Waste Water Treatment Plant Modernization – Drawings and Project Documentation
This is a comprehensive set of construction drawings and technical documentation for the Main Garrison Wastewater Treatment Plant Phase 2 Upgrades project prepared for the California Military Department at Camp Roberts, California. The project involves the modernization of the existing wastewater treatment facility through installation of a Membrane Bioreactor (MBR) system, sludge handling equipment (DRYPAC dewatering system), permeate retention pond construction, and associated infrastructure improvements. Key project components include replacement of the existing headworks mechanical screen with new screening and compactor equipment, demolition of existing digesters and sludge drying beds, repurposing of the secondary clarifier as an equalization tank, installation of new pumping stations, trenching and pipeline installation for new 24-inch HDPE and 8-inch DI piping, electrical service upgrades, and site restoration. The construction drawings set consists of 42 sheets including site plans, process flow diagrams, civil details, structural plans, electrical schematics, and instrumentation/control diagrams. The drawings are dated through March 31, 2026, indicating 100% design submittal status with revisions progressing from 35% through 95% design phases. A mandatory pre-bid job walk is scheduled for July 21, 2026, at 1:00 PM at Camp Roberts with the bid submission deadline of September 1, 2026, at 2:45 PM and bid opening at 3:00 PM the same day, with questions due by August 11, 2026.
The prime contractor must possess either a B-General Building Contractor or A-General Engineering license and a C-22 Asbestos Abatement license or subcontract accordingly. Project scope includes clearing and site preparation, removal of accumulated sludge from existing drying beds and digesters, demolition of multiple existing WWTP components, installation of new MBR and sludge handling systems with associated concrete pads and canopies, pipeline installation and surface restoration, electrical utility service upgrades and subsurface electrical lines, permeate retention pond grading and HDPE liner installation, controls integration with basewide SCADA system, and startup testing and commissioning. Estimated earthwork volumes include approximately 500 cubic yards of non-structural import backfill and 2,500 cubic yards of structural import backfill, with 1,265 cubic yards of cut and approximately 2,500 cubic yards of sludge removal from existing drying beds. The contractor is responsible for managing sludge handling throughout construction, environmental compliance, hazardous materials assessment and removal, and maintaining minimal disruption to ongoing Army National Guard training operations at the facility. All contractor submittals and shop drawings require approval, and the contractor must provide a two-year warranty on all materials and workmanship following final inspection acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Report_Waste_Discharge.pdf | ||
| PROCORE_Spec.pdf | ||
| Design_Report_20260416.pdf | ||
| QC_Spec_Rev_01.pdf | ||
| Specifications_20260512.pdf | ||
| IFB_No_130636.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PASO ROBLES
CAMP ROBERTS
ATASCADERO
MORRO BAY
SAN LUIS OBISPO
PISMO BEACH
AVENAL
COALINGA
KING CITY
ARROYO GRANDE
GROVER BEACH
C :\W
O R
K \D
R A
FT
IN
G \C
R W
W
TP
\G
TI
TL
E
.D W
G
CAMP ROBERTS, CALIFORNIA
INDEX OF DRAWINGS
PREPARED FOR
SITE LOCATION MAP
APPROXIMATE
SCALE
2,0000 4,000 FEET
CALIFORNIA MILITARY DEPARTMENT
PROJECT TITLE
MAIN GARRISON WASTEWATER TREATMENT PLANT
PHASE 2 UPGRADES
IN
D
E X
O F
D R
A W
IN
G
S , S
IT
E
V
IC
IN
IT
Y M
A P
A N
D S
IT
E
L O
C A
TI
O
N M
A P
G
G
TI
TL
E
.D W
G
S H
E E
T
O F
R E
VI
S
IO
N
S H
E E
T N o.
P R
O
JE
C T
N o.
FI
LE
N A
M E
C H
E C
K E
D B
Y:
A P
P R
O
VE
D B
Y:
D A
TE
D R
A W
N B
Y:
D E
S
IG
N E
R
A S
N O
TE
D
IF
N
O T
IN
CH
, A
DJ
US
T
SC
AL
E
AC
CO
RD
IN
G
LY
BA
R
SH
O
UL
D
BE
E
XA
CT
LY
IN
CH
L O
NG
S C
A
LE
D A
TE
R
E V
D E
S C
R
IP
TI
O
N
R E
V
IS
IO
N
S U
M M
A R
Y A
P P
'D B
Y
P R
E P
A R
E D
B Y
P R
E P
A R
E D
F O
R
C A
LI
FO
R N
IA
M
IL
IT
A R
Y D
E P
A R
TM
E
N T
B
E A
R H
O
LL
O W
D R
IV
E
R A
N C
H O
C O
R D
O V
A , C
A
W A
S
TE
W A
TE
R
T R
E A
TM
E
N T
P
LA
N T
U P
G R
A D
E S
P H
A S
E
C A
M P
R O
B E
R
TS
, C A
TM
H
TM
H
P M
TM
H
-3
-0 1-
/2
8/
A
D
E S
IG
N
JP
B
B
/1
7/
B R
E
VI
S
IO
N S
T O
C
IV
IL
5% D
E S
IG
N
TM
H
TM
H
/3 1/
/1
6/
C
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
T
EC
H
N O
LO
GY
D R
IV
E, S U
IT
E
C5
IR
V
IN
E, C A
LI
FO
R N
IA
-5
/0
8/
D R
E
VI
S E
D
5% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/0
7/
E
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/3
1/
0% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
SITE LOCATION
PLAN (G03)
MAIN
GARRISON
DPW OFFICE
SECURITY OFFICE
MAIN GATE
ACCESS
ROUTE
FIRING
RANGE
EAST
GARRISON
REFERENCE:
N
APPROXIMATE
SCALE
REFERENCE:
N
SITE VICINITY MAP
APPROXIMATE
SCALE
120 24 MILES
REFERENCE: ESRI ArcGIS USA DATA, 2005
N
SITE LOCATION
MAP
ESRI ArcGIS USGS THE NATIONAL MAP, 2018
G01 INDEX OF DRAWINGS, SITE VICINITY MAP, AND SITE LOCATION MAP
G02 GENERAL NOTES, ABBREVIATIONS, AND LEGEND
G03 WASTEWATER TREATMENT PLANT SITE PLAN
G04 FLOW PROFILE - LOW FLOW AND PERMEATE RECIRCULATION
G05 FLOW PROFILE - EQUALIZATION TANK
P01 WWTP SITE PROCESS FLOW DIAGRAM
P02 MBR PROCESS FLOW DIAGRAM
C01 EXISTING SITE AND DEMOLITION PLAN (1 OF 2)
C02 EXISTING SITE AND DEMOLITION PLAN (2 OF 2)
C03 SITE PLAN
C04 MEMBRANE BIOREACTOR (MBR) PLAN AND PROFILE
C05 DRYPAC PLAN AND PROFILE
C06 PERMEATE RETENTION POND PLAN
C07 DETAILS AND SECTIONS (1 OF 3)
C08 DETAILS AND SECTIONS (2 OF 3)
C09 DETAILS AND SECTIONS (3 OF 3)
C10 DETAILS AND SECTIONS (4 OF 4)
C11 HARDSCAPE PLAN
S01 STRUCTURAL TITLE SHEET
S02 STRUCTURAL SPECIFICATIONS
S03 STRUCTURAL SPECIFICATIONS
S04 MBR FOUNDATION PLAN
S05 MBR MAT SLAB REBAR PLAN
S06 MBR CANOPY FRAMING PLAN
S07 SLUDGE TANK FOUNDATION PLAN
S08 SLUDGE TANK MAT SLAB REBAR PLAN
S09 SLUDGE TANK CANOPY FRAMING PLAN
S10 STRUCTURAL DETAILS
S11 STRUCTURAL DETAILS
S12 STRUCTURAL DETAILS
E01 ELECTRICAL SYMBOLS, NOTES, AND LEGEND
E02 SINGLE LINE DIAGRAM
E03 ELECTRICAL SCHEDULES
E04 OVERALL ELECTRICAL SITE PLAN
E05 SCHEMATIC & CONNECTION DIAGRAMS - SHEET 1
E06 SCHEMATIC & CONNECTION DIAGRAMS - SHEET 2
E07 COMMUNICATION DIAGRAM
E08 CONDUIT BLOCK DIAGRAM
E09 ELECTRICAL DETAILS
I01 P&ID SYMBOLS AND LEGEND
I02 P&ID - SHEET 1
I03 P&ID - SHEET 2
I04 P&ID - SHEET 3
PROJECT INFORMATION
OWNER/OPERATOR: CALIFORNIA MILITARY DEPARTMENT
10601 BEAR HOLLOW DRIVE
RANCHO CORDOVA, CALIFORNIA 95670
SITE ADDRESS: WASTEWATER TREATMENT PLANT
CAMP ROBERTS, CALIFORNIA
CIVIL ENGINEER: WEAVER CONSULTANTS GROUP OF CALIFORNIA, LLC.
1 TECHNOLOGY DRIVE, SUITE C515
IRVINE, CALIFORNIA 92618
STRUCTURAL ENGINEER: T&S STRUCTURAL
684 CLARION COURT
SAN LUIS OBISPO, CALIFORNIA 93401
ELECTRICAL ENGINEER: NCS ENGINEERS
202 E. EARLL DRIVE, SUITE 110
PHOENIX, ARIZONA 85012
MBR ENGINEER/VENDOR: CLOACINA, LLC
2385 PRECISION DRIVE
ARROYO GRANDE, CALIFORNIA 93420
GEOTECHNICAL ENGINEER: KLING CONSULTING GROUP, INC.
18008 SKY PARK CIRCLE, SUITE 250
IRVINE, CALIFORNIA 92618
LETTER DISCIPLINE
C CIVIL
E ELECTRICAL
G GENERAL
I INSTRUMENTATION / CONTROLS
P PROCESS
S STRUCTURAL
C03
INDIVIDUAL DRAWING NUMBER
DISCIPLINE
SHEET No. DESIGNATION
MONTEREY COUNTY
SAN LUIS OBISPO COUNTY
C :\W
O R
K \D
R A
FT
IN
G \C
R W
W
TP
\G
A
B B
R E
V
IA
TI
O
N S
A N
D L
E G
E N
D .D
W G
P
LO
TT
E D
B Y
H U
N T, T
IM
O N
4/
/2
LEGENDABBREVIATIONS
SHEET ON WHICH THE DETAIL PLAN, DETAIL, OR SECTION IS SHOWN
DETAIL PLAN, DETAIL, OR SECTION LABEL. DETAIL PLANS AND DETAILS ARE IDENTIFIED
WITH NUMBERS (e.g., 1, 2, 3) . SECTIONS ARE IDENTIFIED WITH LETTERS (e.g., A, B, C)
SHEET ON WHICH THE DETAIL PLAN, DETAIL, OR SECTION IS CALLED OUT
UNDISTURBED EARTH
UNCLASSIFIED BACKFILL (SOIL [NATIVE OR IMPORT] USED IN NON-STRUCTURAL
APPLICATIONS AND PLACED IN ACCORDANCE WITH SECTION 300-4 OF THE SSPWC).
UNCLASSIFIED FILL WILL BE COMPACTED TO 90% OF ITS RELATIVE MAXIMUM DENSITY
PER ASTM D1557, UNLESS OTHERWISE SPECIFIED IN THE CONSTRUCTION DOCUMENTS.
PREPARED SUBGRADE/STRUCTURAL FILL (NATIVE OR IMPORTED SOIL PLACED IN
ACCORDANCE WITH SECTION 301-1 OF THE SSPWC). PREPARED
SUBGRADE/STRUCTURAL FILL WILL BE COMPACTED TO 95% OF ITS RELATIVE MAXIMUM
DENSITY PER ASTM D1557, UNLESS OTHERWISE SPECIFIED IN THE CONSTRUCTION
DOCUMENTS.
SAND BEDDING (IMPORTED MATERIAL, UNLESS OTHERWISE AUTHORIZED, MEETING THE
REQUIREMENTS OF SECTION 200-1.5 OF THE SSPWC AND THE SCHEDULE OF
MATERIALS).
CONCRETE (AS GENERALLY SPECIFIED IN SECTION 201-1.1.2 OF THE SSPWC UNLESS
SPECIFICALLY DESCRIBED IN THE DRAWINGS)
ASPHALT (UNLESS SPECIFIED OTHERWISE ASPHALT SHALL CONSIST OF 4-INCHES OF
ASPHALT PER SECTION 203-6 OF THE SSPWC).
