAL FOR NEW FIRE ALARM SYSTEM. OBTAIN ELECTRICAL

INSPECTION APPROVAL ON PROJECT.

7. TRAIN OWNER ON NEW SYSTEM FOR EACH BUILDING.

8. SUBMIT ALL O & E MANUALS AND AS-BUILTS TO ENGINEER FOR APPROVAL.

9. ONCE THE NEW SYSTEM HAS BEEN APPROVED, DEMO EXISTING FIRE ALARM

SYSTEM. REMOVE ALL EXPOSED WIREMOLD, CONDUIT, AND WIRE. SALVAGE

ALL EXISTING DEVICES AND RELINQUISH TO OWNER.

10. PATCH AND PAINT AS REQUIRED WITH LIKE MATERIALS. REPAIR FIRE

SUPPRESSION AS REQUIRED. REMOVE TAGS ON NEW FIRE ALARM DEVICES.

11. TURN OVER O & E MANUALS AND AS-BUILTS TO OWNER.

SEQUENCE OF WORK

1. BUILDING IS 100% SPRINKLED.

GENERAL BUILDING NOTES

1. ALL POWER CABLE AND FIRE ALARM DEVICE WIRE SHALL BE INSTALLED IN

MINIMUM 3/4" EMT CONDUIT PAINTED RED UNLESS OTHERWISE SPECIFIED.

2. ALL CABLE SHALL BE INSTALLED PER FIRE ALARM MANUFACTURER'S

SPECIFICATIONS.

3. FIRE ALARM REMOTE POWER AND AUDIO SUPPLY SHALL BE MONITORED. REFER

TO MANUFACTURER RECOMMENDATIONS.

4. PROVIDE SMOKE DETECTOR ABOVE ALL FIRE ALARM PANELS, REMOTE AND

AUDIO POWER SUPPLIES.

5. REFER TO DRAWINGS FOR MINIMUM REQUIRED DEVICE QUANTITIES AND

LOCATIONS. REFER TO SPECIFICATIONS ON FIRE ALARM REQUIREMENTS.

CONTRACTOR IS REQUIRED TO MEET ALL NFPA CODE REQUIREMENTS. BRING

TO THE ENGINEER'S ATTENTION DISCREPANCIES PRIOR TO BIDDING PROJECT.

6. UPON ALARM OF SMOKE DETECTORS, FIRE ALARM SYSTEM TO RELEASE DOORS

THOUGH SECURITY PANEL. SECURITY VENDOR WILL PROGRAM AND MAKE

CONNECTIONS IN THERE PANEL COORDINATE AS REQUIRED.

7. POWER, AND AUDIO SUPPLIES IN BOTH FACP AND FCPS SHALL HAVE 25% SPARE

CAPACITY.

8. TRUE PEER TO PEER NETWORK FOR FIRE ALARM SYSTEM.

9. FIRE ALARM CONTRACTOR IS RESPONSIBLE FOR ALL CANDELA RATINGS OF

VISUAL UNITS TO COMPLY WITH NFPA 72. STROBE CANDELA SETTINGS SHALL

BE SET DURING INSTALLATION OF THE DEVICE.

10. INSTALLATION METHODS SHALL BE IN ACCORDANCE WITH THE NATIONAL

ELECTRICAL CODE, ARTICLE 760, AND NFPA 72.

11. 120V AC POWER FOR FIRE ALARM SYSTEM ENCLOSURES SHALL NOT SHARE

CONDUIT RACEWAY WITH FIRE ALARM SYSTEM CIRCUITS.

12. FIRE ALARM SYSTEM DEVICES SHALL BE MOUNTED TO ELECTRICAL BOXES AS

REQUIRED AND REFLECTED ON DEVICE INSTALLATION SHEET. DEVICES SHALL

FIT PROPERLY ON BACK BOX.

13. AREA SMOKE DETECTORS SHALL NOT BE PLACED WITHIN 36-INCHES OF AIR

DISTRIBUTION DIFFUSERS OR RETURN GRILLS.

