Drawing D2 Pharmacy 1-2.pdf
PDF 413 KB Posted
- Attached to
- N071--VA Orlando Pharmacy Casework _Renovation
- Solicitation number
- 36C24823Q0400
About this file
This document contains construction plans and notes for a pharmacy renovation project at the Orlando Veterans Affairs Healthcare System facility, as well as a related federal contract opportunity notice. The construction plans provide dimensions, notes, and details for the renovation of pharmacy areas on level two of the facility, including offices, storage areas, and corridors. The related solicitation is for modular pharmacy casework design, implementation, and installation services for the renovation project, with a performance period from award until completion. The solicitation will be posted on February 6, 2023 via beta.sam.gov as a set-aside for SDVOSB/VOSB firms. Responses are due by March 3, 2023 at 4:00pm EST to the contracting specialist via email.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 36C24823Q0400 0001.pdf | ||
| FloorPlan-BASEBIDLEVELH2_IV.docx | DOCX document | |
| S02 36C24823Q0400.pdf | ||
| First Floor Layout (Potential).pdf | ||
| D.1 Wage Determination 2015-4553.pdf | ||
| S02 36C24823Q0400.pdf | ||
| 1st Floor Pharmacy.pdf | ||
| Second Floor (Potential).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
KEY NOTE LEGEND
A. SEE SHEET G-011 FOR GENERAL ABBREVIATIONS AND
ARCHITECTURAL SYMBOLS.
B. REFER TO SHEETS H-LS SERIES FOR LIFE SAFETY PLANS
C. ALL INTERIOR PARTITIONS ARE TYPE 27 U.O.N.
SEE SHEET H-AE5.600 SERIES FOR PARTITION TYPES
D.
SEE SHEETS H-AE4.301 FOR ENLARGED PLANS - TYPICAL
ROOMS.
E.
REFER TO EQUIPMENT PLAN SHEETS H-QH4.000 SERIES
FOR ADDITIONAL DIMENSIONS AND INFORMATION.
G.
REFER TO SHEET H-AE6.000 SERIES FOR DOOR, FRAME AND
BORROWED LITE SCHEDULES AND DETAILS
H.
DIMENSIONS ARE TO COLUMN GRID, FACE OF MASONRY
OR CONCERETE OR FACE OF METAL STUD U.O.N.
DIMENSIONS NOTED AS "CLEAR" ARE FINISH FACE TO
FINISH FACE INCLUDING ALL FINISHES SUCH AS TILE,
WALL PANELS, ETC.
F.
REFER TO SHEET H-QH6.101 FOR NON-MEDICAL
EQUIPMENT LIST. REFER TO H-QH6.102 FOR TYPICAL
MOUNTING HEIGHTS AND TOILET INFORMATION.
I.
SEE H-AE6.4 SERIES FOR WINDOW AND LOUVER TYPES.
J.
REFER TO PLUMBING PANS, H-MP1 SERIES, FOR FLOOR
DRAIN LOCATIONS
K.
REFER TO SHEET H-AE5.210 FOR TYPICAL EXPANSION
JOINT DETAILS.
L.
REFER TO SHEET H-AE5.201 THRU H-AE5.302 FOR TYPICAL
PLAN DETAILS.
REFER TO 1/16" AREA PLANS FOR INTERSTITIAL SPACE
PLANS AND LEVEL 6 OVERALL ROOF PLANS.
M.