AGGREGATE BASE (UNLESS SPECIFIED OTHERWISE AGGREGATE BASE SHALL CONSIST
OF CRUSHED AGGREGATE BASE AS SPECIFIED IN SECTION 200-2.2 OF THE SSPWC).
PL
CL
SCREWED OR SOCKETWELD
FLANGED OR GROOVED PIPE COUPLING
BELL AND SPIGOT OR MECHANICAL
FLEXIBLE COUPLING
FLANGED COUPLING ADAPTER
REDUCER
JOINTS
FITTINGS
BLIND FLANGE
UNION
SINGLE LINE DOUBLE LINE
PIPE CLEANOUT
MALE CAM COUPLER
PIPING SYMBOLS
GENERAL LINE TYPES AND
SYMBOLS
R E
VI
S
IO
N
S H
E E
T N o.
P R
O
JE
C T
N o.
FI
LE
N A
M E
C H
E C
K E
D B
Y:
A P
P R
O
VE
D B
Y:
D A
TE
D R
A W
N B
Y:
D E
S
IG
N E
R
A S
N O
TE
D
IF
N
O T
IN
CH
, A
DJ
US
T
SC
AL
E
AC
CO
RD
IN
G
LY
BA
R
SH
O
UL
D
BE
E
XA
CT
LY
IN
CH
L O
NG
S C
A
LE
D A
TE
R
E V
D E
S C
R
IP
TI
O
N
R E
V
IS
IO
N
S U
M M
A R
Y A
P P
'D B
Y
P R
E P
A R
E D
B Y
P R
E P
A R
E D
F O
R
C A
LI
FO
R N
IA
M
IL
IT
A R
Y D
E P
A R
TM
E
N T
B
E A
R H
O
LL
O W
D R
IV
E
R A
N C
H O
C O
R D
O V
A , C
A
W A
S
TE
W A
TE
R
T R
E A
TM
E
N T
P
LA
N T
U P
G R
A D
E S
P H
A S
E
C A
M P
R O
B E
R
TS
, C A
TM
H
TM
H
P M
TM
H
-3
-0 1-
/2
8/
A
D
E S
IG
N
JP
B
B
/1
7/
B R
E
VI
S
IO
N S
T O
C
IV
IL
5% D
E S
IG
N
TM
H
TM
H
/3 1/
/1
6/
C
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
T
EC
H
N O
LO
GY
D R
IV
E, S U
IT
E
C5
IR
V
IN
E, C A
LI
FO
R N
IA
-5
/0
8/
D R
E
VI
S E
D
5% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/0
7/
E
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/3
1/
0% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
G E
N E
R A
L N
O
TE
S , A
B B
R E
V
IA
TI
O
N S
A N
D L
E G
E N
D G
G
A B
B R
E V
IA
TI
O N
S A
N D
L E
G E
N D
.D W
G
S H
E E
T
O F
SUBJECT LINE (PROPOSED CONSTRUCTION)
EXISTING CONDITIONS
FENCE LINE
CENTER LINE
SUBSURFACE LINE
GAS
WATER
SANITARY SEWER
ELECTRICAL (UNDERGROUND)
S
E
G x
W
C COMMUNICATION/OPTICAL
WATER VALVE
E UNDERGROUND ELECTRIC VAULT
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
FIRE HYDRANT
STORM DRAINSD
S NEW SANITARY SEWER MANHOLE
SANITARY SEWER CLEAN OUT
NEW SANITARY SEWER CLEAN OUT
ELECTRICAL MANHOLE
LIGHT POLE
UKN UNKNOWN UTILITY
GAS VALVE
/////////////////////////////////////// ABANDON
DEMOLISH/REMOVE
CONTROL POINT
DIRECTION OF SURFACE FLOW
SURVEY CONTROL NOTES
1. THESE DRAWINGS, TOGETHER WITH THE PROJECT-SPECIFIC SPECIFICATIONS, AND
THE THE UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS) CONSTITUTE THE
CONSTRUCTION DOCUMENTS FOR THIS PROJECT. THE CONTRACTOR SHALL KEEP AT
LEAST ONE COPY OF THE LATEST APPROVED VERSION OF THESE DOCUMENTS
ON-SITE AT ALL TIMES. THE ENGINEER SHALL HAVE ACCESS TO THE CONTRACTOR'S
DOCUMENTS AT ALL TIMES.
2. ON FINDING A DISCREPANCY BETWEEN THE CONTRACT DOCUMENTS INTERNALLY, OR
BETWEEN THE CONTRACT DOCUMENTS AND ACTUAL FIELD CONDITIONS, THE
CONTRACTOR SHALL IMMEDIATELY BRING SAID DISCREPANCY TO THE ATTENTION OF
THE CMD PM. SPECIFICATIONS SHALL TAKE PRECEDENCE OVER DRAWINGS.
3. DURING CONSTRUCTION, CONTRACTOR SHALL TAKE FIELD NOTES OF ACTUAL
LOCATIONS OF ALL INSTALLED EQUIPMENT, SLABS, PIPING, CONDUIT, AND ALL OTHER
CONSTRUCTION RELATED MATERIAL ON A DAILY BASIS TO REFLECT WORK
COMPLETED. CONTRACTOR SHALL PREPARE AND MAINTAIN A REDLINE "AS-BUILT"
SET OF PLANS THROUGHOUT THE PROJECT. THE CONTRACTOR SHALL PERIODICALLY
REVIEW THE "AS-BUILT" SET WITH THE CMD PM TO ENSURE CHANGES ARE KEPT UP
TO DATE. THE CONTRACTOR SHALL SUBMIT "AS-BUILT" PLANS TO THE CMD PM FOR
REVIEW AND APPROVAL PRIOR TO PREPARATION OF FINAL "AS-BUILT" SET.
4. THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL
ENVIRONMENTAL LAWS AND ORDINANCES.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE ENVIRONMENT DURING
CONSTRUCTION BY PROTECTING TREES AND SHRUBS, CONTAINING ANY RUNON OR
RUNOFF, CONTROLLING DUST AND CONTAMINATION CAUSED BY THE CONTRACTOR.
THE CONTRACTOR SHALL DISPOSE OF ALL CONSTRUCTION DEBRIS OFFSITE
INCLUDING PAVEMENT, CONCRETE, PIPELINES, SOIL, OR OTHER CONSTRUCTION
RELATED MATERIAL REMOVED DURING CONSTRUCTION. IF EXCAVATED MATERIALS
CANNOT BE USED AS BACKFILL, THEY SHALL BE DISPOSED OF AT AN AUTHORIZED
FACILITY AND WITH THE PROPER DOCUMENTATION. THE CONTRACTOR SHALL
PROVIDE THE CMD PM WITH THE APPROPRIATE MANIFESTS AND CERTIFICATES TO
DEMONSTRATE THAT THE MATERIALS HAVE BEEN PROPERLY DISPOSED OF. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR WASTE PROFILING OF MATERIAL FOR
DISPOSAL. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO RECYCLE
CONSTRUCTION MATERIAL IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS.
6. THE CONTRACTOR SHALL CLEARLY MARK PROPOSED EXCAVATIONS PRIOR TO ANY
INTRUSIVE WORK. EXCAVATION AREAS SHALL BE CLEARED BY UNDERGROUND
SERVICE ALERT, GEOPHYSICAL SURVEY, AND THE OWNER'S REPRESENTATIVE PRIOR
TO ANY INTRUSIVE WORK. SUBSURFACE WORK SHALL NOT COMMENCE UNTIL AN
AREA HAS BEEN CLEARED.
7. THE CONTRACTOR SHALL EXERCISE CAUTION IN PERFORMING SUBSURFACE WORK. IF
AN UNMARKED UTILITY IS ENCOUNTERED THE CONTRACTOR SHALL IMMEDIATELY
NOTIFY THE CMD PM, WHO WILL BE RESPONSIBLE FOR DETERMINING HOW TO
PROCEED RELATIVE TO THE UNMARKED UTILITY.
8. THE CONTRACTOR SHALL PERFORM ALL THE NECESSARY WORK TO COMPLETE THE
PROJECT IN A SATISFACTORY MANNER. UNLESS OTHERWISE PROVIDED, THE
CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, TOOLS, LABOR, AND
INCIDENTALS NECESSARY TO COMPLETE THE WORK.
9. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL DIMENSIONS AND
CONDITIONS BEFORE STARTING WORK. ALL WORK SHALL CONFORM TO THE LINE,
GRADE AND ELEVATIONS SHOWN ON THESE PLANS. ANY DISCREPANCY, ERROR, OR
OMISSION DISCOVERED BY THE CONTRACTOR SHALL BE BROUGHT TO THE
ATTENTION OF THE CMD PM.
10. CONSTRUCTION AND TRENCHING AREAS SHALL BE CLEARLY MARKED WITH CONES,
BARRICADES, OR OTHER APPROVED SAFETY MARKERS AS REQUIRED BY LOCAL
CODES TO RESTRICT ACCESS AND PROVIDE A SAFE WORK AREA FOR THE
CONTRACTOR, ENGINEER, AND ANYONE ELSE PERMITTED TO ENTER THE WORK AREA
(E.G. INSPECTORS, OWNERS, ETC.).
11. ALL MATERIALS, PARTS, AND EQUIPMENT FURNISHED BY THE CONTRACTOR FOR THIS
PROJECT SHALL BE NEW, HIGH GRADE AND FREE FROM DEFECTS. QUALITY OF WORK
SHALL BE TO GENERALLY ACCEPTED STANDARDS. MATERIALS AND WORK QUALITY
ARE SUBJECT TO THE ENGINEER'S APPROVAL. MATERIALS AND WORK NOT
CONFORMING TO THE CONSTRUCTION DOCUMENTS SHALL BE CONSIDERED
DEFECTIVE AND SUBJECT TO REJECTION. DEFECTIVE WORK OR MATERIAL, WHETHER
IN PLACE OR NOT, SHALL BE REMOVED IMMEDIATELY FROM THE SITE BY THE
CONTRACTOR, AT ITS EXPENSE, WHEN SO DIRECTED BY THE CONTRACTING OFFICER.
IF THE CONTRACTOR FAILS TO REPLACE ANY DEFECTIVE OR DAMAGED WORK OR
MATERIAL AFTER REASONABLE NOTICE, THE CONTRACTING OFFICER MAY CAUSE
SUCH WORK OR MATERIALS TO BE REPLACED, THE COST OF WHICH WILL BE
DEDUCTED FROM PAYMENTS DUE TO THE CONTRACTOR.
12. THE CONTRACTOR SHALL WARRANT ALL MATERIALS AND WORKMANSHIP FOR A
PERIOD OF TWO YEARS FOLLOWING ACCEPTANCE OF THE FINAL WALKTHROUGH
INSPECTION BY THE CMD PM. DEFECTS SHALL BE CMD PMRECTED AT NO COST TO
THE OWNER.
13. THE CONTRACTOR SHALL COMMISSION ALL EQUIPMENT IN ACCORDANCE WITH THE
CONTRACT SPECIFICATIONS AND SHALL PROVIDE FOR THE TRAINING OF ALL
OPERATIONAL STAFF THROUGHOUT THE WARRANTY PERIOD.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF SLUDGE GENERATED
BY THE MBR SYSTEM THROUGHOUT THE WARRANTY PERIOD.
15. THE CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT IN PLACE EXISTING
FEATURES NOT INCLUDED FOR DEMOLITION IN THESE PLANS. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY DAMAGES TO EXISTING FEATURES DURING
CONSTRUCTION ACTIVITIES AND SHALL REPAIR OR REPLACE DAMAGED FEATURES AT
ITS OWN EXPENSE.
16. THE WORK AREA IS AN OPERATING TRAINING FACILITY FOR THE CALIFORNIA ARMY
NATIONAL GUARD. IT IS LIKELY THAT TRAINING MAY BE IN PROGRESS DURING
EXECUTION OF THIS WORK. THE CONTRACTOR SHALL COORDINATE HIS WORK AND
THE WORK OF HIS SUBCONTRACTORS TO ENSURE A MINIMAL IMPACT TO THE
OPERATIONS AT CAMP ROBERTS.