14. ALL CONTRACTOR ARE RESPONSIBLE FOR MEETING SPECIFICATIONS AND

DRAWING REQURMENTS.

15. VERIFY ALL VOLTAGE REQUIREMENTS WITH REQUIRED INTERFACE OF OTHER

EQUIPMENT.

16. HVAC UNITS, DAMPERS, EXHAUST FANS SHALL BE SHUTDOWN BY ANY

ACTIVATION OF A SMOKE OR HEAT DETECTOR IN THE BUILDING (GENERAL

ALARM).

17. NO "T" TAPPING IS ALLOWED UNLESS PRIOR APPROVAL FROM ENGINEER/ PSC.

18. ALL CONTRACTOR ARE REQUIRED TO MEET ALL PARTS OF THE DRAWINGS AND

SPECIFICATIONS.

FIRE ALARM NOTES

TYPICAL STATE OF MICHIGAN FIRE ALARM RISER DIAGRAM CLASS B WIRING

TO RELAY FOR 24 VOLT FAN

SHUTDOWN (RELAY BY EC)

EOL

EOL

EOL

N.T.S.

ADDRESSABLE

CONTROL PNL

FIRE ALARM

M

SUPPLY

REMOTE POWER & AUDIO

FIRE ALARM

EOL

CAT 6E

IN EACH BUILDING

CONFIGURE SYSTEM PER

STATE OF MICHIGAN GUIDELINES

FOR CENTRAL STATION SIGNAL

S H

C

M

S H

EOL

EOL

EOL

EOL

TO RELAY FOR 120-480 VOLT FAN

SHUTDOWN (RELAY BY EC)

C

RELAY WITH A 24 VOLT INPUT AND

120-480 VOLT OUTPUT RATED TO

HANDLE UNIT INTERFACE (RELAY BY EC)

C C C

DAMPERS, MECHANICAL

AND EXHAUST UNITS

DAMPERS, MECHANICAL

AND EXHAUST UNITS

SECURITY PANEL(S)

FIRE ALARM

WEATHER

ALL CLEAR

M

FIRE PUMP

M M

POWER

PHASE REVERSED

RUN

REST

ALARM SILENCE

PANEL SILENCE

DRILL

MSP POST SPEAKERS

CITY TIE DISABLED

SPEAKERS DISABLED

STROBE DISABLED

DOOR CONTROL DISABLED

HVAC DISABLED

SHOOTER

TORNADO

ALL CLEAR

(4) SPARES

BUILT IN MONITOR AND

TRIP SETTINGS PROVIDE

DATA LOOP ADDRESS

AS REQUIRED

STROBE CIRCUIT TYP.

120V-1Ø, 20A CIRCUIT TO

NEAREST GENERATOR PANEL

(PROVIDE BREAKER IN PANEL

AS REQUIRED)

(3) #12

(1) #12 GND

(1) 3/4" CND

(PROVIDE LOCKOUT BREAKER

AS REQUIRED BY CODE)

120V-1Ø, 20A CIRCUIT TO

NEAREST GENERATOR PANEL

(PROVIDE BREAKER IN PANEL

AS REQUIRED)

(3) #12

(1) #12 GND

(1) 3/4" CND

(PROVIDE LOCKOUT BREAKER

AS REQUIRED BY CODE)

EOL

EOL

SPEAKER CIRCUIT TYP.

ANNUNCIATOR PANEL REQUIRED SWITCHES

PAGING SWITCHES

ALL CALL

ALL CALL MINUS

PHONE PAGE

EVAC

ALERT

FIRE ALARM CONTROL PANEL AND REMOTE

TO RELAY FOR 24 VOLT FAN

SHUTDOWN (RELAY BY EC)

EOL

EOL

EOL

ADDRESSABLE

CONTROL PNL

FIRE ALARM

M

SUPPLY

REMOTE POWER & AUDIO

FIRE ALARM

EOL

S H

C

M

S H

EOL

EOL

TO RELAY FOR 120-480 VOLT FAN

SHUTDOWN (RELAY BY EC)

C

RELAY WITH A 24 VOLT INPUT AND

120-480 VOLT OUTPUT RATED TO

HANDLE UNIT INTERFACE (RELAY BY EC)

C C C

DAMPERS, MECHANICAL

AND EXHAUST UNITS

DAMPERS, MECHANICAL

AND EXHAUST UNITS

SECURITY PANEL(S)

FIRE ALARM

WEATHER

ALL CLEAR

BUILT IN MONITOR AND

TRIP SETTINGS PROVIDE

DATA LOOP ADDRESS

AS REQUIRED

STROBE CIRCUIT TYP.

