Q&A_DJTMZ8D627.docx

DOCX document 12 KB Posted

Attached to
DISA JITC Flooring Reinforcement
Solicitation number
DJTMZ8D627b
Issued by

About this file

Questions and Responses clarifying work required.

View the file

Other files

File Type Posted
Attachment_4__Pre-Proposal_Site_Visit_Information.docx DOCX document
Attachment_6__FAR_DFARS_Provisions_Clauses.docx DOCX document
Attachment_1__Materials_List.xls XLS spreadsheet
Attachment_5__QASP.pdf PDF
RFQ_DJTMZ8D627.pdf PDF
Attachment_3__57439B_UPS_Location_Drawing.pdf PDF
Attachment_2__PWS.DOCX DOCX document
Attachment_4__Pre-Proposal_Site_Visit_Information.docx DOCX document
Attachment_1__Materials_List.xls XLS spreadsheet
RFQ_DJTMZ8D627.pdf PDF
Attachment_3__57439B_UPS_Location_Drawing.pdf PDF
Attachment_5__QASP.pdf PDF
Attachment_2__PWS.DOCX DOCX document
Attachment_6__FAR_DFARS_Provisions_Clauses.docx DOCX document
Attachment_4__Pre-Proposal_Site_Visit_Information.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Responses

RFQ: DJTMZ8D627

July 2, 2018

1. We notice that the site visit says it will be 6/11/18, we want to know if this date will be rescheduled?

Response: Please review the RFQ DJTMZ8D627 letter. The site survey was re-scheduled for July 6th at 9am AZ. The site POC to contact for the site survey has also changed.

2. Is the UPS going to go on top of the existing raised floor or are we going to match existing floor?

Response: Yes, the UPS will go on top of a raised floor. We already have the required stands to support the weight from the subfloor to the raised floor. We only need the subfloor reinforced.

3. Please provide the manufacture, make and model of the existing raised computer floor.

Response: I do not think this information is needed since we only need the subfloor reinforced. We have the stands custom made to go from the subfloor to the raised floor. We only need the vendor to reinforce the subfloor and our stands will take care of the rest.

4. We will not be able to accommodate the timeline specified in the PWS, due to our current workload we are unable to start until mid September 2018, will this be an issue?

Response: Yes, because we have a paying customer who requires their equipment installed into this UPS to begin testing. Every day we delay is another day we have a customer waiting on us.