17. UNLESS SPECIFIED OTHERWISE, SUBMITTALS WILL BE REQUIRED FOR ALL MATERIALS
TO BE USED FOR CONSTRUCTION. SHOP DRAWINGS WILL BE REQUIRED FOR ALL
ITEMS THAT WILL BE FABRICATED FOR THE WORK. THE CONTRACTOR SHALL HANDLE
SUBMITTALS AS DESCRIBED IN SECTION 01 22 00 OF THE UFGS. THE CMD PM CAN
WAIVE THIS REQUIREMENT FOR MINOR ITEMS AT HIS DISCRETION.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING LOCAL SURVEYING
CONTROL. SUCH CONTROL SHALL USE THE CALIFORNIA STATE PLANE COORDINATE
SYSTEM (ZONE 4), THE HORIZONTAL DATUM FOR THE PROJECT SHALL BE THE NORTH
AMERICAN DATUM OF 1983 (NAD 83). THE VERTICAL DATUM SHALL BE THE NORTH
AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).
19. THE CA ARNG WILL OPERATE ITS FACILITIES IN AND AROUND THE WORK AREA. THE
CONTRACTOR SHALL MAKE EVERY REASONABLE EFFORT TO ENSURE THAT WATER
(AND OTHER UTILITY) SERVICE IS DISRUPTED AS LITTLE AS POSSIBLE DURING THE
WORK. THE CONTRACTOR SHALL COORDINATE WITH THE CAMP ROBERTS
DEPARTMENT OF PUBLIC WORKS TO IDENTIFY UTILITY SHUT-OFFS IN THE EVENT THE
WORK AREA MUST BE ISOLATED.
20. THE EXISTING TREATMENT FACILITIES SHALL REMAIN IN OPERATION AT ALL TIMES
DURING THE CONSTRUCTION OF THE PROJECT TO THE EXTENT POSSIBLE. PORTABLE
OR TEMPORARY TREATMENT FACILITIES AND EQUIPMENT SHALL BE UTILIZED IF
PORTIONS OF THE EXISTING TREATMENT SYSTEM NEED TO BE BROUGHT OFFLINE
DUE TO DEMOLITION OR NEW COMPONENT TIE-INS PRIOR TO MBR COMMISSIONING.
21. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO
PROTECT EXISTING FACILITIES THAT ARE TO REMAIN IN PLACE. ALL FACILITIES
DAMAGED BY THE CONTRACTOR'S OPERATIONS SHALL BE EXPEDITIOUSLY REPAIRED
OR RECONSTRUCTED AT THE CONTRACTOR'S EXPENSE WITHOUT ADDITIONAL
COMPENSATION.
22. THE CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF ALL SURPLUS
EXCAVATION MATERIAL AND DEBRIS PROMPTLY FROM THE SITE AND SHALL MAINTAIN
THE SITE IN A NEAT AND ORDERLY CONDITION.
23. FOR WORK SEQUENCE, REFER TO SPECIFICATION SECTION 01 11 00 PART 1.2.1.
24. EXISTING FENCE AND GATES SHALL BE PROTECTED IN PLACE UNLESS NOTED
OTHERWISE.
25. LOCATION AND DEPTH OF (E) UTILITIES SHOWN ARE BASED ON AVAILABLE DRAWINGS
AND OBSERVABLE SURFACE FEATURES. CONTRACTOR SHALL POTHOLE AND FIELD
VERIFY DEPTH AND LOCATION OF ALL UTILITIES, (IN PARTICULAR AT CONNECTION
AND PIPE CROSSING POINTS).
26. CONTRACTOR SHALL GRADE SITE TO PRE-CONSTRUCTION CONDITIONS AND
RESTORE EXISTING ACCESS ROADS TO PRE-CONSTRUCTION CONDITIONS UNLESS
OTHERWISE NOTED ON THE DRAWINGS.
27. SPECIAL INSPECTIONS SHALL BE AS DESCRIBED ON SHEET S01.
28. PRIOR TO EXISTING INFRASTRUCTURE DEMOLITION, CONTRACTOR SHALL HAVE
PERFORMED A HAZARDOUS MATERIALS INSPECTION AND ASSESSMENT OF
INFRASTRUCTURE TO BE REMOVED FOR LEAD AND ASBESTOS. REMOVAL AND
DISPOSAL OF SUCH MATERIAL SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE,
AND DoD PROCEDURES.
29. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH CMD
ENVIRONMENTAL PRIOR TO ANY GROUND DISTURBANCE.\
30. THE CONTRACTOR SHALL LOCATE ALL STAGING AND EQUIPMENT STORAGE WITHIN
THE FENCED AREAS OF THE WWTP. CONTRACTOR SHALL COORDINATE FINAL
LOCATION WITH CMD PM.
GENERAL NOTES
HORIZONTAL DATUM:
CALIFORNIA STATE PLANE COORDINATE SYSTEM ZONE IV
NAD83(2010.0) CA HPGN
MEAN COMBINATION FACTOR (CF):
1.0000218950633270
DISTANCES SHOWN HEREON ARE GRID DISTANCES
TO CONVERT GRID DISTANCE TO GROUND DISTANCE ... DIVIDE BY THE CF
TO CONVERT GROUND DISTANCE TO GRID DISTANCE ... MULTIPLY BY THE CF
VERTICAL DATUM:
NAVD88 BASED ON BENCH MARK
PLATE
& AND
L ANGLE
± APPROXIMATELY
> GREATER THAN
< LESS THAN
Ø DIAMETER
% PERCENT
@ AT
AB AGGREGATE BASE, ANCHOR BOLT
AC ASPHALT CONCRETE
A.C. ALTERNATING CURRENT
ACP ASBESTOS CEMENT PIPE
ALUM ALUMINUM
APPROX APPROXIMATE
ARV AIR RELEASE VALVE
AVE AVENUE
AVG AVERAGE
ADD ADDITIONAL
AWG AMERICAN WIRE GAUGE
AWWA AMERICAN WATER WORKS ASSOCIATION
B BURIED
BF BLIND FLANGE
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BLDG BUILDING
BLKG BLOCKING
BOTT BOTTOM
BM BENCH MARK
BP BEGINNING POINT
BS BLACK STEEL
B&S BELL & SPIGOT
BV BALL VALVE
BWR BACKWASH RETURN WATER
C CONCRETE ENCASED
, C/L CENTERLINE
CA COMPRESSED AIR
CAV COMBINATION AIR-VACUUM RELEASE
VALVE
CB CATCH BASIN
CC CENTER TO CENTER
CDF CONTROLLED DENSITY FILL
CF CUBIC FEET
CFS CUBIC FEET PER SECOND
CI CAST IRON
CIP CAST IRON PIPE
CIPP CURED-IN-PLACE PIPE LINING
CL2 CHLORINE
CLG CHLORINE GAS
CLR CLEAR, CLEARANCE
CLS CHLORINE SOLUTION
CLSM CONTROLLED LOW STRENGTH MATERIAL
CLW CLEARWELL
CML&C CEMENT LINED & COATED
CML CEMENT MORTAR LINING
CO CLEANOUT
COMB COMBINED
COMM COMMUNICATIONS
COMP COMPACTION
CONC CONCRETE
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS
COORD COORDINATE
CMD PM CALIFORNIA MILITARY DEPARTMENT
PROJECT MANAGER
CPLG COUPLING
CSK COUNTERSINK
CTR CENTER
CTS CATHODIC PROTECTION TEST STATION
CU COPPER
D DIAMETER, DRAIN
(D) DEMOLISH
DF DITCH FLOW LINE
DFE DENITRIFYING FILTER EFFLUENT
DG DECOMPOSED GRANITE
DI DUCTILE IRON
DIA DIAMETER
DIM DIMENSION
DIP DUCTILE IRON PIPE
DN DOWN
DoD DEPARTMENT OF DEFENSE
DPW DEPARTMENT OF PUBLIC WORKS
DR DRIVE
DS DIGESTED SLUDGE
DWG DRAWING
E EAST, EXPOSED
(E) EXISTING
EA EACH
ECC ECCENTRIC
ED EQUIPMENT DRAIN
EF EACH FACE
EFF PLANT EFFLUENT
EL, ELEV ELEVATION
ELL ELBOW
ELEC ELECTRICAL
EP EDGE OF PAVEMENT
EQ EQUAL, EQUATION
EXP EXPANSION
EW EACH WAY
(F) FUTURE
FB FLAT BAR
FC FLEX COUPLING
FCA FLANGE COUPLING ADAPTER
FD FLOOR DRAIN
FES FILTER EFFLUENT SAMPLE
FF FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FIG FIGURE
FIN FINISHED
FLEX FLEXIBLE
FLG FLANGE
FLGD FLANGED
FM FLOW METER
FO FIBER OPTIC
FRP FIBERGLASS REINFORCED PLASTIC
FT FEET
FTGS FITTINGS
FURN FURNISH
GA GAUGE OR GUY ANCHOR
GALV GALVANIZED
GAL GALLON
GFI GROUND FAULT INTERRUPTER
GND GROUND
GP GUARD POST
GPM GALLON PER MINUTE
GS GALVANIZED STEEL
GSP GALVANIZED STEEL PIPE
GV GATE VALVE
H HEIGHT
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HGL HYDRAULIC GRADE LINE
HORIZ HORIZONTAL
HP HORSEPOWER
ID INSIDE DIAMETER OR IDENTIFICATION
IE INVERT ELEVATION
IN INCH
INT INTERIOR
INV INVERT
JT JOINT
JB, J-BOX JUNCTION BOX
KW KILOWATT
LB POUND
LONGIT LONGITUDINAL
LP LOW POINT
LTG LIGHTING
(M) MODIFIED
MAX MAXIMUM
MC MICRO
MCC MOTOR CONTROL CENTER
MB MACHINE BOLT
MBR MEMBRANE BIOREACTOR
MECH MECHANICAL
MEM MEMBRANE
MFR MANUFACTURER
MGD MILLION GALLONS PER DAY
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
MTR MOTOR
(N) NEW
N NORTH
NaOH SODIUM HYDROXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NO. NUMBER
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
N/A NOT APPLICABLE
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED -
CONTRACTOR INSTALLED
OG ORIGINAL GRADE
OPNG OPENING
PC "PIECE, POINT OF CURVE"
PCC POINT OF CURVE TO CURVE
PE PLAIN END, PERMANENT EASEMENT,
PRIMARY EFFLUENT
PI POINT OF INTERSECTION
PL "PLATE, PROPERTY LINE"
PLCS PLACES
POLY POLYMER
PP POWER POLE
PPD POUNDS PER DAY
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSF POUNDS PER SQUARE FOOT
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
PW PLANT WATER
R RADIUS
(R) RELOCATE
RAS RETURN ACTIVATED SLUDGE
RCP REINFORCED CONCRETE PIPE
RD ROAD
RECT RECTANGULAR
RED REDUCER
REG REGULATOR
REINF REINFORCING
REQ'D REQUIRED
R/W RIGHT OF WAY
RW RAW WASTEWATER
S SOUTH, SLOPE
SA SAMPLE
SD STORM DRAIN
SE SECONDARY EFFLUENT
SED SEDIMENTATION
SES SEDIMENTATION EFFLUENT SAMPLE
SDMH STORM DRAIN MANHOLE
SK SCUM
SS SANITARY SEWER, STAINLESS STEEL
SSMH SANITARY SEWER MANHOLE
SCH, SCHED SCHEDULE
SECT SECTION
SF SQUARE FEET
SHT,SH SHEET
SIM SIMILAR
SL SLUDGE
SPECS SPECIFICATIONS
SQ SQUARE
STA STATION
STL STEEL
STD STANDARD
t THICKNESS
T & B TOP & BOTTOM
T & G TONGUE & GROOVE
TB THRUST BLOCK
TBC TOP BACK OF CURB
TBM TEMPORARY BENCH MARK
TCE TEMPORARY CONSTRUCTION EASEMENT
TFE TRICKLING FILTER EFFLEUNT
