This document summarizes an amendment to a solicitation for pharmacy casework renovation services at the Orlando Veterans Affairs Healthcare System facility. The amendment extends the response deadline to March 13, 2023, provides clarification on statement of work details, furniture delivery logistics, and answers questions from prospective offerors. Key details include reconfiguring and adding to existing modular pharmacy casework to match current specifications, including electric sit-stand workstations and filling/checking stations. The small business set-aside solicitation is for a firm-fixed price contract awarded by the VA Network Contracting Office 8 to provide design, removal of old casework, installation of new modular and pre-wired casework, and project management services in multiple phases while the pharmacy remains operational.

View the file

Other files

File Type Posted
FloorPlan-BASEBIDLEVELH2_IV.docx DOCX document
S02 36C24823Q0400.pdf PDF
1st Floor Pharmacy.pdf PDF
S02 36C24823Q0400.pdf PDF
Drawing D2 Pharmacy 1-2.pdf PDF
D.1 Wage Determination 2015-4553.pdf PDF
First Floor Layout (Potential).pdf PDF
Second Floor (Potential).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 8

36C248

Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Orlando VA Healthcare System 13800 Veterans Way Orlando FL 32827

36C248

Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Orlando VA Healthcare System 13800 Veterans Way Orlando FL 32827

To all Offerors/Bidders

36C24823Q0400

02-23-2023

X

X X

March 13, 2022, at 16:00 PM EST.

See CONTINUATION Page

1 1

The purpose of this amendment is to answer questions. As a result:

a. Response to the solicitation is extended from 03/03/2023 at 16:00 PM EST to 03/13/2023 at 16:00 PM EST.

b. See Section A.1 for corrections to the Performance Work Statement.

c. See Section A.2 for answers to participant questions.

d. Questions and answer requests are closed. Questions will no longer be entertained.

e. Please submit your proposals to the best of your ability no later than 03/13/2023 to robert.edwards2@va.gov and Jessica.Kiser@va.gov.

36C24823Q0400 0001

A.1 Statement of Work Changes

Section 1.5, paragraph 2 reads as:

The pharmacy needs workstations added to the existing configuration to match existing casework, including workstations with electric sit/stand capability, pharmacy filling and checking stations, and cleanable, sound-absorbing modular walls. This would also involve reconfiguring current casework to new locations and augmenting casework for additional functionality. All casework that is augmented or new must match currently existing casework in form and functionality. The installation will include a vendor representative to conduct an onsite visit to field measure and refer to drawings of the custom modular casework layout. The vendor will provide all specified materials per pharmacy specifications for materials: laminate, countertop, modular walls, and hardware. All materials used and work performed shall conform to the laws and ordinances of the STATE, municipality, and other governing subdivision within which work under this need is performed.

Section 1.5, paragraph 2. Changed to:

The pharmacy needs workstations added to the existing configuration to match existing casework, including workstations with electric sit/stand capability, pharmacy filling and checking stations, and cleanable, sound-absorbing modular walls. This would also involve reconfiguring current casework to new locations and augmenting casework for additional functionality. All casework that is augmented or new must match currently existing casework in form and functionality. The installation will include a vendor representative to conduct an onsite visit to field measure and refer to drawings of the custom modular casework layout. The vendor will provide all specified materials per pharmacy specifications for materials: laminate, countertop, modular walls, and hardware. All materials used and work performed shall conform to the laws and ordinances of the STATE, municipality, and other governing subdivision within which work under this need is performed. The furniture design and requirements requested shall consider ADA laws, wheelchair accessibility, sustainability, infection control, flame resistance, indoor air quality features, and ergonomic features for long working hours and patient services.

Section 1.6, paragraph 2 reads as:

Furniture delivery location at the Orlando VA Healthcare System Warehouse (See Section C.3 for address) will be required by a date to be determined.

Section 1.5, paragraph 2. Changed to:

Furniture delivery location at the Orlando VA Healthcare System can be done at the loading docks and transported to the Pharmacy Location.

Section 5.1, paragraph e reads as:

e. Contractor to provide expert support in Environmental Product specifications, tracking, and documentation building to obtain Leadership in Energy and Environmental Design (LEED) Credits for ongoing projects as needed.

Section 5.1, paragraph e. Changed to:

This paragraph has been removed.

Section 8.0, paragraph e. reads as:

e. Contractor shall comply with all Environmental Product specifications, tracking, and documentation building to obtain Leadership in Energy and Environmental Design (LEED) Credits for ongoing projects as needed.

Section 8.0, paragraph e. changed to:

This paragraph has been removed.

A.2 Questions and Answers

1. QUESTION: The drawing that was sent out is hard to see. Can we get a CAD-Drawing and Product

List?

ANSWER: The SAM.gov website does not support uploading .dwg files (AutoCAD) onto the website. Reference word document FloorPlan-BASEBIDLEVELH2_IV with the .dwg file attached.

