DE-SOL-0011296
x x
0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PHOENIX AZ 85005-6457
DSW
PO BOX 6457
DESERT SOUTHWEST REGIONAL OFFICE
US DOE/WESTERN AREA POWER
WAPA (DSW)
07/12/2017000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/15/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Eric W. Jordan
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
DE-SOL-0011296
Amendment 0001
The purpose of this amendment is to incorporate the below changes into the Project Drawings, post the contractors questions and answers and pre-bid site visit attendance register. This solicitation is revised as follows:
A. Replace attachment C of the solicitation with the revised attachment C. The revised drawing package adds drawing GLA-GIV 1001 and updates table of contents of project drawings package.
B. Contractors questions and answers are provided as follows:
Question 1. Drawing GLA-GIV 1000 note 1 references drawing GLA-GIV 1001, which is not contained in the solicitation drawing package (attachment C). We respectfully request a copy of GLA-GIV 1001?
Answer 1. See attached WAPA Construction Drawing GLA-GIV 1001
Question 2. This project calls for several different conductor sizes to be replaced, and several small sections of conductor to be reused. This will incur a lot of extra cost in material procurement because small batch conductor costs more per foot. It will cost a lot more in labor and equipment, because we have to have different grips, sleeves, crimping dies, etc, and the consideration of moving from one conductor size to another and having to manage the small sections of reused conductor. We would like to suggest that WAPA replaces all conductor on the project, with 1 uniform and standard conductor size that will suit all load conditions. This will save the project 10-20% in total cost by streamlining the constructability. Can you make these changes?
Answer 2. WAPA considered your suggestion, however at this time the specification will not be changed.
Question 3. Can you provide the outage dates for each lateral?
Answer 3. See WAPA Construction Specifications Division 1.D.3
Question 4. Most of the transformer bank poles have very low transformer to ground clearance. When replacing these poles we assume we will be building to WAPA current spec which will raise the banks. The issue here will be that the LV cable feeds will not be long enough to reach the new transformers. Who is responsible for the LV cable feeds? If the contract is then please provide material list and construction units for this scope?
Answer 4. See WAPA Construction Specifications Division 10.A.10
C. A copy of the pre-bid site visit attendance register is attached.
DE-SOL-0011296
Amendment 0001
D. The date and time set for receipt of proposals remains unchanged. The bid opening date is July 20, 2017 at 1400 MST.