TFR TRICKLING FILTER RECYCLE
TDH TOTAL DISCHARGE HEAD
TEL TELEPHONE
TEMP TEMPORARY
THK THICK
TOC TOP OF CONCRETE
TOS TOP OF SLAB
TV TOP OF VAULT
TYP TYPE or TYPICAL
UG UNDERGROUND
V VENT
VARS VARIES
VCP VITRIFIED CLAY PIPE
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT TO ROOF
W WEST, WATER, WIDE
W/ WITH
W/O WITHOUT
WAB WORK AREA BOUNDARY
WP WATERPROOF
WS WELDED STEEL, WATER SURFACE
WSEL WATER SURFACE ELEVATION
WSP WELDED STEEL PIPE
WWTP WASTE WATER TREATMENT PLANT
WW WASTE WATER
WWF WELDED WIRE FABRIC
C03 C04
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text
WV
AutoCAD SHX Text
GV
S
S S
S
S
S
S
ASPHALT
PAVEMENT
GATE
NEW MBR SYSTEM
LIMIT OF WORK
AREA, CONFINED
TO THE EXISTING
FENCED WWTP
FACILITY
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
O H
O H
O H
O H
O H
W
W
W
W W
W W
W W
W W
S
S
W
W
W W W W W W
W
W W
W W
W W
W W W W W W W W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
SS
S
W W
E
E
E
E
E E
E E
E
E
S S
S
S S
S
S
S S
S
S
W
W
W S
S
S
S
SS
S
S
S
S S
S S
S
S NEW SLUDGE
HANDLING
SYSTEM
PROPOSED CONTRACTOR
LAYDOWN AND STAGING AREA,
CONTRACTOR SHALL CONFIRM
LOCATION WITH THE CMD PM
NEW PERMEATE
RETENTION POND
EXISTING TREATMENT
SYSTEM BYPASS PIPE
EXISTING TREATMENT
SYSTEM BYPASS PIPE
ABANDONED
STABILIZER
TANK (TO BE
REMOVED)
NEW PERMEATE PUMP
STATION TO
RECIRCULATION PIPE
EXISTING
DENITRIFYING
SYSTEM
EXISTING
TRICKLING FILTER
TF1
EXISTING TRICKLING
FILTER TF2
(ABANDON IN PLACE)
EXISTING
PRIMARY
CLARIFIER
NEW SUBSURFACE
POWER SUPPLY
W W
TP
E N
TR
AN
C E
FR
O
M
H
IG
H W
AY
EXISTING OVERFLOW
MANHOLE
EXISTING
DIVERSION
MANHOLE
NEW TREATED WW
DISCHARGE PIPE TO
EXISTING DISCHARGE
MANHOLE
EXISTING
PERCOLATION POND
S S
HEADWORKSGRIT
CHAMBER
GRIT
CHAMBER
LAB
BUILDINGMAIN WET
WELL
EXISTING
DISCHARGE
VAULT
FLOW METER
EXISTING
DIVERSION
CHAMBER
EXISTING
OFFICE
BUILDING
REPLACE EXISTING
3-PHASE TRANSFORMER
PER SHEET E02
NEW LOW-FLOW
PUMP STATION
EXISTING SECONDARY CLARIFIER,
REPURPOSE AS EQUALIZATION TANK,
REMOVE SLUDGE ARM AND RAKE. CENTER
COLUMN AND WALKWAY TO REMAIN
DEMO
EXISTING
SLUDGE
PUMP
EXISTING WW DISCHARGE
TO PERCOLATION PONDS
NEW WWTP
PIPELINE TO MBR
NEW EQUALIZATION
TANK INLET PIPE
NEW PERMEATE
PIPELINE TO PERMEATE
RETENTION POND
EXISTING DIGESTER #1
(TO BE REMOVED)
EXISTING DIGESTER #2
(ABANDONED, TO BE
REMOVED)
MAIN GATE
DRAIN /
RECIRCULATION
NEW SCREEN COMPACTOR
AND DUMPSTER
S
S
S
MBR OVERFLOW
AND RECIRCULATION
NEW WATER
SUPPLY TO MBR
EXISTING DIGESTER PUMP
AND VALVE BUILDING
(TO BE REMOVED)
SLUDGE
WASTEWATER
DRAIN
SCALE
0 30 60 FEET
C :\W
O R
K \D
R A
FT
IN
G \C
R W
W
TP
\G
-E X
IS
TI
N G
S
IT
E P
LA
N
.D W
G
R E
VI
S
IO
N
S H
E E
T N o.
P R
O
JE
C T
N o.
FI
LE
N A
M E
C H
E C
K E
D B
Y:
A P
P R
O
VE
D B
Y:
D A
TE
D R
A W
N B
Y:
D E
S
IG
N E
R
A S
N O
TE
D
IF
N
O T
IN
CH
, A
DJ
US
T
SC
AL
E
AC
CO
RD
IN
G
LY
BA
R
SH
O
UL
D
BE
E
XA
CT
LY
IN
CH
L O
NG
S C
A
LE
D A
TE
R
E V
D E
S C
R
IP
TI
O
N
R E
V
IS
IO
N
S U
M M
A R
Y A
P P
'D B
Y
P R
E P
A R
E D
B Y
P R
E P
A R
E D
F O
R
C A
LI
FO
R N
IA
M
IL
IT
A R
Y D
E P
A R
TM
E
N T
B
E A
R H
O
LL
O W
D R
IV
E
R A
N C
H O
C O
R D
O V
A , C
A
W A
S
TE
W A
TE
R
T R
E A
TM
E
N T
P
LA
N T
U P
G R
A D
E S
P H
A S
E
C A
M P
R O
B E
R
TS
, C A
TM
H
TM
H
P M
TM
H
-3
-0 1-
/2
8/
A
D
E S
IG
N
JP
B
B
/1
7/
B R
E
VI
S
IO
N S
T O
C
IV
IL
5% D
E S
IG
N
TM
H
TM
H
/3 1/
/1
6/
C
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
T
EC
H
N O
LO
GY
D R
IV
E, S U
IT
E
C5
IR
V
IN
E, C A
LI
FO
R N
IA
-5
/0
8/
D R
E
VI
S E
D
5% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/0
7/
E
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/3
1/
0% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
W A
S
TE
W A
TE
R
T R
E A
TM
E
N T
P
LA
N T
S
IT
E P
LA
N
G
G
-E X
IS
TI
N G
S
IT
E P
LA
N
.D W
G
S H
E E
T
O F
SCOPE OF WORK
1. CLEARING, GRUBBING, SITE PREPARATION AND INSTALLATION OF SITE CONTROLS.
2. REPLACE EXISTING HEADWORKS MECHANICAL SCREEN HMI.
3. INSTALL NEW HEADWORKS MECHANICAL SCREEN SPRAY WASH, COMPACTOR, AND DISPOSAL
DUMPSTER.
4. REMOVE ACCUMULATED SLUDGE FROM THE EXISTING SLUDGE DRYING BEDS AND EXISTING
SLUDGE DIGESTERS (STORAGE TANKS) AND DISPOSE OF AT AN APPROVED FACILITY. PROVIDE
FOR SLUDGE HANDLING OF EXISTING WWTP PRIMARY CLARIFIER DURING CONSTRUCTION AND
UP TO COMMISSIONING OF MBR.
5. ABANDON, RELOCATE, AND/OR DEMOLISH EXISTING WASTE WATER TREATMENT PLANT (WWTP)
COMPONENTS TO ALLOW FOR INSTALLATION OF MEMBRANE BIOREACTOR SYSTEM(S), SLUDGE
HANDLING SYSTEM, AND ASSOCIATED COMPONENTS. REMOVE ALL ABANDONED SUBSURFACE
PIPING AND CONDUITS ENCOUNTERED DURING CONSTRUCTION.
6. ABANDON AND REMOVE EXISTING 24-INCH DIA. RCP FROM DIVERSION CHAMBER TO
SECONDARY CLARIFIER.
7. REPURPOSE EXISTING SECONDARY CLARIFIER AS MBR EQUALIZATION TANK WITH UPSTREAM
LOW-FLOW EQUALIZATION TANK BY-PASS PUMP STATION.
8. INSTALL NEW 24-INCH DIA. HDPE GRAVITY LINE FROM DIVERSION CHAMBER TO LOW-FLOW
PUMP STATION AND FROM LOW-FLOW PUMP STATION TO EQUALIZATION TANK.
9. INSTALL NEW EQUALIZATION TANK SUBMERSIBLE TRANSFER PUMPS WITH ASSOCIATED
CONTROLS.
10. TRENCH EXCAVATION AND INSTALLATION OF NEW PIPELINE(S).
11. SURFACE RESTORATION IN AREAS OF TRENCHING (MATCH EXISTING CONDITIONS WHERE
APPROPRIATE).
12. INSTALL NEW MBR SYSTEM, SLUDGE HANDLING SYSTEM, AND ASSOCIATED PIPING AND
CONCRETE PADS.
13. INSTALL NEW ELECTRICAL SERVICE AND SUBSURFACE ELECTRICAL LINE(S) PROVIDING POWER
TO THE NEW MBR SYSTEM AND ASSOCIATED COMPONENTS.
14. GRADE PERMEATE RETENTION POND AND INSTALL HDPE LINER SYSTEM. EXCESS CUT THAT
MEETS SPECIFICAITONS MAY BE UTILIZED AS BACKFILL, STOCKPILED AT THE CAMP ROBERTS
LANDFILL BORROW AREA UPON APPROVAL BY CAMP ROBERTS ENVIRONMENTAL, OR AS
DIRECTED BY THE CMD PM.
15. INSTALL NEW PERMEATE RETENTION POND PUMP STATION WITH ASSOCIATED CONTROLS.
16. PROVIDE CONTROLS AS REQUIRED FOR IMPLEMENTATION OF ALL WWTP COMPONENTS WITH
THE NEW MBR SYSTEM.
17. UPGRADE THE ELECTRICAL UTILITY SERVICE TO ACCOMMODATE NEW SYSTEM LOAD(S).
18. PROVIDE FOR REMOTE MONITORING OF WWTP COMPONENTS WITHIN EXISTING BASEWIDE
SCADA SYSTEM.
19. PERFORM STARTUP TESTING AND COMMISSIONING REQUIREMENTS AS SPECIFIED IN THE
CONTRACT DOCUMENTS.
NOTES:
1. SEE SHEETS C01 AND C02 FOR EXISTING BELOWGROUND WASTEWATER TREATMENT PLANT
PIPING AND DEMOLITION PLAN. SEE SHEET C03 FOR SITE LAYOUT AND IMPROVEMENT PLAN.
SEE SHEET C11 FOR HARDSCAPE IMPROVEMENT PLAN.
2. THE EXISTING SLUDGE DIGESTER #1 IS CURRENTLY IN USE. VOLUME OF SLUDGE CONTAINED
WITHIN THE DIGESTER AT TIME OF PROJECT CONSTRUCTION MAY VARY AND IS DEPENDANT ON
CAMP ROBERTS OCCUPANCY AND TIMING OF LAST DISPOSAL EVENT. CONTRACTOR IS
RESPONSIBLE FOR EVALUATING AND DETERMINING AMOUNT OF SLUDGE CONTAINED WITHIN
THE DIGESTER FOR REMOVAL AND DISPOSAL AT TIME OF PROJECT CONSTRUCTION.
TEMPORARY SLUDGE STORAGE AND REMOVAL SHALL BE PROVIDED BY CONTRACTOR DURING
CONSTRUCTION OF MBR AND ASSOCIATED SLUDGE HANDLING SYSTEM.
3. PERMEATE RETENTION POND CUT MATERIAL IS ASSUMED TO BE COMPRISED OF SLUDGE
MATERIAL FROM THE EXISTING DIGESTER(S). CONTRACTOR IS RESPONSIBLE FOR EVALUATING
THE THICKNESS AND DETERMINING AMOUNT OF SLUDGE MATERIAL CONTAINED WITHIN THE
EXISTING SLUDGE DRYING BEDS TO BE REMOVED. MATERIAL SHALL BE CHARACTERIZED AND
DISPOSED OF AT AN APPROVED FACILITY.
ESTIMATED DEMOLITION AND BACKFILL IMPORT EARTHWORK VOLUMES
APPROXIMATE VOLUME OF NON-STRUCTURAL IMPORT BACKFILL: ~500 CY
APPROXIMATE VOLUME OF STRUCTURAL IMPORT BACKFILL: ~2,500 CY
FENCE LINE
WATER
SANITARY SEWER
ELECTRICAL (UNDERGROUND)
S
E x
W
EXISTING GRADES (MAJOR - 5 FOOT)
EXISTING GRADES (MINOR - 1 FOOT)
ELECTRICAL (OVERHEAD)OH
LEGEND
SUBJECT LINES (PROPOSED CONSTRUCTION)
EXISTING CONDITIONS
N
PROPOSED GRADES (MAJOR - 5 FOOT)
PROPOSED GRADES (MINOR - 1 FOOT)
LIMIT OF GRADING
PERMEATE RETENTION POND GRADING
APPROXIMATE GRADED AREA: 38,100 SQ. FT.