120V-1Ø, 20A CIRCUIT TO

NEAREST GENERATOR PANEL

(PROVIDE BREAKER IN PANEL

AS REQUIRED)

(3) #12

(1) #12 GND

(1) 3/4" CND

(PROVIDE LOCKOUT BREAKER

AS REQUIRED BY CODE)

120V-1Ø, 20A CIRCUIT TO

NEAREST GENERATOR PANEL

(PROVIDE BREAKER IN PANEL

AS REQUIRED)

(3) #12

(1) #12 GND

(1) 3/4" CND

(PROVIDE LOCKOUT BREAKER

AS REQUIRED BY CODE)

EOL

EOL

EOL

EOL

SPEAKER CIRCUIT TYP.

EOL

EOL

NETWORKING CABLING AS REQUIRED BY MANUFACTURER

FOR INTERFACING MORE THEN ONE CONTROL PANEL

PANEL

ANNUNCIATOR

FIRE ALARM

NETWORKING CABLING AS REQUIRED BY MANUFACTURER

FOR INTERFACING MORE THEN ONE CONTROL PANEL

ONE PER BUILDING

MULTIPLE PER BUILDING

(COORDINATE CONNECTIONS WITH VENDOR)

NOTE: VERIFY WITH FLOOR PLAN DRAWINGS ON MINIMUM DEVICE AND CONNECTIONS REQUIRED

SURGE PROTECTIONSP

MULTIPLE PER BUILDING

(COORDINATE CONNECTIONS WITH VENDOR)

FIRE ALARM CONTRACTOR TO INDICATE IF ADDITIONAL FIRE

ALARM PANELS ARE REQUIRED FOR THE BUILDING TO MEET

CODES, SPECIFICATIONS, AND DRAWINGS

INITIATING (DATA LOOP) CIRCUIT TYP.

SP

SP

WP

EOL

EOL

FDC

SP

SP

SP

SP

WP

EXTERIOR DEVICE ON ROOF TYP.

EOL

EOL

FIRE ALARM

INTERACTIVE

GRAPHIC DISPLAY

TO STATE OF

MICHIGAN NETWORK

file no.

checked by drawn by consultant issue date contract order no.

171CODTMB7337

consultant job no.

22225.05

M a tr ix

171/22202. HJD

acct. template sheet description

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

Y22312

FOR BID 10/22/2025

E-100

KPM

JFS

FIRE ALARM

SYMBOLS

ABBREV.

+ NOTES

F

F

F

F

H

H

H

F

FACP

BP

S

H

2 2

2 2

S

S S

S S

S S

S

SS

S

SS S

S

EX. PNL

"LPDD"

VEST

LOBBY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

VESTIBULE

CORR

CORR

STOR

MUG RM

WOMENS

MENS

CONFERENCE

STOR

OFFICE

INTERROGATION

OFFICE

FILES

CORR

OFFICE

WOMENS

MECHANICAL

GARAGE

BREAK RM

OFFICE

STORAGE

ELEC

PROP

AUTO

MENS

LOCKER RM

LOCKER RM

STORAGE

EVIDENCE

STORAGE

EQUIPMENT

OBSERVATION

OFFICE

OFFICE

RESTROOMRESTROOM

RESTROOMWOMENS

LOUNGE

JAN

ELEC

OFFICE

OFFICE

OFFICE

OFFICE

STORAGE

COMMUNICATIONS

INFO

OFFICE

OBSERV RM

OFFICE OFFICE OFFICE

OFFICE

INTERROGATION

EXISTING EQUIPMENT TO REMAIN.