H-AE3.243
H-AE3.243
H-AE3.244
H-AE3.245
H-AE3.243
H-AE3.244
H-AE3.243
H-AE5.312
H-AE5.312
G
H
J
K
L
35.2
AS
32333435 A7
H-AE3.440
H-AE3.440
H-AE3.441
H-AE3.441
33.6
K.6
2P104
OFFICE, CHIEF
2P106
SECRETARY
2P102
ASST CHIEF 2P118
PHARMACIST
2P116
PHARMACIST
2P114
PHARMACIST
2PC01b
CLERK
2P112
PHARMACIST
2P110
PHARMACIST
2N112
NEUR CHIEF OFFICE
2P920
DRUG REC'G
2P702a
O.P. VAULT
2N305
WAITING
2N503a
CLEAN RM/EQUIP STOR
2N503
EQ CLNG/SOIL
2N101e
BEDROOM
2N118
SECRETARY/PFT
2N113
VENTILATORY ROOM
TEST
2N312
EXERCISE ROOM
2NC01a
BLOOD GAS ANALYSIS
2P908
HAC
2P201
IP ACTIVE STORAGE
2P202
O.P. FILLING &
ASSEMBLY
2P706
EXTEMPORANEOUS
COMPOUNDING
2N114
CHIEF PULM OFC
2P121a
COMM
2P121b
ELEC
2N301
COMM
2K502
PERSONAL ID
VERIFICATION
2P202a
O.P. ROBOT
2N308
HAC 2N310
TOILET
2PC01a
CLERK
2P113
STUDY CUBICLES
2P111
OFFICE; CLINICAL
PHARM.
2P704
PRESCRIPTION REC.
2N116
SECRETARY
2N505
KITCHEN
2N507
COMPUTER
2N101f
BATHROOM
2N101g
CHIEF TECH
2N306
STAFF TOILET
B5F
2P808a
SUPV PHARM
2P204
O.P. ROBOT SUPPORT
2K602b
SAFETY STORAGE
2N105
BEDROOM
2N109
TECHS & READING
2N506
ELEC
2N304
HOME RT
2P708a
IP VAULT
2N107 BEDROOM 2N107a
BATHROOM
2P708
IP VAULT ANTE ROOM
2P702
OP VAULT ANTE ROOM
2P808
ADMIX STORAGE
2N110
PULMONARY OFFICE
2P806
I.P. ROBOT
2P804
IP CHECKING
2K605
OFFICE
2K516f
CODING
2K516h
CODING
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
2K407
DSS SUPV
2K602d
SAFETY OFFICE
2K602c
SAFETY OFFICE
2NC03a
LOCKERS
2NC08
CORRIDOR
2PC09
CORRIDOR
2PC01
CORRIDOR
2NC09
CORRIDOR
2NC03
CORRIDOR
2NC05
CORRIDOR
2PC07
CORRIDOR
2P121
STAFF LOUNGE
2PC08
CORRIDOR
2PC02
CORRIDOR
2US01
STAIR
2TS02
STAIR
2NC03b
CORRIDOR
2P C0
2.
2N113.1
2K C0
2K
2.
2NC03
2N113.2
2PC01
2NC05
2N
3.
2P121.1
2N101.1
2N
1.
2J
0a .2
2PC09
2P121.2
2P C0
2.
2N
7.
2N
7.
2PC08.1
2N503.2
2K C0
2PC08.2
77c77c77c
27b
27bs 27bs
27bs
27bs
77c
77c
68c
68c68c
68c
68cs
68cs
77c
68cs
68cs
68cs
68cs
68cs
77c77c
77c
77c
68c68c
68c
68c
77c 68c
77c 68c
68c
67bs
67bs 68cs 67bs
67bs
77c
77c
77c
77c
2P
2NC01b
ALCOVE
9 9
68cs
68cs