APPROXIMATE CUT: 1,265 CUBIC YD
APPROXIMATE FILL: 37 CUBIC YD.
APPROXIMATE NET (CUT): 1,228 CUBIC YD. (SEE NOTE 3)
ESTIMATED SLUDGE VOLUME FOR REMOVAL AND DISPOSAL
APPROXIMATE VOLUME OF SLUDGE WITHIN DRYING BEDS: ~2,500 CY (SEE NOTE 3)
APPROXIMATE VOLUME OF SLUDGE IN DIGESTER #1: VARIES (SEE NOTE 2)
APPROXIMATE VOLUME OF SLUDGE IN DIGESTER #2: EMPTY
REFERENCE: EXISTING ELEVATIONS AND TOPOGRAPHIC CONTOURS ARE APPROXIMATE AND ARE BASED ON TOPOGRAPHIC INFORMATION PROVIDED BY ANDREGG GEOMATICS, DATED FEBRUARY 13, 2013. CONTRACTOR SHALL FIELD VERIFY ELEVATIONS.
FLOW PROFILE - LOW FLOW SCENARIO
(E) HEADWORKS
(E) DIVERSION
CHAMBER
EL 581.4
(E) PERCOLATION
PONDS
EL 582.10
EL 578.00 EL 577.80
(E) MH 1
(N) MBR PACKAGE PLANT
EL 578.50
IE 566.00
EL 566.00
(E) 24" RCP
IE 577.41
BOTTOM OF
CHANNEL
EL. 578.47
(E) 24" RCP
IE: 578.62
(E) 24" RCP
IE: 578.47
48" STAND PIPE
AUTOMATED SELF
CLEANING SCREEN
HORZ: NTS
VERT: 1" = 4'
FLOW PROFILE - PERMEATE RECIRCULATION
HORZ: NTS
VERT: 1" = 4'
(N) PERMEATE
RETENTION POND
PUMP STATION
(N) MBR PACKAGE PLANT
EL 578.00
EL 570.00
EL 564.00
(N) PERMEATE RETENTION POND
(FORMERLY SLUDGE DRYING BEDS)
(N) LOW FLOW
PUMP STATION(N) 24" HDPE
IE 573.39
EL 578.9
EL 578.00
ELEV 565.00
EL 578.00
6" HDPE (RECIRCULATE
TO LOW-FLOW WET WELL)
(N) 24" HDPE
IE 577.00
(N) 4" HDPE / SS
6" SS (PERMEATE TO
RETENTION POND)
(N) 8" HDPE TREATED WW PIPE
4" HDPE
IE: 568.00
EL 570.64
EXISTING INFRASTRUCTURE
EXISTING INFRASTRUCTURE
EL 587.00
(N) LOW FLOW
PUMP STATION
DISCHARGE TO MBR
(SEE LOW-FLOW
PROFILE)
(N) 6" HDPE / SS
IN-SPEC TREATED WW MBR DISCHARGE
(PER CLOACINA DISCHARGE VALVE CLUSTER)
OUT-OF-SPEC TREATED WW MBR
DISCHARGE (PER CHLOACINA
DISCHRAGE VALVE CLUSTER)
FL
O
W P
R O
FI
LE
L
O W
F
LO
W A
N D
P E
R M
E A
TE
R
E C
IR
C
U
LA
TI
O
N G
G
H Y
D R
A U
LI
C
P R
O
FI
LE
.D
W G
C :\W
O R
K \D
R A
FT
IN
G \C
R W
W
TP
\G
H
Y D
R A
U
LI
C P
R O
FI
LE
.D W
G
S H
E E
T
O F
R E
VI
S
IO
N
S H
E E
T N o.
P R
O
JE
C T
N o.
FI
LE
N A
M E
C H
E C
K E
D B
Y:
A P
P R
O
VE
D B
Y:
D A
TE
D R
A W
N B
Y:
D E
S
IG
N E
R
A S
N O
TE
D
IF
N
O T
IN
CH
, A
DJ
US
T
SC
AL
E
AC
CO
RD
IN
G
LY
BA
R
SH
O
UL
D
BE
E
XA
CT
LY
IN
CH
L O
NG
S C
A
LE
D A
TE
R
E V
D E
S C
R
IP
TI
O
N
R E
V
IS
IO
N
S U
M M
A R
Y A
P P
'D B
Y
P R
E P
A R
E D
B Y
P R
E P
A R
E D
F O
R
C A
LI
FO
R N
IA
M
IL
IT
A R
Y D
E P
A R
TM
E
N T
B
E A
R H
O
LL
O W
D R
IV
E
R A
N C
H O
C O
R D
O V
A , C
A
W A
S
TE
W A
TE
R
T R
E A
TM
E
N T
P
LA
N T
U P
G R
A D
E S
P H
A S
E
C A
M P
R O
B E
R
TS
, C A
TM
H
TM
H
P M
TM
H
-3
-0 1-
/2
8/
A
D
E S
IG
N
JP
B
B
/1
7/
B R
E
VI
S
IO
N S
T O
C
IV
IL
5% D
E S
IG
N
TM
H
TM
H
/3 1/
/1
6/
C
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
T
EC
H
N O
LO
GY
D R
IV
E, S U
IT
E
C5
IR
V
IN
E, C A
LI
FO
R N
IA
-5
/0
8/
D R
E
VI
S E
D
5% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/0
7/
E
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/3
1/
0% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
NOTES:
1. THE WATER SURFACE DOWNSTREAM OF THE EQUALIZATION TANK IS A
CONSTANT AND IS DEFINED BY THE PUMPING RATE OF THE PUMPING
UNITS THAT SUPPLY THE MBR SYSTEM.
2. THE WATER SURFACE IN THE PERCOLATION PONDS WILL BE SUBJECT TO
TWO FACTORS --- THE ACTUAL PERCOLATION CAPACITY AND THE
BYPASS FLOW (WHEN IT OCCURS).
FLOW PROFILE - EQUALIZATION TANK
(E) HEADWORKS
(E) DIVERSION
CHAMBER
EL 581.4
EL 582.10
(N) MBR PACKAGE PLANT
(E) 24" RCP
IE 577.41
BOTTOM OF
CHANNEL
EL. 578.47
(E) 24" RCP
IE: 578.62 (E) 24" RCP
IE: 578.47
AUTOMATED SELF
CLEANING SCREEN
HORZ: NTS
VERT: 1" = 4'
EL 578.3
(N) LOW FLOW
PUMP STATION
EL 578.00
EQUALIZATION TANK
(FORMERLY SECONDARY
CLARIFIER)
(N) 24" HDPE
IE 572.08
(E) PERCOLATION
PONDS
EL 578.00 EL 577.80
(E) MH 1
EL 578.50
IE 566.00
EL 566.00
(E) 48" STAND PIPE
ELEV 565.00
(N) 24" HDPE
IE 573.14
(N) 24" HDPE
IE 573.39
(N) 24" HDPE
IE 577.00
(N) 6" HDPE / SS WW PIPE
(N) 8" HDPE TREATED WW PIPE
EL 570.64
EXISTING INFRASTRUCTURE
EL 587.00
EXISTING INFRASTRUCTURE
EXISTING INFRASTRUCTURE
IN-SPEC TREATED WW MBR DISCHARGE
(PER CLOACINA DISCHARGE VALVE CLUSTER)
FL
O
W P
R O
FI
LE
E
Q U
A
LI
Z A
TI
O
N T
A N
K G
G
H Y
D R
A U
LI
C
P R
O
FI
LE
.D
W G
C :\W
O R
K \D
R A
FT
IN
G \C
R W
W
TP
\G
H
Y D
R A
U
LI
C P
R O
FI
LE
.D W
G
S H
E E
T
O F
R E
VI
S
IO
N
S H
E E
T N o.
P R
O
JE
C T
N o.
FI
LE
N A
M E
C H
E C
K E
D B
Y:
A P
P R
O
VE
D B
Y:
D A
TE
D R
A W
N B
Y:
D E
S
IG
N E
R
A S
N O
TE
D
IF
N
O T
IN
CH
, A
DJ
US
T
SC
AL
E
AC
CO
RD
IN
G
LY
BA
R
SH
O
UL
D
BE
E
XA
CT
LY
IN
CH
L O
NG
S C
A
LE
D A
TE
R
E V
D E
S C
R
IP
TI
O
N
R E
V
IS
IO
N
S U
M M
A R
Y A
P P
'D B
Y
P R
E P
A R
E D
B Y
P R
E P
A R
E D
F O
R
C A
LI
FO
R N
IA
M
IL
IT
A R
Y D
E P
A R
TM
E
N T
B
E A
R H
O
LL
O W
D R
IV
E
R A
N C
H O
C O
R D
O V
A , C
A
W A
S
TE
W A
TE
R
T R
E A
TM
E
N T
P
LA
N T
U P
G R
A D
E S
P H
A S
E
C A
M P
R O
B E
R
TS
, C A
TM
H
TM
H
P M
TM
H
-3
-0 1-
/2
8/
A
D
E S
IG
N
JP
B
B
/1
7/
B R
E
VI
S
IO
N S
T O
C
IV
IL
5% D
E S
IG
N
TM
H
TM
H
/3 1/
/1
6/
C
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
T
EC
H
N O
LO
GY
D R
IV
E, S U
IT
E
C5
IR
V
IN
E, C A
LI
FO
R N
IA
-5
/0
8/
D R
E
VI
S E
D
5% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/0
7/
E
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/3
1/
0% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
NOTES:
1. THE WATER SURFACE DOWNSTREAM OF THE EQUALIZATION TANK IS A
CONSTANT AND IS DEFINED BY THE PUMPING RATE OF THE PUMPING
UNITS THAT SUPPLY THE MBR SYSTEM.
2. THE WATER SURFACE IN THE PERCOLATION PONDS WILL BE SUBJECT TO
TWO FACTORS --- THE ACTUAL PERCOLATION CAPACITY AND THE
BYPASS FLOW (WHEN IT OCCURS).