DISCONNECT & REMOVE EXISTING DEVICE. REMOVE ASSOCIATED CONDUIT

& WIRE IN ACCORDANCE WITH GENERAL ELECTRIC NOTES 4-6 ON SHEET

E-100. SALVAGE EXISTING DEVICE AND RELINQUISH TO OWNER.

DISCONNECT & REMOVE EXISTING EQUIPMENT. REMOVE ASSOCIATED

CONDUIT & WIRE. SALVAGE ALL EXISTING EQUIPMENT AND RELINQUISH TO

OWNER.

DEMOLITION NOTES

1. CONTRACTOR SHALL DISCONNECT AND REMOVE ALL EXISTING FIRE ALARM

NOTIFICATION DEVICES AND EQUIPMENT. REMOVE ASSOCIATED CONDUIT & WIRE IN

ACCORDANCE WITH GENERAL ELECTRIC NOTES 4-6 ON SHEET E-100. SALVAGE

EXISTING DEVICES AND RELINQUISH TO OWNER.

GENERAL ELECTRICAL NOTES

file no.

checked by drawn by consultant issue date contract order no.

171CODTMB7337

consultant job no.

22225.05

M a tr ix

171/22202. HJD

acct. template sheet description

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

Y22312

FOR BID 10/22/2025

E-300

JKB

JFS

FLOOR PLAN

FIRE ALARM

DEMOLITION

N FLOOR PLAN - FIRE ALARM DEMOLITION

SCALE: 1/8" = 1'-0"

0 1 5 10 20

VEST

LOBBY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

VESTIBULE

CORR

CORR

STOR

MUG RM

WOMENS

MENS

CONFERENCE

STOR

OFFICE

INTERROGATION

OFFICE

FILES

CORR

OFFICE

WOMENS

MECHANICAL

GARAGE

BREAK RM

OFFICE

STORAGE

ELEC

PROP

AUTO

MENS

LOCKER RM

LOCKER RM

STORAGE

EVIDENCE

STORAGE

EQUIPMENT

OBSERVATION

OFFICE

OFFICE

RESTROOMRESTROOM

RESTROOMWOMENS

LOUNGE

JAN

ELEC

OFFICE

OFFICE

OFFICE

OFFICE

STORAGE

COMMUNICATIONS

INFO

OFFICE

OBSERV RM

OFFICE OFFICE OFFICE

OFFICE

F

F

F

F

H

H

S S

S S

S S

S

SSSSSSS

S S

S S

S

S S S S S H

H

HSS

S S S

SS

S

S S

S S

SS

SS

S S

S

S S

S S

S

H

S

S

S

S

S

S

H

C

C

C

C

C

C

C

C

C

C C

C

C

C

C

C

C

CC

C

C

C C

C

C

C

CCC

C

C

C

C

CCCC

C

C

C

C

CC

C

C

C C

C C

C

C

C

C

C

CCC

FACP

WP

FDC

WP

EX. PNL

"LPDD"

IGD

AMP LPDD-11

LPDD-2

LPDD-22

S

H

S S

S

S

INTERROGATION

1. COORDINATE FINAL LOCATION OF FACP, FFCP, FARP, FAIGD, NACP, & AMP WITH

OWNER PRIOR TO INSTALLATION.

2. NATIONAL TIME TO PROVIDE PIECES, PARTS, & PROGRAMMING.

3. RACEWAY & INSTALLATION BY ELECTRICAL CONTRACTOR.

4. EXPOSED CONDUIT TO MATCH WALL COLOR.

5. WIRE MOLD IS ACCEPTABLE FOR USE WHEN MOUNTING ON MARBLE. WIRE MOLD TO

MATCH SURFACE. REVIEW ALL LOCATIONS WITH OWNER PRIOR TO INSTALLATION.

6. REUSE OF EXISTING DEVICE LOCATIONS IS ACCEPTABLE IN PUBLIC SPACES.

CONTRACTOR SHALL COORDINATE THOSE LOCATIONS WITH OWNER ONCE PROJECT

IS AWARDED. OWNER MUST APPROVE ALL LOCATIONS.