Reference the pdf version Attachment: Drawing D2 Pharmacy 1-2 in the solicitation.

2. QUESTION: The existing casework and cabinets appear to be brand specific and of dated material.

Does the Government want to match the exact material, or would it be receptive to an alternative product that is very similar but superior to existing material?

ANSWER: This is a Brand Name or Equal requirement; reference the Performance Work Statement (PWS) Section 2.0 - 2.5.

3. QUESTION: Will the government consider modular pharmacy casework only or fixed casework?

ANSWER: The government requires modular casework as referenced in the PWS Section 1.3 - 1.5.

4. QUESTION: Who is the Architect-Engineering Designer of the project?

ANSWER: This is not a Construction Project. There is no Architect-Engineering Designer.

5. QUESTION: Who would be the POC for the Contractor of the Project?

ANSWER: The Point of Contact will be identified after the contract is awarded.

6. QUESTION: Would the Government consider a new design with an alternative material, such as metal cabinetry, in order to have the most modern and durable needed for such a large production pharmacy?

ANSWER: See Question # 2.

7. QUESTION: Is the government aware that the current placement and configuration may not be following ADA standards?

ANSWER: Please refer to section A.1 of this amendment. Section 1.5, paragraph 2,

8. QUESTION: Due to the size and complexity of the SOW, would the Government extend the response date to March 31, 2023?

ANSWER: See page one of this amendment, line number 11 and 14, for the new date.

9. QUESTION: The Contractor shall provide all personnel, parts and labor, equipment, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the work as defined in this Performance Work Statement:

a. Project management.

b. Design of Area.

c. Repurposing of current furniture.

d. Furniture removal.

e. Professional installation.

f. Maintenance / Warranty.

WHO WILL HANDLE THE CONSTRUCTION PHASE (PAINT, FLOORING, CEILINGS,

TRADES, ETC.)? VA FACILITIES MGT OR CONTRACTOR? IF CONTRACTOR, HAS THAT

PHASE BEEN AWARDED YET? WHAT IS THE OVERALL BUDGET APPROVED FOR THIS

ENTIRE PROJECT, INCLUDING BOTH CONSTRUCTION AND EQUIPMENT

REPLACEMENT AND/OR RELOCATION?

ANSWER: This is not a construction project.

10. QUESTION: The installation is composed of three separate implementation phases.

IN EACH PHASE, WILL ANY CONSTRUCTION (PAINT, FLOORING, CEILINGS, TRADES,

ETC.) NEED TO HAPPEN BETWEEN TEAR OUT AND INSTALLATION?

11. QUESTION: Furniture delivery location at the Orlando VA Healthcare System Warehouse (See

Section C.3 for address) will be required by a date to be determined.

THIS WILL ADD COMPLEXITY, COST AND RISK OF DAMAGE TO NEW EQUIPMENT

HAVING TO BE MOVED MULTIPLE TIMES FROM FACTORY TO LAB. ARE YOU WILLING

First Phase: The contractor is to design, break down, remove existing furniture, reconfigure current casework, and work around the installation of New Pharmacy Equipment for the Outpatient Pharmacy Section. (Second Floor)

Second Phase: The contractor is to design, break down, remove existing furniture, reconfigure current casework, and work around the installation of New Pharmacy Equipment on the First Floor Dispensing Pharmacy Section.

Third Phase: The contractor is to design, break down, remove existing furniture, reconfigure current casework, and work around the installation of New Pharmacy Equipment for the Inpatient Pharmacy Section.

TO CONSIDER A MORE COORDINATED LOGISTICS PLAN THAT ALLOWS A SINGLE

SHIPMENT OF EACH PHASE FROM FACTORY TO LAB?

ANSWER: Please refer to section A.1 of this amendment. Section 1.5, paragraph 2

12. QUESTION: Finishes and Colors – Brand Name or Equal Solid Surface Countertops – Beige Tempest 1530TM Casings, end panels, backsplash/side splash: Manufacturer: Wilsonart – Williamsburg Cherry (7936K-07), with PVC edge banding to match laminate. Shelves and Laminate Countertops - Wilsonart - Wild Cherry (7054-60)

IS THE GOVERNMENT SET ON LAMINATE, OR WOULD YOU BE OPEN TO AN

ALTERNATE MATERIAL THAT MANY NEW PHARMACIES ARE MOVING TO, SUCH AS

STEEL WITH FENOLIC COUNTERTOPS? THESE MATERIALS WOULD BE COMPARABLE

IN PRICE AND CARRY A MUCH LONGER WARRANTY AND LOWER INSTALL COST DUE

TO THE FACT IT IS MUCH EASIER TO ASSEMBLE IN THE LAB AS MUCH OF IT IS PRE-

ASSEMBLED IN THE FACTORY. PICTURES INCLUDED.

ANSWER: See Question # 2.

13. QUESTION: Contractor shall be responsible for all safety and security guidelines within the area where work is being performed, including securing any contractor-owned tools or equipment and any on-site storage being utilized.