68cs
9 9
77c
77c
68c
99999
9 9
CL
EA
R
8'
- 0
11' - 4 1/8"
3' - 3 7/8" 12' - 10 1/4"
3'
- 0
/8
"0' - 7 1/4"
9' - 9 1/4" 0' - 9 3/4"
18' - 0 7/8"
CL
EA
R
6'
- 0
/8
CL
EA
R
6'
- 0
1/
4" 0'
- 1
3/ 4"
1/
8"
0'
- 9
/4
1/
8"
13' - 10 1/8" 4' - 2 3/4"
1' - 11 1/4"
10' - 0 3/4" 11 1/2"
12' - 2 1/8" 9' - 5 3/4" 0' - 7 7/8"
9' - 0"
2' - 9 5/8"
6' - 5 1/8" 4' - 10 1/4" 6' - 5"
1' - 2 1/2"
2'
- 1
3/
8" 9'
- 5
/8
10' - 4 1/4"
9' - 9"
1' - 6 1/2"
3' - 0"
A A
10' - 2 3/8"
1' - 2 1/2"
4' - 1 1/2"
2'
- 2
/2
0' - 2 1/8"
2'
- 5
1' - 2 1/2"
3'
- 1
0"
9' - 5 1/2"0' - 10 7/8"
9' - 3 3/4" 3' - 0 1/2"
8' - 4" 8' - 10 3/4"
10' - 7 3/4"
CL
EA
R
5'
- 9
/2
1' - 1 7/8" 9' - 9"
4' - 10"3' - 4"
0'
- 1
3/
4"
1/ 2"
1/
4"
0'
- 1
7/
8"
4'
- 8
/8
8' - 8 1/4"
0' - 4 1/4" 10' - 6 1/2"
/2
8'
- 8
/4
8' - 1 1/4" 1' - 2 1/2"
6' - 5"
CL
EA
R
8'
- 0
A A
8' - 7 3/4"
0' - 5 5/8" CLEAR
5' - 6 7/8"
A
2'
- 4
/4
5'
- 2
/2
6' - 9 1/4"
4' - 8 1/2"
A
H-
AE
1.
2F
D2
H-
AE
1.
2F
D1
H-
AE
1.
2F
D3
H-
AE
1.
2F
D2
H-AE1.2FD5
H-AE1.2FD2
3/
4"
0'
- 1
3/
4"
9' - 8" 2' - 5 7/8"
A A
CL
EA
R
8'
- 0
2' - 2 1/8" 8' - 11 1/8"
21' - 7 3/4"
2'
- 5
3'
- 1
1/
8" 5'
- 2
CL
EA
R
8'
- 0
77c
77c
67bs
77c
77c
28cs
9'
- 5
/4
7'
- 4
/8
1'
- 3
/8
3'
- 6
/8
9' - 6 1/2" 9' - 4"
CLEAR
6' - 0"
36 36
24' - 4 5/8"
8' - 11 1/4"
36 36 36
36 36
36 36 36
36b
36b
36b 36 36
4' - 6 1/4"
CLEAR
5' - 0"
39b
36 27
36 27
77c
9'
- 1
1/
8"
CL
R
1'
- 8
7'
- 2
0' - 3 1/8"
H-AE4.302
H-AE4.302
H-AE4.340
H-AE4.341
H-AE4.320
3/
8" 2'
- 2
/8
CLEAR
5' - 0"
0' - 2 3/4"
6' - 5 3/4"12' - 1 7/8"
2'
- 6
6' - 1 1/2"
2' - 0 3/4"
CLEAR
5' - 0"
2'
- 6
39bs27bs
3'
- 1
/8
11' - 11 3/8"
4' - 2 3/4"
TO FINISH
10' - 3 1/2"
TO FINISH
10' - 3 1/2"
A
TO FINISH
1' - 3 1/8"
1' - 8 1/8"
8' - 7 5/8"
CL
EA
R
9'
- 1
0'
- 3
4' - 1 3/8"
13' - 5" 8' - 6"
1' - 2 1/2"
9'
- 6
/4
2'
- 1
1" 6'
- 0
3'
- 6
6'
- 0
2'
- 1
1" 6'
- 0
3'
- 6
6'
- 0
1'
- 3
/8
5'
- 9
/4
4'
- 2
/2
0' - 11 1/4"
B5F B5F
0'
- 1
3/
4"
1/
2"
0'
- 1
0"
1/
2"
2NC08
2N914 REF/FREEZER ALCOVE 2N914a
SPECIMEN ACCESS,
PROCESS & DIST.