7. CONTRACTOR IS RESPONSIBLE FOR PATCHING, PAINTING, REPAIRS, ETC. WHERE

EXISTING SYSTEMS ARE REMOVED AND NEW DEVICES ARE NOT INSTALLED.

8. SALVAGE ALL EXISTING DEVICES AND RELINQUISH TO OWNER DURING DEMOLITION.

LABEL ALL SALVAGED DEVICES AND SUBMIT AN INVENTORY TO DTMB. INVENTORY OF

SPARE PARTS LIST FOR ALL DEVICES AND EQUIPMENT MUST INCLUDE THE

FOLLOWING INFO: DESCRIPTION, MANUFACTURER, PART NUMBER, AND QUANTITIES

OF EACH ITEM.

GENERAL ELECTRICAL NOTES

ELECTRICAL KEY NOTES

CONTRACTOR SHALL CONSTRUCT COVE AROUND FACP AND IGD. REFER TO

E-800 FOR MORE DETAILS.

file no.

checked by drawn by consultant issue date contract order no.

171CODTMB7337

consultant job no.

22225.05

M a tr ix

171/22202. HJD

acct. template sheet description

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

Y22312

FOR BID 10/22/2025

E-500

JKB

JFS

FLOOR PLAN

FIRE ALARM NEW

N FLOOR PLAN - FIRE ALARM NEW

SCALE: 1/8" = 1'-0"

0 1 5 10 20

SYSTEM OUTPUTS

ANNUNCIATION NOTIFICATION FIRE

SAFETY

SY

ST

EM

IN

PU

TS

STATUS

INITIATION

EXTERNAL

SYSTEM

INPUTS

MANUAL PULL STATION OPERATION

COMMON AREA HEAT DETECTOR OPERATION

COMMON AREA SMOKE DETECTOR OPERATION

AUTOMATIC SPRINKLER SYSTEM WATER FLOW OPERATION

FIRE PROTECTION VALVE TAMPER OPERATION

FIRE PUMP OPERATIONS

OPEN CIRCUIT, SHORT CIRCUIT, OR GROUND FAULT ON INITIATING DEVICE, SIGNALING LINE, OR

NOTIFICATION APPLIANCE CIRCUIT

OPENING, TAMPERING, OR REMOVAL OF ALARM-INITIATING DEVICES

LOSS OF PRIMARY POWER OF FACP

GROUND IN SIGNAL BREAK-IN FACP INTERNAL CIRCUITS

ABNORMAL AC VOLTAGE AT THE FACP

STANDBY BATTERY CIRCUITRY BREAK

FAILURE OF BATTERY CHARGING SYSTEM

ABNORMAL POSITION OF ANY SWITCH AT THE FACP

FIRE PUMP FAILURE - INCLUDING A DEAD PHASE OR PHASE REVERSAL CONDITION

OPENING, TAMPERING, OR REMOVAL OF SUPERVISORY SIGNAL INITIATING DEVICES

ABNORMAL POSITION OF ANY SWITCH AT THE ANNUNCIATOR

IN

IT

IA

TE

F

IR

E

AL

AR

M

SI

GN

AL

ID

EN

TI

FY

A

LA

RM

A

T

FA

CP

ID

EN

TI

FY

A

LA

RM

A T

RE

MO

TE

A

NN

UN

CI

AT

OR

(S

AN

NU

NC

IA

TE

S

UP

ER

VI

SO

RY

S

IG

NA

L A T

FA

CP

AN

NU

NC

IA

TE

S

UP

ER

VI

SO

RY

S

IG

NA

L A T

RE

MO

TE

A

NN

UN

CI

AT

OR

(S

AN

NU

NC

IA

TE

T

RO

UB

LE

S

IG

NA

L A T

FA

CP

AN

NU

NC

IA

TE

T

RO

UB

LE

S

IG

NA

L A T

RE

MO

TE

A

NN

UN

CI

AT

OR

(S

OP

ER

AT

E

AL

AR

M

NO

TI

FI

CA

TI

ON

A

PP

LIA

NC

ES

C

ON

TI

NU

OU

SL

Y

AC

TI

VA

TE

A

UD

IB

LE

/A

LA

RM

C

OM

MU

NI

CA

TI

ON

S

YS

TE

M

RE

CO

RD

E

VE

NT

S

IN

T

HE

S

YS

TE

M

ME

MO

RY

AC

TI

VA

TE

W

EA

TH

ER

PR

OO

F

HO

RN

/S

TR

OB

E

AB

OV

E

F.