003-5
FGV
003-4
FGV
N E
W
-IN
C
H D
I ( G
R A
NEW 6-INCH SS (GRA)
NEW 6-INCH HDPE
EXISTING 24-INCH
PIPE (GRA)
24-INCH PIPE
(GRA)
SLG-210
(E) SLG-117 (INSPECT &
REPLACE AS NECESSARY)
SLG-211SLG-116
FM
DIVERSION
MANHOLE
(ELEV 567.5')
EXISTING SECONDARY
CLARIFIER
(REPURPOSED
EQUALIZATION TANK)
RAW WASTEWATER
RAW WASTEWATER ROLL OFF
BIN
MBR PACKAGE PLANT
(CLOACINA DESIGNED/SUPPLIED)
(SEE PSHEET 02 FOR PROCESS)
MANUAL
SCREEN
PARSHALL FLUME
W/ EXISTING FLOW
SENSOR/TRANSMITTER
AND PANEL
GRIT CHAMBER
(APPROXIMATELY
850,000 GALLON
STORAGE CAPACITY)
EXISTING
DIVERSION
CHAMBER
(ELEV 569.5')
GRIT CHAMBER
MECHANICAL
SCREEN
SCREENINGS
DUMPSTER
E X
IS
TI
N G
-IN
C
H P
IP
E
G
R A
TO LANDFILL OR
OTHER WASTE
DISPOSAL FACILITY
HDPE LINED PERMEATE
RETENTION POND
(FORMER SLUDGE
DRYING BEDS)
(ELEV 570.0)
PERCOLATION POND
(ELEV 570.0')
EXISTING 18 -INCH PIPE (GRA)
EXISTING OVERFLOW MAHHOLE
(FORMER SECONDARY EFFLUENT
PUMP STATION)
(ELEV 563.5')
EXISTING DISCHARGE
MANHOLE MH-1
(ELEV 566.0')
EXISTING 18 -INCH PIPE (GRA)
PERMEATE
RETENTION POND
PUMP STATION
(ELEV 568.0')
002-5
FGV
002-4
FGV
001-1
FGVN
E W
-IN
C H
H D
P E
G
R A
SP-5 SP-6
LT
PERCOLATION POND
(ELEV 568.0')
PERCOLATION POND
(ELEV 566.0')
DISCHARGE
VAULT
REPLACE 24-INCH
PIPE (GRA)
NEW 6-INCH HDPE (PRES)
LT
005-1
FGV
EXISTING CLARIFIER
DISCHARGE (USED FOR
EMERGENCY OVERFLOW)
EXISTING MANHOLE
003-1
FGV
002-1
FGV
SP-1
LLS
HLS
LLS
HLSLT
003-2
FGV
002-2
FGV
24-INCH HDPE
PIPE (GRA)
N E
W
-IN
C
H H
D P
E P
IP
E
P
R E
S
(L O
W F
LO
W
LOW FLOW WET
WELL
003-3
FGV
002-3
FGV
LLS
HLS
SECONDARY
CONTAINMENT
SECONDARY
CONTAINMENT
SECONDARY
CONTAINMENT
SCREEN
WASH AND
COMPACTOR HHLS
HHLS
HHLS
SP-2 SP-3 005-4
FGV
N E
W
-IN
C
H H
D P
E (G
R A
DRYPAC SLUDGE HANDLING SYSTEM
(CLOACINA DESIGNED/SUPPLIED)
TREATED MBR DISCHARGE
M B
R O
V E
R
FL
O W
R
E C
IR
C
U
LA
TI
O
N
NEW 4-INCH HDPE
AUTOMATED EFFLUENT
VALVE CLUSTER,
CLOACINA SUPPLIED
(SEE NOTE 1)
2-INCH HDPE
PIPE (GRA)
005-3
FGV
C :\W
O R
K \D
R A
FT
IN
G \C
R W
W
TP
\P
P
ID
.D W
G
W W
TP
S
IT
E
P R
O C
E S
S F
LO
W
D
IA
G R
A M
P
P
P
ID
.D W
G
S H
E E
T
O F
GATE OR GENERIC
VALVE
STOP CHECK VALVE
SWING CHECK VALVE
AIR RELEASE VALVE
KNIFE VALVE
BALL CHECK VALVE
CHECK VALVE
BALL VALVE
PLUG VALVE
ECCENTRIC
PLUG VALVE
BUTTERFLY VALVE
SP-1
PRESSURE RELIEF VALVE
PUMP CONTROL VALVE
SOLENOID VALVE 2-WAY
CENTRIFUGAL PUMP
SUBMERSIBLE PUMP
DRAIN
AIR RELIEF VALVE
PROCESS LINE FROM ANOTHER SHEET
(MATCH LETTERS)
PROCESS LINES CROSSING
(NOT CONNECTED)
ELECTRICAL DIRECTION ARROW
FLOW ARROW FOR PROCESS PIPING
PROCESS LINE GOING TO ANOTHER
SHEET (MATCH LETTERS)
ELECTRICAL SIGNAL
EXISTING PROCESS PIPING AND EQUIPMENT
PROCESS PIPING
PRESSURE
PRESSURE SWITCH
POUNDS PER SQUARE INCH
PROCESS VARIABLE
RETURN ACTIVATED SLUDGE
RAW WATER
REMOTE
RADIO FREQUENCY
REMOTE INPUT OUTPUT
RAW SEWAGE
RAW SEWAGE PUMP
RESET
RESISTANCE TEMPERATURE DETECTOR
REMOTE TELEMETRY UNIT
RUN (FAST SPEED)
RUN (SLOW SPEED)
SLUDGE BLANKET
SERVICE ENTRANCE EQUIPMENT
SERVICE ENTRANCE SECTION
SINGLE LOOP CONTROLLER
START-LOCK-OFF-STOP
SULFUR DIOXIDE
SOLENOID OPERATED VALVE
SET POINT
SPEED
SPARE
START/STOP (MAINTAINED)
SOLID STATE STARTER (SOFT START)
MOTOR STARTER
TEMPERATURE ALARM HIGH
TEMPERATURE AND/OR MOISTURE
TEMPERATURE
TEMPERATURE SWITCH
TOTAL SUSPENDED SOLIDS
UNDERGROUND
UP/STOP/DOWN
VOLT
VARIABLE FREQUENCY DRIVE
WATER
WASTE ACTIVATED SLUDGE
WASTEWATER
TRANSMITTER
POSITION (i.e. LIMIT) SWITCH
PRES
PS
PSI
PV
RAS
RAW
REM
RF
RIO
RS
RSP
RST
RTD
RTU
RUNf RUNs
SB
SEQ
SES
SLC
SLOS
SO2
SOV
SP
SPD
SPR
SS
SSS
STR
TAH
T/M
TEMP
TS
TSS
UG
USD
V
VFD
W
WAS
WW
XMTR
ZS
JB
L, LO
LAN
LC
LCP
LIT
LOS
LR
LS
M
MA
mA
MC
MCC
MCP
MFR(S)
MGD
MG/L
MH
MLR
MO
MOD
MTU
NPW
NS
NTU
O/C
OCA
OCR
OIT
OL
OO
OOA
OOR
OSC
PAH
PDIT
PDS
PER
PIT
PLC
PNL
PO
POS
POT
PPG
PPH
PPM
PR
A
AFD
AI
AIC
ARV
AO
AS
ATS
AUTO
CB
CL2
CON
CU
CV
DCS
DI
DO
DP
DWG
EGO
ETM
ETMf ETMs
EOL
ELEV
EXIST
FA
FC
FE
FIT
FR
FS
FVNR
FW
GND
GAL
GPD
GPH
GPM
GRA
H, HI
H2S
HMI
HOA
I
IO
IOE
AMPERE
ADJUSTABLE FREQUENCY DRIVE
ANALOG INPUT
AMPS INTERRUPTING CAPACITY
AIR RELIEF VALVE
ANALOG OUTPUT
AIR SUPPLY
AUTOMATIC TRANSFER SWITCH
AUTOMATIC
CIRCUIT BREAKER
CHLORINE
CONTACTOR
COPPER
CONTROL VALVE
DISTRIBUTED CONTROL SYSTEM
DISCRETE INPUT
DISSOLVED OXYGEN, DISCRETE OUTPUT
DIFFERENTIAL PRESSURE
DRAWING
EMERGENCY GAS OFF
ELAPSED TIME METER
ELAPSED TIME METER (FAST SPEED)
ELAPSED TIME METER (SLOW SPEED)
ELECTRONIC OVERLOAD
MEAN SEA LEVEL ELEVATION
EXISTING
FOUL AIR
FAIL CLOSED
FINAL EFFLUENT
FLOW INDICATING TRANSMITTER
FORWARD-REVERSE
FLOAT SWITCH
FULL VOLTAGE NON-REVERSING
FINISHED WATER
GROUND
GALLONS
GALLONS PER DAY
GALLONS PER HOUR
GALLONS PER MINUTE
GRAVITY
HIGH
HYDROGEN SULFIDE
HUMAN MACHINE INTERFACE
HAND-OFF-AUTO
CURRENT
INPUT/OUTPUT
INTERNAL-OFF-EXTERNAL
JUNCTION BOX
LOW
LOCAL AREA NETWORK
LOOP CONTROLLER
LOCAL CONTROL PANEL
LEVEL INDICATING TRANSMITTER
LOCK-OFF-STOP
LOCAL/REMOTE
LEVEL (i.e.. FLOAT) SWITCH
METER
MANUAL/AUTO
MILLIAMP
MANUFACTURE CABLE
MOTOR CONTROL CENTER
MOTOR CIRCUIT PROTECTOR
MANUFACTURER(S)
MILLION GALLONS PER DAY
MILLIGRAMS PER LITER
MANHOLE
MIXED LIQUOR RETURN
MOISTURE
MODULATED
MASTER TELEMETRY UNIT
NON-POTABLE WATER
NITROGEN SUPPLY
TURBIDITY
OPEN / CLOSE
OPEN-CLOSE-AUTO
OPEN-CLOSE-REMOTE
OPERATOR INTERFACE TERMINAL
OVERLOAD
ON/OFF (MAINTAINED)
ON-OFF-AUTO
ON-OFF-REMOTE
OPEN-STOP-CLOSE
PRESSURE ALARM HIGH
PRESSURE DIFFERENTIAL INDICATING TRANSMITTER
PRESSURE DIFFERENTIAL SWITCH
PERMISSIVE
PRESSURE INDICATING TRANSMITTER
PROGRAMMABLE LOGIC CONTROLLER
PANEL
PULSE OUTPUT
POSITION
POTENTIOMETER
POUNDS PER GALLON
POUNDS PER HOUR
PARTS PER MILLION
PAIR
FUTURE PIPING AND EQUIPMENT
PINCH VALVE
3-WAY VALVE
4-WAY VALVE
ANGLE VALVE
DIAPHRAGM VALVE
DIAPHRAGM VALVE
(ALTERNATE)
GLOBE VALVE
HAND VALVE
PRESSURE REGULATOR WITH
REMOTE PROCESS
CONNECTION
PRESSURE REGULATOR SELF
CONTAINED
SOLENOID VALVE 3-WAY
FLOW CONTROL VALVE
VACUUM RELIEF VALVE
PROCESS EQUIPMENT AND SYMBOLS PROCESS LINE SYMBOLSPROCESS ABBREVIATIONS
PIPE REDUCER
SCHEDULE OF VALVES
VALVE DESIGNATION SIZE TYPE MATERIAL OF CONSTRUCTION SERVICE
FGV 001 6-INCH GATE DI BURIED/EXPOSED
FGV 002 4-INCH GATE DI BURIED/EXPOSED
FGV 003 4-INCH CHECK DI BURIED/EXPOSED
FGV 004 8-INCH GATE DI BURIED/EXPOSED
FGV 005 6-INCH BUTTERFLY SS EXPOSED
SCHEDULE OF PUMPS
PUMP DESIGNATION FLOWRATE POWER DESCRIPTION TYPE MANUFACTURER / MODEL OR EQUAL
SP-1 75 GPM 1 HP LOW-FLOW LIFT STATION SUBMERSIBLE GOULDS WS10BF
SP-2 250 GPM 3 HP EQ LIFT STATION SUBMERSIBLE EBARA 100DLMFU63.7
SP-3 250 GPM 3 HP EQ LIFT STATION SUBMERSIBLE EBARA 100DLMFU63.7
SP-5 75 GPM 0.5 HP PERMEATE RECIRCULATION SUBMERSIBLE GOULDS WS05BF
SP-6 75 GPM 0.5 HP PERMEATE RECIRCULATION SUBMERSIBLE GOULDS WS05BF
R E
VI
S
IO
N
S H
E E
T N o.
P R
O
JE
C T
N o.
FI
LE
N A
M E
C H
E C
K E
D B
Y:
A P
P R
O
VE
D B
Y:
D A
TE
D R
A W
N B
Y:
D E
S
IG
N E
R
A S
N O
TE
D
IF
N
O T
IN
CH
, A
DJ
US
T
SC
AL
E
AC
CO
RD
IN
G
LY
BA
R
SH
O
UL
D
BE
E
XA
CT
LY
IN
CH
L O
NG
S C
A
LE
D A
TE
R
E V
D E
S C
R
IP
TI
O
N
R E
V
IS
IO
N
S U
M M
A R
Y A
P P
'D B
Y
P R
E P
A R
E D
B Y
P R
E P
A R
E D
F O
R
C A
LI
FO
R N
IA
M
IL
IT
A R
Y D
E P
A R
TM
E
N T
B
E A
R H
O
LL
O W
D R
IV
E
R A
N C
H O
C O
R D
O V
A , C
A
W A
S
TE
W A
TE
R
T R
E A
TM
E
N T
P
LA
N T
U P
G R
A D
E S
P H
A S
E
C A
M P
R O
B E
R
TS
, C A
TM
H
TM
H
P M
TM
H
-3
-0 1-
/2
8/
A
D
E S
IG
N
JP
B
B
/1
7/
B R
E
VI
S
IO
N S
T O
C
IV
IL
5% D
E S
IG
N
TM
H
TM
H
/3 1/
/1
6/
C
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
T
EC
H
N O
LO
GY
D R
IV
E, S U
IT
E
C5
IR
V
IN
E, C A
LI
FO
R N
IA
-5
/0
8/
D R
E
VI
S E
D
5% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/0
7/
E
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/3
1/
0% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
NOTES:
1. MBR SYSTEM EFFLUENT SHALL BE FITTED WITH AUTOMATED VALVES TO ALLOW
FOR OUT-OF-SPEC EFFLUENT TO BE DISCHARGED TO THE PERMEATE RETENTION
POND. IN-SPEC EFFLUENT SHALL BE DISCHARGED TO THE EXISTING DISCHARGE
MANHOLE. CLOACINA SHALL PROVIDE AUTOMATED VALVING TO BE ACTUATED BY
THE MBR PLC BASED ON TREATED WASTEWATER QUALITY PARAMETERS.