WILL HARD HATS BE REQUIRED?

14. QUESTION: Contractor to provide design services such as space planning, schematic design, specifications, finish boards, 2D/3D Rendered models, construction drawings, and installation layouts in AutoCAD, Sketch Up, Revit, and Adobe Creative Suite Programs.

ALL OF THESE PROGRAMS OR 1 OR THE OTHER?

ANSWER: Any program will suffice as long as it meets the government requirement per the PWS Section 5.1, line d and Section 8, line d.

15. QUESTION: Will the government be providing the trades required for utilities disconnect and reconnect, such as plumbing, electrical, data connections, etc.? The scope of work does not specify whether the Government or the contractor will be required to perform this work?

ANSWER: No, all work will be done in-house.

16. QUESTION: Will the list of attendees for the site visit be posted?

ANSWER: No, this is not required.

17. QUESTION: Is the VA going to provide a drawing with the current floor plan?

ANSWER: Drawings were provided with initial solicitation.

18. QUESTION: May we get the name of the new workflow filling equipment system being implemented on the first and second floors?

ANSWER: The equipment getting installed on the first floor is Scriptpro for dispensing, and the second floor is receiving Scriptpro for filling and verification, Pyxis Carousel, and Pyxis Safe Equipment.

19. QUESTION: Who is going to remove the existing and install the new workflow-filling equipment systems on the first and second floors?

ANSWER: This requirement does not address the removal of the existing and installation of the new workflow-filling equipment systems on the first and second floors.

20. QUESTION: Are we expected to integrate any existing modular casework with new modular casework?

ANSWER: Yes, as outlined in the PWS Section 1.5. and Section 8.0 paragraph p.

21. QUESTION: May we get the name of the current modular system?

ANSWER:

• Solid Surface Countertops – Beige Tempest 1530TM

• Casings, end panels, backsplash/side splash: Manufacturer: Wilsonart – Williamsburg Cherry

(7936K-07), with PVC edge banding to match laminate.

• Shelves and Laminate Countertops - Wilsonart - Wild Cherry (7054-60)

22. QUESTION: There's a link on the SAM website page of the project that opens to a document with a .dwg file image on it. May we get a link to the reference file in the drawing?

ANSWER: See Question #1.

23. QUESTION: Does the VA have an expected time frame for completion?

ANSWER: The contractor is responsible for proposing a timeframe.

24. QUESTION: Does the VA have an expected time frame for completion?

ANSWER: See Question #23.

25. QUESTION: Are all countertops to be solid surface? Page 10 lists finish for solid surface countertops as well as Laminate countertops. If both are to be provided, please clarify which areas need to be solid surface and plastic laminate?

ANSWER: The Pharmacy filling/dispensing areas will require a solid surface. The use of any laminate countertops will be finalized during the design phase, as outlined in the PWS Section 1.3 - 1.5.

26. QUESTION: Is pharmacy casework to be pre-wired having electrical components built into casework?

ANSWER: Yes.

27. QUESTION: Who is responsible for installing, moving or demo to the jboxes in the ceiling to support the power needed for the pre-wired workstations?

ANSWER: All utilities will be handled by VA Facility Management Service (FMS).

28. QUESTION: Does this scope of work include the final connections for electrical?

ANSWER: See Question # 27.

29. QUESTION: At the beginning of each phased de-installation of casework, the electrical feeding that area will need to be terminated for installers to handle the pre-wired casework. Will this be the responsibility of the VA or the bidder?

30. QUESTION: Will this project scope include a demo of existing electrical floor boxes and adding new to power casework needs if necessary?

31. QUESTION: Will this project’s scope of work include the plumbing cut-off and connection for new sink fixtures?

32. QUESTION: Within the scope of this project, who is responsible for the removal of computers, equipment, medications, and other VA property that is not a part of the casework being removed or relocated?

ANSWER: This would be handled by VA personnel.

33. QUESTION: Are LEED credits needed for this project?

ANSWER: Please refer to section A.1 of this amendment. Section 5.1,

34. QUESTION: Within the scope of this project, who is responsible for the data being run and terminated into the casework? Who is responsible for connecting the switches at the facility panel?

35. QUESTION: Section 5.1 Contract Tasks (t.) states that an automated take-off report generated from AutoCAD is required for products purchased by government. We use AutoCad but the takeoff report is not part of our product options. We will provide a detail of the products manufactured and provided. Is this sufficient?

ANSWER: See Question # 14.

36. QUESTION: Is there an estimated time frame for when this project may occur?

ANSWER: The project will initiate following the contract award and Kick-off meeting

37. QUESTION: During the installation, what are the preferred working hours? Also, are weekends allowed since each phase will need to be completed as quickly as possible to keep the pharmacy operational?

ANSWER: Refer to PWS, Section 1.6 Period of Performance.

A.1 Statement of Work Changes