D.

C.

SW

IT

CH

H

VA

C

EQ

UI

PM

EN

T

CO

NT

RO

LS

T

O

FI

RE

A

LA

RM

M

OD

UL

E

SH

UT

DO

W

N

HV

AC

U

NI

T

SE

RV

IN

G

ON

E

IN

A

LA

RM

V

IA

C

ON

TR

OL

M

OD

UL

E

(IN

TE

RL

OC

K)

CL

OS

E

SM

OK

E

DA

MP

ER

S

IN

A

IR

D

UC

T

SY

ST

EM

S

ER

VI

NG

Z

ON

E

W

HE

RE

A

LA

RM

W

AS

IN

IT

IA

TE

D

TYPICAL DEVICE AND APPLIANCE MOUNTING HEIGHTS

N.T.S.

1. DO NOT INSTALL ANY EQUIPMENT OUTSIDE UNLESS IT IS LISTED

FOR OUTDOOR USE.

2. FOR LOW CEILINGS WHERE THE MOUNTING HEIGHTS CAN NOT

BE MET, MOUNT THE INDICATING APPLIANCE 6" FROM THE

CEILING.

3. MOUNT ALL INDICATING APPLIANCES ON THE WALL,

UNLESS INDICATED OTHERWISE.

4. ALL DEVICE & APPLIANCE HEIGHTS SHOULD BE CONSISTENT

FOR THE ENTIRE PROJECT.

5. THE FIRE PANEL SHALL HAVE A MINIMUM 3' CLEARANCE FROM

THE FRONT OF THE CONTROL EQUIPMENT & SHALL BE LOCATED

IN A CLIMATE CONTROLLED AREA.

THIS INFORMATION IS PROVIDED FOR REFERENCE ONLY. THE PROJECT

SPECIFICATIONS & LOCAL AHJ REQUIREMENTS SHALL BE USED AS THE

ACTUAL INSTALLATION CRITERIA.

FINISHED CEILING

FINISHED FLOOR

ANN

REMOTE ANNUNCIATOR

5'

MAX

6'

MAXFACP

EXIT DOOR

V 110 CD

24"

ACCEPTABLE MOUNTING LOCATION

FOR STROBES IN SLEEPING ROOMS,

MEASURED FROM THE TOP OF THE

LENS. THE APPLIANCE MUST BE

WITHIN 16' OF THE PILLOW.

FACCEPTABLE MOUNTING AREA

FOR MANUAL PULL STATIONS.

MEASURED FROM THE CENTER

OF THE HANDLE.

42"

MIN

6"

5' MAX

AC

CE

PT

AB

LE

M

OU

NT

IN

G

AR

EA

F

OR

A

UD

IB

LE

DE

VI

CE

, D

IS

TA

NC

ES

A

RE

M

EA

SU

RE

D

FR

OM

TH

E

TO

P

OF

T

HE

A

PP

LIA

NC

E.

6"

MIN

90"

MIN

16"

80"

MIN

V

AC

CE

PT

AB

LE

M

OU

NT

IN

G

AR

EA

F

OR

S

TR

OB

ES

OR

A

UD

IB

LE

/S

TR

OB

E

CO

MB

IN

AT

IO

N

AP

PL

IA

NC

ES

(N

ON

-S

LE

EP

IN

G

RO

OM

S

AN

D

CO

RR

ID

OR

S)

. D

IS

TA

NC

ES

A

RE

M

EA

SU

RE

D

SO

TH

AT

T

HE

E

NT

IR

E

LE

NS

M

US

T

BE

W

IT

HI

N

TH

E

AR

EA

S

HO

W

N.