CONTRACTOR SHALL CONNECT IN-SPEC AND OUT-OF-SPEC DISCHARGE PIPING IN
ACCORDANCE WITH CLOACINA PROVIDED MBR SYSTEM.
AutoCAD SHX Text P03 /A
AutoCAD SHX Text P03 /A
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
FAS
CHAMBER
CLEAR WELL
MEM 2 MEM 1 CHAMBER
PERMEATE
PERMEATE
PERMEATE
FAS
FAS
FAS
WAS
MEM 3
R A
S
RAS
RAS
CHAMBER 2
RAS
CHAMBER 1
WW
ANOXIC
CHAMBER RB CHAMBER RA
AERATION
ANOXIC
CHAMBER LB CHAMBER LA
AERATION
WW
WW
PF
PF
PF
WW
POST FINE SCREEN INFLUENT
TREATED WASTE WATER
SURFACE DISCHARGE TO
EXISTING PERCOLATION
PONDS
R A
S
WW
WAS
WW
WW
CHAMBER MB CHAMBER MB
AERATION ANOXIC
TO DRYPAC SLUDGE
PROCESS SYSTEM
W A
S
W A
S
RAS WAS
WW
WW WAS
CLOACINA MEMPAC-M6 MBR
OUT-OF-SPEC TREATED
WASTE WATER
DISCHARGE TO
PERMEATE RETENTION
POND
AUTOMATED VALVE CLUSTER, IN-SPEC WW
DIRECTED TO PERCOLATION PONDS,
OUT-OF-SPEC WW DIRECTED TO PERMEATE
RETENTION POND (CLOACINA PROVIDED AND
CONTROLLED)
M B
R P
R O
C E
S S
F
LO
W D
IA
G
R A
M P
P
P
ID
.D
W G
S H
E E
T
O F
R E
VI
S
IO
N
S H
E E
T N o.
P R
O
JE
C T
N o.
FI
LE
N A
M E
C H
E C
K E
D B
Y:
A P
P R
O
VE
D B
Y:
D A
TE
D R
A W
N B
Y:
D E
S
IG
N E
R
A S
N O
TE
D
IF
N
O T
IN
CH
, A
DJ
US
T
SC
AL
E
AC
CO
RD
IN
G
LY
BA
R
SH
O
UL
D
BE
E
XA
CT
LY
IN
CH
L O
NG
S C
A
LE
D A
TE
R
E V
D E
S C
R
IP
TI
O
N
R E
V
IS
IO
N
S U
M M
A R
Y A
P P
'D B
Y
P R
E P
A R
E D
B Y
P R
E P
A R
E D
F O
R
C A
LI
FO
R N
IA
M
IL
IT
A R
Y D
E P
A R
TM
E
N T
B
E A
R H
O
LL
O W
D R
IV
E
R A
N C
H O
C O
R D
O V
A , C
A
W A
S
TE
W A
TE
R
T R
E A
TM
E
N T
P
LA
N T
U P
G R
A D
E S
P H
A S
E
C A
M P
R O
B E
R
TS
, C A
TM
H
TM
H
P M
TM
H
-3
-0 1-
/2
8/
A
D
E S
IG
N
JP
B
B
/1
7/
B R
E
VI
S
IO
N S
T O
C
IV
IL
5% D
E S
IG
N
TM
H
TM
H
/3 1/
/1
6/
C
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
T
EC
H
N O
LO
GY
D R
IV
E, S U
IT
E
C5
IR
V
IN
E, C A
LI
FO
R N
IA
-5
/0
8/
D R
E
VI
S E
D
5% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/0
7/
E
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/3
1/
0% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
C :\W
O R
K \D
R A
FT
IN
G \C
R W
W
TP
\P
P
ID
.D W
G
REFERENCE: MBR PROCESS FLOW DIAGRAM PROVIDED BY CLOACINA DRAWING,
STANDARD MEMPAC-M6 BARDENPHO WASTE WATER TREATMENT PLANT, SHEET
NUMBER P-001, REVISION A
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
O H
O H
O H
O H
O H
O H
O H
TRICKLING FILTER TF1
TRICKLING FILTER TF2
PRIMARY CLARIFIER
(E) SECONDARY
CLARIFIER
LAB
BUILDING
DIGESTER
DIGESTER
(ABANDONED)
STABILIZER
TANK
(ABANDONED)
TBM
CHAIN LINK
FENCE
3" GI PIPE
WATER LINE
TRANSFORMER PLATFORM
WATER SUPPLY
BACKFLOW PREVENTER
EXISTING 18" PIPE
EXISTING 8" DFE
MH 1
EXISTING 4" HDPE
WATER
4" PW
REPURPOSE EXISTING DENITRIFICATION BLDG FOR
STORAGE, OR IN ACCORDANCE WITH CMD PM
DIRECTION
GATE
DENITRIFYING FILTER AND ASSOCIATED
EQUIPMENT (DECOMMISSION AND
REMOVE AFTER MBR STARTUP IN
ACCORDANCE WITH CMD PM DIRECTION)
6" SE
2" PW
HOSE BIBB
AND HOSE RACK
4" HDPE
WATER LINE
6" CI PIPE
2" GI PIPE WATER LINE
2" HDPE
WATER LINE
DEMO AND REMOVE EXISTING PUMP
STATION AND WET WELL (SEE NOTE 1)
WALL AND SLIDE
GATE
8" TFE
6" CI
PIPE
24" RCP
DEMO/ABANDON 24" RCP
ABANDON 24" RCP
OVERFLOW MANHOLE
(SECONDARY EFFLUENT
PUMP STATION)
ASPHALT
PAVEMENT
24" RCP
DIVERSION
CHAMBER
24" RCP
2" GI PIPE
6" CI PIPEGRIT
CHAMBER
SCREEN
HEADWORKS
SERVICE
POLE
FLOW
METER
GRIT
CHAMBER
24" RCP
24" RCP
16" PIPE
TFI UNDERFLOW
OUTLET BOX
24" CONC.
PIPE
MH-BURIED
MH
PP
PP PP
PP
PP
GATE
HB
HB
HB
HB
18" PIPE
21" GRAVITY
INFLUENT
18" GRAVITY
INFLUENT 6" CI PIPE
SLUDGE LINE
1" GI PIPE
WATER LINE
2" PVC PIPE
WATER LINE
2" PVC PIPE
WATER LINE
6" CI
PIPE
24" CONC.
PIPE
2" CI PIPE
6" CI PIPE (ABANDON)
2" GI PIPE
3" GAS
EXISTING FENCING SHALL BE
MOVED TO ACCOMMODATE
NEW EQUIPMENT FOOTPRINT,
REPLACE TO MATCH EXISTING
EXISTING SLUDGE
DRYING POND
EXISTING SLUDGE
DRYING POND
MTSGROUND ROD
#2/0 CUG
SECONDARY PULL
BOXES H20 RATED
ELECTRICAL
LINE
ELECTRICAL
LINE
EFFLUENT PUMP
STATION PULL BOXES
H20 RATED
TO
PE
R C
O
LATIO
N
PO
N
D S
DEMO
EXISTING TANK
WATER LINE
REMOVE ASSOCIATED
SLUDGE DRYING POND
EQUIPMENT AND PIPELINES
REMOVE ASSOCIATED
SLUDGE DRYING POND
EQUIPMENT AND PIPELINES
REMOVE OVERFLOW
MANHOLE PUMP EQUIPMENT
W
AS
TE
W
ATE
R
FR
O
M M
AIN
G
AR
R
IS
O N
W A
S
TE
W A
TE
R
FR
O
M M
A
IN
G A
R R
IS
O
N
DISCHARGE
VAULT
MAIN WET
WELL
OFFICE
BUILDING
BUILDING
ELECTRICAL SERVICE UPGRADE
PER ELECTRICAL PLANS
DEMO EXISTING DIGESTERS,
STRUCTURES, AND HOLDING
TANKS, ABANDON IN PLACE
ALL ASSOCIATED
BELOWGROUND PIPING AND
CONDUITS
24" CONC.
PIPE (ABANDON)
/ REMOVE EXISTING RAKE ARM
(SEE NOTE 5)
REMOVE EXISTING FEEDWELL
(SEE NOTE 5)
ABANDON EXISTING 4"
DENITRIFICATION
RECIRCULATION LINE
REMOVE
WATER LINE4 5
REMOVE AND
REPLACE EXISTING
DIVERSION MANHOLE
9 9
///8
SCALE
0 20 40 FEET
C :\W
O R
K \D
R A
FT
IN
G \C
R W
W
TP
\C
E
X
IS
TI
N
G S
IT
E
P
LA
N A
N D
D E
M O
.D W
G
R E
VI
S
IO
N
S H
E E
T N o.
P R
O
JE
C T
N o.
FI
LE
N A
M E
C H
E C
K E
D B
Y:
A P
P R
O
VE
D B
Y:
D A
TE
D R
A W
N B
Y:
D E
S
IG
N E
R
A S
N O
TE
D
IF
N
O T
IN
CH
, A
DJ
US
T
SC
AL
E
AC
CO
RD
IN
G
LY
BA
R
SH
O
UL
D
BE
E
XA
CT
LY
IN
CH
L O
NG
S C
A
LE
D A
TE
R
E V
D E
S C
R
IP
TI
O
N
R E
V
IS
IO
N
S U
M M
A R
Y A
P P
'D B
Y
P R
E P
A R
E D
B Y
P R
E P
A R
E D
F O
R
C A
LI
FO
R N
IA
M
IL
IT
A R
Y D
E P
A R
TM
E
N T
B
E A
R H
O
LL
O W
D R
IV
E
R A
N C
H O
C O
R D
O V
A , C
A
W A
S
TE
W A
TE
R
T R
E A
TM
E
N T
P
LA
N T
U P
G R
A D
E S
P H
A S
E
C A
M P
R O
B E
R
TS
, C A
TM
H
TM
H
P M
TM
H
-3
-0 1-
/2
8/
A
D
E S
IG
N
JP
B
B
/1
7/
B R
E
VI
S
IO
N S
T O
C
IV
IL
5% D
E S
IG
N
TM
H
TM
H
/3 1/
/1
6/
C
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
T
EC
H
N O
LO
GY
D R
IV
E, S U
IT
E
C5
IR
V
IN
E, C A
LI
FO
R N
IA
-5
/0
8/
D R
E
VI
S E
D
5% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/0
7/
E
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/3
1/
0% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
E X
IS
TI
N G
S
IT
E A
N D
D E
M O
LI
TI
O N
P
LA
N
O
F 2)
C
C
E
X
IS
TI
N
G S
IT
E
P
LA
N A
N D
D E
M O
.D W
G
S H
E E
T
O F
NOTES:
1. THE CONTRACTOR SHALL REMOVE, RELOCATE, OR REPLACE EXISTING EQUIPMENT TO
ALLOW FOR THE INSTALLATION OF NEW EQUIPMENT. REMOVAL, RELOCATION OR
REPLACEMENT ACTIVITIES WILL BE CONDUCTED IN COORDINATION WITH THE CMD PM.
2. THE CONTRACTOR SHALL PROVIDE FOR SLUDGE HANDLING PRIOR TO DEMOLITION OF THE
EXISTING SLUDGE DIGESTERS UNTIL PROJECT CONSTRUCTION IS COMPLETED AND
WASTEWATER TREATMENT PROCESSES ARE MIGRATED TO THE NEW MBR AND SLUDGE
HANDLING FACILITIES. THE CONTRACTOR MAY UTILIZE MOBILE SLUDGE HANDLING PROCESS
UNITS PROVIDED BY CLOACINA, OR OTHERS, AS APPROPRIATE.
3. THE CONTRACTOR SHALL RE-ESTABLISH EXISTING GRADE AFTER DEMOLITION AND
SUBSURFACE STRUCTURE/PIPELINE REMOVAL. BACKFILL MATERIAL SHALL BE CLEAN
IMPORT, NON-STRUCTURAL BACKFILL, COMPACTED TO A MINIMUM 90% RELATIVE MAXIMUM
DENSITY, UNLESS OTHERWISE SPECIFIED. BACKFILL BENEATH THE PROPOSED MBR AND
DRYPACK SYSTEMS SHALL BE STRUCTURAL BACKFILL, COMPACTED TO A MINIMUM 95%
RELATIVE MAXIMUM DENSITY IN ACCORDANCE WITH GEOTECHNICAL REQUIREMENTS
PROVIDED ON SHEET S01.