2J510
LAB ALCOVE
2J510a
CHECK IN &
OUT/BLOOD
BANK/TRANSFUSION
2J508
AISLEWAY
2N912
AUTOMATION TRACK
SYSTEM
2J506
URINALYSIS/SEROLOGY
2NC09a
CORRIDOR
2N101
WORKROOM
27b
27b
68cs
68c 68c
68c
68c
27b
27b
2N923
HAC
2J510a.1
2NC09
2N
4a
2N912a
BATHROOM
2N
2.
2'
- 5
/8
6' - 1 1/4" 3' - 1 7/8"
3/
8"
A
67b
18 39
27b
1/
4"A
3/
8"
15' - 5 1/2"
A
2N902
CLINICAL
MICROBIOLOGY
7 1/2" 2' - 9"
5'
- 1
/8
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
4'
- 1
1'
- 0
7'
- 5
/8
H-AE5.411
10 1/4" 12' - 4 5/8"
2J508c
2J508b
2J508a
2J508b
OFFICE
2J508c
OFFICE
2J508a
OFFICE
EQ
EQ
EQ
3' - 1 7/8" 1' - 10 1/4"
9' - 9 1/4"
2PC01
2' - 5"
2T S0
68c
77c
15' - 9"
6'
- 2
" C
LR
5/
8"
"5' - 0"
3/
8"
1' - 9 1/2"
2' - 0 1/2"
1'
- 8
2"
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BUILDING IS FULLY SPRINKLERED
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950
04 JUNE, 2010
Professional Seals:
EB / RLF
NOTES:
SHEET NOTES:
HOSPITAL / CLINIC
01 AND 02
4322Checker
LEVEL 2, AREA D, ZONE 2
CONSTRUCTION PLAN
H-AE1.2FD2
N
1/8" = 1'-0" GRAPHIC SCALE
4' 8' 24'16'
A1
C2
KEY PLAN
C1
D3
D4
E2
A2 A3
B1 B2
AREA D, ZONE 2
D2
D5 D6
E1 E3
D1
D7
CLINIC
HOSPITAL
P-W P-E
A4
E4
W
1 PNEUMATIC TUBE STATION, SEE VERTICAL
CIRCULATION SERIES DRAWINGS
2 DUMBWAITER, SEE VERTICAL CIRCULATION
SERIES DRAWINGS
3 EXPANSION JOINT FLOOR COVER ASSEMBLY.
TYP. SIM. DETAIL 2/H-AE5.210
4 INTERIOR FLOOR DRAIN, TYPICAL. SEE PLUMBING
DRAWINGS.
5 EXPANSION JOINT WALL TO WALL COVER
ASSEMBLY. TYP. AT UNRATED PARTITIONS, SIM.
DETAIL 8/H-AE5.210
6 EXPANSION JOINT WALL COVER ASSEMBLY. TYP.
SIM. DETAIL 6/H-AE5.210
7 MODULAR CASEWORK SHOWN FOR REFERENCE
ONLY. REFER TO H-QH4 SERIES FOR
MANUFACTURER INFORMATION.
8 ALTERNATING, IN-FLOOR PLUMBING AND
ELECTRICAL BOXES, TYPICAL. SEE PLUMBING &
ELECTRICAL DRAWINGS.
9 DEMOUNTABLE PARTITION, SEE SPEC SECTION
102219
10 ACCESS PANEL 2 HOUR RATED 30" X 30" 4" A.F.F.
11 INSTALL FURRING 3" FROM PNEUMATIC TUBE
RISERS.
12 UTILITY CHASE WITHIN MODULAR FURNITURE
13 ACCESS PANEL 2 HOUR RATED 36" X 30" 4" A.F.F.
PROVIDES ACCESS TO TWO DAMPERS
No. Description Date
9 CPR 220 02/06/2012
10 CPR 228 (VOIDED) 02/13/2012
11 CPR 228 (REISSUED) 03/13/2012
12 CPR 242 03/14/2012
13 CPR 264 04/04/2012
14 CPR 340 09/27/2012
15 CPR 370 01/11/2013
16 CPR 374 01/31/2013
File details come from the government source that posted it. Updated .