TYPICAL DETECTOR MOUNTING LOCATIONS, PLAN & SIDE VIEW

N.T.S.

HVAC WALL DIFFUSER

36"

MINIMUM

36"

MINIMUM

36"

MINIMUM

4"

MINIMUM

12"

MAXIMUM

4"

MINIMUM

DISTANCES ARE MEASURED

FROM THE CLOSEST EDGE OF

THE DETECTOR.

UNACCEPTABLE

HERE

CEILING DETECTOR

ACCEPTABLE HERE

S S S

CEILING

DETECTOR

MOUNTED IN BEAM

POCKET

UNACCEPTABLE

HERE

BEAM 12" DEEP OR GREATER

HVAC CEILING DIFFUSER

CEILING DETECTOR

ACCEPTABLE HERE

UNACCEPTABLE

HERE

SUSPENDED OR HARD CEILING

SLOPED CEILING

MOUNT DETECTOR ANYWHERE

IN THIS AREA

3' 3'

S S

D=LISTED SPACING OF DETECTOR

1/2D D 1/2DD

UNACCEPTABLE

HERE

SWALL MOUNTED DETECTOR

ACCEPTABLE HERE

UNACCEPTABLE HERE

SIDEWALL

DENOTES UNACCEPTABLE AREA FOR

SMOKE DETECTOR MOUNTING

1. MEASUREMENTS SHOWN ARE TO THE CLOSEST EDGE OF THE

DETECTOR.

2. DETECTORS SHOULD NOT BE LOCATED IN DIRECT AIR FLOW OR

CLOSER THAN 3' FROM AN AIR SUPPLY DIFFUSER.

3. AVOID LOCATING SMOKE DETECTORS IN CLOSE PROXIMITY TO

DOMESTIC SMOKE SOURCES SUCH AS KITCHENS, AND AREAS

OF RELATIVELY HIGH HUMIDITY WHERE CONDENSATION MAY

OCCUR.

4. AVOID LOCATING HEAT DETECTORS IN CLOSE PROXIMITY TO

DOMESTIC HEAT SOURCES SUCH AS KITCHENS, HEATERS,

BURNERS, AND AREAS OF SUDDEN TEMPERATURE CHANGES.

5. DO NOT INSTALL SMOKE DETECTORS UNTIL ALL CONSTRUCTION

IS FINAL AND COMPLETE. DETECTORS INSTALLED PRIOR TO

FINAL CLEANUP BY ALL TRADES SHALL BE CLEANED OR

REPLACED.

6. INSTALL ALL SMOKE DETECTORS ON THE CEILING, UNLESS

NOTED OTHERWISE.

7. DO NOT MOUNT DETECTORS DIRECTLY ADJACENT TO

FLUORESCENT LIGHTS. A RECOMMENDED DISTANCE IS 1' OR

GREATER.

8. MOUNT SMOKE DETECTORS A MINIMUM OF 3' OUTSIDE

BATHROOMS WHICH HAVE SHOWERS.

9. FOR BEAMS WITH DEPTHS EXCEEDING 1' OR CEILING OVER 12'

IN HEIGHT, DETECTORS MUST BE INSTALLED IN EVERY BEAM

POCKET.

POSITIVE

NEGATIVE NEVER LOOP WIRE UNDER TERMINALS. BREAK

THE WIRE RUN TO PROVIDE SUPERVISION OF

CONNECTION.

#1 #2

SHIELD

IN OUT

NOTE: IF SHIELDED WIRE IS USED, NEVER LAND

THE SHIELD ON THE DEVICE. FOLD AND TAPE

THE SHIELD SO IT FORMS A CONTINUOUS

CIRCUIT. LAND THE SHIELD ONLY AT THE PANEL

WHERE THE CIRCUIT ORIGINATED.

TYPICAL DEVICE CONNECTIONS

N.T.S.

FLUSH MOUNTED ELECTRICAL BOXES

N.T.S.