4. PIPE LINES 6 INCH DIA. OR SMALLER ARE DISPLAYED AS SINGLE LINE.
5. CONTRACTOR TO REMOVE AND DISPOSE OF EXISTING RAKE ARM AND FEEDWELL. CENTER
COLUMN, COLUMN FRAME, AND BRIDGE PLATFORM TO REMAIN IN PLACE.
N
FENCE LINEx
EXISTING GRADES (MAJOR - 5 FOOT)
EXISTING GRADES (MINOR - 1 FOOT)
ELECTRICAL (OVERHEAD)OH
LEGEND
SUBJECT LINES (PROPOSED CONSTRUCTION)
EXISTING CONDITIONS
SUBSURFACE LINE
DEMO/ABANDON
DEMOLISH/REMOVE
ELECTRICAL (UNDERGROUND)E
SHEET C02
SHEET C01
CUT AND PLUG EXISTING PIPE WITH MINIMUM 18-INCHES
CONCRETE PLUG ON EACH END
2 REMOVE EXISTING CLARIFIER RAKE ARM AND FEEDWELL
REMOVE EXISTING 24" DIA. RCP FROM DIVERSION CHAMBER TO
EXISTING CLARIFIER. PLUG PIPING BENEATH CLARIFIER WITH
MINIMUM 18-INCHES CONCRETE PLUG ON EACH END
4 REMOVE EXISTING WATER LINE, CAP AT HOSE BIB
DEMO AND REMOVE EXISTING SLUDGE PUMP STATION, WET
WELL, AND SUBSURFACE PIPING TO DIGESTER PUMP(S)
DISPOSE OF EXISTING DIGESTER SLUDGE, DEMO EXISTING
DIGESTERS, PIPING, AND PUMP STATION. BACKFILL WITH
STRUCTURAL FILL
DEMO AND REMOVE EXISTING CONE BOTTOM, IN-GROUND,
CONCRETE TANK. PLUG INLET/OUTLET PIPING WITH MINIMUM
18-INCH CONCRETE PLUG ON EACH END. BACKFILL WITH
STRUCTURAL FILL
REMOVE EXISTING SUBMERSIBLE PUMPS, ASSOCIATED
CONTROLS, AND POWER. REMOVE VERTICAL DISCHARGE RISER.
REMOVE PUMP DISCHARGE PIPES AND PLUG MANHOLE PIPE
PENETRATIONS
DEMO AND REMOVE EXISTING SLUDGE DRYING BED
INFRASTRUCTURE. CUT AND PLUG SUBSURFACE PIPING WITH
MINIMUM 18-INCHES CONCRETE PLUG
10 REMOVE ACCUMULATED SLUDGE TO NATIVE SOIL. GRADE PER
GRADING PLAN
UPON COMMISSIONING OF MBR AND SLUDGE HANDLING
EQUIPMENT, DEMO AND REMOVE EXISTING DENITRIFICATION
EQUIPMENT, CHEMICAL FEED EQUIPMENT, PIPING, AND
APPURTENANCES
ITEM No. DESCRIPTION
TRICKLING FILTER TF2
(E) SECONDARY
CLARIFIER
WATER SUPPLY
BACKFLOW PREVENTER
EXISTING 18" PIPE
EXISTING 8" DFE
MH 1
EXISTING 4" HDPE
WATER
4" PW
REPURPOSE EXISTING DENITRIFICATION BLDG FOR
STORAGE, OR IN ACCORDANCE WITH CMD PM
DIRECTION
GATE
DENITRIFYING FILTER AND ASSOCIATED
EQUIPMENT (DECOMMISSION AND
REMOVE AFTER MBR STARTUP IN
ACCORDANCE WITH CMD PM DIRECTION)
6" SE
2" PW
HOSE BIBB
AND HOSE RACK
4" HDPE
WATER LINE
ABANDON 24" RCP
OVERFLOW MANHOLE
(SECONDARY EFFLUENT
PUMP STATION)
ASPHALT
PAVEMENT
24" RCPCHAMBER
GATE
18" PIPE
EXISTING FENCING SHALL BE
MOVED TO ACCOMMODATE
NEW EQUIPMENT FOOTPRINT,
REPLACE TO MATCH EXISTING
EXISTING SLUDGE
DRYING POND
EXISTING SLUDGE
DRYING POND
SECONDARY PULL
BOXES H20 RATED
ELECTRICAL
LINE
EFFLUENT PUMP
STATION PULL BOXES
H20 RATED
TO
PE
R C
O
LATIO
N
PO
N
D S
WATER LINE
REMOVE ASSOCIATED
SLUDGE DRYING POND
EQUIPMENT AND PIPELINES
REMOVE ASSOCIATED
SLUDGE DRYING POND
EQUIPMENT AND PIPELINES
REMOVE OVERFLOW
MANHOLE PUMP EQUIPMENT
DISCHARGE/ // / / / / / / / / / / / / / / / / / DEMO EXISTING DIGESTERS,
REMOVE ASSOCIATED
SLUDGE DRYING POND
EQUIPMENT AND PIPELINES
APPROXIMATE EXTENT
OF BRUSH AND SHRUB
BRUSH AND SHRUB
VEGETATION
EXISTING TREATED WASTEWATER
PERCOLATION POND
(E) TREE
(E) TREE
REMOVE ASSOCIATED
SLUDGE DRYING POND
EQUIPMENT AND PIPELINES
APPROXIMATE
EXTENT OF SLUDGE
(SEE NOTE 5)
APPROXIMATE
EXTENT OF SLUDGE
(SEE NOTE 5)
/ REMOVE EXISTING RAKE ARM
(SEE NOTE 5)
REMOVE EXISTING FEEDWELL
(SEE NOTE 5)
ABANDON EXISTING 4"
DENITRIFICATION
RECIRCULATION LINE
9 9
///8
SCALE
0 20 40 FEET
C :\W
O R
K \D
R A
FT
IN
G \C
R W
W
TP
\C
E
X
IS
TI
N
G S
IT
E
P
LA
N A
N D
D E
M O
.D W
G
R E
VI
S
IO
N
S H
E E
T N o.
P R
O
JE
C T
N o.
FI
LE
N A
M E
C H
E C
K E
D B
Y:
A P
P R
O
VE
D B
Y:
D A
TE
D R
A W
N B
Y:
D E
S
IG
N E
R
A S
N O
TE
D
IF
N
O T
IN
CH
, A
DJ
US
T
SC
AL
E
AC
CO
RD
IN
G
LY
BA
R
SH
O
UL
D
BE
E
XA
CT
LY
IN
CH
L O
NG
S C
A
LE
D A
TE
R
E V
D E
S C
R
IP
TI
O
N
R E
V
IS
IO
N
S U
M M
A R
Y A
P P
'D B
Y
P R
E P
A R
E D
B Y
P R
E P
A R
E D
F O
R
C A
LI
FO
R N
IA
M
IL
IT
A R
Y D
E P
A R
TM
E
N T
B
E A
R H
O
LL
O W
D R
IV
E
R A
N C
H O
C O
R D
O V
A , C
A
W A
S
TE
W A
TE
R
T R
E A
TM
E
N T
P
LA
N T
U P
G R
A D
E S
P H
A S
E
C A
M P
R O
B E
R
TS
, C A
TM
H
TM
H
P M
TM
H
-3
-0 1-
/2
8/
A
D
E S
IG
N
JP
B
B
/1
7/
B R
E
VI
S
IO
N S
T O
C
IV
IL
5% D
E S
IG
N
TM
H
TM
H
/3 1/
/1
6/
C
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
T
EC
H
N O
LO
GY
D R
IV
E, S U
IT
E
C5
IR
V
IN
E, C A
LI
FO
R N
IA
-5
/0
8/
D R
E
VI
S E
D
5% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/0
7/
E
D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
/3
1/
0% D
E S
IG
N
S U
B M
IT
TA
L
TM
H
TM
H
E X
IS
TI
N G
S
IT
E A
N D
D E
M O
LI
TI
O N
P
LA
N (2
O F
2) C
C
E X
IS
TI
N G
S
IT
E P
LA
N
A N
D D
E M
O .D
W G
S H
E E
T
O F
N
FENCE LINEx
EXISTING GRADES (MAJOR - 5 FOOT)
EXISTING GRADES (MINOR - 1 FOOT)
ELECTRICAL (OVERHEAD)OH
LEGEND
SUBJECT LINES (PROPOSED CONSTRUCTION)
EXISTING CONDITIONS
SUBSURFACE LINE
DEMO/ABANDON
DEMOLISH/REMOVE
ELECTRICAL (UNDERGROUND)E
SHEET C02
SHEET C01
NOTES:
1. THE CONTRACTOR SHALL REMOVE, RELOCATE, OR REPLACE EXISTING
EQUIPMENT TO ALLOW FOR THE INSTALLATION OF NEW EQUIPMENT.
REMOVAL, RELOCATION OR REPLACEMENT ACTIVITIES WILL BE
CONDUCTED IN COORDINATION WITH THE CMD PM.
2. THE CONTRACTOR SHALL PROVIDE FOR SLUDGE HANDLING AFTER THE
EXISTING SLUDGE DIGESTERS HAVE BEEN DEMOLISHED AND REMOVED
UNTIL PROJECT CONSTRUCTION IS COMPLETED AND WASTEWATER
TREATMENT PROCESSES ARE MIGRATED TO THE NEW MBR AND
SLUDGE HANDLING FACILITIES. THE CONTRACTOR MAY UTILIZE
MOBILE SLUDGE HANDLING PROCESS UNITS PROVIDED BY CLOACINA,
OR OTHERS, AS APPROPRIATE.
3. THE CONTRACTOR SHALL RE-ESTABLISH EXISTING GRADE AFTER
DEMOLITION AND SUBSURFACE STRUCTURE/PIPELINE REMOVAL.
BACKFILL MATERIAL SHALL BE CLEAN IMPORT, NON-STRUCTURAL
BACKFILL, COMPACTED TO A MINIMUM 90% RELATIVE MAXIMUM
DENSITY, UNLESS OTHERWISE SPECIFIED.
4. PIPE LINES 6 INCH DIA. OR SMALLER ARE DISPLAYED AS SINGLE LINE.
5. CONTRACTOR SHALL FIELD VERIFY EXTENT AND DEPTH OF EXISTING
SLUDGE TO BE REMOVED AND DISPOSED.
C05C02
A
CUT AND PLUG EXISTING PIPE WITH MINIMUM 18-INCHES
CONCRETE PLUG ON EACH END
2 REMOVE EXISTING CLARIFIER RAKE ARM AND FEEDWELL
REMOVE EXISTING SUBMERSIBLE PUMPS, ASSOCIATED
CONTROLS, AND POWER. REMOVE VERTICAL DISCHARGE RISER.
REMOVE PUMP DISCHARGE PIPES AND PLUG MANHOLE PIPE
PENETRATIONS
DEMO AND REMOVE EXISTING SLUDGE DRYING BED
INFRASTRUCTURE. CUT AND PLUG SUBSURFACE PIPING WITH
MINIMUM 18-INCHES CONCRETE PLUG
10 REMOVE ACCUMULATED SLUDGE TO NATIVE SOIL. GRADE PER
PLAN
UPON COMMISSIONING OF MBR AND SLUDGE HANDLING
EQUIPMENT, DEMO AND REMOVE EXISTING DENITRIFICATION
EQUIPMENT, CHEMICAL FEED EQUIPMENT, PIPING, AND
APPURTENANCES
ITEM No. DESCRIPTION
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
O H
O H
O H
O H
O H
O H
O H
W W W
E E
E E
E
E
E E
E
E
E
E
E
E
E
EE
E
E
E E
E
E E
E E
E E
E E
E E
E
E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E E
E E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E
E
W W
W W
W W
W W
W
W W
W
W
W W
EXISTING 24"
PIPE
EXISTING EQUIPMENT
RETAINED FOR
REDUNDANCY/EMERGENCY
FLOW
CONVERT EXISTING CLARIFIER
INTO EQUALIZATION TANK
RELOCATED FENCING
(MATCH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .