Draft Exploration Plan - Checklist Reference Document.pdf

PDF 2 MB Posted

Attached to
ER Geotechnical Drilling and Sampling
Solicitation number
S-73000-00016301
Issued by
Jackson County, Oregon

About this file

This is a Draft Exploration Plan and Checklist Reference Document prepared for emergency response geotechnical drilling and sampling services in Jackson County, Oregon, specifically addressing three separate landslide locations along Highway 227 Tiller Trail Highway. The project encompasses three drill sites at milepost locations 43.1, 44.1, and 44.7, with each site requiring three drillholes at an estimated depth of 60 feet per hole, totaling 180 feet of drilling per location with 20 feet of coring per hole. The exploration plan details anticipated drilling methods including HQ3 coring, HSA techniques, and Standard Penetration Tests (SPT) at 2.5-foot intervals. Instrumentation requirements include slope inclinometers and vibrating wire transducers (VWT) to be installed at each drillhole. The anticipated start date is listed as TBD, with an estimated 4 to 5 days required for drilling operations at each site. Environmental clearance requests have been submitted to Jessica Bochart, though environmental clearance status and environmental restrictions remain to be determined.

The document indicates anticipated subsurface conditions of asphalt and dirt at all three locations, with no special sampling such as Shelby tubes expected. Erosion control requirements, utility locate ticket numbers, site access arrangements, right-of-way considerations, staging areas, and traffic control plans remain to be finalized (TBD). All three sites are identified under Emergency Response Landslide project designation with the same Environmental Response Assessment number (ERADMF25000) and are located within Jackson County, Oregon. The document serves as a reference checklist for project planning and coordination of the geotechnical exploration activities.

View the file

Other files

File Type Posted
00016301 Request for Competitive Quotes.docx DOCX document
Sample Contract~54.docx DOCX document
ATT C Bid Pricing Form~18.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GPS

42.753564, -122.870386

1000 ft

N

N © 2026 Google

© 2026 Google

© 2026 Google

Image © 2026 Airbus

Image © 2026 Airbus

Image © 2026 Airbus

DH-01 DH-02

DH-03

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Text Box HWY 227 MP43.1 Tiller Trail Highway Exploration Plan 2/9/2026

Hwy 227 MP 43.1

February 9, 2026

² 0 0.08 0.160.04 mi

0 0.1 0.20.05 km

1:4,800

IMPORTANT NOTICE:

This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information.

DH-01 DH-02

DH-03

Access Road

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Underline

HWYE33L

Polygonal Line

HWYE33L

Line

Project Location: HWY 227 MP 43.1

County: Jackson

Key No.: N/A

EA No.: ERADMF25000

Project File Location: County Jackson\OR227 Tiller-Trail 2025 ER Landslides

Project Description: Emergency Response Landslide

Number of Drillholes and Depths: 3

Estimated Footage: 60 ft ea., total 180 feet, 20 feet of coring

Anticipated Subsurface Conditions: Asphalt and Dirt

Anticipated Drill Methods: HQ3 coring, HSA, tracked or Truck, SPT 2.5’ intervals

Special Sampling (Shelby Tubes, etc.): Not expected

Instrumentation/Installation: 3 slope inclinometers and 1 VWT per Drill Hole

Anticipated Start Date: TBD

Anticipated # of Days to Drill: 4-5 days

Erosion Control Required: TBD

Utility Locate Ticket Numbers, submitted by?:

Environmental Clearance Requests Submitted to REC?:

Jessica Bochart

Environmental Clearance Obtained?:

Environmental Restrictions?:

Site Access, R/W, Staging Area:

Traffic Control Plan:

GPS Location

42.747164 , -122.865716

1000 ft

N

N © 2026 Google

© 2026 Google

© 2026 Google

Image © 2026 Airbus

Image © 2026 Airbus

Image © 2026 Airbus

DH-02DH-01

DH-03

HWYE33L

Text Box HWY 227 MP44.1 Tiller Trail Highway Exploration Plan 2/9/2026

HWYE33L

Oval

HWYE33L

Oval

Oval

HWY 227 MP 44.1 Tiller Trail Highway Exploration Plan

February 6, 2026

² 0 0.015 0.030.0075 mi

0 0.025 0.050.0125 km

1:960

IMPORTANT NOTICE:

This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information.

DH-02DH-01

DH-03

Access Road

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Polygonal Line

Project Location: HWY 227 MP 44.1

Key No.: N/A

EA No.: ERADMF25000

Project File Location: County Jackson\OR227 Tiller-Trail 2025 ER Landslides

Project Description: Emergency Response Landslide

Number of Drillholes and Depths: 3

Estimated Footage: 60 ft each, total 180 feet, 20 feet each of coring

Anticipated Subsurface Conditions: Asphalt and Dirt

Anticipated Drill Methods: HQ3 coring, HSA, tracked or Truck, SPT 2.5’ intervals

Special Sampling (Shelby Tubes, etc.): Not expected

Instrumentation/Installation: 2 slope inclinometers and 1 VWT in each SI

Anticipated Start Date: TBD

Anticipated # of Days to Drill: 4-5 days

Erosion Control Required: TBD

Utility Locate Ticket Numbers, submitted by?:

Environmental Clearance Requests Submitted to REC?:

Jessica Bochart

Environmental Clearance Obtained?:

Environmental Restrictions?:

GPS

42.739403, -122.863553

1000 ft

N

N Image © 2026 Airbus

Image © 2026 Airbus

Image © 2026 Airbus

DH-01

DH-02

DH-03

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Text Box HWY 227 MP 44.7 Tiller Trail Highway Exploration Plan 2/9/2026

HWY 227 MP 44.7

February 9, 2026

² 0 0.02 0.040.01 mi

0 0.03 0.060.015 km

1:1,200

IMPORTANT NOTICE:

This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information.

DH-01 DH-02

DH-03

Access Roads

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Polygonal Line

HWYE33L

Line

HWYE33L

Line

Project Location: HWY 227 MP 44.7

Key No.: N/A

EA No.: ERADMF25000

Project File Location: County Jackson\OR227 Tiller-Trail 2025 ER Landslides

Project Description: Emergency Response Landslide

Number of Drillholes and Depths: 3

Estimated Footage: 60 ft each, total 180 feet, 20 feet each of coring

Anticipated Subsurface Conditions: Asphalt and Dirt

Anticipated Drill Methods: HQ3 coring, HSA, tracked or Truck, SPT 2.5’ intervals

Special Sampling (Shelby Tubes, etc.): Not expected

Instrumentation/Installation: 3 slope inclinometers and 1 VWT per Drill Hole

Anticipated Start Date: TBD

Anticipated # of Days to Drill: 4-5 days

Erosion Control Required: TBD

Utility Locate Ticket Numbers, submitted by?:

Environmental Clearance Requests Submitted to REC?:

Jessica Bochart

Environmental Clearance Obtained?:

Environmental Restrictions?:

File details come from the government source that posted it. Updated .