STEEL ELECTRIC BOX

OCTAGON BOX

24"

MINIMUM

TYPICAL DROP CEILING DETECTOR MOUNTING

N.T.S.

TYPICAL DRYWALL DETECTOR MOUNTING

N.T.S.

FLOOR CONSTRUCTION

CONDUIT INSTALLED TO FIT

EXISTING CONDITIONS

JUNCTION BOX MOUNTED TO

CEILING SLAB

FLEXIBLE CONDUIT

JUNCTION BOX MOUNTED TO

"CADDY" TEE BAR SUSPENDED CEILING

GRID SYSTEM

"CADDY" TEE BAR CLIPS

TO SUSPENDED CEILING TILE.

SUPPORT IS PROVIDED BY

CEILING GRID

DETECTOR BASE MOUNTING

SMOKE DETECTOR

SMOKE DETECTOR NOTES:

THE DETECTOR AND THE BASE MUST BE

SUPPORTED INDEPENDENTLY OF THE

CONDUCTORS. DO NOT HOLD THE DETECTORS

AGAINST THE CEILING WITH FIRE ALARM CABLE.

SCREW THE BASE INTO AN ELECTRICAL BOX.

STANDARD OR DEEP

OCTAGON BOX

DB-11 BASE

6"

1 1/2"

SMOKE OR HEAT DETECTOR

(HFP-11 OR HFPT-11)

MULTICOLOR LED

TYPICAL SYSTEM MATRIX

NOTES:

1. OUTLET & SWITCH BOXES ON OPPOSITE SIDES OF A WALL OR

PARTITION SHALL BE SEPARATED BY A HORIZONTAL DISTANCE OF

NOT LESS THAN 24" IN ORDER TO MAINTAIN THE FIRE RESISTIVE

RATING. IF THE MINIMUM SEPARATION DISTANCE CAN NOT BE

MAINTAINED, ALTERNATIVE SOLUTIONS USING FIRE BARRIERS ARE

AVAILABLE.

2. ELECTRICAL BOX SHALL BE SIZED FOR FIRE ALARM DEVICE. NO

OVERHEAD OF DEVICE IS ALLOWED.

SMOKE DETECTOR NOTES:

EQUIPMENT MOUNTING NOTES:

FI

RE

A

LA

RM

W

EA

TH

ER

AL

L C

LE

AR

SECURITY

PANEL

WEATHER POSITION SWITCH AT THE FACP

ALL CLEAR POSITION SWITCH AT THE FACP

FIRE PROTECTION WATERFLOW OPERATION

TR

AN

SM

IT

F

IR

E

AL

AR

M

TO

C

EN

TR

AL

S

TA

TI

ON

TR

AN

SM

IT

S

UP

ER

VI

SO

RY

T O

CE

NT

RA

L S

TA

TI

ON

TR

AN

SM

IT

T

RO

UB

LE

T O

CE

NT

RA

L S

TA

TI

ON

FACPIGD

FINISHED CEILING

FINISHED FLOOR

6"

72"

6"96" 6" 6"

6" 6"

CONTRACTOR SHALL FIELD

VERIFY FLOOR TO CEILING

HEIGHT

NEW FIRE ALARM FACP AND IGD COVE - FRONT VIEW

N.T.S.

NEW FIRE ALARM FACP AND IGD COVE - SIDE VIEW

N.T.S.

E-800

KPM

JFS

FIRE ALARM

DETAILS &

SPECIFICATIONS

file no.

checked by drawn by consultant issue date contract order no.

171CODTMB7337

consultant job no.

22225.05

M a tr ix

171/22202. HJD

acct. template sheet description

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O F

M

IC

H

IG

A N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

Y22312

FOR BID 10/22/2025

E-900

KPM

JFS

PANEL SCHEDULE

file no.

checked by drawn by consultant issue date contract order no.

171CODTMB7337

consultant job no.

22225.05

M a tr ix

171/22202. HJD

acct. template sheet description

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O F

M

IC

H

IG

A N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

Y22312

FOR BID 10/22/2025